ROADWORKS SUMMARY
Sunny Bank, BARNSTAPLE, EX32 8LD
Introduction
View current and future planned roadworks and road closures for Sunny Bank, EX32 8LD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Sunny Bank, BARNSTAPLE, EX32 8LD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Sunny Bank are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Devon County Council are carrying out Highway improvement works on North Devon Link Road, South Molton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 July 2021 at 19:00 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 16 May 2024 at 14:47.
31 Mar 2025
Devon County Council are carrying out Highway improvement works on North Devon Link Road, South Molton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2021 at 19:00 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Devon County Council on 16 May 2024 at 14:12.
31 Mar 2026
Devon County Council are carrying out Highway repair and maintenance works on Venn Road, Barnstaple.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 April 2024 at 23:00 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 11 Apr 2024 at 13:57.
2 Sep 2024 and 30 Jun 2025
Devon County Council are proposing to carry out Highway improvement works on Braunton Road, Barnstaple.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Devon County Council on 4 Jun 2024 at 09:45.
15 Sep 2024 and 27 Jun 2025
Devon County Council are proposing to carry out Highway improvement works on Road From Barnstaple By Pass To Old Bideford Road, Roundswell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2024 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Devon County Council on 19 Apr 2024 at 13:39.
15 Nov and 30 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Bickington Road, Bickington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 09:53.
15 Nov and 30 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Road From Church Hill To Combrew Lane, Fremington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 09:55.
15 Nov and 30 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Combrew Lane, Bickington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Sep 2024 at 09:14.
15 Nov and 30 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Bickington Road, Bickington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2024 and run through until 30 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 09:43.
15 Nov and 30 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Road From Church Hill To Combrew Lane, Fremington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2024 and run through until 30 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 09:49.
17 Dec 2024 and 15 Jan 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Fishleigh Road, Roundswell Business Park, Roundswell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by Western Power Distribution (South West) on 28 Aug 2024 at 17:27.
17 Dec 2024 and 15 Jan 2025
Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Road From Barnstaple By Pass To Old Bideford Road, Roundswell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by Western Power Distribution (South West) on 28 Aug 2024 at 17:28.
31 Dec 2024 and 4 Jan 2025
Devon County Council are proposing to carry out Section 50 on Seven Brethren Bank, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 December 2024 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 11 Sep 2024 at 09:36.
2 and 15 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Victoria Road, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 28 Oct 2024 at 15:58.
2 and 28 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Victoria Road, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 30 Oct 2024 at 14:41.
5 and 17 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Eastacombe Cross To Collabear Corner, Tawstock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 19 Sep 2024 at 10:23.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Bickington Road, Bickington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Nov 2024 at 10:55.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Road From Church Hill To Combrew Lane, Fremington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Dec 2024 at 13:27.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bickington Road, Bickington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Dec 2024 at 13:25.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Road From Church Hill To Combrew Lane, Fremington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Nov 2024 at 11:35.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Road From Church Hill To Combrew Lane, Fremington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Nov 2024 at 16:22.
6 Jan and 28 Mar 2025
Devon County Council are proposing to carry out Highway improvement works on Braunton Road, Barnstaple.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Devon County Council on 12 Dec 2024 at 09:25.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Road From Church Hill To Combrew Lane, Fremington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Dec 2024 at 13:23.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bickington Road, Bickington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Nov 2024 at 16:17.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bickington Road, Bickington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Dec 2024 at 13:18.
6 Jan and 2 May 2025
Devon County Council are proposing to carry out Highway improvement works on Sticklepath Terrace, Sticklepath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Devon County Council on 4 Jun 2024 at 10:06.
6 Jan and 2 May 2025
Devon County Council are proposing to carry out Highway improvement works on Busway From Station Road To Sticklepath Hill, Barnstaple.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Devon County Council on 25 Jun 2024 at 15:18.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Road From Church Hill To Combrew Lane, Fremington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 Oct 2024 at 12:23.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Road From Church Hill To Combrew Lane, Fremington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Nov 2024 at 16:20.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bickington Road, Bickington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Nov 2024 at 11:35.
6 and 8 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Higher Road, Fremington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 7 Oct 2024 at 11:23.
13 Jan and 7 Mar 2025
Devon County Council are proposing to carry out Highway improvement works on Alexandra Road, Barnstaple.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Devon County Council on 25 Nov 2024 at 11:57.
13 and 22 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Old School Lane To Lydacott Cross, Fremington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 10 Oct 2024 at 15:37.
13 and 17 Jan 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Barnstaple By Pass, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 9 Oct 2024 at 12:15.
14 and 16 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Lane Past Barn Lane Farm, Stoke Rivers.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 27 Sep 2024 at 11:32.
14 and 16 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Lane Past Barn Lane Farm, Stoke Rivers.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 12 Dec 2024 at 10:57.
15 and 28 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Road From Alexandra Road To Victoria Road, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 30 Oct 2024 at 14:43.
15 and 28 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Road From Alexandra Road To Victoria Road, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 28 Oct 2024 at 15:59.
16 Jan and 17 Feb 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on North Road, Barnstaple.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 17 Dec 2024 at 11:21.
23 Jan and 4 Feb 2025
ESP Electricity were proposing to carry out New service connection on Road From Barnstaple By Pass To Old Bideford Road, Roundswell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 January 2025 and run through until 4 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by ESP Electricity on 14 Oct 2024 at 09:15.
3 and 7 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lower Park Road, Braunton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 16:03.
3 and 13 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lower Park Road, Braunton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 5 Dec 2024 at 15:44.
3 Feb and 7 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belle Meadow Road, Barnstaple.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 09:13.
3 Feb and 11 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belle Meadow Road, Barnstaple.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 09:16.
5 Feb and 11 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belle Meadow Road, Barnstaple.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 13 Nov 2024 at 15:47.
10 and 14 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on Grosvenor Street, Barnstaple.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by South West Water on 5 Nov 2024 at 11:36.
10 and 14 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Grosvenor Street, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 5 Nov 2024 at 13:46.
10 Feb and 12 Mar 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on North Road, Barnstaple.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 25 Oct 2024 at 11:54.
17 and 28 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Bicton Street, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 3 Dec 2024 at 15:04.
17 and 27 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lower Park Road, Braunton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 14 Nov 2024 at 10:00.
17 and 28 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on Victoria Street, Barnstaple.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 20 Nov 2024 at 15:29.
17 and 28 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on Victoria Street, Barnstaple.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 21 Nov 2024 at 12:00.
17 and 28 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on Victoria Street, Barnstaple.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 12 Dec 2024 at 14:55.
19 and 21 Feb 2025
BT are proposing to carry out Utility asset works on Road From Plaistow Mills To Tollbar Cross, Shirwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 27 Nov 2024 at 15:01.
19 and 21 Feb 2025
BT are proposing to carry out Utility asset works on Road From Indicott Cross To Rose Cottages, Muddiford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 27 Nov 2024 at 15:02.
20 Feb and 5 Mar 2025
ESP Electricity were proposing to carry out New service connection on Road From Barnstaple By Pass To Old Bideford Road, Roundswell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 5 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by ESP Electricity on 13 Nov 2024 at 12:36.
24 and 26 Feb 2025
Western Power Distribution (Telecoms) were proposing to carry out Utility asset works on Sanders Lane, Bishops Tawton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 12 Dec 2024 at 10:49.
2 and 9 Mar 2025
BT are proposing to carry out Utility asset works on Broadclose Road, Sticklepath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 March 2025 and could run through until 9 March 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 4 Dec 2024 at 15:55.
2 and 9 Mar 2025
BT are proposing to carry out Utility asset works on Broadclose Road, Sticklepath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 March 2025 and could run through until 9 March 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 3 Dec 2024 at 14:24.
3 and 14 Mar 2025
Devon County Council are proposing to carry out Highway improvement works on Alexandra Road, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 28 Oct 2024 at 11:23.
3 Mar and 4 Jul 2025
Devon County Council are proposing to carry out Highway improvement works on Barnstaple By Pass, Barnstaple.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Devon County Council on 27 Nov 2024 at 10:07.
3 and 5 Mar 2025
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Sanders Lane, Bishops Tawton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 17 Dec 2024 at 14:27.
3 and 14 Mar 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Bear Street, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 28 Oct 2024 at 10:47.
3 Mar and 4 Jul 2025
Devon County Council are proposing to carry out Highway improvement works on Road From Woodstrait To Tithe Barn Court Farm, Bishops Tawton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Devon County Council on 27 Nov 2024 at 10:12.
3 Mar and 4 Jul 2025
Devon County Council are proposing to carry out Highway improvement works on Bishops Tawton Road, Barnstaple.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Devon County Council on 27 Nov 2024 at 10:13.
6 and 10 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on Vicarage Street, Barnstaple.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 March 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 2 Dec 2024 at 10:00.
6 and 10 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on Vicarage Street, Barnstaple.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 March 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 3 Dec 2024 at 15:06.
6 and 11 Mar 2025
Devon County Council are proposing to carry out Highway repair and maintenance works on Road From Week Lane End To Chapelton Cross, Chapelton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 21 Aug 2024 at 10:09.
10 and 21 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on Victoria Street, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 16 Dec 2024 at 11:43.
10 and 18 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on West Yelland, Yelland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 9 Dec 2024 at 14:34.
10 and 21 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on West Yelland, Yelland.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Dec 2024 at 09:19.
10 and 21 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on West Yelland, Yelland.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 29 Nov 2024 at 14:03.
17 and 21 Mar 2025
Devon County Council are proposing to carry out Highway improvement works on Braunton Road, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Devon County Council on 17 Dec 2024 at 15:12.
17 and 28 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on Bicton Street, Barnstaple.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 3 Dec 2024 at 11:35.
Roadworks Map near to Sunny Bank, BARNSTAPLE, EX32 8LD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Sunny Bank, BARNSTAPLE, EX32 8LD (20 Events)
(Scheduled Dates)
(miles)
(Scheduled: 13 Dec 2024 - 20 Dec 2024)
(Scheduled: 12 Dec 2024 - 24 Dec 2024)
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
(Scheduled: 17 Dec 2024 - 23 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.