ROADWORKS SUMMARY
Churt Road, BORDON, GU35 8SR
Introduction
View current and future planned roadworks and road closures for Churt Road, GU35 8SR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Churt Road, BORDON, GU35 8SR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Churt Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
4 Nov and 6 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hindhead Road, Hindhead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 10:20.
4 Nov and 6 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haslemere Footpath 12/10, Haslemere.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:17.
4 Nov and 6 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Haslemere Footpath 12/10, Haslemere.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 14:02.
4 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 09:06.
12 Nov 2024 and 31 Jan 2025
Hampshire County Council are proposing to carry out Section 50 on Bolley Avenue, Whitehill, Bordon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 22 Oct 2024 at 14:19.
12 Nov 2024 and 31 Jan 2025
Hampshire County Council are proposing to carry out Section 50 on Bolley Avenue, Whitehill, Bordon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 21 Oct 2024 at 16:02.
12 Nov and 9 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Dolphin Close, Haslemere.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:43.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Hindhead Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Oct 2024 at 10:41.
Today
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hale House Lane, Churt, Farnham.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:21.
Southern Gas Networks carried out Utility repair and maintenance works on Crossways, Churt, Farnham.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 19 Nov 2024 and 28 Nov 2024 and were actually completed between 19 Nov 2024 (23:30) and 27 Nov 2024 (15:05). The works impacted the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:12.
19 Nov 2024 and 19 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lickfolds Road, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 11:44.
25 Nov and 13 Dec 2024
Thames Water were proposing to carry out Utility asset works on The Street, Wrecclesham, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:24.
25 Nov and 13 Dec 2024
Thames Water were proposing to carry out Utility asset works on The Street, Wrecclesham, Farnham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:36.
25 Nov and 14 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Bell Road, Fernhurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 7 Oct 2024 at 13:48.
25 Nov and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on The Street, Wrecclesham, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:53.
Tuesday
Hampshire County Council are carrying out Highway repair and maintenance works on Portsmouth Road, Liphook.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 16:00 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 16:32.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Rutton Hill Road, Bowlhead Green, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 12:50.
2 Dec 2024 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jubilee Lane, Boundstone, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 12:42.
2 Dec 2024 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jubilee Lane, Boundstone, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 14:29.
4 and 6 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wey Hill, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 11:02.
9 and 11 Dec 2024
South East Water are proposing to carry out New service connection on Rectory Lane, Bramshott, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 23 Oct 2024 at 15:52.
9 and 11 Dec 2024
South East Water are proposing to carry out New service connection on Rectory Lane, Bramshott, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 28 Oct 2024 at 10:29.
11 and 13 Dec 2024
BT are proposing to carry out Utility asset works on Passfield Road, Passfield, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 13 Sep 2024 at 15:41.
11 and 13 Dec 2024
BT were proposing to carry out Utility asset works on Passfield Road, Passfield, Liphook.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Sep 2024 at 11:18.
11 and 13 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Standford Lane, Standford, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 16 Oct 2024 at 15:15.
11 and 13 Dec 2024
BT are proposing to carry out Utility asset works on Passfield Road, Passfield, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Sep 2024 at 11:48.
16 and 20 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Devils Lane, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2024 at 16:11.
16 and 20 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Devils Lane, Liphook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Aug 2024 at 14:14.
16 and 18 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Headley Road, Lindford, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 5 Sep 2024 at 15:33.
6 and 8 Jan 2025
Gigaclear were proposing to carry out Utility asset works on Churt Road, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gigaclear on 15 Oct 2024 at 13:53.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dolphin Close, Haslemere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:10.
13 and 15 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Summerfield Lane, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 07:55.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Oct 2024 at 09:50.
15 and 17 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Summerfield Lane, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 07:17.
20 and 22 Jan 2025
South East Water are proposing to carry out New service connection on Boundary Road, Dockenfield, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 8 Nov 2024 at 10:16.
20 and 22 Jan 2025
South East Water are proposing to carry out New service connection on Boundary Road, Dockenfield, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 29 Oct 2024 at 13:33.
22 and 24 Jan 2025
South East Water are proposing to carry out New service connection on High Thicket Road, Dockenfield, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 8 Nov 2024 at 10:15.
22 and 24 Jan 2025
South East Water are proposing to carry out New service connection on High Thicket Road, Dockenfield, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 29 Oct 2024 at 12:25.
23 and 29 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Isington Road, Binsted, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:39.
23 and 29 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Isington Road, Binsted, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 10:59.
27 Jan and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Street, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Oct 2024 at 09:12.
27 Jan and 10 Feb 2025
BT were proposing to carry out Utility asset works on Hollycombe Lane, Linch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 28 Oct 2024 at 09:53.
29 Jan and 4 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 14 Nov 2024 at 10:46.
29 Jan and 6 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 09:21.
29 Jan and 6 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 11:46.
29 and 31 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Longdene Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 18:52.
29 Jan and 4 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Mill Lane, Headley, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 11:09.
3 and 14 Feb 2025
BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 6 Nov 2024 at 10:02.
3 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:47.
5 and 13 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 13:50.
5 and 13 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 09:25.
5 and 13 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Headley Road, Grayshott, Hindhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 15:21.
6 and 8 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Main Road, Bucks Horn Oak, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 5 Nov 2024 at 12:13.
10 and 14 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 11:48.
10 and 14 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 09:27.
10 and 14 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Standford Lane, Standford, Bordon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 13:49.
17 Feb and 14 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Liphook Road, Haslemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:58.
17 Feb and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tunbridge Lane, Bramshott, Liphook.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:28.
17 and 19 Feb 2025
South East Water are proposing to carry out Utility repair and maintenance works on Marley Lane, Fernhurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 21 Nov 2024 at 10:44.
17 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:36.
17 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Hollycombe Lane, Linch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 6 Nov 2024 at 10:00.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wey Hill, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 11:33.
24 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Liphook Road, Haslemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 11:00.
Roadworks Map near to Churt Road, BORDON, GU35 8SR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Churt Road, BORDON, GU35 8SR (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.