ROADWORKS SUMMARY
Lower Ham Lane, GODALMING, GU8 6HQ
Introduction
View current and future planned roadworks and road closures for Lower Ham Lane, GU8 6HQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lower Ham Lane, GODALMING, GU8 6HQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lower Ham Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Aug 2024 and 1 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Elstead Road, Elstead, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Mar 2024 at 16:43.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Station Hill, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:36.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Farnham By-pass, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:38.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Longbridge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:42.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Lower Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:43.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Union Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Upper Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:45.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:40.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on West Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:46.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Downing Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:44.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Bear Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on The Borough, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Woolmead, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:49.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on East Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:50.
1 Oct 2024 and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:39.
1 Oct 2024 and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Farnham Footpath 171/20, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footpath only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 12:48.
14 Oct 2024 and 28 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Shawfield Road, Ash.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 28 February 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 20 Aug 2024 at 11:25.
17 Oct 2024 and 8 Jan 2025
Surrey County Council were proposing to carry out Highway improvement works on Foreman Road, Ash.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 October 2024 and run through until 8 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 15:18.
28 Oct 2024 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 14:09.
28 Oct 2024 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 08:07.
28 Oct 2024 and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 14:12.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 09:08.
28 Oct 2024 and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Suffield Lane, Puttenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 25 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 14:33.
1 May 2025
Surrey County Council are carrying out Highway repair and maintenance works on Suffield Lane, Puttenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 07:00 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Nov 2024 at 10:12.
29 Oct 2024 and 18 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Compton Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 31 Jan 2024 at 08:52.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoneyfields, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Jan 2024 at 08:37.
30 Nov 2024 and 31 Jan 2025
Surrey County Council are proposing to carry out Highway improvement works on Foreman Road, Ash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 08:22.
30 Nov 2024 and 31 Jan 2025
Surrey County Council are proposing to carry out Highway improvement works on Ash Church Road, Ash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 08:27.
2 Dec 2024 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jubilee Lane, Boundstone, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 12:42.
2 Dec 2024 and 17 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Jubilee Lane, Boundstone, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 08:58.
21 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Jubilee Lane, Boundstone, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 18:30 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 12:35.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgway Road, Farnham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:15.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Weydon Hill Road, Farnham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:00.
Tuesday
Surrey County Council are carrying out Highway repair and maintenance works on Shackleford Road, Elstead, Godalming.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 10:55 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Dec 2024 at 11:09.
27 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Tilford Road, Rushmoor, Farnham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 05:30 and could run through until 27 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:11.
Tomorrow
BT were proposing to carry out Utility asset works on Holloway Hill, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Oct 2024 at 14:46.
Tomorrow
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 23 Oct 2024 at 09:20.
Tuesday
GTC Pipelines are carrying out Utility repair and maintenance works on Green Lane, Badshot Lea, Farnham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 10:00 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 17 Dec 2024 at 11:05.
2 Jan and 30 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on Shawfield Road, Ash.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Network Rail on 16 Oct 2024 at 12:43.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 12:19.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 16:05.
6 Jan and 24 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on Meadrow, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:40.
6 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farncombe, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 08:14.
6 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elm Road, Farncombe, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 08:13.
6 and 20 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on High Street, Aldershot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 4 Nov 2024 at 11:57.
6 and 20 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on High Street, Aldershot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 5 Nov 2024 at 09:08.
8 and 11 Jan 2025
Thames Water are proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:03.
8 and 13 Jan 2025
Thames Water are proposing to carry out New service connection on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:32.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Oct 2024 at 09:50.
13 and 15 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Summerfield Lane, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 07:55.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Catteshall Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 06:53.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Catteshall Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 16 Dec 2024 at 10:14.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Meadrow, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 13:27.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Meadrow, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 08:12.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 12:54.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 06:55.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 16 Dec 2024 at 10:15.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 08:59.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 12:54.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 13:41.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Station Hill, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:49.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Farnham By-pass, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:46.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Longbridge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:40.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Lower Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:44.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Upper Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:48.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:50.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Union Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:47.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on West Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:37.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:46.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Downing Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:46.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on The Borough, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:39.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Bear Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:35.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woolmead, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:49.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on East Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:32.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on High Park Road, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 10:11.
13 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hogs Back, Puttenham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 16:50.
14 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Ockford Ridge, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:27.
15 and 17 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Summerfield Lane, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 07:17.
20 Jan and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:10.
20 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on Ash Green Road, Ash Green, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 26 Nov 2024 at 14:03.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on New Road, Wormley, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:04.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on New Road, Wormley, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:21.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:52.
21 and 22 Jan 2025
Thames Water are proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 07:53.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:27.
23 and 27 Jan 2025
Thames Water were proposing to carry out New service connection on High View Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:20.
27 Jan and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Street, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Oct 2024 at 09:12.
28 and 30 Jan 2025
Thames Water are proposing to carry out New service connection on Croft Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:33.
28 and 30 Jan 2025
Thames Water are proposing to carry out New service connection on Croft Road, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:37.
28 Jan and 12 Feb 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Grenville Road, Shackleford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 12 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 15:27.
28 Jan and 12 Feb 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Lombard Street, Shackleford, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 12 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 15:20.
28 Jan and 12 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lombard Street, Shackleford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 12:14.
28 Jan and 12 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Cuttmill Road, Shackleford, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 12:58.
28 Jan and 12 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on The Street, Shackleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 09:05.
28 Jan and 12 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Puttenham Lane, Shackleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 11:36.
31 Jan and 3 Feb 2025
Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:58.
31 Jan and 3 Feb 2025
Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:33.
3 Feb and 30 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on The Burys, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:45.
3 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:47.
3 Feb and 24 Dec 2025
Hampshire County Council are proposing to carry out Works for road purposes on Denmark Street, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 5 Dec 2024 at 12:04.
4 Feb and 4 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bourne Grove, Lower Bourne, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Nov 2024 at 07:52.
10 and 28 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Guildford Road, Normandy.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2024 at 11:35.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Water Lane, Enton, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:55.
17 and 20 Feb 2025
Thames Water are proposing to carry out New service connection on New Road, Wormley, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:17.
17 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:36.
17 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 10:34.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:21.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:27.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:26.
17 and 19 Feb 2025
BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:32.
17 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Holloway Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Oct 2024 at 12:07.
17 Feb and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:20.
17 Feb and 22 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Street, Ash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Sep 2024 at 08:03.
17 Feb and 29 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Street, Ash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 10:23.
17 Feb and 22 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Church Road, Ash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 9 Sep 2024 at 17:30.
17 Feb and 29 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Church Road, Ash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 11:40.
18 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Aarons Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:12.
19 and 21 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Burnt Hill Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 07:03.
19 Feb and 12 Mar 2025
Hampshire County Council are proposing to carry out Highway improvement works on North Lane, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 09:39.
19 Feb and 12 Mar 2025
Hampshire County Council are proposing to carry out Highway improvement works on North Lane, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 10:11.
21 and 23 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Oct 2024 at 07:50.
21 Feb and 1 Mar 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on North Lane, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 25 Jul 2024 at 14:11.
21 Feb and 1 Mar 2025
Hampshire County Council were proposing to carry out Highway repair and maintenance works on North Lane, Aldershot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 February 2025 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 25 Nov 2024 at 12:14.
26 and 28 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Dec 2024 at 08:38.
3 and 5 Mar 2025
BT are proposing to carry out Utility asset works on Ash Green Road, Ash Green, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 5 Aug 2024 at 14:57.
3 and 5 Mar 2025
BT are proposing to carry out Utility asset works on Harpers Road, Ash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 5 Aug 2024 at 14:58.
3 and 12 Mar 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Eastern Road, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Sep 2024 at 15:16.
3 and 12 Mar 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Eastern Road, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Sep 2024 at 15:39.
10 and 12 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Burnt Hill Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 09:31.
10 and 28 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Guildford Road, Normandy.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Sep 2024 at 13:48.
17 and 19 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Holloway Hill, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 14:20.
17 and 21 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Tilford Road, Tilford, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 09:52.
Roadworks Map near to Lower Ham Lane, GODALMING, GU8 6HQ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lower Ham Lane, GODALMING, GU8 6HQ (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 10 Dec 2024 - 24 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.