ROADWORKS SUMMARY
College Road, HARROW, HA1 1BQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for College Road, HA1 1BQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to College Road, HARROW, HA1 1BQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for College Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

HS2 logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
Bennetts Avenue

HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 09:00 and could run through until 1 November 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 1 Oct 2024 at 12:49.

London Borough Of Barnet logo
LONG TERM
Until
1 Mar 2025
Details
View Map
Share
Follow
Charcot Road

London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.

These works are categorised as Major.

The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

HS2 logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Western Avenue

HS2 are carrying out Utility asset works on Western Avenue, Perivale.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 11 March 2024 at 09:30 and could run through until 15 October 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by HS2 on 12 Aug 2024 at 15:38.

HS2 logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
West Gate

HS2 are carrying out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 00:01 and could run through until 15 October 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 28 Aug 2024 at 16:08.

HS2 logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Ruskin Gardens

HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 11 November 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 8 Oct 2024 at 13:18.

HS2 logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Brentham Way

HS2 are carrying out Utility asset works on Brentham Way, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 11 November 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 8 Oct 2024 at 13:07.

HS2 logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Brunswick Road

HS2 are carrying out Utility asset works on Brunswick Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 8 Oct 2024 at 13:18.

London Borough Of Barnet logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are carrying out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2024 at 23:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2024 at 10:16.

London Borough Of Barnet logo
LONG TERM
Until
23 Nov 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, Hendon, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 June 2024 at 09:23 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Jun 2024 at 07:18.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

Thames Water logo
LONG TERM
Until
10 Nov 2024
Details
View Map
Share
Follow
Acton Lane

Thames Water are carrying out Utility asset works on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 07:35.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.

London Borough Of Barnet logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.

London Borough Of Ealing logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are carrying out Highway improvement works on Ruislip Road, Northolt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 09:30 and could run through until 12 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 4 Jul 2024 at 09:17.

HS2 logo
LONG TERM
Until
14 Nov 2024
Details
View Map
Share
Follow
Lynwood Road

HS2 are carrying out Utility asset works on Lynwood Road, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 07:00 and could run through until 14 November 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 8 Oct 2024 at 13:07.

Thames Water logo
LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Follow
Greenhill Park

Thames Water are carrying out Utility asset works on Greenhill Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 14:35 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 07:01.

Cadent Gas logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Northwood Way

Cadent Gas are carrying out Utility asset works on Northwood Way, Northwood.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 11:03 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:41.

Cadent Gas logo
LONG TERM
Until
20 Oct 2024
Details
View Map
Share
Follow
Cotman Gardens

Cadent Gas are carrying out Utility asset works on Cotman Gardens, Edgware.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:41 and could run through until 20 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 10:04.

London Borough Of Barnet logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
Deans Lane

London Borough Of Barnet are carrying out Highway improvement works on Deans Lane, Mill Hill, Edgware.

These works are categorised as Major.

The works started on 2 August 2024 at 00:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Aug 2024 at 08:45.

Network Rail logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Acton Lane

Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2024 at 23:00 and could run through until 13 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Oct 2024 at 09:41.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Chaplin Road

Cadent Gas are carrying out Utility asset works on Chaplin Road, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 09:43 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:49.

LONG TERM
Between
12 Aug and 15 Nov 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:39.

LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 12 Aug 2024 at 09:32.

LONG TERM
Between
12 Aug and 15 Nov 2024
Details
View Map
Share
Greenhill Way

London Borough Of Harrow were proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 12 Aug 2024 at 09:27.

National Highways logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
Bushey Bridleway And Footpath 040

National Highways are carrying out Highway repair and maintenance works on Bushey Bridleway And Footpath 040, Bushey.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 August 2024 at 00:00 and could run through until 1 November 2024. The works will impact the verge only.

This roadwork event was last updated by National Highways on 26 Sep 2024 at 13:52.

Thames Water logo
LONG TERM
Until
25 Oct 2024
Details
View Map
Share
Follow
Greenford Road

Thames Water are carrying out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

The works started on 19 August 2024 at 08:00 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 09:52.

LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
College Road

London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Fairlight Avenue

Thames Water are carrying out Utility asset works on Fairlight Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 August 2024 at 13:00 and could run through until 14 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:35.

London Borough Of Ealing logo
LONG TERM
Between
21 Aug and 31 Oct 2024
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 22 May 2024 at 08:02.

Cadent Gas logo
LONG TERM
Between
26 Aug and 22 Oct 2024
Details
View Map
Share
Follow
Sharps Lane

Cadent Gas are proposing to carry out Utility asset works on Sharps Lane, Ruislip.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 22 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:20.

Thames Water logo
LONG TERM
Until
18 Oct 2024
Details
View Map
Share
Follow
District Road

Thames Water are carrying out Utility repair and maintenance works on District Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 15:00 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 20:29.

London Borough Of Ealing logo
LONG TERM
Until
10 Nov 2024
Details
View Map
Share
Follow
Broadmead Road

London Borough Of Ealing are carrying out Highway improvement works on Broadmead Road, Northolt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 13 Sep 2024 at 15:03.

Transport for London (TfL) logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Edgware Road Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road Flyover, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 09:50.

Cadent Gas logo
LONG TERM
Between
9 Sep and 17 Nov 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:52.

Cadent Gas logo
LONG TERM
Between
9 Sep and 17 Nov 2024
Details
View Map
Share
Follow
Perryfield Way

Cadent Gas are proposing to carry out Utility asset works on Perryfield Way, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:06.

Cadent Gas logo
LONG TERM
Between
9 Sep and 17 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:52.

Electricity Network Company logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Booth Road

Electricity Network Company are carrying out Utility asset works on Booth Road, Colindale, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 9 Sep 2024 at 08:09.

Cadent Gas logo
LONG TERM
Between
16 Sep and 22 Nov 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:59.

Cadent Gas logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are carrying out Utility asset works on Station Road, Hendon, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:40 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:02.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Herbert Road

Cadent Gas are proposing to carry out Utility asset works on Herbert Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:38.

Cadent Gas logo
LONG TERM
Between
16 Sep and 22 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:45.

Cadent Gas logo
LONG TERM
Between
16 Sep and 24 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:02.

Cadent Gas logo
LONG TERM
Between
16 Sep and 24 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 09:42.

Cadent Gas logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are carrying out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:51 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:04.

London Borough Of Hillingdon logo
Finishing
Wednesday
Details
View Map
Share
Follow
Northgate

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Northgate, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Sep 2024 at 15:22.

London Borough Of Barnet logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jun 2024 at 13:51.

Scottish Hydro Electric Power Dis logo
Until
18 Oct 2024
Details
View Map
Share
Follow
Parkfield Drive

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Parkfield Drive, Northolt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Oct 2024 at 11:58.

London Borough Of Hillingdon logo
Between
19 Sep and 18 Oct 2024
Details
View Map
Share
Follow
High Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:32.

London Borough Of Hillingdon logo
Between
19 Sep and 19 Oct 2024
Details
View Map
Share
Follow
Breakspear Road North

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road North, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 19 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:00.

Cadent Gas logo
LONG TERM
Until
21 Oct 2024
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are carrying out Utility repair and maintenance works on Sandy Lane, Northwood.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 18:34 and could run through until 21 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 16:52.

UK Power Networks Eastern & London logo
Finishing
Wednesday
Details
View Map
Share
Follow
Church Road

UK Power Networks Eastern & London are carrying out New service connection on Church Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2024 at 10:01 and could run through until 16 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 16:42.

Murphy Power Distribution logo
Until
21 Oct 2024
Details
View Map
Share
Follow
Bideford Avenue

Murphy Power Distribution are carrying out Utility asset works on Bideford Avenue, Perivale.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:00 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 10 Oct 2024 at 15:09.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are carrying out Utility asset works on Sandy Lane, Northwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 23:21 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 08:05.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
Follow
Kenton Avenue

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Kenton Avenue, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 12:00 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Oct 2024 at 12:31.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
Follow
Denbigh Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Denbigh Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 12:00 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Oct 2024 at 14:47.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Kenton Road

Cadent Gas are carrying out Utility repair and maintenance works on Kenton Road, Kenton.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 12:00 and could run through until 14 October 2024. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:20.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Coronation Road

Thames Water were proposing to carry out New service connection on Coronation Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2024 and run through until 13 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 09:14.

Scottish Hydro Electric Power Dis logo
Until
22 Oct 2024
Details
View Map
Share
Follow
Parkfield Drive

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Parkfield Drive, Northolt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 13:45 and could run through until 22 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Oct 2024 at 12:20.

Thames Water logo
Until
18 Oct 2024
Details
View Map
Share
Follow
Springfield Gardens

Thames Water are carrying out Utility repair and maintenance works on Springfield Gardens, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 10:00 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 16:45.

London Borough Of Barnet logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are carrying out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2024 at 09:26.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Watford Way Access Road Southfields To Hendale Avenue

Thames Water are carrying out Utility repair and maintenance works on Watford Way Access Road Southfields To Hendale Avenue, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 09:50 and could run through until 17 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 15:09.

HS2 logo
Until
24 Oct 2024
Details
View Map
Share
Follow
Western Avenue

HS2 are carrying out Utility asset works on Western Avenue, Ealing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2024 at 22:00 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 8 Oct 2024 at 11:20.

Cadent Gas logo
Between
6 and 25 Oct 2024
Details
View Map
Share
Follow
The Oaks

Cadent Gas are proposing to carry out Utility asset works on The Oaks, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 10:45.

Cadent Gas logo
Until
25 Oct 2024
Details
View Map
Share
Follow
The Oaks

Cadent Gas are carrying out Utility asset works on The Oaks, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:00 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:45.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Preston Hill

Affinity Water are carrying out Utility repair and maintenance works on Preston Hill, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2024 at 10:06 and could run through until 14 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 15:11.

Cadent Gas logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Northfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 15:24.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Grove Road

Thames Water are proposing to carry out New service connection on Grove Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:08.

Transport for London (TfL) logo
Between
7 and 24 Oct 2024
Details
View Map
Share
Follow
Brentfield

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brentfield, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 07:59.

Transport for London (TfL) logo
Between
7 and 24 Oct 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 08:02.

Transport for London (TfL) logo
Between
7 and 24 Oct 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 20:33.

Transport for London (TfL) logo
Until
24 Oct 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 21:00 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 08:04.

London Borough Of Barnet logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodfield Avenue

London Borough Of Barnet are carrying out roadworks on Woodfield Avenue, Colindale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 20:00 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Oct 2024 at 08:32.

London Borough Of Barnet logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Varley Parade Service Road

London Borough Of Barnet are carrying out Highway improvement works on Varley Parade Service Road, Colindale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 20:00 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Oct 2024 at 08:32.

London Borough Of Barnet logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Flight Approach

London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.

These works are categorised as Major.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Aug 2024 at 14:09.

London Borough Of Barnet logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Flight Approach

London Borough Of Barnet are carrying out Highway improvement works on Flight Approach, Colindale, London.

These works are categorised as Major.

The works started on 7 October 2024 at 08:00 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2024 at 08:39.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 17:02.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 15:10.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 14:52.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 12:07.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 14:53.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 12:07.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 14:51.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 12:07.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 14:53.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 12:32.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cavendish Avenue

Thames Water are proposing to carry out New service connection on Cavendish Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2024 at 10:28.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Alperton Lane

Thames Water are carrying out Utility repair and maintenance works on Alperton Lane, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 09:22 and could run through until 14 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:03.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Herlwyn Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Herlwyn Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:40.

Thames Water logo
Until
1 Nov 2024
Details
View Map
Share
Follow
The Mead

Thames Water are carrying out Utility repair and maintenance works on The Mead, Carpenders Park.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 10:00 and could run through until 1 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 12:30.

London Borough Of Hillingdon logo
LONG TERM
Between
9 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 14:07.

London Borough Of Hillingdon logo
LONG TERM
Between
9 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:09.

London Borough Of Hillingdon logo
LONG TERM
Between
9 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:43.

Finishing
Today
Details
View Map
Share
Follow
Norwood Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Norwood Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 08:51.

Finishing
Tomorrow
Details
View Map
Share
Follow
Pinner Green

London Borough Of Harrow are carrying out Highway improvement works on Pinner Green, Pinner.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 19:00 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 10 Oct 2024 at 08:34.

Hertfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Turnberry Court

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Turnberry Court, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 Sep 2024 at 12:24.

Finishing
Tomorrow
Details
View Map
Share
Follow
Eastcote Road

London Borough Of Harrow are carrying out Highway improvement works on Eastcote Road, South Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2024 at 08:16 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 10 Oct 2024 at 08:21.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Magnaville Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Magnaville Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Oct 2024 at 14:03.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Potter Street

Thames Water are proposing to carry out Utility repair and maintenance works on Potter Street, Pinner.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 15 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 20:59.

Until
31 Oct 2024
Details
View Map
Share
Follow
Old Redding

London Borough Of Harrow are carrying out Highway repair and maintenance works on Old Redding, Stanmore.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 06:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 27 Aug 2024 at 06:49.

Until
1 Nov 2024
Details
View Map
Share
Follow
Common Road

London Borough Of Harrow are carrying out Highway repair and maintenance works on Common Road, Stanmore.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 09:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Aug 2024 at 11:20.

Thames Water logo
Between
14 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Connaught Road

Thames Water are proposing to carry out Utility asset works on Connaught Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 9 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 17:39.

Affinity Water logo
Between
14 and 25 Oct 2024
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Wembley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 12 Jul 2024 at 09:05.

Cadent Gas logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Bridgewater Road

Cadent Gas were proposing to carry out Utility asset works on Bridgewater Road, Wembley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 10:04.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
St James Gardens

Affinity Water are proposing to carry out Utility asset works on St James Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Jul 2024 at 14:41.

London Borough Of Barnet logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Heybourne Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Heybourne Crescent, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 08:38.

Cadent Gas logo
Between
14 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Northwood Hills Circus

Cadent Gas are proposing to carry out Utility asset works on Northwood Hills Circus, Northwood.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 11:39.

London Borough Of Barnet logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Clayton Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Clayton Field, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2024 at 14:03.

London Borough Of Barnet logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Clayton Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Clayton Field, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2024 at 14:03.

BT logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
The Avenue

BT are proposing to carry out Utility repair and maintenance works on The Avenue, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Jul 2024 at 09:17.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Barnet Lane

Cadent Gas are proposing to carry out New service connection on Barnet Lane, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 12:52.

Finishing
Thursday
Details
View Map
Share
Follow
Peterborough Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:10.

Between
17 and 19 Oct 2024
Details
View Map
Share
Follow
Pinner Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 19 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 29 Jul 2024 at 15:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Oct and 28 Nov 2024
Details
View Map
Share
Hale Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Hale Lane, Mill Hill, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2024 at 10:37.

Network Rail logo
LONG TERM
Between
19 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 16:26.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 10 Oct 2024 at 11:41.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

Between
21 and 26 Oct 2024
Details
View Map
Share
Follow
Park Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Park Lane, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 11:16.

London Borough Of Hillingdon logo
LONG TERM
Between
21 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Herlwyn Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Herlwyn Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 08:56.

Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
Peterborough Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Sep 2024 at 09:40.

Cadent Gas logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
King Edwards Road

Cadent Gas are proposing to carry out Utility asset works on King Edwards Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 10:53.

Cadent Gas logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
King Edwards Road

Cadent Gas are proposing to carry out Utility asset works on King Edwards Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 14:36.

Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
Peterborough Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Aug 2024 at 14:52.

Cadent Gas logo
LONG TERM
Between
21 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:00.

Cadent Gas logo
LONG TERM
Between
21 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 08:32.

UK Power Networks Eastern & London logo
Between
21 and 28 Oct 2024
Details
View Map
Share
Follow
Hermitage Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Hermitage Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Aug 2024 at 09:21.

UK Power Networks Eastern & London logo
Between
21 and 28 Oct 2024
Details
View Map
Share
Follow
Hermitage Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Hermitage Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 08:34.

London Borough Of Barnet logo
Between
21 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Deans Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Deans Lane, Mill Hill, Edgware.

These works are categorised as Major.

The works will start on or after 21 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jun 2024 at 09:36.

London Borough Of Barnet logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Daws Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Daws Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2024 at 08:51.

London Borough Of Barnet logo
Between
21 and 27 Oct 2024
Details
View Map
Share
Follow
Marsh Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Marsh Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 27 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2024 at 09:08.

Cadent Gas logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Bournehall Lane

Cadent Gas are proposing to carry out New service connection on Bournehall Lane, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 12:57.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Oct and 22 Nov 2024
Details
View Map
Share
Follow
West End Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 20 Aug 2024 at 15:13.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 30 Sep 2024 at 14:17.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 09:14.

London Borough Of Barnet logo
Between
22 and 25 Oct 2024
Details
View Map
Share
Follow
Daws Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Daws Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jun 2024 at 09:21.

Between
23 and 25 Oct 2024
Details
View Map
Share
Follow
Wargrave Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Wargrave Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

Between
24 and 26 Oct 2024
Details
View Map
Share
Follow
Whitby Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Whitby Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

Between
24 and 26 Oct 2024
Details
View Map
Share
Follow
Beechwood Gardens

London Borough Of Harrow are proposing to carry out Highway improvement works on Beechwood Gardens, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 27 Sep 2024 at 14:07.

London Borough Of Ealing logo
Between
26 and 28 Oct 2024
Details
View Map
Share
Follow
Aintree Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Aintree Road, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 16 Sep 2024 at 12:36.

Between
27 and 29 Oct 2024
Details
View Map
Share
Follow
Junction Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Junction Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 29 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Oct 2024 at 09:03.

Between
27 and 29 Oct 2024
Details
View Map
Share
Follow
Headstone Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Headstone Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 29 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Oct 2024 at 08:16.

Thames Water logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Longfield Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:18.

Thames Water logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Longfield Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 08:46.

London Borough Of Hillingdon logo
LONG TERM
Between
28 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Owen Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Owen Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:37.

London Borough Of Hillingdon logo
LONG TERM
Between
28 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Kings College Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings College Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 27 Sep 2024 at 07:56.

Between
28 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Oct 2024 at 08:35.

Between
28 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Havelock Place

London Borough Of Harrow are proposing to carry out Highway improvement works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Oct 2024 at 09:11.

Affinity Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Masons Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 08:10.

Affinity Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Masons Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Sep 2024 at 14:17.

Affinity Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Masons Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 10:10.

Virgin Media logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Aerodrome Road

Virgin Media are proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 10:22.

Virgin Media logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Aerodrome Road

Virgin Media are proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 19 Sep 2024 at 12:24.

Cornerstone Telecommunications Infrastructure logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Weston Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 17 Sep 2024 at 10:25.

Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
College Hill Road

London Borough Of Harrow are proposing to carry out Highway improvement works on College Hill Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:07.

Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Weald Rise

London Borough Of Harrow are proposing to carry out Highway improvement works on Weald Rise, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:43.

Between
28 and 31 Oct 2024
Details
View Map
Share
Weald Rise

London Borough Of Harrow were proposing to carry out Highway improvement works on Weald Rise, Harrow Weald.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Aug 2024 at 14:54.

Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Weald Rise

London Borough Of Harrow are proposing to carry out Highway improvement works on Weald Rise, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 29 Aug 2024 at 16:30.

Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Brookshill

London Borough Of Harrow are proposing to carry out Highway improvement works on Brookshill, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:07.

London Borough Of Barnet logo
Between
28 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Footpath From Hale Grove Gardens To Glendor Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Footpath From Hale Grove Gardens To Glendor Gardens, Mill Hill, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 May 2024 at 06:40.

London Borough Of Barnet logo
Between
28 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Footpath From Hale Grove Gardens To Glendor Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Footpath From Hale Grove Gardens To Glendor Gardens, Mill Hill, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Aug 2024 at 10:35.

London Borough Of Barnet logo
Between
28 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Footpath From Hale Grove Gardens To Glendor Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Footpath From Hale Grove Gardens To Glendor Gardens, Mill Hill, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Aug 2024 at 10:12.

Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Old Redding

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Old Redding, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Aug 2024 at 10:53.

Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Common Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Common Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:42.

London Borough Of Barnet logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Marsh Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Marsh Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Jul 2024 at 17:31.

Vodafone logo
On
28 Oct 2024
Details
View Map
Share
Follow
Edgwarebury Lane Rbw (2nd Section)

Vodafone are proposing to carry out Utility repair and maintenance works on Edgwarebury Lane Rbw (2nd Section), Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 28 October 2024 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 16 Sep 2024 at 07:56.

Vodafone logo
On
28 Oct 2024
Details
View Map
Share
Edgwarebury Lane Rbw (2nd Section)

Vodafone were proposing to carry out Utility repair and maintenance works on Edgwarebury Lane Rbw (2nd Section), Edgware.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 28 October 2024 The works were due to impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 2 Sep 2024 at 11:54.

Electricity Network Company logo
LONG TERM
Between
29 Oct 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Booth Road

Electricity Network Company are proposing to carry out Utility asset works on Booth Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 6 Aug 2024 at 13:20.

London Borough Of Hillingdon logo
LONG TERM
Between
30 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:56.

Between
31 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Latimer Gardens

London Borough Of Harrow are proposing to carry out Highway improvement works on Latimer Gardens, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:43.

Between
31 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Latimer Gardens

London Borough Of Harrow are proposing to carry out Highway improvement works on Latimer Gardens, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 27 Sep 2024 at 16:30.

Between
31 Oct and 3 Nov 2024
Details
View Map
Share
Follow
College Hill Road

London Borough Of Harrow are proposing to carry out Highway improvement works on College Hill Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:08.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Glencoe Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glencoe Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:58.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:57.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Greenway

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Greenway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:55.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Kingshill Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kingshill Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:50.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Owen Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Owen Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:49.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Ayles Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Ayles Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:37.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Greenway

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Greenway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:56.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Approach, South Ruislip, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 09:41.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Field End Road

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Field End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 15:54.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
West End Road

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 20 Aug 2024 at 15:01.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:39.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:58.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
High Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:53.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:59.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Kings Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings Close, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:51.

London Borough Of Barnet logo
Between
2 and 8 Nov 2024
Details
View Map
Share
Follow
Fairmead Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Fairmead Crescent, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2024 at 12:56.

Between
3 and 10 Nov 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Oct 2024 at 08:46.

Cadent Gas logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Northfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 11:33.

Cadent Gas logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Northfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 11:31.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Green Man Lane

Thames Water were proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 15:50.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Green Man Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 08:59.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Green Man Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:00.

Virgin Media logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Standard Road

Virgin Media were proposing to carry out Utility asset works on Standard Road, Park Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2024 at 15:32.

Virgin Media logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 Aug 2024 at 15:39.

London Borough Of Ealing logo
LONG TERM
Between
4 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2024 at 14:49.

Between
4 and 8 Nov 2024
Details
View Map
Share
Cannon Lane

London Borough Of Harrow were proposing to carry out Highway improvement works on Cannon Lane, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 15:09.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Rusland Park Road

BT are proposing to carry out Utility repair and maintenance works on Rusland Park Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Sep 2024 at 09:48.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Rusland Park Road

BT are proposing to carry out Utility repair and maintenance works on Rusland Park Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Sep 2024 at 11:06.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Rusland Park Road

BT are proposing to carry out Utility repair and maintenance works on Rusland Park Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 Oct 2024 at 14:33.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Marlborough Hill

BT are proposing to carry out Utility repair and maintenance works on Marlborough Hill, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Sep 2024 at 09:47.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Marlborough Hill

BT are proposing to carry out Utility repair and maintenance works on Marlborough Hill, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Sep 2024 at 11:05.

Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Belmont Circle

London Borough Of Harrow are proposing to carry out Highway improvement works on Belmont Circle, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:11.

Hertfordshire County Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Gosforth Lane

Hertfordshire County Council are proposing to carry out Works for road purposes on Gosforth Lane, Hayling, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Sep 2024 at 15:55.

Cadent Gas logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Barnet Lane

Cadent Gas are proposing to carry out New service connection on Barnet Lane, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 16:30.

Hertfordshire County Council logo
Between
4 and 18 Nov 2024
Details
View Map
Share
Follow
Tylers Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Tylers Way, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 November 2024. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2024 at 07:34.

Hertfordshire County Council logo
Between
4 and 18 Nov 2024
Details
View Map
Share
Follow
Tylers Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Tylers Way, Watford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 November 2024. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2024 at 09:25.

Murphy Power Distribution logo
Between
5 and 22 Nov 2024
Details
View Map
Share
Varley Parade Service Road

Murphy Power Distribution were proposing to carry out New service connection on Varley Parade Service Road, Colindale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 12 Aug 2024 at 09:20.

Affinity Water logo
Between
5 and 8 Nov 2024
Details
View Map
Share
Follow
Cornwall Road

Affinity Water are proposing to carry out Utility asset works on Cornwall Road, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 08:07.

Affinity Water logo
Between
5 and 8 Nov 2024
Details
View Map
Share
Follow
Cornwall Road

Affinity Water are proposing to carry out Utility asset works on Cornwall Road, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 10:09.

UK Power Networks Eastern & London logo
Between
5 and 30 Nov 2024
Details
View Map
Share
Follow
Downhurst Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Downhurst Avenue, Mill Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 08:17.

London Borough Of Barnet logo
Between
5 and 15 Nov 2024
Details
View Map
Share
Follow
Lilley Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Lilley Lane, Manor Close To Hale Grove Gardens, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 5 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 May 2024 at 06:40.

London Borough Of Barnet logo
Between
5 and 15 Nov 2024
Details
View Map
Share
Follow
Lilley Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Lilley Lane, Manor Close To Hale Grove Gardens, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 5 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Aug 2024 at 10:12.

Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Sudbury Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:21.

London Borough Of Hillingdon logo
Between
7 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Glencoe Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glencoe Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:31.

Between
7 and 9 Nov 2024
Details
View Map
Share
Follow
Sudbury Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 27 Aug 2024 at 09:58.

London Borough Of Barnet logo
LONG TERM
Between
7 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:38.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 13:40.

Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Chester Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on Chester Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Aug 2024 at 23:22.

London Borough Of Hillingdon logo
Between
11 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.

London Borough Of Barnet logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
Flight Approach

London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jul 2024 at 12:10.

UK Power Networks Eastern & London logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
The Broadway

UK Power Networks Eastern & London are proposing to carry out New service connection on The Broadway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2024 at 15:13.

UK Power Networks Eastern & London logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
The Broadway

UK Power Networks Eastern & London are proposing to carry out New service connection on The Broadway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Oct 2024 at 09:25.

Murphy Power Distribution logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 21 Aug 2024 at 16:25.

Murphy Power Distribution logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 29 Aug 2024 at 15:22.

UK Power Networks Eastern & London logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Monks Park

UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 20:26.

Affinity Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Sussex Crescent

Affinity Water were proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Aug 2024 at 09:51.

Thames Water logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Bolton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bolton Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 11:54.

Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Pinner Green

London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Green, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:39.

Between
18 and 20 Nov 2024
Details
View Map
Share
Paines Lane

London Borough Of Harrow were proposing to carry out Highway improvement works on Paines Lane, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 13:20.

Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Paines Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Paines Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 24 Sep 2024 at 12:33.

Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Altham Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Altham Road, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 10:04.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 15:44.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:02.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Burnt Oak Broadway

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 08:12.

UK Power Networks Eastern & London logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Brockley Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockley Hill, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 12:02.

UK Power Networks Eastern & London logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Brockley Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockley Hill, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 13:44.

Affinity Water logo
Between
19 and 22 Nov 2024
Details
View Map
Share
Follow
Hawthorn Farm Avenue

Affinity Water are proposing to carry out Utility asset works on Hawthorn Farm Avenue, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 14:38.

Affinity Water logo
Between
19 and 22 Nov 2024
Details
View Map
Share
Follow
Hawthorn Farm Avenue

Affinity Water are proposing to carry out Utility asset works on Hawthorn Farm Avenue, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Sep 2024 at 10:48.

Between
19 and 23 Nov 2024
Details
View Map
Share
Pinner Green

London Borough Of Harrow were proposing to carry out Highway improvement works on Pinner Green, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 13:18.

Between
19 and 23 Nov 2024
Details
View Map
Share
Follow
Pinner Green

London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Green, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Oct 2024 at 15:32.

Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Sylvia Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Sylvia Avenue, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

BT logo
Between
21 and 25 Nov 2024
Details
View Map
Share
Follow
Woodheyes Road

BT are proposing to carry out Utility asset works on Woodheyes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Aug 2024 at 11:55.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:58.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:18.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Eliot Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Eliot Drive, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
East Towers

London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
East Towers

London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:01.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
West End Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.

Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
West End Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 4 Sep 2024 at 14:34.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Manor Park Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Manor Park Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Burnt Oak Broadway

London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.

Affinity Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Parkfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Parkfield Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.

London Borough Of Barnet logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Great Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 13:52.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
The Chase

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Chase, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.

UK Power Networks Eastern & London logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Eastglade

UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 15:54.

UK Power Networks Eastern & London logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Wood End Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wood End Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2024 at 09:39.

Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:49.

Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Elmcroft Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Elmcroft Crescent, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

Affinity Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Springfield

Affinity Water are proposing to carry out Utility repair and maintenance works on Springfield, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 10:54.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Sandringham Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Sandringham Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:50.

Between
27 and 29 Nov 2024
Details
View Map
Share
Alexandra Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Alexandra Avenue, Rayners Lane.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:27.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Exeter Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Exeter Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Eastcote Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Eastcote Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Coles Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Coles Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Capthorne Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Capthorne Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:46.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Alfriston Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Alfriston Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Rosecroft Walk

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Rosecroft Walk, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:42.

Between
27 and 29 Nov 2024
Details
View Map
Share
West End Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on West End Avenue, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:49.

Between
27 and 29 Nov 2024
Details
View Map
Share
Broadcroft Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Broadcroft Avenue, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 09:41.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Woodhall Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Woodhall Avenue, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Woodhall Drive

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Woodhall Drive, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:56.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Wolverton Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Wolverton Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Hathaway Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Hathaway Close, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Queensbury Circle Parade

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:25.

Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Queensbury Circle Parade

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2024 at 09:38.

Between
28 Nov and 2 Dec 2024
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Ridgeway, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.

London Borough Of Barnet logo
Between
28 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Fairmead Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Fairmead Crescent, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2024 at 12:39.

Thames Water logo
Between
29 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, The Hale, Edgware.

These works are categorised as Major.

The works will start on or after 29 November 2024 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 14:14.

London Borough Of Hillingdon logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Kingshill Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kingshill Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:50.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Sep 2024 at 06:16.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 11:19.

UK Power Networks Eastern & London logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Monks Park

UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:32.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 07:32.

Between
2 and 4 Dec 2024
Details
View Map
Share
Milman Close

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Milman Close, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:50.

Between
2 and 4 Dec 2024
Details
View Map
Share
Marsworth Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Marsworth Avenue, Hatch End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:55.

Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Fallowfield

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:08.

Between
2 and 5 Dec 2024
Details
View Map
Share
Fallowfield

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:24.

Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Fallowfield

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 24 Sep 2024 at 12:39.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Heathbourne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Heathbourne Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.

Cadent Gas logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Bournehall Lane

Cadent Gas are proposing to carry out New service connection on Bournehall Lane, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 15:15.

Affinity Water logo
Between
3 and 11 Dec 2024
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Sep 2024 at 15:25.

Between
4 and 6 Dec 2024
Details
View Map
Share
Naresby Fold

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:42.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Naresby Fold

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 12 Sep 2024 at 11:49.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Thames Water are proposing to carry out New service connection on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:08.

London Borough Of Hillingdon logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 09:17.

London Borough Of Hillingdon logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Oct 2024 at 13:52.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Oct 2024 at 08:39.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Varley Parade Service Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Varley Parade Service Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:38.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Parkfield Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Gardens, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

London Borough Of Barnet logo
LONG TERM
Between
9 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Sep 2024 at 14:32.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Weston Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 12:09.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Weston Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 10 Oct 2024 at 11:34.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Uphill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 14:45.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Uphill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:01.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Watford Heath

Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Sep 2024 at 12:40.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Little Bushey Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Little Bushey Lane, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 13:40.

Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 22 Dec 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:48.

Between
11 and 16 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 18 Dec 2024
Details
View Map
Share
Havelock Place

London Borough Of Harrow were proposing to carry out roadworks on Havelock Place, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:44.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Nibthwaite Road

BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Sep 2024 at 13:32.

Affinity Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Langland Crescent

Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Sep 2024 at 14:48.

Affinity Water logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Aug 2024 at 11:48.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:28.

London Borough Of Hillingdon logo
LONG TERM
Between
16 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 10:11.

Affinity Water logo
Between
17 and 22 Dec 2024
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 14:47.

London Borough Of Hillingdon logo
LONG TERM
Between
20 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Oct 2024 at 07:22.

Thames Water logo
Between
23 and 31 Dec 2024
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:48.

London Borough Of Barnet logo
Between
24 and 26 Dec 2024
Details
View Map
Share
Follow
Rectory Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Rectory Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Aug 2024 at 10:53.

Murphy Power Distribution logo
Between
26 Dec 2024 and 19 Jan 2025
Details
View Map
Share
Follow
Glengall Road

Murphy Power Distribution are proposing to carry out New service connection on Glengall Road, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Oct 2024 at 14:47.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 17:58.

Vodafone logo
On
28 Dec 2024
Details
View Map
Share
Follow
Edgwarebury Lane Rbw (2nd Section)

Vodafone are proposing to carry out Utility repair and maintenance works on Edgwarebury Lane Rbw (2nd Section), Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 28 December 2024 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 10 Sep 2024 at 13:37.

Cadent Gas logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Batchworth Lane

Cadent Gas are proposing to carry out Utility asset works on Batchworth Lane, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 16 May 2024 at 13:54.

Affinity Water logo
Between
4 and 7 Jan 2025
Details
View Map
Share
School Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on School Lane, Bushey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Sep 2024 at 10:25.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:30.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:39.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 09:07.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 09:27.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 13:05.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Junction Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Junction Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:50.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Havelock Place

London Borough Of Harrow are proposing to carry out Highway improvement works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:43.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 11:08.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
The Hyde

Cadent Gas were proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Edgware Road

Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 12:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:52.

Affinity Water logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tewkesbury Gardens

Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:13.

Hertfordshire County Council logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
North Western Avenue (Watford Bypass)

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Western Avenue (Watford Bypass), Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 25 Sep 2024 at 12:47.


Roadworks Map near to College Road, HARROW, HA1 1BQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Oct 2024 03:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to College Road, HARROW, HA1 1BQ (34 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
MAJOR
  
JUNCTION ROAD 
(0.1 miles)
London Borough Of Harrow
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 31 Aug 2024 08:00
(Scheduled: 31 Aug 2024 - 24 Feb 2025)
0.1
Details
Share
Follow
2
MAJOR
  
HEADSTONE ROAD 
(0.1 miles)
London Borough Of Harrow
Highway improvement works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 24 Jun 2024 08:18
(Scheduled: 24 Jun 2024 - 12 Oct 2024)
0.1
Details
Share
Follow
3
MAJOR
  
COLLEGE ROAD 
(0.1 miles)
London Borough Of Harrow
Highway improvement works - Footway, Carriageway - Lane closure
In Progress
Since: 19 Aug 2024 08:00
(Scheduled: 19 Aug 2024 - 25 Feb 2025)
0.1
Details
Share
Follow
4
MAJOR
  
GREENHILL WAY 
(0.1 miles)
London Borough Of Harrow
Highway improvement works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 12 Aug 2024 - 15 Nov 2024
0.1
Details
Share
Follow
5
MAJOR
  
GREENHILL WAY 
(0.1 miles)
London Borough Of Harrow
Highway improvement works - Footway, Carriageway - Multi-way signals
In Progress
Since: 12 Aug 2024 09:30
(Scheduled: 12 Aug 2024 - 15 Nov 2024)
0.1
Details
Share
Follow
6
Virgin Media logo
VAUGHAN ROAD 
(0.3 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 12 Oct 2024
0.3
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
HARROW VIEW 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
In Progress
Since: 17 Jun 2024 09:11
(Scheduled: 17 Jun 2024 - 13 Mar 2025)
0.3
Details
Share
Follow
8
HARROW VIEW 
(0.3 miles)
London Borough Of Harrow
Disconnection or alteration of supply - Footway - No carriageway incursion
In Progress
Since: 10 Oct 2024 12:00
(Scheduled: 10 Oct 2024 - 11 Oct 2024)
0.3
Details
Share
Follow
9
STATION ROAD 
(0.4 miles)
London Borough Of Harrow
Highway repair and maintenance works - Carriageway - Lane closure
Planned
Scheduled: 9 Oct 2024 - 11 Oct 2024
0.4
Details
Share
Follow
10
Affinity Water logo
VAUGHAN ROAD 
(0.4 miles)
Affinity Water
Utility repair and maintenance works - Footpath - Some carriageway incursion
Planned
Scheduled: 10 Oct 2024 - 14 Oct 2024
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data