ROADWORKS SUMMARY
Manor Lane, WOTTON-UNDER-EDGE, GL12 8TN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Manor Lane, GL12 8TN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Manor Lane, WOTTON-UNDER-EDGE, GL12 8TN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Manor Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
9 Nov 2026
Details
View Map
Share
Follow
Little Bristol Lane

Network Rail are carrying out Works for Rail Purposes on Little Bristol Lane, Charfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 06:00 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 2 Jul 2026 at 12:51.

Severn Trent Water logo
LONG TERM
Until
13 Nov 2026
Details
View Map
Share
Follow
Woodfield Road

Severn Trent Water are carrying out Utility asset works on Woodfield Road, Cam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2026 at 11:00 and could run through until 13 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 1 Jun 2026 at 09:12.

South Gloucestershire Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Grovesend.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 May 2026 at 06:00 and could run through until 31 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 22 May 2026 at 14:02.

South Gloucestershire Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Grovesend.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 May 2026 at 07:45 and could run through until 31 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 22 May 2026 at 14:03.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
15 Dec 2026
Details
View Map
Share
Follow
France Lane

Western Power Distribution (West Midlands) are carrying out Utility asset works on France Lane, Hawkesbury Upton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 11:00 and could run through until 15 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Aug 2026 at 12:34.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
15 Dec 2026
Details
View Map
Share
Follow
Park Street

Western Power Distribution (West Midlands) are carrying out Utility asset works on Park Street, Hawkesbury Upton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 11:00 and could run through until 15 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Aug 2026 at 12:35.

Severn Trent Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lane To Hystfield

Severn Trent Water are carrying out Utility repair and maintenance works on Lane To Hystfield, Stone, Berkeley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 09:38 and could run through until 21 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2026 at 14:29.

Severn Trent Water logo
LONG TERM
Until
21 Oct 2026
Details
View Map
Share
Follow
The Quarry

Severn Trent Water are carrying out Utility asset works on The Quarry, Cam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 09:37 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Aug 2026 at 09:54.

Severn Trent Water logo
LONG TERM
Until
15 Oct 2026
Details
View Map
Share
Follow
Yew Tree Close

Severn Trent Water are carrying out Utility asset works on Yew Tree Close, Cam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 08:32 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Aug 2026 at 09:54.

Wessex Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Alkington Farm

Wessex Water are proposing to carry out Utility asset works on Alkington Farm, Newport, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 19 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 3 Aug 2026 at 10:10.

South Gloucestershire Council logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
Little Bristol Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Little Bristol Lane, Charfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 27 Jan 2025 at 14:42.

Gloucestershire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Chase Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Chase Lane, Wickwar, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 23 Jun 2026 at 09:15.

Gloucestershire County Council logo
Today
Details
View Map
Share
Chase Lane

Gloucestershire County Council carried out Highway improvement works on Chase Lane, Wickwar, Wotton-under-edge.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 15 Sep 2026 and 17 Sep 2026 and were actually completed between 15 Sep 2026 (14:27) and 17 Sep 2026 (08:57). The works impacted the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 17 Sep 2026 at 09:02.

South Gloucestershire Council logo
LONG TERM
Between
25 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Grovesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 26 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 Jul 2026 at 10:58.

South Gloucestershire Council logo
Between
28 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Tytherington Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Tytherington Road, Thornbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 24 Jul 2026 at 11:50.

South Gloucestershire Council logo
Between
28 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Grovesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 24 Jul 2026 at 11:50.

South Gloucestershire Council logo
Between
28 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Grovesend Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Grovesend Road, Thornbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 24 Jul 2026 at 11:44.

Gloucestershire County Council logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Standle Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Standle Lane, Stinchcombe, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 17 Sep 2026 at 10:14.

Gloucestershire County Council logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Standle Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Standle Lane, Stinchcombe, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Aug 2026 at 09:29.

Gloucestershire County Council logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Road To The Croft Off Clingre Lane Stinchcombe

Gloucestershire County Council are proposing to carry out Highway improvement works on Road To The Croft Off Clingre Lane Stinchcombe, Stinchcombe, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Aug 2026 at 09:29.

Gloucestershire County Council logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Echo Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Echo Lane, Stinchcombe, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Aug 2026 at 09:29.

Gloucestershire County Council logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Echo Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Echo Lane, Stinchcombe, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 17 Sep 2026 at 10:12.

Gloucestershire County Council logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Road To The Croft Off Clingre Lane Stinchcombe

Gloucestershire County Council are proposing to carry out Highway improvement works on Road To The Croft Off Clingre Lane Stinchcombe, Stinchcombe, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 17 Sep 2026 at 10:12.

BT logo
Between
20 and 22 Oct 2026
Details
View Map
Share
Follow
Westend Road

BT are proposing to carry out Utility asset works on Westend Road, Wickwar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 22 October 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 25 Jun 2026 at 09:41.

BT logo
Between
20 and 22 Oct 2026
Details
View Map
Share
Follow
Chase Hill

BT are proposing to carry out Utility asset works on Chase Hill, Inglestone Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 22 October 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 26 Jun 2026 at 11:05.

Gloucestershire County Council logo
LONG TERM
Between
23 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Kingsdown

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Kingsdown, Dursley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 2 Sep 2026 at 09:54.

South Gloucestershire Council logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Station Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Station Road, Charfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 14 Aug 2026 at 13:54.

Wessex Water logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Road From A38 To The Yews

Wessex Water are proposing to carry out Utility repair and maintenance works on Road From A38 To The Yews, Stone, Berkeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Aug 2026 at 11:39.

Network Rail logo
Between
30 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Road From Railway Bridge To Road Green

Network Rail are proposing to carry out roadworks on Road From Railway Bridge To Road Green, Blanchworth, Stinchcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Aug 2026 at 08:55.

Network Rail logo
Between
30 Oct and 1 Nov 2026
Details
View Map
Share
A38 Junction To Railway Bridge

Network Rail were proposing to carry out Works for Rail Purposes on A38 Junction To Railway Bridge, Heathfield, Alkington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2026 and run through until 1 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2026 at 11:12.

Network Rail logo
Between
30 Oct and 1 Nov 2026
Details
View Map
Share
Follow
A38 Junction To Railway Bridge

Network Rail are proposing to carry out Works for Rail Purposes on A38 Junction To Railway Bridge, Heathfield, Alkington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Aug 2026 at 09:02.

Bristol Waterworks Company logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Follow
The Furlongs To Burden Court Farm

Bristol Waterworks Company are proposing to carry out Utility asset works on The Furlongs To Burden Court Farm, Tresham, Wotton-under-edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 18 Aug 2026 at 11:26.

BT logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Baden Hill Road

BT are proposing to carry out Utility asset works on Baden Hill Road, Tytherington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Aug 2026 at 10:09.

Bristol Waterworks Company logo
Between
16 and 27 Nov 2026
Details
View Map
Share
Follow
Kilcott Road

Bristol Waterworks Company are proposing to carry out Utility asset works on Kilcott Road, Hillesley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 17 Aug 2026 at 12:43.

BT logo
Between
16 and 19 Nov 2026
Details
View Map
Share
Follow
Baden Hill Road

BT are proposing to carry out Utility asset works on Baden Hill Road, Tytherington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Aug 2026 at 15:12.

BT logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Leechpool Way

BT are proposing to carry out Utility asset works on Leechpool Way, Yate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2026 at 08:10.

Gloucestershire County Council logo
Between
24 and 27 Nov 2026
Details
View Map
Share
Follow
Hill Mill Lane

Gloucestershire County Council are proposing to carry out Works for road purposes on Hill Mill Lane, Ozleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 27 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 9 Sep 2026 at 09:56.

Severn Trent Water logo
Between
24 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Woodend Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodend Lane, Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 18 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 29 Jul 2026 at 15:19.

Gloucestershire County Council logo
Between
24 and 27 Nov 2026
Details
View Map
Share
Follow
Hill Mill Lane

Gloucestershire County Council are proposing to carry out Works for road purposes on Hill Mill Lane, Ozleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 27 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 15 Sep 2026 at 10:59.

Gloucestershire County Council logo
Between
26 Nov and 1 Dec 2026
Details
View Map
Share
Follow
Somerset Close

Gloucestershire County Council are proposing to carry out Highway improvement works on Somerset Close, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 17 Aug 2026 at 11:02.

Gloucestershire County Council logo
Between
26 Nov and 1 Dec 2026
Details
View Map
Share
Follow
Wickwar Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Wickwar Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 17 Aug 2026 at 13:17.

BT logo
Between
26 and 30 Nov 2026
Details
View Map
Share
Follow
Hall End Lane

BT are proposing to carry out Utility asset works on Hall End Lane, Wickwar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 30 November 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Sep 2026 at 12:35.

Western Power Distribution (West Midlands) logo
Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Kingswood Footpath 53

Western Power Distribution (West Midlands) are proposing to carry out Disconnection or alteration of supply on Kingswood Footpath 53, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footpath only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Sep 2026 at 12:52.

BT logo
Between
2 and 15 Dec 2026
Details
View Map
Share
Follow
Box Walk

BT are proposing to carry out Utility asset works on Box Walk, Tortworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 15 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 8 Sep 2026 at 12:10.

BT logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Box Walk

BT are proposing to carry out Utility asset works on Box Walk, Tortworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 14 Sep 2026 at 12:15.

BT logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Box Walk

BT are proposing to carry out Utility asset works on Box Walk, Tortworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2026 at 14:15.

BT logo
Between
7 and 9 Dec 2026
Details
View Map
Share
Follow
Westend Road

BT are proposing to carry out Utility asset works on Westend Road, Wickwar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 14 Sep 2026 at 08:39.

BT logo
Between
7 and 9 Dec 2026
Details
View Map
Share
Follow
Westend Road

BT are proposing to carry out Utility asset works on Westend Road, Wickwar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Sep 2026 at 14:24.

BT logo
Between
15 and 17 Dec 2026
Details
View Map
Share
Follow
Hawkesbury Hill

BT are proposing to carry out Utility asset works on Hawkesbury Hill, Hawkesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2026 and could run through until 17 December 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 19 Aug 2026 at 11:11.

BT logo
Between
15 and 17 Dec 2026
Details
View Map
Share
Follow
Church Lane

BT are proposing to carry out Utility asset works on Church Lane, Hawkesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2026 and could run through until 17 December 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 19 Aug 2026 at 11:11.


Roadworks Map near to Manor Lane, WOTTON-UNDER-EDGE, GL12 8TN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Sep 2026 14:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Manor Lane, WOTTON-UNDER-EDGE, GL12 8TN (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
WOODLANDS ROAD 
(0.2 miles)
BT
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 17 Sep 2026 - 18 Sep 2026
0.2
Details
Share
Follow
2
South Gloucestershire Council logo
MAJOR
  
LITTLE BRISTOL LANE 
(0.3 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 14 Sep 2026 - 18 Dec 2026
0.3
Details
Share
Follow
3
Network Rail logo
MAJOR
  
LITTLE BRISTOL LANE 
(0.3 miles)
Network Rail
Works for Rail Purposes - Carriageway - Lane closure
In Progress
Since: 19 Aug 2025 06:00
(Scheduled: 19 Aug 2025 - 9 Nov 2026)
0.3
Details
Share
Follow
4
South Gloucestershire Council logo
MAJOR
  
STATION ROAD 
(0.4 miles)
South Gloucestershire Council
Highway improvement works - Footway, Carriageway, Verge - Priority working
In Progress
Since: 2 Jun 2025 09:30
(Scheduled: 2 Jun 2025 - 29 Jan 2027)
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.