ROADWORKS SUMMARY
Pleasant Way, WEMBLEY, HA0 1DH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Pleasant Way, HA0 1DH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Pleasant Way, WEMBLEY, HA0 1DH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pleasant Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Ealing logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 08:28.

Transport for London (TfL) logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Pump Lane

Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2023 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2023 at 12:00.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2023 at 23:01 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 20 May 2024 at 11:32.

London Borough Of Barnet logo
LONG TERM
Until
1 Mar 2025
Details
View Map
Share
Follow
Charcot Road

London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.

These works are categorised as Major.

The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Hammersmith Bridge, Barnes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 00:00 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Mar 2024 at 07:34.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
1 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 11:02.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
1 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 10:58.

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

Transport for London (TfL) logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:34.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

London Borough Of Ealing logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.

London Borough Of Ealing logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.

Transport for London (TfL) logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:53.

Transport for London (TfL) logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
South Africa Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:54.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:30 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 20 Dec 2024 at 08:52.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
College Road

London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Kensington Park Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

Thames Water logo
LONG TERM
Between
4 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Lydford Road

Thames Water are proposing to carry out Utility asset works on Lydford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

London Borough Of Barnet logo
LONG TERM
Between
6 Nov 2024 and 13 Mar 2025
Details
View Map
Share
Shirehall Lane

London Borough Of Barnet were proposing to carry out Highway improvement works on Shirehall Lane, Hendon, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:37.

London Borough Of Barnet logo
LONG TERM
Between
7 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 13:18.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 11:07.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:11.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:58.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:58.

London Borough Of Ealing logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are carrying out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 13 Nov 2024 at 09:00.

Thames Water logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out Utility repair and maintenance works on Abbey Road, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 12:50 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 07:53.

Thames Water logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Cumberland Avenue

Thames Water are carrying out Utility repair and maintenance works on Cumberland Avenue, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 12:50 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 07:52.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Lydford Road

Thames Water are carrying out Utility asset works on Lydford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:24.

ESP Electricity logo
LONG TERM
Until
20 Jan 2025
Details
View Map
Share
Follow
Bramshill Road

ESP Electricity are carrying out Utility repair and maintenance works on Bramshill Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:11 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 19 Dec 2024 at 09:08.

London Borough Of Ealing logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Rowdell Road

London Borough Of Ealing are carrying out Highway improvement works on Rowdell Road, Northolt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:30 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 29 Nov 2024 at 16:48.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 5 Jan 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:20.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 16 Jun 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Burnt Oak Broadway

London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bulwer Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bulwer Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are carrying out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:55.

Transport for London (TfL) logo
LONG TERM
Between
9 Dec 2024 and 2 May 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

London Borough Of Barnet logo
LONG TERM
Between
9 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Sep 2024 at 14:32.

Cadent Gas logo
LONG TERM
Between
11 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:46.

Cadent Gas logo
Between
11 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:47.

Transport for London (TfL) logo
LONG TERM
Between
12 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Spring Grove Road

Cadent Gas are carrying out Utility repair and maintenance works on Spring Grove Road, Isleworth.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 10:01 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 15:44.

Thames Water logo
Until
10 Jan 2025
Details
View Map
Share
Follow
Lancelot Road

Thames Water are carrying out Utility repair and maintenance works on Lancelot Road, Wembley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 10:00 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:55.

London Borough Of Hillingdon logo
LONG TERM
Between
20 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Oct 2024 at 07:22.

Cadent Gas logo
Until
3 Jan 2025
Details
View Map
Share
Follow
Graham Road

Cadent Gas are carrying out Utility repair and maintenance works on Graham Road, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 December 2024 at 16:36 and could run through until 3 January 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 09:24.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:48.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hay Lane

Affinity Water are carrying out Utility repair and maintenance works on Hay Lane, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 December 2024 at 17:01 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Dec 2024 at 09:47.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Corringham Road

Affinity Water are carrying out Utility repair and maintenance works on Corringham Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 December 2024 at 11:25 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Dec 2024 at 13:19.

BT logo
Finishing
Tuesday
Details
View Map
Share
Cromwell Place

BT were proposing to carry out Utility asset works on Cromwell Place, Mortlake.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Oct 2024 at 12:03.

Thames Water logo
Between
28 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Rosebank Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 17:58.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Oct 2024 at 13:42.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 18:36.

Scottish Hydro Electric Power Dis logo
Between
1 and 17 Jan 2025
Details
View Map
Share
Bromyard Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Bromyard Avenue, Acton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:14.

Scottish Hydro Electric Power Dis logo
Between
2 and 21 Jan 2025
Details
View Map
Share
Follow
Noel Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Noel Road, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Dec 2024 at 13:07.

Scottish Hydro Electric Power Dis logo
Between
2 and 21 Jan 2025
Details
View Map
Share
Follow
Noel Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Noel Road, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Dec 2024 at 12:06.

Scottish Hydro Electric Power Dis logo
Between
2 and 21 Jan 2025
Details
View Map
Share
Noel Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Noel Road, Acton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 21 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Dec 2024 at 13:04.

Scottish Hydro Electric Power Dis logo
Between
2 and 29 Jan 2025
Details
View Map
Share
Follow
Noel Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Noel Road, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Dec 2024 at 11:21.

Scottish Hydro Electric Power Dis logo
Between
2 and 29 Jan 2025
Details
View Map
Share
Follow
Noel Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Noel Road, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Dec 2024 at 12:06.

Scottish Hydro Electric Power Dis logo
Between
2 and 29 Jan 2025
Details
View Map
Share
Noel Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Noel Road, Acton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Dec 2024 at 11:20.

Affinity Water logo
LONG TERM
Between
4 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tewkesbury Gardens

Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Dec 2024 at 12:08.

UK Power Networks South Eastern logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Pagoda Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Pagoda Avenue, Richmond.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2024 at 13:11.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:53.

Cadent Gas logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:27.

Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Beech Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Beech Avenue, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Dec 2024 at 11:27.

London Borough Of Hounslow logo
LONG TERM
Between
6 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Chiswick High Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 9 Dec 2024 at 09:59.

Scottish Hydro Electric Power Dis logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dagmar Mews

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Dagmar Mews, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 12:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Bomore Road

Cadent Gas are proposing to carry out Utility asset works on Bomore Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Bomore Road

Cadent Gas are proposing to carry out Utility asset works on Bomore Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 14:22.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Walmer Road

Cadent Gas are proposing to carry out Utility asset works on Walmer Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 10:53.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Drenon Square

Cadent Gas are proposing to carry out Utility asset works on Drenon Square, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 10:10.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Drenon Square

Cadent Gas are proposing to carry out Utility asset works on Drenon Square, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:35.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 11:50.

Thames Water logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Scrubs Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Scrubs Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 10:29.

City Of Westminster logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tolhurst Drive

City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:09.

City Of Westminster logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tolhurst Drive

City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 12:39.

Thames Water logo
Between
6 and 12 Jan 2025
Details
View Map
Share
Follow
Ponsard Road

Thames Water are proposing to carry out New service connection on Ponsard Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 11:02.

London Borough Of Ealing logo
Between
6 and 31 Jan 2025
Details
View Map
Share
West Gate

London Borough Of Ealing were proposing to carry out Utility asset works on West Gate, Ealing.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 6 Dec 2024 at 22:09.

London Borough Of Ealing logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
West Gate

London Borough Of Ealing are proposing to carry out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 6 Dec 2024 at 22:21.

London Borough Of Ealing logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
West Gate

London Borough Of Ealing are proposing to carry out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 9 Dec 2024 at 12:51.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:30.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:39.

Thames Water logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Willesden Lane

Thames Water are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:50.

Thames Water logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Balmoral Road

Thames Water are proposing to carry out Utility asset works on Balmoral Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.

Thames Water logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Balmoral Road

Thames Water are proposing to carry out Utility asset works on Balmoral Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 09:34.

Thames Water logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Mulgrave Road

Thames Water were proposing to carry out Utility asset works on Mulgrave Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 07:28.

T-Mobile (UK) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
The Avenue

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on The Avenue, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 18 Oct 2024 at 13:15.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:34.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:12.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:13.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 09:07.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 09:27.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 16:42.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 13:35.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Dec 2024 at 08:46.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 13:05.

London Borough Of Barnet logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, Hendon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Dec 2024 at 10:37.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Junction Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Junction Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:50.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Havelock Place

London Borough Of Harrow are proposing to carry out Highway improvement works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:43.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Nibthwaite Road

BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 10:18.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 20:57.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
The Hyde

Cadent Gas were proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Edgware Road

Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Edgware Road

Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 20:57.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:52.

Affinity Water logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tewkesbury Gardens

Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:13.

BT logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Mullins Path

BT are proposing to carry out Utility asset works on Mullins Path, Mortlake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Oct 2024 at 10:07.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:26.

London Borough Of Barnet logo
LONG TERM
Between
7 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Oct 2024 at 08:45.

Transport for London (TfL) logo
LONG TERM
Between
8 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Blythe Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blythe Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 15:50.

T-Mobile (UK) logo
Between
9 and 24 Jan 2025
Details
View Map
Share
Kensington Park Gardens

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Kensington Park Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 2 Dec 2024 at 12:35.

Affinity Water logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Pebworth Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Pebworth Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 18 Dec 2024 at 06:16.

Network Rail logo
Between
11 and 17 Jan 2025
Details
View Map
Share
Follow
North Road

Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Dec 2024 at 12:34.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 22 Oct 2024 at 14:25.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 23 Oct 2024 at 15:48.

Transport for London (TfL) logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 14:34.

Transport for London (TfL) logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 09:35.

London Borough Of Hounslow logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
North Street

London Borough Of Hounslow were proposing to carry out Highway improvement works on North Street, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 11 Dec 2024 at 10:01.

London Borough Of Hounslow logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
St Johns Road

London Borough Of Hounslow were proposing to carry out Highway improvement works on St Johns Road, Isleworth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 11 Dec 2024 at 10:02.

London Borough Of Hounslow logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Twickenham Road

London Borough Of Hounslow were proposing to carry out Highway improvement works on Twickenham Road, Isleworth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 11 Dec 2024 at 10:01.

Network Rail logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
North Road

Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 09:41.

London Borough Of Hounslow logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Capital Interchange Way

London Borough Of Hounslow are proposing to carry out Highway improvement works on Capital Interchange Way, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 17 Dec 2024 at 13:02.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Sussex Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 10:51.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Sussex Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 16:24.

Royal Borough Of Kensington And Chelsea logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Chepstow Crescent

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Chepstow Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 18 Dec 2024 at 11:15.

Royal Borough Of Kensington And Chelsea logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Chepstow Crescent

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Chepstow Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 18 Dec 2024 at 14:33.

Cadent Gas logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Grenfell Road

Cadent Gas are proposing to carry out Utility asset works on Grenfell Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.

Cadent Gas logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Walmer Road

Cadent Gas are proposing to carry out Utility asset works on Walmer Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.

Transport for London (TfL) logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 20:17.

Transport for London (TfL) logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 20:28.

Transport for London (TfL) logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 20:39.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Oct 2024 at 14:10.

Cadent Gas logo
Between
13 and 23 Jan 2025
Details
View Map
Share
Follow
Costons Avenue

Cadent Gas are proposing to carry out Utility asset works on Costons Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 14:48.

Cadent Gas logo
Between
13 and 23 Jan 2025
Details
View Map
Share
Follow
Costons Avenue

Cadent Gas are proposing to carry out Utility asset works on Costons Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 16:59.

Thames Water logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:36.

Thames Water logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 07:31.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 4 Oct 2024 at 10:43.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 18 Sep 2024 at 08:43.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:44.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 6 Nov 2024 at 07:48.

Thames Water logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Colin Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Colin Park Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:59.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Aerodrome Road

Virgin Media were proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 08:38.

Cadent Gas logo
LONG TERM
Between
13 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Stag Lane

Cadent Gas are proposing to carry out Utility asset works on Stag Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 07:28.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
King Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:03.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
King Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 15:06.

Affinity Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 16:33.

Cadent Gas logo
LONG TERM
Between
14 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Stag Lane

Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.

Thames Water logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Rootes Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:37.

Thames Water logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Rootes Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 15:36.

City Of Westminster logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.

Transport for London (TfL) logo
Between
18 and 22 Jan 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Dec 2024 at 10:11.

National Grid Electricity Transmission logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Great West Road

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Great West Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by National Grid Electricity Transmission on 23 Dec 2024 at 13:54.

National Grid Electricity Transmission logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Great West Road

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Great West Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 23 Dec 2024 at 13:53.

Thames Water logo
Between
20 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:07.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Cherington Road

Thames Water are proposing to carry out New service connection on Cherington Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:29.

Thames Water logo
Between
20 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Creffield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:10.

Thames Water logo
Between
20 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Creffield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 12:14.

Thames Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Longfield Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 16:25.

Cadent Gas logo
LONG TERM
Between
20 Jan and 15 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 07:30.

Cadent Gas logo
LONG TERM
Between
20 Jan and 15 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 09:24.

Affinity Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Eastcote Lane

Affinity Water were proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 12:25.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Llanover Road

Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:51.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Llanover Road

Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:38.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 5 Apr 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Dec 2024 at 15:45.

Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Pinner Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Nov 2024 at 07:21.

Cadent Gas logo
Between
23 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Grenfell Road

Cadent Gas are proposing to carry out Utility asset works on Grenfell Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 10:53.

London Borough Of Ealing logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Wharncliffe Drive

London Borough Of Ealing are proposing to carry out Highway improvement works on Wharncliffe Drive, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 13:57.

London Borough Of Hounslow logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Twickenham Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Twickenham Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 16 Dec 2024 at 15:46.

London Borough Of Hounslow logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Milnthorpe Road

London Borough Of Hounslow are proposing to carry out Section 50 on Milnthorpe Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 16 Dec 2024 at 11:29.

London Borough Of Hounslow logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Milnthorpe Road

London Borough Of Hounslow are proposing to carry out Section 50 on Milnthorpe Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 16 Dec 2024 at 11:32.

London Borough Of Ealing logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
York Road

London Borough Of Ealing are proposing to carry out Highway improvement works on York Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 09:02.

London Borough Of Ealing logo
Between
27 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Shelley Crescent

London Borough Of Ealing are proposing to carry out Highway improvement works on Shelley Crescent, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 10:40.

Thames Water logo
LONG TERM
Between
27 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Willesden Lane

Thames Water are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:53.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Coles Green Road

Thames Water are proposing to carry out New service connection on Coles Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:13.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Coles Green Road

Thames Water are proposing to carry out New service connection on Coles Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 19:29.

Affinity Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Kingsfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:48.

Affinity Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Kingsfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 16:09.

London Borough Of Ealing logo
LONG TERM
Between
28 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Northolt.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 31 Oct 2024 at 16:15.

Affinity Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 16:02.

Affinity Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 08:19.

Thames Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Northfield Avenue

Thames Water were proposing to carry out New service connection on Northfield Avenue, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 13:41.

Thames Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Kingsdown Avenue

Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 11:45.

London Borough Of Barnet logo
Between
29 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 13:49.

Transport for London (TfL) logo
Between
31 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Talgarth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Talgarth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 16:30.

Thames Water logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Selbie Avenue

Thames Water are proposing to carry out Utility asset works on Selbie Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:17.

Thames Water logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Selbie Avenue

Thames Water are proposing to carry out Utility asset works on Selbie Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 18:06.

Thames Water logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are proposing to carry out Utility asset works on Denzil Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:01.

Thames Water logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are proposing to carry out Utility asset works on Denzil Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 18:05.

Thames Water logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Severn Way

Thames Water are proposing to carry out Utility asset works on Severn Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:01.

Thames Water logo
Between
3 and 9 Feb 2025
Details
View Map
Share
Follow
Castelnau

Thames Water are proposing to carry out New service connection on Castelnau, Barnes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:42.

Transport for London (TfL) logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Talgarth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Talgarth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 12:55.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kilmarsh Road

Thames Water are proposing to carry out New service connection on Kilmarsh Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 13:54.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kilmarsh Road

Thames Water are proposing to carry out New service connection on Kilmarsh Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:12.

London Borough Of Ealing logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Strelley Way

London Borough Of Ealing are proposing to carry out Highway improvement works on Strelley Way, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 09:02.

Thames Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Amherst Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Amherst Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 10:35.

Cadent Gas logo
LONG TERM
Between
3 Feb and 30 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Feb and 16 Jun 2025
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 10:07.

London Borough Of Hillingdon logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Dec 2024 at 13:54.

London Borough Of Hillingdon logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Dec 2024 at 07:46.

London Borough Of Hillingdon logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Dec 2024 at 08:57.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Southam Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 24 Oct 2024 at 11:26.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Southam Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Adair Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Adair Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Golborne Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Golborne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.

Transport for London (TfL) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Cleve Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cleve Road, West Hampstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 09:41.

Transport for London (TfL) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
West End Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on West End Lane, West Hampstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 09:42.

Thames Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Bowrons Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Bowrons Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:02.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Castleton Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Castleton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Nov 2024 at 19:10.

City Of Westminster logo
Between
4 and 17 Feb 2025
Details
View Map
Share
Follow
Ledbury Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Ledbury Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Dec 2024 at 13:53.

Affinity Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Norval Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 11:23.

Affinity Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Norval Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 23:04.

Thames Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

Thames Water are proposing to carry out Utility repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:35.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Neal Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Neal Avenue, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:14.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Lady Margaret Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2024 at 13:48.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Lady Margaret Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Dec 2024 at 12:09.

Transport for London (TfL) logo
LONG TERM
Between
7 Feb and 28 Apr 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out roadworks on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Jul 2024 at 16:26.

Network Rail logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
Eastcote Lane

Network Rail are proposing to carry out Works for Rail Purposes on Eastcote Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Nov 2024 at 16:55.

London Borough Of Barnet logo
Between
7 and 21 Feb 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 14 Oct 2024 at 15:18.

London Borough Of Ealing logo
LONG TERM
Between
9 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Park Royal Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Aug 2024 at 09:49.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Pembroke Place

Thames Water are proposing to carry out New service connection on Pembroke Place, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:20.

Scottish Hydro Electric Power Dis logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Dagmar Mews

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Dagmar Mews, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 16:07.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Neasden Lane North

Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 14:32.

Affinity Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Blenheim Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Blenheim Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 10:47.

Affinity Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Alexandra Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Alexandra Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 10 Dec 2024 at 12:56.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Feb 2025
Details
View Map
Share
Follow
Western Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Dec 2024 at 13:17.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Feb 2025
Details
View Map
Share
Follow
Western Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Dec 2024 at 10:00.

Cadent Gas logo
Between
14 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Chessington Court

Cadent Gas are proposing to carry out Utility asset works on Chessington Court, Pinner.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:40.

Cadent Gas logo
LONG TERM
Between
15 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Lonsdale Road

Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Barnes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:57.

London Borough Of Brent logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Hawkins Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hawkins Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 15 Oct 2024 at 11:10.

London Borough Of Brent logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Bridge Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 23 Oct 2024 at 09:07.

Cadent Gas logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 12:30.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Carville Crescent

Thames Water are proposing to carry out New service connection on Carville Crescent, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 12:31.

Transport for London (TfL) logo
LONG TERM
Between
17 Feb and 19 May 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:40.

Virgin Media logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Greenford Road Service Road To Numbers 20-60

Virgin Media are proposing to carry out Utility asset works on Greenford Road Service Road To Numbers 20-60, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 13 Dec 2024 at 16:48.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Golborne Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Golborne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Dec 2024 at 15:36.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Dec 2024 at 14:45.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 12 Dec 2024 at 14:42.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Dec 2024 at 14:50.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Dec 2024 at 14:45.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 17 Dec 2024 at 15:48.

Thames Water logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:01.

Thames Water logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 07:57.

Affinity Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Clarendon Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Clarendon Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 21:31.

London Borough Of Barnet logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 18 Oct 2024 at 13:23.

Thames Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Wentworth Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 16:05.

Thames Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Wentworth Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:57.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:51.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 08:17.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:58.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 14:49.

Thames Water logo
Between
17 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Colin Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Colin Park Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:19.

Vodafone logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Caple Road

Vodafone are proposing to carry out Remedial works on Caple Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 9 Dec 2024 at 16:30.

UK Power Networks Eastern & London logo
Between
18 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Willesden Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Willesden Lane, Kilburn, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Dec 2024 at 10:18.

Affinity Water logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Eastcote Lane

Affinity Water were proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 14:24.

Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Dec 2024 at 12:19.

Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
The Close

London Borough Of Harrow are proposing to carry out Highway improvement works on The Close, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Dec 2024 at 12:20.

Affinity Water logo
Between
18 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Palmerston Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Palmerston Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 12:21.

Affinity Water logo
Between
18 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Palmerston Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Palmerston Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 13:56.

Transport for London (TfL) logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Shortlands

Transport for London (TfL) are proposing to carry out Highway improvement works on Shortlands, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Dec 2024 at 11:51.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Kingsdown Avenue

Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 15:54.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Kingsdown Avenue

Thames Water were proposing to carry out New service connection on Kingsdown Avenue, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 10:00.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Northolt Road

Affinity Water are proposing to carry out Highway repair and maintenance works on Northolt Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 12:28.

Transport for London (TfL) logo
LONG TERM
Between
21 Feb and 19 May 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:39.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Harman Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 12:11.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Harman Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 11:12.

Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Kenmore Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenmore Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Dec 2024 at 10:57.

Thames Water logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Lonsdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lonsdale Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:21.

Thames Water logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Carthew Road

Thames Water are proposing to carry out Utility asset works on Carthew Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 09:59.

Thames Water logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Carthew Road

Thames Water are proposing to carry out Utility asset works on Carthew Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:37.

Thames Water logo
Between
24 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Long Drive

Thames Water are proposing to carry out Utility asset works on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 14:29.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Kilburn Lane, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 08:20.

Thames Water logo
Between
24 Feb and 2 Mar 2025
Details
View Map
Share
Ponsard Road

Thames Water were proposing to carry out roadworks on Ponsard Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:51.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Clifton Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Clifton Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 04:32.

Cadent Gas logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Christchurch Avenue

Cadent Gas are proposing to carry out Utility asset works on Christchurch Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 09:14.

Thames Water logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Severn Way

Thames Water are proposing to carry out Utility asset works on Severn Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:51.

BT logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Greenford Road

BT are proposing to carry out Utility repair and maintenance works on Greenford Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Dec 2024 at 10:56.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Blackbird Hill

Cadent Gas are proposing to carry out Utility asset works on Blackbird Hill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 08:35.

London Borough Of Barnet logo
Until
10 Mar 2025
Details
View Map
Share
Follow
Shirehall Lane

London Borough Of Barnet are carrying out Highway improvement works on Shirehall Lane, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 00:00 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:28.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Girton Avenue

Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Girton Avenue

Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
North Way

Affinity Water are proposing to carry out Utility asset works on North Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
North Way

Affinity Water are proposing to carry out Utility asset works on North Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 11:12.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 15:58.

Transport for London (TfL) logo
Between
26 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Shortlands

Transport for London (TfL) are proposing to carry out Highway improvement works on Shortlands, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 14:42.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:10.

UK Power Networks Eastern & London logo
Between
28 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Carlton Vale

UK Power Networks Eastern & London are proposing to carry out New service connection on Carlton Vale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 17:23.

Vodafone logo
Between
1 and 4 Mar 2025
Details
View Map
Share
Follow
Station Road

Vodafone are proposing to carry out Remedial works on Station Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 24 Dec 2024 at 09:01.

Thames Water logo
Between
3 and 9 Mar 2025
Details
View Map
Share
Follow
Ponsard Road

Thames Water are proposing to carry out New service connection on Ponsard Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 14:42.

G2 Energy IDNO logo
LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Adelphi Crescent

G2 Energy IDNO are proposing to carry out Utility asset works on Adelphi Crescent, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:57.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Acton Lane, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 6 Nov 2024 at 11:23.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 31 Jul 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 15 Nov 2024 at 15:04.

Affinity Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Kingsfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 15:11.

Cadent Gas logo
LONG TERM
Between
3 Mar and 21 May 2025
Details
View Map
Share
Follow
Stag Lane

Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 09:28.

Thames Water logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Kingsgate Road

Thames Water are proposing to carry out New service connection on Kingsgate Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 11:01.

Thames Water logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Kingsgate Road

Thames Water are proposing to carry out New service connection on Kingsgate Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 16:48.

London Borough Of Ealing logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
George Street

London Borough Of Ealing are proposing to carry out Highway improvement works on George Street, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 22 Nov 2024 at 13:27.

Affinity Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Lancelot Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Lancelot Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 12:04.

T-Mobile (UK) logo
Between
6 and 21 Mar 2025
Details
View Map
Share
Follow
Kensington Park Gardens

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Kensington Park Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 9 Dec 2024 at 09:21.

G2 Energy IDNO logo
LONG TERM
Between
6 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Lansbury Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Lansbury Drive, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 15:00.

Cadent Gas logo
Between
8 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Greenford Road

Cadent Gas are proposing to carry out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 16:59.

Cadent Gas logo
Between
8 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Rockware Avenue

Cadent Gas are proposing to carry out Utility asset works on Rockware Avenue, Greenford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 16:48.

Thames Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Nasmyth Street

Thames Water are proposing to carry out Utility asset works on Nasmyth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 09:59.

Thames Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Nasmyth Street

Thames Water are proposing to carry out Utility asset works on Nasmyth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 09:00.

T-Mobile (UK) logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Kensington Park Gardens

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Kensington Park Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 9 Dec 2024 at 15:58.

UK Power Networks Eastern & London logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Harrow Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 12:09.

UK Power Networks Eastern & London logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Harrow Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 11:30.

Thames Water logo
LONG TERM
Between
10 Mar and 6 Oct 2025
Details
View Map
Share
Follow
High Road

Thames Water are proposing to carry out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

Thames Water logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.

Thames Water logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 09:33.

Thames Water logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Normanby Road

Thames Water are proposing to carry out Utility asset works on Normanby Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:12.

Thames Water logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Hillcroft Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Hillcroft Crescent, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 19:52.

Cadent Gas logo
LONG TERM
Between
10 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Stag Lane

Cadent Gas are proposing to carry out Utility asset works on Stag Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.

Thames Water logo
Between
11 and 28 Mar 2025
Details
View Map
Share
Follow
Lonsdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lonsdale Road, Barnes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 09:50.

G2 Energy IDNO logo
LONG TERM
Between
11 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Balmoral Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Balmoral Drive, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:58.

Cadent Gas logo
Between
13 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Goldhawk Road

Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 12:30.

Cadent Gas logo
Between
13 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Paddenswick Road

Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 15:30.

Cadent Gas logo
Between
13 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Greenside Road

Cadent Gas are proposing to carry out Utility asset works on Greenside Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 15:00.

Cadent Gas logo
Between
13 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Askew Road

Cadent Gas are proposing to carry out Utility asset works on Askew Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 12:00.

Affinity Water logo
Between
13 and 17 Mar 2025
Details
View Map
Share
Follow
Cambridge Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Cambridge Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Dec 2024 at 09:50.

G2 Energy IDNO logo
LONG TERM
Between
14 Mar and 1 May 2025
Details
View Map
Share
Follow
Balmoral Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Balmoral Drive, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:58.

London Borough Of Hounslow logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
North Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on North Street, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 16 Dec 2024 at 15:59.

London Borough Of Hounslow logo
LONG TERM
Between
17 Mar and 31 Jul 2025
Details
View Map
Share
Follow
Hayes Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Hayes Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 12 Dec 2024 at 10:03.

T-Mobile (UK) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Kensington Park Gardens

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Kensington Park Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 9 Dec 2024 at 15:58.

London Borough Of Ealing logo
LONG TERM
Between
17 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Park Royal Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 16 Dec 2024 at 11:58.

Thames Water logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility repair and maintenance works on London Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 15:48.

Affinity Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Pebworth Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Pebworth Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 15 Dec 2024 at 21:26.

Thames Water logo
Between
18 and 24 Mar 2025
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 12:48.

Thames Water logo
Between
18 and 24 Mar 2025
Details
View Map
Share
Follow
Grosvenor Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Grosvenor Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 11:22.

London Borough Of Ealing logo
Between
20 and 24 Mar 2025
Details
View Map
Share
Follow
Ribblesdale Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Ribblesdale Avenue, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 12:39.

London Borough Of Ealing logo
Between
21 and 25 Mar 2025
Details
View Map
Share
Follow
Clarence Street

London Borough Of Ealing are proposing to carry out Highway improvement works on Clarence Street, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 12:28.

London Borough Of Ealing logo
Between
22 and 25 Mar 2025
Details
View Map
Share
Follow
Ennismore Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Ennismore Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 12:39.

Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Lonsdale Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Lonsdale Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 6 Dec 2024 at 11:47.

Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Lonsdale Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Lonsdale Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 10 Dec 2024 at 13:04.

Between
24 and 26 Mar 2025
Details
View Map
Share
Lonsdale Road

London Borough Of Richmond Upon Thames were proposing to carry out Highway improvement works on Lonsdale Road, Barnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 6 Dec 2024 at 11:18.

Thames Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Denbigh Road

Thames Water are proposing to carry out New service connection on Denbigh Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 11:15.

City Of Westminster logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 09:19.

Thames Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
College Road

Thames Water are proposing to carry out New service connection on College Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:54.

Thames Water logo
LONG TERM
Between
24 Mar and 6 May 2025
Details
View Map
Share
Follow
Normanby Road

Thames Water are proposing to carry out Utility asset works on Normanby Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 10:36.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Field End Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Dec 2024 at 13:31.

Affinity Water logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Westmorland Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Westmorland Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Dec 2024 at 11:51.


Roadworks Map near to Pleasant Way, WEMBLEY, HA0 1DH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 26 Dec 2024 14:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Pleasant Way, WEMBLEY, HA0 1DH (38 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Affinity Water logo
MAY GARDENS 
(0.1 miles)
Affinity Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 27 Dec 2024 - 31 Dec 2024
0.1
Details
Share
Follow
2
Cadent Gas logo
MARSH ROAD 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Complete
12 Dec 2024 12:05 - 18 Dec 2024 09:17
0.3
Details
Share
3
London Borough Of Ealing logo
URGENT
  
BILTON ROAD 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
Complete
19 Dec 2024 00:00 - 20 Dec 2024 23:59
0.3
Details
Share
4
London Borough Of Ealing logo
URGENT
  
BILTON ROAD 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
Complete
19 Dec 2024 00:00 - 20 Dec 2024 23:59
0.3
Details
Share
5
London Borough Of Ealing logo
URGENT
  
BILTON ROAD 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 19 Dec 2024 00:00
(Scheduled: 19 Dec 2024 - 18 Jan 2025)
0.3
Details
Share
Follow
6
London Borough Of Ealing logo
URGENT
  
BILTON ROAD 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
Complete
19 Dec 2024 00:00 - 21 Dec 2024 23:59
0.3
Details
Share
7
London Borough Of Ealing logo
URGENT
  
BIDEFORD AVENUE 
(0.5 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 6 Dec 2024 00:00
(Scheduled: 6 Dec 2024 - 5 Jan 2025)
0.5
Details
Share
Follow
8
Scottish Hydro Electric Power Dis logo
URGENT
  
WALMGATE ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 20 Oct 2024 10:29
(Scheduled: 20 Oct 2024 - 1 Dec 2025)
0.5
Details
Share
Follow
9
London Borough Of Ealing logo
URGENT
  
BIDEFORD AVENUE 
(0.5 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
Complete
6 Dec 2024 00:00 - 18 Dec 2024 23:59
0.5
Details
Share
10
London Borough Of Ealing logo
URGENT
  
LINDFIELD ROAD 
(0.6 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
Complete
6 Dec 2024 00:00 - 18 Dec 2024 23:59
0.6
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data