ROADWORKS SUMMARY
College Road, HARROW, HA1 1BA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for College Road, HA1 1BA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to College Road, HARROW, HA1 1BA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for College Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Barnet logo
LONG TERM
Until
1 Mar 2025
Details
View Map
Share
Follow
Charcot Road

London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.

These works are categorised as Major.

The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

HS2 logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Ruskin Gardens

HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 4 December 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 20 Nov 2024 at 14:54.

HS2 logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Brentham Way

HS2 are carrying out Utility asset works on Brentham Way, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 4 December 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 19 Nov 2024 at 16:12.

HS2 logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Brunswick Road

HS2 are carrying out Utility asset works on Brunswick Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 20 Nov 2024 at 14:54.

London Borough Of Barnet logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are carrying out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2024 at 23:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2024 at 10:16.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.

London Borough Of Barnet logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 29 Oct 2024 at 14:57.

National Highways logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Bushey Bridleway And Footpath 040

National Highways are carrying out Highway repair and maintenance works on Bushey Bridleway And Footpath 040, Bushey.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 August 2024 at 00:00 and could run through until 21 December 2024. The works will impact the verge only.

This roadwork event was last updated by National Highways on 26 Nov 2024 at 13:46.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
College Road

London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are carrying out Utility asset works on Sandy Lane, Northwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 23:21 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 08:05.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 13:37.

London Borough Of Barnet logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 11 Oct 2024 at 14:10.

Network Rail logo
LONG TERM
Between
19 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 16:26.

Network Rail logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 October 2024 at 22:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Oct 2024 at 09:21.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

Cadent Gas logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Sharps Lane

Cadent Gas are carrying out Utility asset works on Sharps Lane, Ruislip.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:40 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:33.

Cadent Gas logo
LONG TERM
Between
21 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:00.

Cadent Gas logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are carrying out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 13:05 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:28.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Downhurst Avenue

UK Power Networks Eastern & London are carrying out New service connection on Downhurst Avenue, Mill Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:28.

Electricity Network Company logo
LONG TERM
Between
29 Oct 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Booth Road

Electricity Network Company are proposing to carry out Utility asset works on Booth Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 21 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 6 Aug 2024 at 13:20.

London Borough Of Hillingdon logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Kings College Road

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Kings College Road, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Dec 2024 at 14:29.

London Borough Of Barnet logo
LONG TERM
Between
7 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.

London Borough Of Ealing logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are carrying out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 13 Nov 2024 at 09:00.

London Borough Of Brent logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Park Lane

London Borough Of Brent are carrying out Highway repair and maintenance works on Park Lane, Wembley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 25 Nov 2024 at 12:53.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:38.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
Eaton Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Eaton Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 16 Oct 2024 at 14:45.

Thames Water logo
Until
12 Dec 2024
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out Utility repair and maintenance works on Abbey Road, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 12:50 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:38.

Thames Water logo
Until
12 Dec 2024
Details
View Map
Share
Follow
Cumberland Avenue

Thames Water are carrying out Utility repair and maintenance works on Cumberland Avenue, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 12:50 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:38.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
Eaton Road

London Borough Of Barnet are carrying out Highway improvement works on Eaton Road, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 14:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 15 Nov 2024 at 14:37.

Murphy Power Distribution logo
Finishing
Friday
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 21 Aug 2024 at 16:25.

Murphy Power Distribution logo
Finishing
Saturday
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are carrying out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:53 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 4 Dec 2024 at 15:48.

London Borough Of Hillingdon logo
Finishing
Friday
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 7 Nov 2024 at 14:09.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bolton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bolton Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:19.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
High Road

Cadent Gas are carrying out Utility repair and maintenance works on High Road, Wembley.

The works started on 19 November 2024 at 14:18 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:30.

ESP Electricity logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Bramshill Road

ESP Electricity are carrying out Utility repair and maintenance works on Bramshill Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:11 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Dec 2024 at 11:04.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lovett Way

Cadent Gas are carrying out Utility repair and maintenance works on Lovett Way, London.

The works started on 23 November 2024 at 09:54 and could run through until 10 December 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 16:30.

London Borough Of Ealing logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Rowdell Road

London Borough Of Ealing are carrying out Highway improvement works on Rowdell Road, Northolt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:30 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 29 Nov 2024 at 16:48.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Lancelot Crescent

Cadent Gas are carrying out Utility repair and maintenance works on Lancelot Crescent, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:00 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:13.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 5 Jan 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:20.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 16 Jun 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Burnt Oak Broadway

London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.

London Borough Of Barnet logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Great Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 13:52.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Wood End Avenue

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Wood End Avenue, South Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 10:07 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 11:47.

Scottish Hydro Electric Power Dis logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Bennetts Avenue

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Bennetts Avenue, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 08:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Dec 2024 at 11:46.

Thames Water logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Franklyn Road

Thames Water are carrying out Utility repair and maintenance works on Franklyn Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 12:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 18:49.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
Fairmead Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Fairmead Crescent, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2024 at 12:39.

Thames Water logo
Between
29 Nov and 24 Dec 2024
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility repair and maintenance works on Station Road, The Hale, Edgware.

These works were categorised as Major.

The works were originally planned to start 29 November 2024 and run through until 24 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:39.

London Borough Of Hillingdon logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Kingshill Avenue

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Kingshill Avenue, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Dec 2024 at 09:03.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Sep 2024 at 06:16.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are carrying out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 06:47 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 15:41.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Monks Park

UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:32.

Thames Water logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Buxton Road

Thames Water are proposing to carry out Utility asset works on Buxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
Until
22 Dec 2024
Details
View Map
Share
Follow
Buxton Road

Thames Water are carrying out Utility asset works on Buxton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 08:36.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are carrying out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:55.

Finishing
Today
Details
View Map
Share
Milman Close

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Milman Close, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:50.

UK Power Networks Eastern & London logo
Tomorrow
Details
View Map
Share
High Street

UK Power Networks Eastern & London carried out Utility repair and maintenance works on High Street, Wealdstone.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 2 Dec 2024 and 5 Dec 2024 and were actually completed between 2 Dec 2024 (03:14) and 4 Dec 2024 (14:15). The works impacted the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 14:57.

Finishing
Today
Details
View Map
Share
Marsworth Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Marsworth Avenue, Hatch End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:55.

Hertfordshire County Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
The Woods

Hertfordshire County Council are proposing to carry out Highway improvement works on The Woods, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 14:18.

Finishing
Today
Details
View Map
Share
Follow
Fallowfield

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:08.

Finishing
Tomorrow
Details
View Map
Share
Fallowfield

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:24.

Finishing
Tomorrow
Details
View Map
Share
Follow
Fallowfield

London Borough Of Harrow are carrying out Highway repair and maintenance works on Fallowfield, Stanmore.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:09 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Dec 2024 at 08:14.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Heathbourne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Heathbourne Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Heathbourne Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Heathbourne Road, Bushey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 11:53.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Bournehall Lane

Cadent Gas are proposing to carry out New service connection on Bournehall Lane, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 09:44.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Long Drive

Network Rail are carrying out Works for Rail Purposes on Long Drive, Ruislip.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 22:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Dec 2024 at 12:10.

Affinity Water logo
Between
3 and 11 Dec 2024
Details
View Map
Share
Borthwick Road

Affinity Water were proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 10:14.

Finishing
Friday
Details
View Map
Share
Naresby Fold

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:42.

Finishing
Friday
Details
View Map
Share
Follow
Naresby Fold

London Borough Of Harrow are carrying out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 08:10 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 4 Dec 2024 at 08:15.

London Borough Of Brent logo
Between
5 and 19 Dec 2024
Details
View Map
Share
Follow
Nicoll Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nicoll Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 29 Nov 2024 at 10:40.

London Borough Of Brent logo
Between
5 and 19 Dec 2024
Details
View Map
Share
Follow
Nicoll Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nicoll Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 29 Nov 2024 at 10:40.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Fairway Drive

BT are proposing to carry out New service connection on Fairway Drive, Greenford.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Dec 2024 at 16:30.

Finishing
Sunday
Details
View Map
Share
Pinner Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 8 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 11:13.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Oct 2024 at 15:31.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.

Finishing
Sunday
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:05.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Ingram Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 10:15.

Finishing
Sunday
Details
View Map
Share
Follow
Ingram Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:05.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Thames Water are proposing to carry out New service connection on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:08.

London Borough Of Hillingdon logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 09:17.

London Borough Of Hillingdon logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Oct 2024 at 13:52.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 12:02.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:19.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Oct 2024 at 14:54.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Varley Parade Service Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Varley Parade Service Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:38.

Between
9 and 12 Dec 2024
Details
View Map
Share
Parkfield Gardens

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Parkfield Gardens, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Oct 2024 at 11:29.

London Borough Of Barnet logo
LONG TERM
Between
9 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Sep 2024 at 14:32.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Weston Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 12:09.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Weston Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 18 Oct 2024 at 09:24.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Masefield Avenue

Cadent Gas are proposing to carry out Utility asset works on Masefield Avenue, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:04.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Uphill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 14:45.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Uphill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:01.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Uphill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:19.

Hertfordshire County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Magnaville Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Magnaville Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 11:29.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Watford Heath

Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Sep 2024 at 12:40.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Little Bushey Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Little Bushey Lane, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 13:40.

Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 22 Dec 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:48.

Between
11 and 16 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 18 Dec 2024
Details
View Map
Share
Havelock Place

London Borough Of Harrow were proposing to carry out roadworks on Havelock Place, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:44.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Nibthwaite Road

BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Oct 2024 at 09:19.

Affinity Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Langland Crescent

Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 13:24.

Affinity Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Langland Crescent

Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 15:35.

Affinity Water logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Aug 2024 at 11:48.

Between
12 and 14 Dec 2024
Details
View Map
Share
Follow
Lower Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Lower Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 12:38.

Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Alperton Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Oct 2024 at 12:01.

Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Alperton Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.

Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Alperton Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Nov 2024 at 13:45.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:28.

London Borough Of Hillingdon logo
LONG TERM
Between
16 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 10:11.

Hertfordshire County Council logo
Between
16 and 24 Dec 2024
Details
View Map
Share
Follow
Gosforth Lane

Hertfordshire County Council are proposing to carry out Section 50 on Gosforth Lane, Hayling, South Oxhey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 16:51.

Affinity Water logo
Between
17 and 22 Dec 2024
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 14:47.

Between
18 and 21 Dec 2024
Details
View Map
Share
Pinner Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 21 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Oct 2024 at 15:34.

London Borough Of Hillingdon logo
LONG TERM
Between
20 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Oct 2024 at 07:22.

Thames Water logo
Between
23 and 31 Dec 2024
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:48.

London Borough Of Barnet logo
Between
24 and 26 Dec 2024
Details
View Map
Share
Rectory Lane

London Borough Of Barnet carried out Highway improvement works on Rectory Lane, Edgware.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 24 Dec 2024 and 26 Dec 2024 and were actually completed on between and . The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Oct 2024 at 12:56.

Murphy Power Distribution logo
Between
26 Dec 2024 and 19 Jan 2025
Details
View Map
Share
Follow
Glengall Road

Murphy Power Distribution are proposing to carry out New service connection on Glengall Road, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Oct 2024 at 14:47.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 17:58.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Oct 2024 at 13:42.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 18:36.

Vodafone logo
On
28 Dec 2024
Details
View Map
Share
Follow
Edgwarebury Lane Rbw (2nd Section)

Vodafone are proposing to carry out Utility repair and maintenance works on Edgwarebury Lane Rbw (2nd Section), Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 28 December 2024 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 10 Sep 2024 at 13:37.

Cadent Gas logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Batchworth Lane

Cadent Gas are proposing to carry out Utility asset works on Batchworth Lane, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 16 May 2024 at 13:54.

Affinity Water logo
Between
4 and 7 Jan 2025
Details
View Map
Share
School Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on School Lane, Bushey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Sep 2024 at 10:25.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:30.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:39.

Thames Water logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Mulgrave Road

Thames Water were proposing to carry out Utility asset works on Mulgrave Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 07:28.

T-Mobile (UK) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
The Avenue

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on The Avenue, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 18 Oct 2024 at 13:15.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:34.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:12.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:13.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 09:07.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 09:27.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 16:42.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 13:35.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 13:05.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Junction Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Junction Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:50.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Havelock Place

London Borough Of Harrow are proposing to carry out Highway improvement works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:43.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Nibthwaite Road

BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 10:18.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 20:57.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
The Hyde

Cadent Gas were proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Edgware Road

Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Edgware Road

Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 20:57.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:52.

Affinity Water logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tewkesbury Gardens

Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:13.

Affinity Water logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tewkesbury Gardens

Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:26.

London Borough Of Barnet logo
LONG TERM
Between
7 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Oct 2024 at 08:45.

Hertfordshire County Council logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
North Western Avenue (Watford Bypass)

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Western Avenue (Watford Bypass), Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 21 Oct 2024 at 09:08.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 22 Oct 2024 at 14:25.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 23 Oct 2024 at 15:48.

Cadent Gas logo
Between
13 and 23 Jan 2025
Details
View Map
Share
Follow
Costons Avenue

Cadent Gas are proposing to carry out Utility asset works on Costons Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 14:48.

Thames Water logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:36.

Thames Water logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 07:31.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 4 Oct 2024 at 10:43.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 18 Sep 2024 at 08:43.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:44.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 6 Nov 2024 at 07:48.

Thames Water logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Colin Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Colin Park Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:59.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Aerodrome Road

Virgin Media were proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 08:38.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Clitheroe Gardens

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:30.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Clitheroe Gardens

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:32.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
The Watergate

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Watergate, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:26.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
The Watergate

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Watergate, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:36.

UK Power Networks Eastern & London logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brockley Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockley Hill, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 14:25.

Affinity Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 16:33.

London Borough Of Hillingdon logo
LONG TERM
Between
14 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Dec 2024 at 08:08.

Cadent Gas logo
LONG TERM
Between
14 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Stag Lane

Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Clitheroe Gardens

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:44.

Affinity Water logo
Between
18 and 20 Jan 2025
Details
View Map
Share
Elstree Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Elstree Road, Bushey Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 10:14.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Cherington Road

Thames Water are proposing to carry out New service connection on Cherington Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:29.

Thames Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Longfield Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 16:25.

Affinity Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Eastcote Lane

Affinity Water were proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 12:25.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Llanover Road

Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:51.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Llanover Road

Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:38.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 5 Apr 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 20 Nov 2024 at 08:01.

Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Pinner Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Nov 2024 at 07:21.

London Borough Of Ealing logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Wharncliffe Drive

London Borough Of Ealing are proposing to carry out Highway improvement works on Wharncliffe Drive, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 13:57.

Affinity Water logo
Between
25 and 29 Jan 2025
Details
View Map
Share
Rudolph Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Rudolph Road, Bushey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 09:59.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Coles Green Road

Thames Water are proposing to carry out New service connection on Coles Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:13.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Coles Green Road

Thames Water are proposing to carry out New service connection on Coles Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 19:29.

Affinity Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Kingsfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:48.

Hertfordshire County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Elstree Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Elstree Road, Bushey Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 12:57.

Hertfordshire County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Elstree Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Elstree Road, Bushey Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 4 Dec 2024 at 06:47.

London Borough Of Ealing logo
LONG TERM
Between
28 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Northolt.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 31 Oct 2024 at 16:15.

Affinity Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 16:02.

Affinity Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 08:19.

Thames Water logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Selbie Avenue

Thames Water are proposing to carry out Utility asset works on Selbie Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:05.

Thames Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Bowrons Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Bowrons Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:02.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Castleton Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Castleton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Nov 2024 at 19:10.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Fernside Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 08:44.

Hertfordshire County Council logo
Between
3 and 20 Feb 2025
Details
View Map
Share
Follow
Little Bushey Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Bushey Lane, Bushey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 8 Oct 2024 at 11:38.

Hertfordshire County Council logo
Between
3 and 20 Feb 2025
Details
View Map
Share
Follow
Little Bushey Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Bushey Lane, Bushey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 10:38.

Affinity Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Norval Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 11:23.

Affinity Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Norval Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 23:04.

London Borough Of Hillingdon logo
Between
5 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Dec 2024 at 15:43.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Neal Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Neal Avenue, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:14.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Lady Margaret Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2024 at 13:48.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Lady Margaret Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Nov 2024 at 10:46.

Network Rail logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
Eastcote Lane

Network Rail are proposing to carry out Works for Rail Purposes on Eastcote Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Nov 2024 at 16:55.

Hertfordshire County Council logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
Windmill Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Oct 2024 at 09:16.

Hertfordshire County Council logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
Windmill Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:16.

London Borough Of Ealing logo
LONG TERM
Between
9 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Park Royal Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Aug 2024 at 09:49.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Neasden Lane North

Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:39.

Affinity Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Blenheim Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Blenheim Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 10:47.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Fine Bush Lane

BT are proposing to carry out Utility asset works on Fine Bush Lane, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 10:24.

Affinity Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Alexandra Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Alexandra Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 08:40.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Feb 2025
Details
View Map
Share
Follow
Western Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Dec 2024 at 10:41.

G2 Energy IDNO logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Field End Road

G2 Energy IDNO were proposing to carry out New service connection on Field End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 February 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 28 Nov 2024 at 10:45.

G2 Energy IDNO logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Follow
Field End Road

G2 Energy IDNO are proposing to carry out New service connection on Field End Road, Ruislip.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 28 Nov 2024 at 11:07.

Cadent Gas logo
Between
14 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Chessington Court

Cadent Gas are proposing to carry out Utility asset works on Chessington Court, Pinner.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:40.

London Borough Of Brent logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Hawkins Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hawkins Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 15 Oct 2024 at 11:10.

London Borough Of Brent logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Bridge Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 23 Oct 2024 at 09:07.

Thames Water logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:01.

Affinity Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Clarendon Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Clarendon Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 21:31.

Thames Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Wentworth Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 16:05.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:51.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 08:17.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:58.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Chase

Cadent Gas are proposing to carry out Utility asset works on The Chase, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:39.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 10:51.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 09:22.

Vodafone logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Caple Road

Vodafone are proposing to carry out Remedial works on Caple Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 11 Nov 2024 at 16:25.

Affinity Water logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Eastcote Lane

Affinity Water are proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 07:47.

Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Nov 2024 at 07:30.

Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
The Close

London Borough Of Harrow are proposing to carry out Highway improvement works on The Close, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Nov 2024 at 07:39.

Affinity Water logo
Between
18 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Palmerston Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Palmerston Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 11:28.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Dene Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 14:34.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Dene Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 10:09.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Northolt Road

Affinity Water are proposing to carry out Highway repair and maintenance works on Northolt Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 12:28.

Hertfordshire County Council logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Little Potters

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Potters, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:16.

Hertfordshire County Council logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Little Potters

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Potters, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 13:40.

Hertfordshire County Council logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Ivinghoe Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ivinghoe Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:09.

Hertfordshire County Council logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Ivinghoe Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ivinghoe Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 13:42.

Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Kenmore Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenmore Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Nov 2024 at 13:48.

Hertfordshire County Council logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Richfield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:21.

Hertfordshire County Council logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Richfield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 13:39.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Clifton Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Clifton Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 04:32.

BT logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Greenford Road

BT are proposing to carry out Utility repair and maintenance works on Greenford Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 15:55.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Blackbird Hill

Cadent Gas are proposing to carry out Utility asset works on Blackbird Hill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:41.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Girton Avenue

Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Girton Avenue

Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
North Way

Affinity Water are proposing to carry out Utility asset works on North Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
North Way

Affinity Water are proposing to carry out Utility asset works on North Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 11:12.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 15:58.

Cadent Gas logo
Between
25 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Elms Road

Cadent Gas are proposing to carry out Utility asset works on Elms Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:24.

Affinity Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Rudolph Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Rudolph Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 11:23.

Affinity Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Dene Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 13:40.

Affinity Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Dene Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 07:59.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Acton Lane, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 6 Nov 2024 at 11:23.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 31 Jul 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 15 Nov 2024 at 15:04.

Affinity Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Kingsfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 15:11.

Cadent Gas logo
LONG TERM
Between
3 Mar and 21 May 2025
Details
View Map
Share
Follow
Stag Lane

Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:37.


Roadworks Map near to College Road, HARROW, HA1 1BA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 18:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to College Road, HARROW, HA1 1BA (55 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Affinity Water logo
STATION ROAD 
(0.1 miles)
Affinity Water
Permanent reinstatement - Footway - Some carriageway incursion
Planned
Scheduled: 4 Dec 2024 - 5 Dec 2024
0.1
Details
Share
Follow
2
COLLEGE ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Dec 2024 - 5 Dec 2024
0.1
Details
Share
Follow
3
STATION ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
4 Dec 2024 10:40 - 10:58
0.1
Details
Share
4
COLLEGE ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Dec 2024 - 5 Dec 2024
0.1
Details
Share
Follow
5
ST ANNS ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
4 Dec 2024 10:00 - 10:45
0.1
Details
Share
6
COLLEGE ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Dec 2024 - 5 Dec 2024
0.1
Details
Share
Follow
7
STATION ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
4 Dec 2024 11:15 - 11:35
0.1
Details
Share
8
COLLEGE ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
4 Dec 2024 10:32 - 10:39
0.1
Details
Share
9
COLLEGE ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
4 Dec 2024 10:10 - 10:19
0.1
Details
Share
10
STATION ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
4 Dec 2024 11:22 - 11:39
0.1
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data