ROADWORKS SUMMARY
Milford Road, GODALMING, GU8 6HE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Milford Road, GU8 6HE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Milford Road, GODALMING, GU8 6HE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Milford Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Moor Park Lane

Surrey County Council are carrying out Highway repair and maintenance works on Moor Park Lane, Farnham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Oct 2024 at 11:08.

Surrey County Council logo
LONG TERM
Between
1 Aug 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Elstead Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Elstead Road, Elstead, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Mar 2024 at 16:43.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Station Hill

Surrey County Council are proposing to carry out Highway improvement works on Station Hill, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:36.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Farnham By-pass

Surrey County Council are proposing to carry out Highway improvement works on Farnham By-pass, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:38.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Longbridge

Surrey County Council are proposing to carry out Highway improvement works on Longbridge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:42.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Lower Church Lane

Surrey County Council are proposing to carry out Highway improvement works on Lower Church Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:43.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Victoria Road

Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Union Road

Surrey County Council are proposing to carry out Highway improvement works on Union Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Upper Church Lane

Surrey County Council are proposing to carry out Highway improvement works on Upper Church Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:45.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:40.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
West Street

Surrey County Council are proposing to carry out Highway improvement works on West Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:46.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Downing Street

Surrey County Council are proposing to carry out Highway improvement works on Downing Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:44.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Bear Lane

Surrey County Council are proposing to carry out Highway improvement works on Bear Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
The Borough

Surrey County Council are proposing to carry out Highway improvement works on The Borough, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Woolmead

Surrey County Council are proposing to carry out Highway improvement works on Woolmead, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:49.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
East Street

Surrey County Council are proposing to carry out Highway improvement works on East Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:50.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Castle Street

Surrey County Council are proposing to carry out Highway improvement works on Castle Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:47.

Surrey County Council logo
LONG TERM
Between
15 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Catteshall Road

Surrey County Council are proposing to carry out Highway improvement works on Catteshall Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:42.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 9 Dec 2024
Details
View Map
Share
Petworth Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 15:18.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Petworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:25.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:39.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Farnham Footpath 171/20

Surrey County Council are proposing to carry out Highway improvement works on Farnham Footpath 171/20, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footpath only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 12:48.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Green Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Feb 2024 at 12:08.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Monkton Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Monkton Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 07:09.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Monkton Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Monkton Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 14:19.

Surrey County Council logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Monkton Lane

Surrey County Council are carrying out Highway repair and maintenance works on Monkton Lane, Farnham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 20:00 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 09:25.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Weybourne Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Weybourne Road, Farnham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 30 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 13:38.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Weybourne Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Weybourne Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 07:08.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Weybourne Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Weybourne Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 14:18.

Surrey County Council logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Weybourne Road

Surrey County Council are carrying out Highway repair and maintenance works on Weybourne Road, Farnham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 19:00 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 08:37.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Bullers Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bullers Road, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 07:10.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Bullers Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bullers Road, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 14:19.

Surrey County Council logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Bullers Road

Surrey County Council are carrying out Highway repair and maintenance works on Bullers Road, Farnham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 20:00 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 09:27.

Network Rail logo
LONG TERM
Between
14 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Shawfield Road

Network Rail are proposing to carry out Works for Rail Purposes on Shawfield Road, Ash.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 28 February 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 20 Aug 2024 at 11:25.

Surrey County Council logo
LONG TERM
Between
17 Oct 2024 and 8 Jan 2025
Details
View Map
Share
Foreman Road

Surrey County Council were proposing to carry out Highway improvement works on Foreman Road, Ash.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2024 and run through until 8 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 15:18.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Petworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 14:09.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Petworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 08:07.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 17 Mar 2025
Details
View Map
Share
Follow
Lodge Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 14:12.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Lodge Hill Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 09:08.

Surrey County Council logo
LONG TERM
Between
28 Oct 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Suffield Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Suffield Lane, Puttenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 14:33.

Surrey County Council logo
LONG TERM
Until
1 May 2025
Details
View Map
Share
Follow
Suffield Lane

Surrey County Council are carrying out Highway repair and maintenance works on Suffield Lane, Puttenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 07:00 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Nov 2024 at 10:12.

Southern Gas Networks logo
LONG TERM
Between
29 Oct 2024 and 18 Feb 2025
Details
View Map
Share
Follow
Old Compton Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Compton Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2024 at 08:52.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Tilford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 09:06.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Ridgway Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgway Road, Farnham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 13:49.

Hampshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Harvest Lane

Hampshire County Council are carrying out Highway improvement works on Harvest Lane, Aldershot.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 10:07.

Southern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Ridgway Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgway Road, Farnham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 14:29.

Surrey County Council logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Ash.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 15:19.

Surrey County Council logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Ash.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 12:25.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Hale House Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hale House Lane, Churt, Farnham.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:21.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Crossways

Southern Gas Networks are carrying out Utility repair and maintenance works on Crossways, Churt, Farnham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 23:30 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:31.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bourne Road

Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Jul 2024 at 06:27.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bourne Road

Network Rail are carrying out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 22:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Nov 2024 at 07:57.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 19 Feb 2025
Details
View Map
Share
Follow
Green Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Jan 2024 at 14:11.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Stoneyfields

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoneyfields, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Jan 2024 at 08:37.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Ockford Ridge

Thames Water were proposing to carry out New service connection on Ockford Ridge, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 09:00.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Rutton Hill Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rutton Hill Road, Bowlhead Green, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 12:50.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Station Lane

Network Rail were proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 08:35.

Surrey County Council logo
LONG TERM
Between
30 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Foreman Road

Surrey County Council are proposing to carry out Highway improvement works on Foreman Road, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 10:07.

Surrey County Council logo
LONG TERM
Between
30 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Ash Church Road

Surrey County Council are proposing to carry out Highway improvement works on Ash Church Road, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:16.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
New Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road, Wormley, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 10:29.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Lane End

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lane End, Hambledon, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 12:11.

Scottish Hydro Electric Power Dis logo
Between
2 and 11 Dec 2024
Details
View Map
Share
Follow
French Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on French Lane, Thursley, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 11 December 2024. The works will impact the verge only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 08:52.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Jubilee Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jubilee Lane, Boundstone, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 12:42.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Jubilee Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jubilee Lane, Boundstone, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 14:29.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Green Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farncombe, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 09:41.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Elm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elm Road, Farncombe, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 07:48.

Neoscorp logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Hale Road

Neoscorp were proposing to carry out Utility asset works on Hale Road, Farnham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Neoscorp on 9 Oct 2024 at 13:57.

Southern Gas Networks logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Ridgway Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgway Road, Farnham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:15.

Southern Gas Networks logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Weydon Hill Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Weydon Hill Road, Farnham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:00.

BT logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Ash Green Road

BT were proposing to carry out Utility repair and maintenance works on Ash Green Road, Ash Green, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by BT on 7 Oct 2024 at 11:06.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:41.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:42.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:43.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:43.

BT logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Holloway Hill

BT were proposing to carry out Utility asset works on Holloway Hill, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Oct 2024 at 14:46.

BT logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 23 Oct 2024 at 09:20.

Network Rail logo
LONG TERM
Between
2 Jan and 30 May 2025
Details
View Map
Share
Follow
Shawfield Road

Network Rail are proposing to carry out Works for Rail Purposes on Shawfield Road, Ash.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Network Rail on 16 Oct 2024 at 12:43.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wormley Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 12:19.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wormley Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 16:05.

Surrey County Council logo
LONG TERM
Between
6 Jan and 24 Apr 2025
Details
View Map
Share
Follow
Meadrow

Surrey County Council are proposing to carry out Highway improvement works on Meadrow, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:40.

Hampshire County Council logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
High Street

Hampshire County Council are proposing to carry out Highway improvement works on High Street, Aldershot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 4 Nov 2024 at 11:57.

Hampshire County Council logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
High Street

Hampshire County Council are proposing to carry out Highway improvement works on High Street, Aldershot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 5 Nov 2024 at 09:08.

Thames Water logo
Between
8 and 11 Jan 2025
Details
View Map
Share
Follow
Godalming Footpath 27/50

Thames Water are proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:03.

Thames Water logo
Between
8 and 13 Jan 2025
Details
View Map
Share
Follow
Farncombe Street

Thames Water are proposing to carry out New service connection on Farncombe Street, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:32.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hale House Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Oct 2024 at 09:50.

Surrey County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Summerfield Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Summerfield Lane, Rowledge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 07:55.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Station Hill

Surrey County Council are proposing to carry out Highway improvement works on Station Hill, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:49.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Farnham By-pass

Surrey County Council are proposing to carry out Highway improvement works on Farnham By-pass, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:46.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Longbridge

Surrey County Council are proposing to carry out Highway improvement works on Longbridge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:40.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Lower Church Lane

Surrey County Council are proposing to carry out Highway improvement works on Lower Church Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:44.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Upper Church Lane

Surrey County Council are proposing to carry out Highway improvement works on Upper Church Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:48.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:50.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Union Road

Surrey County Council are proposing to carry out Highway improvement works on Union Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:47.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
West Street

Surrey County Council are proposing to carry out Highway improvement works on West Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:37.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Victoria Road

Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:46.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Downing Street

Surrey County Council are proposing to carry out Highway improvement works on Downing Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:46.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
The Borough

Surrey County Council are proposing to carry out Highway improvement works on The Borough, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:39.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Bear Lane

Surrey County Council are proposing to carry out Highway improvement works on Bear Lane, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:35.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Woolmead

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woolmead, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:49.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
East Street

Surrey County Council are proposing to carry out Highway improvement works on East Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:32.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Park Row

Surrey County Council are proposing to carry out Highway improvement works on Park Row, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:45.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
High Park Road

Surrey County Council were proposing to carry out Highway improvement works on High Park Road, Farnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 10:11.

Surrey County Council logo
LONG TERM
Between
13 Jan 2025 and 13 Jan 2027
Details
View Map
Share
Follow
Castle Street

Surrey County Council are proposing to carry out Highway improvement works on Castle Street, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:48.

Thames Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Ockford Ridge

Thames Water are proposing to carry out New service connection on Ockford Ridge, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:27.

Surrey County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Summerfield Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Summerfield Lane, Rowledge, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 07:17.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Lodge Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:10.

Surrey County Council logo
LONG TERM
Between
20 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Ash Green Road

Surrey County Council are proposing to carry out Highway improvement works on Ash Green Road, Ash Green, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 09:20.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
New Road

Thames Water were proposing to carry out New service connection on New Road, Wormley, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:04.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
New Road

Thames Water were proposing to carry out New service connection on New Road, Wormley, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:21.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Godalming Footpath 27/50

Thames Water were proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:52.

Thames Water logo
Between
21 and 22 Jan 2025
Details
View Map
Share
Follow
Godalming Footpath 27/50

Thames Water are proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 07:53.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Godalming Footpath 27/50

Thames Water were proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:27.

Thames Water logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
The Street

Thames Water are proposing to carry out Utility repair and maintenance works on The Street, Frensham, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Oct 2024 at 09:12.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Croft Road

Thames Water are proposing to carry out New service connection on Croft Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:33.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Croft Road

Thames Water are proposing to carry out New service connection on Croft Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:37.

Thames Water logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Aarons Hill

Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:58.

Thames Water logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Aarons Hill

Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:33.

Surrey County Council logo
LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
The Burys

Surrey County Council are proposing to carry out Highway improvement works on The Burys, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:45.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Tilford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:47.

Southern Gas Networks logo
Between
4 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Bourne Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bourne Grove, Lower Bourne, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Nov 2024 at 07:52.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Water Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Water Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:10.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
New Road

Thames Water are proposing to carry out New service connection on New Road, Wormley, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:24.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Hale House Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:36.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:21.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:27.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:26.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:32.

BT logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Holloway Hill

BT are proposing to carry out Utility asset works on Holloway Hill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Oct 2024 at 12:07.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Tilford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:20.

Surrey County Council logo
LONG TERM
Between
17 Feb and 22 Mar 2025
Details
View Map
Share
Follow
Ash Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Street, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 5 Sep 2024 at 08:03.

Surrey County Council logo
LONG TERM
Between
17 Feb and 22 Mar 2025
Details
View Map
Share
Follow
Ash Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Church Road, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Sep 2024 at 17:30.

Thames Water logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Aarons Hill

Thames Water are proposing to carry out New service connection on Aarons Hill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:35.

Network Rail logo
Between
21 and 23 Feb 2025
Details
View Map
Share
Follow
Farncombe Street

Network Rail are proposing to carry out Works for Rail Purposes on Farncombe Street, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Oct 2024 at 07:50.

Hampshire County Council logo
Between
21 Feb and 1 Mar 2025
Details
View Map
Share
Follow
North Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on North Lane, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 25 Jul 2024 at 14:11.

Hampshire County Council logo
Between
21 Feb and 1 Mar 2025
Details
View Map
Share
Follow
North Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on North Lane, Aldershot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 29 Jul 2024 at 14:16.


Roadworks Map near to Milford Road, GODALMING, GU8 6HE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Milford Road, GODALMING, GU8 6HE (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Surrey County Council logo
UPPER SPRINGFIELD, ELSTEAD 
(0.1 miles)
Surrey County Council
Highway repair and maintenance works - Footway - Give and take
Planned
Scheduled: 25 Nov 2024 - 29 Nov 2024
0.1
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.