ROADWORKS SUMMARY
Nash Lane, STOURBRIDGE, DY9 9SW
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for Nash Lane, DY9 9SW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Nash Lane, STOURBRIDGE, DY9 9SW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Nash Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
8 Oct 2025
Worcestershire County Council are carrying out Highway improvement works on Stratford Road, Bromsgrove.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 June 2024 at 07:30 and could run through until 8 October 2025. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 10 Sep 2024 at 15:47.
6 Jan and 25 Mar 2025
Worcestershire County Council are proposing to carry out Section 50 on Perryfields Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Worcestershire County Council on 30 Oct 2024 at 15:20.
9 Apr 2025
Worcestershire County Council are carrying out Section 50 on Perryfields Road, Bromsgrove.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:00 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 6 Jan 2025 at 13:16.
6 Jan and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 17 Jul 2024 at 09:54.
7 Mar 2025
Cadent Gas are carrying out Utility asset works on Racecourse Lane, Norton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:40 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 08:56.
7 Mar 2025
BT are carrying out Utility asset works on Albert Road, Bromsgrove.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 09:30 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 13 Jan 2025 at 10:23.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Banners Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 10:14.
21 Jan and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.
20 Jun 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on Walker Avenue, Wollescote.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 07:30 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Feb 2025 at 16:17.
30 Mar 2025
Network Rail are carrying out Works for Rail Purposes on Redlake Road, Stourbridge.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 February 2025 at 01:00 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 3 Feb 2025 at 09:51.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Churchfields Road, Bromsgrove.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2024 at 08:22.
3 Feb and 11 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Catshill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:24.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Long Innage, Cradley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 09:30 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 09:35.
Tuesday
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:08.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 09:30 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 09:34.
10 Feb and 5 May 2025
BT were proposing to carry out Utility asset works on Albert Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 11 Nov 2024 at 11:35.
Friday
Cadent Gas are proposing to carry out Utility asset works on Pennine Way, Amblecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:20.
11 Feb and 5 May 2025
BT are proposing to carry out Utility asset works on Albert Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 5 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Nov 2024 at 14:05.
Friday
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Littleheath Lane, Lickey End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 20 Nov 2024 at 14:15.
16 and 23 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.
16 and 23 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.
16 and 23 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.
16 and 23 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.
16 and 23 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Racecourse Lane, Norton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 11:00.
17 Feb and 24 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Kidderminster Road, Bromsgrove.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 24 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 13:49.
Thursday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 12:50.
Thursday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 15:24.
Friday
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Alcester Road, Lickey End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 27 Aug 2024 at 14:51.
Wednesday
Cadent Gas are proposing to carry out Remedial works on Holy Cross Lane, Holy Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 14:07.
Wednesday
Cadent Gas are proposing to carry out Remedial works on Holy Cross Lane, Holy Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 14:30.
Wednesday
Cadent Gas are proposing to carry out Remedial works on Stakenbridge Lane, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 16:07.
Wednesday
Cadent Gas are proposing to carry out Remedial works on Stakenbridge Lane, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 13:05.
17 Feb and 7 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Worcester Road, West Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:30.
Wednesday
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Grange Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 23 Sep 2024 at 14:37.
Wednesday
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Grange Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 30 Jan 2025 at 12:09.
17 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Pennine Way, Amblecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 07:23.
Friday
Cadent Gas are proposing to carry out New service connection on Barley Mow Lane, Catshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 12:02.
18 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Long Innage, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:39.
18 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:13.
18 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:40.
20 Feb and 1 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 14:56.
20 Feb and 3 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 13:13.
Saturday
Severn Trent Water are proposing to carry out New service connection on Caunsall Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 13:32.
Saturday
Severn Trent Water are proposing to carry out New service connection on Caunsall Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 13:29.
21 Feb and 6 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Drayton, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:32.
21 Feb and 6 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:33.
24 and 26 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brookhouse Road, Barnt Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:01.
24 and 26 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brookhouse Road, Barnt Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Oct 2024 at 15:54.
24 Feb and 2 May 2025
Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Catshill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 15:27.
24 Feb and 21 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Kidderminster Road South, Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:28.
24 Feb and 6 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:45.
24 Feb and 6 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:41.
26 Feb and 11 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Rushock, Droitwich Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 13:08.
26 Feb and 11 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Rushock, Droitwich Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 13:52.
26 Feb and 11 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 13:07.
26 Feb and 11 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 13:51.
26 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hill Pool, Chaddesley Corbett, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 15:57.
26 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Egg Lane, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:20.
28 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:14.
28 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:41.
3 and 5 Mar 2025
Severn Trent Water were proposing to carry out New service connection on Fockbury Road, Dodford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 11:55.
3 Mar and 25 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Lodge Ford Hill, Chaddesley Corbett.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 10:45.
3 Mar and 2 May 2025
Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Lodge Ford Hill, Chaddesley Corbett.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 13:00.
3 Mar and 2 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Lodge Ford Hill, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 20 Jan 2025 at 13:52.
3 Mar and 2 May 2025
Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Fox Lane, Chaddesley Corbett.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 2 May 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 13:04.
3 Mar and 2 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Fox Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 20 Jan 2025 at 13:52.
3 Mar and 25 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Fox Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 27 Jan 2025 at 13:07.
3 Mar and 25 Apr 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Kidderminster Road, Chaddesley Corbett.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 11:18.
3 and 14 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Harvington Hall Lane, Harvington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 27 Jan 2025 at 14:12.
3 and 14 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Harvington Hall Lane, Harvington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Jan 2025 at 15:17.
3 and 6 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Churchill Lane, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 12:52.
3 Mar and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Road, Clent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 11:23.
3 Mar and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Road, West Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 12:05.
3 and 28 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Churchill Lane, Churchill, Kidderminster.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 16:19.
3 Mar and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:45.
3 Mar and 18 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:43.
6 and 17 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 12:04.
6 and 17 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 12:06.
7 and 19 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Berry Lane, Upton Warren.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 13:22.
7 and 20 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Drayton, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 13 Dec 2024 at 13:34.
7 and 20 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 13 Dec 2024 at 12:33.
10 and 21 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Berry Lane, Upton Warren.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:12.
10 and 28 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Pennine Road, Bromsgrove.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 10:23.
10 and 28 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Pennine Road, Bromsgrove.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 09:02.
10 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Pennine Road, Bromsgrove.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 14:52.
10 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Pennine Road, Bromsgrove.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 08:46.
10 and 13 Mar 2025
Cadent Gas are proposing to carry out New service connection on Barley Mow Lane, Catshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 15:47.
10 and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Churchill Lane, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Feb 2025 at 14:44.
10 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on St Marks Road, Lye.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:10.
12 and 14 Mar 2025
Severn Trent Water were proposing to carry out Remedial works on Berry Lane, Upton Warren.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 09:18.
17 and 31 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Lodge Ford Hill, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 12:49.
17 and 26 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hill Pool, Chaddesley Corbett, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 20 Jan 2025 at 08:45.
17 and 26 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Egg Lane, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 16:06.
17 and 31 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Crown Lane, Iverley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 16:20.
17 and 28 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Compton Road, Pedmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 14:42.
24 and 26 Mar 2025
Severn Trent Water are proposing to carry out Remedial works on Berry Lane, Upton Warren.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 16:00.
24 Mar and 20 May 2025
Cadent Gas are proposing to carry out Utility asset works on South Road, Norton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 20 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 07:25.
26 Mar and 16 May 2025
Worcestershire County Council are proposing to carry out Section 50 on King Edward Road, Bromsgrove.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 30 Oct 2024 at 15:22.
26 Mar and 16 May 2025
Worcestershire County Council were proposing to carry out Section 50 on King Edward Road, Bromsgrove.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 March 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 12 Nov 2024 at 10:51.
26 Mar and 16 May 2025
Worcestershire County Council are proposing to carry out Section 50 on King Edward Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 20 Nov 2024 at 16:12.
28 Mar and 10 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Causeway, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 18 Dec 2024 at 12:35.
28 Mar and 10 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Causeway, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 18 Dec 2024 at 15:39.
31 Mar and 11 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Jan 2025 at 11:10.
31 Mar and 11 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Jan 2025 at 14:16.
31 Mar and 11 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Cookley, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Jan 2025 at 11:10.
31 Mar and 11 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Cookley, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Jan 2025 at 14:17.
31 Mar and 11 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Island Pool, Cookley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Jan 2025 at 11:11.
31 Mar and 11 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Island Pool, Cookley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Jan 2025 at 14:18.
1 and 14 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Hill, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 18 Dec 2024 at 12:33.
1 and 14 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Hill, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 19 Dec 2024 at 10:45.
2 and 15 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Causeway, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 16 Dec 2024 at 13:53.
2 and 15 Apr 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Causeway, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Dec 2024 at 13:39.
7 and 25 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Hinton Fields, Catshill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:30.
14 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Stourbridge Road, Catshill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 16 Dec 2024 at 14:35.
14 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Stourbridge Road, Catshill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 17 Dec 2024 at 13:23.
14 and 16 Apr 2025
Severn Trent Water are proposing to carry out New service connection on Fockbury Road, Dodford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 12:44.
14 and 16 Apr 2025
Severn Trent Water are proposing to carry out New service connection on Fockbury Road, Dodford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 3 Dec 2024 at 09:12.
14 Apr and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Grange Lane, Stourbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 12:11.
14 Apr and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Grange Lane, Stourbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 12:37.
21 Apr and 16 May 2025
Cadent Gas were proposing to carry out Utility asset works on Meadow Road, Catshill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:26.
24 Apr and 14 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Warbage Lane, Dodford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 09:38.
24 Apr and 14 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Warbage Lane, Dodford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Jan 2025 at 16:39.
24 Apr and 13 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Twatling Road, Barnt Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 14:51.
24 Apr and 13 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Twatling Road, Barnt Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Jan 2025 at 09:25.
24 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 15:26.
24 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Jan 2025 at 09:42.
25 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Littleheath Lane, Lickey End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 14:55.
25 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Littleheath Lane, Lickey End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Jan 2025 at 09:41.
26 Apr and 14 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Oxwood Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 8 Jan 2025 at 13:15.
26 Apr and 14 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Oxwood Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:38.
26 Apr and 14 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Frankley Green, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 8 Jan 2025 at 13:11.
26 Apr and 14 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Frankley Green, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:41.
26 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Frankley Hill Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 09:43.
26 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Frankley Hill Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:43.
26 Apr and 14 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Frankley Green Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 8 Jan 2025 at 13:13.
26 Apr and 14 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Frankley Green Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:37.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Chapmans Hill Farm Road, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 15:05.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Chapmans Hill Farm Road, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 14:42.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Chapmans Hill, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 15:02.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Chapmans Hill, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 14:42.
27 Apr and 16 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Old House Lane, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 13:35.
27 Apr and 16 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Old House Lane, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:51.
27 Apr and 16 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Dayhouse Bank, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 13:33.
27 Apr and 16 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Dayhouse Bank, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:50.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Newtown Lane, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 13:44.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Newtown Lane, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Jan 2025 at 16:12.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Yew Tree Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 09:50.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Yew Tree Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:49.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Pound Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 09:46.
27 Apr and 15 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Pound Lane, Frankley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:44.
27 Apr and 15 May 2025
Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Hall Drive, Hagley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 April 2025 and run through until 15 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Jan 2025 at 10:32.
28 Apr and 16 May 2025
Cadent Gas were proposing to carry out Utility asset works on Hinton Fields, Catshill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 15:33.
28 Apr 2025 and 30 Apr 2027
Severn Trent Water were proposing to carry out Utility asset works on Rocky Lane, Bournheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 30 April 2027. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 09:42.
28 Apr and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Wolverhampton Road, Kidderminster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 15:11.
28 Apr and 12 May 2025
Cadent Gas are proposing to carry out Utility asset works on Briery Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 10:51.
29 Apr and 1 May 2025
South Staffordshire Water are proposing to carry out New service connection on Spring Lane, Romsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Staffordshire Water on 7 Feb 2025 at 11:37.
30 Apr and 2 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heath Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 3 Feb 2025 at 09:36.
30 Apr and 2 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heath Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 6 Feb 2025 at 11:44.
30 Apr and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on South Road, Norton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 25 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 14:19.
2 and 23 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Western Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 4 Feb 2025 at 10:01.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Drayton, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 14:50.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Drayton, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Jan 2025 at 15:13.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 14:49.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:55.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Holy Cross Green To Broome Lane, Holy Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 15:47.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Holy Cross Green To Broome Lane, Holy Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:53.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Holy Cross Green, Holy Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Jan 2025 at 15:49.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Holy Cross Green, Holy Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Jan 2025 at 08:54.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jan 2025 at 15:11.
3 and 26 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Feb 2025 at 11:06.
5 and 23 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Deansford Lane, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 4 Feb 2025 at 13:44.
5 and 23 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Deansford Lane, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Feb 2025 at 13:42.
6 and 27 May 2025
Cadent Gas are proposing to carry out Utility asset works on Old Birmingham Road, Lickey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 10:00.
6 and 9 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on James Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Feb 2025 at 10:36.
6 and 9 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on James Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Feb 2025 at 13:03.
6 and 8 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Austcliffe Lane, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 26 Jan 2025 at 10:52.
12 May 2025 and 14 May 2027
Severn Trent Water are proposing to carry out Utility asset works on Rocky Lane, Bournheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2027. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Feb 2025 at 11:41.
12 May and 6 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Meadow Road, Catshill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 15:34.
12 and 23 May 2025
Cadent Gas were proposing to carry out Utility asset works on Wildmoor Lane, Catshill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 15:36.
12 and 23 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Worcester Road, West Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 12 Feb 2025 at 10:51.
12 and 23 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Kidderminster Road South, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 12 Feb 2025 at 10:46.
12 and 23 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Worcester Road, West Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 12 Feb 2025 at 11:58.
12 and 23 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Kidderminster Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 12 Feb 2025 at 11:51.
12 and 14 May 2025
Severn Trent Water are proposing to carry out New service connection on Pargeter Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 12 Feb 2025 at 11:02.
12 and 14 May 2025
Severn Trent Water are proposing to carry out New service connection on Pargeter Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Feb 2025 at 12:15.
12 and 14 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brook Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Feb 2025 at 11:28.
12 and 14 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brook Street, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 6 Feb 2025 at 11:32.
16 May and 18 Jun 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Stourbridge Road, Catshill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 16 Dec 2024 at 15:15.
16 May and 18 Jun 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Stourbridge Road, Catshill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 17 Dec 2024 at 13:29.
Roadworks Map near to Nash Lane, STOURBRIDGE, DY9 9SW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Nash Lane, STOURBRIDGE, DY9 9SW (4 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.