ROADWORKS SUMMARY
Royal Military Academy, CAMBERLEY, GU15 4PE
Introduction
View current and future planned roadworks and road closures for GU15 4PE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Royal Military Academy, CAMBERLEY, GU15 4PE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
4 Mar 2025
Surrey County Council are carrying out Highway repair and maintenance works on Deepcut Bridge Road, Deepcut, Camberley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 June 2023 at 07:00 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 21 Aug 2023 at 13:29.
4 Mar 2025
Surrey County Council are carrying out Highway improvement works on Mindenhurst Road, Deepcut, Camberley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2023 at 07:00 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Sep 2023 at 11:30.
7 Mar 2025
Surrey County Council are carrying out Highway improvement works on Deepcut Bridge Road, Deepcut, Camberley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2023 at 09:30 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 22 Mar 2024 at 09:32.
31 May 2024
Hampshire County Council are carrying out Highway improvement works on London Road, Blackwater, Camberley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 October 2023 at 08:30 and could run through until 31 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 24 Nov 2023 at 08:44.
31 May 2024
Thames Water are carrying out Utility repair and maintenance works on Elvetham Heath Way, Fleet.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 November 2023 at 07:40 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Mar 2024 at 11:37.
31 May 2024
Thames Water are carrying out Utility repair and maintenance works on Rykmansford Road, Fleet.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 December 2023 at 09:30 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Mar 2024 at 11:37.
31 Mar 2025
Surrey County Council are carrying out Works for road purposes on Deepcut Bridge Road, Deepcut, Camberley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 January 2024 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 08:55.
24 May 2024
Hampshire County Council are carrying out Highway improvement works on London Road, Blackwater, Camberley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 January 2024 at 09:30 and could run through until 24 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 29 Jan 2024 at 10:04.
12 May 2024
Hampshire County Council are carrying out Highway repair and maintenance works on Farnborough Road, Farnborough.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 February 2024 at 18:00 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Mar 2024 at 09:21.
Wednesday
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Blackwater Valley Road, Farnborough.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 February 2024 at 14:11 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Mar 2024 at 15:38.
4 Feb and 10 Sep 2024
Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Finchampstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2024 and could run through until 10 September 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wokingham Borough Council on 23 Oct 2023 at 07:54.
22 May 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Church Road, Frimley, Camberley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 11:40 and could run through until 22 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Feb 2024 at 11:57.
13 Sep 2024
Wokingham Borough Council are carrying out Highway improvement works on Finchampstead Road, Finchampstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:00 and could run through until 13 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wokingham Borough Council on 14 Feb 2024 at 10:58.
13 Sep 2024
Wokingham Borough Council are carrying out Highway improvement works on Nine Mile Ride, Finchampstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:00 and could run through until 13 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wokingham Borough Council on 14 Feb 2024 at 10:59.
13 May 2024
Southern Gas Networks are carrying out roadworks on Lower Broadmoor Road, Crowthorne.
These works are categorised as Major.
There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works started on 7 March 2024 at 10:00 and could run through until 13 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Mar 2024 at 11:24.
11 Mar and 7 May 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ship Lane, Farnborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2024 and could run through until 7 May 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 9 Jan 2024 at 16:24.
19 Jul 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on The Avenue, Camberley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 12:30 and could run through until 19 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Mar 2024 at 12:36.
5 Jun 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Sandhurst Lane, Blackwater, Camberley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 March 2024 at 11:00 and could run through until 5 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Mar 2024 at 11:32.
8 May 2024
Hampshire County Council are carrying out Highway repair and maintenance works on Ively Road, Farnborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 20:00 and could run through until 8 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 08:11.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Lower Broadmoor Road, Crowthorne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 12:30 and could run through until 29 April 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Apr 2024 at 12:57.
5 Jun 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Church Street, Crowthorne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 12:30 and could run through until 5 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Apr 2024 at 13:02.
31 Mar and 30 Sep 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Frimley Road, Frimley, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 15 Nov 2023 at 13:45.
31 Mar and 30 Sep 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Frimley Road, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 15 Nov 2023 at 13:44.
31 Mar and 30 Sep 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Frimley Road, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 26 Oct 2023 at 12:13.
31 Mar and 30 Sep 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 26 Oct 2023 at 12:31.
31 Mar and 30 Sep 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 26 Oct 2023 at 12:27.
Tomorrow
Hampshire County Council are carrying out Highway improvement works on Farnborough Road, Farnborough.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 April 2024 at 07:00 and could run through until 28 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 08:57.
1 Apr and 21 May 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rectory Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 21 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Jan 2024 at 09:04.
8 Apr and 28 Jun 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coleford Bridge Road, Mytchett, Camberley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Jan 2024 at 13:11.
5 May 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Deepcut Bridge Road, Deepcut, Camberley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 5 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Apr 2024 at 06:31.
16 Apr and 18 Aug 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tekels Avenue, Camberley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 18 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2024 at 13:15.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Church Street, Crowthorne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 April 2024 at 15:00 and could run through until 30 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Apr 2024 at 09:27.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Eversley Centre, Eversley, Hook.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 April 2024 at 05:20 and could run through until 30 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2024 at 09:45.
1 Sep 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Nine Mile Ride, Wokingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 April 2024 at 10:00 and could run through until 1 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Apr 2024 at 10:11.
22 May 2024
Cadent Gas are carrying out Utility asset works on Freemantle Road Footpath, Bagshot.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 26 April 2024 at 10:23 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 10:39.
28 Jun 2024
Icosa Water are carrying out Utility asset works on Government House Road, Farnborough.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 08:00 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Icosa Water on 22 Apr 2024 at 12:07.
22 Apr and 28 Jun 2024
Icosa Water are proposing to carry out Utility asset works on Farnborough Road, Farnborough.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Icosa Water on 25 Sep 2023 at 14:37.
22 Apr and 28 Jun 2024
Icosa Water are proposing to carry out Utility asset works on Farnborough Road, Farnborough.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Icosa Water on 22 Apr 2024 at 09:53.
22 Apr and 26 Jun 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rectory Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Jan 2024 at 09:02.
Tuesday
Hampshire County Council are proposing to carry out Highway improvement works on Medway Drive, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 5 Apr 2024 at 13:07.
Thursday
Surrey County Council are carrying out Highway repair and maintenance works on Frimley Road, Camberley.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 April 2024 at 10:32 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 26 Apr 2024 at 13:25.
28 Apr and 30 May 2024
Toob are proposing to carry out Utility asset works on Pinewood Park Footpaths, Farnborough.
These works are categorised as Major.
The works will start on or after 28 April 2024 and could run through until 30 May 2024. The works will impact the verge only.
This roadwork event was last updated by Toob on 25 Apr 2024 at 07:54.
29 Apr and 31 May 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grange Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Mar 2024 at 15:59.
29 Apr and 31 May 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prince Charles Crescent, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Mar 2024 at 14:36.
29 Apr and 31 May 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawley Lane, Farnborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Mar 2024 at 14:07.
29 Apr and 21 Aug 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waterloo Road, Crowthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 21 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Apr 2024 at 11:18.
Wednesday
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Roundabout, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 9 Apr 2024 at 08:45.
Wednesday
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Church Road, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 9 Apr 2024 at 09:04.
2 and 16 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Robins Grove Crescent, Yateley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 15:03.
3 and 17 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Maple Gardens, Yateley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 15:03.
3 and 17 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Willowford, Yateley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 08:53.
4 and 6 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Lysons Avenue, Ash Vale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Apr 2024 at 11:55.
4 and 6 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Easthampstead Road, Wokingham Without, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Apr 2024 at 12:36.
6 and 27 May 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Darby Green Lane, Blackwater, Camberley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Feb 2024 at 14:26.
6 May and 22 Jul 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Road, Sandhurst.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 22 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Apr 2024 at 09:29.
7 and 21 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Avenue Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 13:59.
7 May and 30 Jul 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elvetham Road, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 30 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Mar 2024 at 15:34.
7 May and 30 Jul 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elvetham Road, Fleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 30 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Feb 2024 at 11:47.
7 and 21 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Apollo Rise, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 11:07.
7 and 15 May 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Fleet Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 13 Feb 2024 at 12:30.
7 and 21 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Orwell Close, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 13:59.
7 and 21 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Rother Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 13:52.
7 and 20 May 2024
Hampshire County Council are proposing to carry out Remedial works on Cricket Hill Lane, Yateley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 11:06.
7 and 20 May 2024
Hampshire County Council are proposing to carry out Remedial works on Hawley Road, Blackwater, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 11:19.
7 and 20 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on East Green, Blackwater, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 14:09.
7 and 20 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Baileys Close, Blackwater, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 11:37.
7 and 20 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Churchill Crescent, Yateley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 15:03.
8 and 22 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Albert Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Apr 2024 at 10:11.
8 and 14 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Kingsmead, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 21 Feb 2024 at 09:41.
8 and 10 May 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Chandlers Lane, Yateley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 17 Apr 2024 at 08:38.
11 and 13 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Lynchford Road, Ash Vale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Apr 2024 at 09:47.
13 and 31 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Skimped Hill Lane, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Apr 2024 at 08:45.
14 and 22 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Pyestock Way, Fleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 22 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2023 at 09:38.
16 and 18 May 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2024 and could run through until 18 May 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Mar 2024 at 08:30.
17 and 21 May 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on The Maultway, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 9 Apr 2024 at 07:00.
20 and 24 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Fleet Road, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 22 Apr 2024 at 11:41.
20 and 24 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Kingsmead, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 19 Apr 2024 at 13:06.
20 May and 7 Oct 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Frimley, Camberley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 7 October 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Feb 2024 at 13:34.
20 May and 29 Jun 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Camberley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 13 Mar 2024 at 14:19.
20 May and 29 Jun 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Grand Avenue, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 4 Mar 2024 at 13:47.
20 May 2024
BT are proposing to carry out Utility asset works on Oaklands Lane, Crowthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 20 May 2024 and are due to last for only one day. The works will impact the verge only.
This roadwork event was last updated by BT on 18 Mar 2024 at 16:30.
22 and 30 May 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Portsmouth Road, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Mar 2024 at 08:07.
23 May and 29 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Ively Road, Cody Technology Park, Farnborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2023 at 09:43.
27 May and 30 Aug 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Portsmouth Road, Frimley, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 2 Apr 2024 at 15:58.
27 May and 30 Aug 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Chobham Road, Frimley, Camberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 2 Apr 2024 at 16:00.
27 May and 12 Aug 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brackendale Road, Camberley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 12 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Feb 2024 at 11:36.
27 May and 24 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on South Road, Bracknell.
These works are categorised as Major.
The works will start on or after 27 May 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Feb 2024 at 17:00.
30 May and 2 Jun 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2024 and could run through until 2 June 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Mar 2024 at 08:32.
2 and 20 Jun 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mytchett Lake Road, Mytchett, Camberley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 20 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Apr 2024 at 09:30.
4 and 7 Jun 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Avondale Road, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 23 Feb 2024 at 09:11.
9 and 13 Jun 2024
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on High Street, Crowthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 11 Apr 2024 at 13:55.
14 and 17 Jun 2024
Wokingham Borough Council are proposing to carry out Highway improvement works on Wiltshire Avenue, Crowthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 4 Mar 2024 at 13:19.
21 and 24 Jun 2024
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 26 Apr 2024 at 08:56.
24 and 29 Jun 2024
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 26 Apr 2024 at 08:58.
28 Jun and 1 Jul 2024
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Winkfield, Windsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:23.
1 and 9 Jul 2024
Surrey County Council are proposing to carry out Highway improvement works on Church Road, Frimley, Camberley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 9 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 1 Feb 2024 at 09:44.
1 and 4 Jul 2024
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:23.
7 Jul and 29 Sep 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tekels Avenue, Camberley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 29 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Apr 2024 at 09:02.
10 and 25 Jul 2024
Hampshire County Council are proposing to carry out Works for road purposes on Reading Road, Yateley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Apr 2024 at 09:14.
12 and 15 Jul 2024
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Winkfield, Windsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:24.
14 and 17 Jul 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Birch Hill Road, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 24 Apr 2024 at 12:23.
15 and 19 Jul 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Nine Mile Ride, Finchampstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Apr 2024 at 09:17.
19 and 22 Jul 2024
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Winkfield, Windsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2024 and could run through until 22 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:24.
21 Jul and 15 Sep 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Camberley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 15 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2024 at 07:46.
Roadworks Map near to Royal Military Academy, CAMBERLEY, GU15 4PE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Royal Military Academy, CAMBERLEY, GU15 4PE (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 11 Mar 2024 - 19 Jul 2024)
Contains public sector information licensed under the Open Government Licence v3.0.