ROADWORKS SUMMARY
Broadwater Drive, STOURBRIDGE, DY9 0JU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Broadwater Drive, DY9 0JU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Broadwater Drive, STOURBRIDGE, DY9 0JU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Broadwater Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Worcestershire County Council logo
LONG TERM
Until
30 Aug 2025
Details
View Map
Share
Follow
Lea Lane

Worcestershire County Council are carrying out Highway repair and maintenance works on Lea Lane, Cookley, Kidderminster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2021 at 00:01 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 2 Sep 2024 at 09:34.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Walker Avenue

Western Power Distribution (West Midlands) are carrying out Utility asset works on Walker Avenue, Wollescote.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 07:30 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Feb 2025 at 16:17.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:45.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:41.

Worcestershire County Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Quantry Lane

Worcestershire County Council are carrying out Highway repair and maintenance works on Quantry Lane, Belbroughton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 07:30 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 19 Mar 2025 at 11:58.

Severn Trent Water logo
LONG TERM
Between
28 Apr 2025 and 30 Apr 2027
Details
View Map
Share
Rocky Lane

Severn Trent Water were proposing to carry out Utility asset works on Rocky Lane, Bournheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 April 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 09:42.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
22 Jun 2025
Details
View Map
Share
Follow
Level Street

Transport for West Midlands (TfWM) are carrying out Utility asset works on Level Street, Brierley Hill.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 07:00 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 28 Apr 2025 at 10:09.

Cadent Gas logo
LONG TERM
Between
30 Apr and 25 Jun 2025
Details
View Map
Share
Follow
South Road

Cadent Gas are proposing to carry out Utility asset works on South Road, Norton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 25 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 14:19.

Cadent Gas logo
LONG TERM
Between
9 May and 20 Jun 2025
Details
View Map
Share
Follow
Meddins Lane

Cadent Gas are proposing to carry out Utility asset works on Meddins Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 13:29.

Cadent Gas logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Meddins Lane

Cadent Gas are carrying out Utility asset works on Meddins Lane, Kinver.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2025 at 10:30 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 10:35.

Severn Trent Water logo
LONG TERM
Between
12 May 2025 and 14 May 2027
Details
View Map
Share
Rocky Lane

Severn Trent Water were proposing to carry out Utility asset works on Rocky Lane, Bournheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 14 May 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Feb 2025 at 15:19.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Meadow Road

Cadent Gas were proposing to carry out Utility asset works on Meadow Road, Catshill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 15:34.

Cadent Gas logo
LONG TERM
Until
10 Jul 2025
Details
View Map
Share
Follow
Newfield Road

Cadent Gas are carrying out Utility asset works on Newfield Road, Hagley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 09:30 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 09:49.

Severn Trent Water logo
LONG TERM
Between
19 May 2025 and 21 May 2027
Details
View Map
Share
Rocky Lane

Severn Trent Water were proposing to carry out Utility asset works on Rocky Lane, Bournheath.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 21 May 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Mar 2025 at 09:38.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Nuthatch Drive

Cadent Gas are proposing to carry out Utility asset works on Nuthatch Drive, Quarry Bank.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 12:42.

Cadent Gas logo
LONG TERM
Between
19 May and 30 Jun 2025
Details
View Map
Share
Follow
Hillfields Road

Cadent Gas are proposing to carry out Utility asset works on Hillfields Road, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 12:39.

Cadent Gas logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Kittiwake Drive

Cadent Gas are proposing to carry out Utility asset works on Kittiwake Drive, Quarry Bank.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 12:41.

Worcestershire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Kidderminster Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Kidderminster Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Feb 2025 at 16:11.

Cadent Gas logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Foster Crescent

Cadent Gas were proposing to carry out Utility asset works on Foster Crescent, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 12:55.

Cadent Gas logo
Between
26 May and 23 Jun 2025
Details
View Map
Share
Kittiwake Drive

Cadent Gas were proposing to carry out Utility asset works on Kittiwake Drive, Quarry Bank.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 09:14.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
26 May and 6 Jul 2025
Details
View Map
Share
Follow
Level Street

Transport for West Midlands (TfWM) are proposing to carry out Utility asset works on Level Street, Brierley Hill.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 13 Mar 2025 at 09:34.

Cadent Gas logo
Until
18 Jun 2025
Details
View Map
Share
Follow
Quantock Drive

Cadent Gas are carrying out Utility asset works on Quantock Drive, Kidderminster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:30 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 11:15.

Cadent Gas logo
Until
18 Jun 2025
Details
View Map
Share
Follow
Elm Road

Cadent Gas are carrying out Utility asset works on Elm Road, Kidderminster.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:30 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 11:12.

Cadent Gas logo
LONG TERM
Between
28 May and 7 Jul 2025
Details
View Map
Share
Peartree Lane

Cadent Gas were proposing to carry out Utility asset works on Peartree Lane, Cradley Heath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 7 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 08:26.

Cadent Gas logo
Until
12 Jun 2025
Details
View Map
Share
Follow
Thicknall Rise

Cadent Gas are carrying out Utility asset works on Thicknall Rise, Hagley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:00 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 09:18.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Kidderminster Road South

Cadent Gas are carrying out Utility repair and maintenance works on Kidderminster Road South, Hagley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 15:53 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 07:41.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Stakenbridge Lane

Cadent Gas are carrying out Utility repair and maintenance works on Stakenbridge Lane, Hagley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 15:49 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 07:48.

Worcestershire County Council logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Clattercut Lane

Worcestershire County Council are carrying out Highway repair and maintenance works on Clattercut Lane, Rushock, Droitwich Spa.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 07:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Jun 2025 at 08:39.

Worcestershire County Council logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Clattercut Lane

Worcestershire County Council are carrying out Highway repair and maintenance works on Clattercut Lane, Chaddesley Corbett.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 07:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Jun 2025 at 08:38.

Worcestershire County Council logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Berry Lane

Worcestershire County Council are carrying out Highway repair and maintenance works on Berry Lane, Upton Warren.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 07:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Jun 2025 at 08:39.

Worcestershire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brook Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Brook Road, Fairfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 24 Feb 2025 at 10:13.

Worcestershire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brook Road

Worcestershire County Council are carrying out Highway repair and maintenance works on Brook Road, Fairfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Worcestershire County Council on 2 Jun 2025 at 09:08.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Grosvenor Avenue

Cadent Gas are proposing to carry out Utility asset works on Grosvenor Avenue, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 09:07.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Dark Lane

Staffordshire County Council are carrying out Highway improvement works on Dark Lane, Kinver.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:26 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Jun 2025 at 13:30.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Timmis Road

Cadent Gas were proposing to carry out Utility asset works on Timmis Road, Lye.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 10:16.

Worcestershire County Council logo
Between
8 and 27 Jun 2025
Details
View Map
Share
Follow
Clattercut Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Rushock, Droitwich Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 16 Jan 2025 at 16:01.

Worcestershire County Council logo
Between
8 and 27 Jun 2025
Details
View Map
Share
Follow
Clattercut Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Chaddesley Corbett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 16 Jan 2025 at 15:59.

Worcestershire County Council logo
Between
8 and 27 Jun 2025
Details
View Map
Share
Clattercut Lane

Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Clattercut Lane, Chaddesley Corbett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 16 Jan 2025 at 13:49.

Worcestershire County Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Dordale Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Dordale Road, Bournheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 25 Apr 2025 at 16:50.

Worcestershire County Council logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Wildmoor Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wildmoor Lane, Catshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 10 Mar 2025 at 09:55.

Worcestershire County Council logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Wildmoor Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wildmoor Lane, Catshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 10 Mar 2025 at 12:46.

Cadent Gas logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Lorne Street

Cadent Gas are proposing to carry out Utility asset works on Lorne Street, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 08:13.

Cadent Gas logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Offmore Road

Cadent Gas are proposing to carry out Utility asset works on Offmore Road, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 14:22.

Cadent Gas logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
The Deansway

Cadent Gas are proposing to carry out Utility asset works on The Deansway, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 14:34.

Severn Trent Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Walton Rise

Severn Trent Water are proposing to carry out Utility asset works on Walton Rise, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Severn Trent Water on 12 May 2025 at 09:25.

Severn Trent Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Walton Rise

Severn Trent Water are proposing to carry out Utility asset works on Walton Rise, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Severn Trent Water on 15 May 2025 at 11:35.

Worcestershire County Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Hagley Hill

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Hill, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 27 May 2025 at 15:38.

Worcestershire County Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Hagley Causeway

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Causeway, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 27 May 2025 at 15:35.

Worcestershire County Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Hagley Causeway

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Causeway, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 27 May 2025 at 15:34.

Cadent Gas logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Compton Road

Cadent Gas are proposing to carry out Utility asset works on Compton Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 17:10.

Cadent Gas logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Compton Road

Cadent Gas are proposing to carry out Utility asset works on Compton Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 18:22.

Worcestershire County Council logo
Between
10 and 30 Jun 2025
Details
View Map
Share
Follow
Berry Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Berry Lane, Upton Warren.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Jan 2025 at 13:02.

Worcestershire County Council logo
Between
13 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Hagley Hill

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Hill, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 3 Mar 2025 at 13:33.

Worcestershire County Council logo
Between
13 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Hagley Causeway

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Causeway, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Feb 2025 at 11:57.

Worcestershire County Council logo
Between
13 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Hagley Causeway

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hagley Causeway, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Feb 2025 at 12:01.

Worcestershire County Council logo
Between
13 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Wolverhampton Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Island Pool, Cookley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 27 Mar 2025 at 15:41.

Worcestershire County Council logo
Between
13 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Wolverhampton Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Island Pool, Cookley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 9 Apr 2025 at 15:04.

Cadent Gas logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Thicknall Lane

Cadent Gas are proposing to carry out Utility asset works on Thicknall Lane, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 13:06.

Cadent Gas logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Thicknall Lane

Cadent Gas are proposing to carry out Utility asset works on Thicknall Lane, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 14:02.

Cadent Gas logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Kidderminster Road South

Cadent Gas were proposing to carry out Utility asset works on Kidderminster Road South, Hagley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 14:39.

Cadent Gas logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Kidderminster Road South

Cadent Gas are proposing to carry out Utility asset works on Kidderminster Road South, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 11:02.

Cadent Gas logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Kidderminster Road South

Cadent Gas are proposing to carry out Utility asset works on Kidderminster Road South, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 15:28.

Severn Trent Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Lower High Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Lower High Street, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 1 Apr 2025 at 10:25.

Cadent Gas logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Nuthatch Drive

Cadent Gas were proposing to carry out Utility asset works on Nuthatch Drive, Quarry Bank.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 7 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 09:11.

Cadent Gas logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Kittiwake Drive

Cadent Gas were proposing to carry out Utility asset works on Kittiwake Drive, Quarry Bank.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:36.

Cadent Gas logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Kittiwake Drive

Cadent Gas are proposing to carry out Utility asset works on Kittiwake Drive, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 11:40.

Cadent Gas logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Belle Vue

Cadent Gas are proposing to carry out New service connection on Belle Vue, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 10:29.

Cadent Gas logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Belle Vue

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Belle Vue, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 11:06.

Worcestershire County Council logo
Between
18 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Hill Pool

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hill Pool, Chaddesley Corbett, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 11 Mar 2025 at 14:13.

Worcestershire County Council logo
Between
18 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Thicknall Farm Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Thicknall Farm Lane, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 31 Mar 2025 at 14:29.

Worcestershire County Council logo
Between
18 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Blakeshall Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Blakeshall Lane, Blakeshall, Wolverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 12 Mar 2025 at 11:24.

Worcestershire County Council logo
Between
18 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Blakeshall Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Blakeshall Lane, Blakeshall, Wolverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 19 Mar 2025 at 14:26.

Worcestershire County Council logo
Between
18 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Solcum Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Solcum Lane, Blakeshall, Wolverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 11 Mar 2025 at 11:26.

Worcestershire County Council logo
Between
18 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Solcum Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Solcum Lane, Blakeshall, Wolverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 20 Mar 2025 at 13:58.

South Staffordshire Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Colley Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Colley Lane, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 31 Mar 2025 at 12:55.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
22 Jun and 16 Aug 2025
Details
View Map
Share
Follow
Waterfront Way

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Waterfront Way, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 2 Jun 2025 at 09:29.

Cadent Gas logo
Between
23 Jun and 16 Jul 2025
Details
View Map
Share
Eastwood Drive

Cadent Gas were proposing to carry out Utility asset works on Eastwood Drive, Kidderminster.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 16 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 07:12.

Cadent Gas logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Churchill Lane

Cadent Gas were proposing to carry out Utility asset works on Churchill Lane, Churchill, Kidderminster.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 11:05.

Cadent Gas logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Churchill Lane

Cadent Gas were proposing to carry out Utility asset works on Churchill Lane, Churchill, Kidderminster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 10:29.

Staffordshire County Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Dark Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dark Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Mar 2025 at 12:18.

South Staffordshire Water logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Park Walk

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Park Walk, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the verge only.

This roadwork event was last updated by South Staffordshire Water on 22 Apr 2025 at 13:18.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
23 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Level Street

Transport for West Midlands (TfWM) are proposing to carry out Utility asset works on Level Street, Brierley Hill.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 25 Mar 2025 at 08:17.

Cadent Gas logo
Between
24 Jun and 18 Jul 2025
Details
View Map
Share
Belvedere Close

Cadent Gas were proposing to carry out Utility asset works on Belvedere Close, Kidderminster.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 18 July 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 07:12.

Cadent Gas logo
LONG TERM
Between
30 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 16:01.

Staffordshire County Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Hyde Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hyde Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Mar 2025 at 09:13.

Staffordshire County Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Wollaston Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wollaston Road, New Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Mar 2025 at 08:57.

Severn Trent Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Walton Pool

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Walton Pool, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 21 Mar 2025 at 15:20.

Severn Trent Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Walton Pool

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Walton Pool, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 25 Mar 2025 at 11:15.

Severn Trent Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Heath Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heath Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 May 2025 at 10:56.

Severn Trent Water logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Heath Lane

Severn Trent Water are proposing to carry out New service connection on Heath Lane, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Apr 2025 at 09:51.

Severn Trent Water logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Queens Hill

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Queens Hill, Belbroughton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 July 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Apr 2025 at 15:19.

Worcestershire County Council logo
Between
7 and 15 Jul 2025
Details
View Map
Share
Follow
Dordale Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Dordale Road, Bournheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 12 May 2025 at 11:28.

Severn Trent Water logo
Between
7 and 15 Jul 2025
Details
View Map
Share
Follow
Linden Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Linden Avenue, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Apr 2025 at 13:34.

Severn Trent Water logo
Between
7 and 15 Jul 2025
Details
View Map
Share
Follow
Linden Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Linden Avenue, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Apr 2025 at 14:10.

Severn Trent Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Holy Cross Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holy Cross Lane, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Apr 2025 at 15:29.

Severn Trent Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Holy Cross Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holy Cross Lane, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Apr 2025 at 11:47.

Cadent Gas logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Stakenbridge Lane

Cadent Gas were proposing to carry out Utility asset works on Stakenbridge Lane, Churchill, Kidderminster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 10:56.

Cadent Gas logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Crown Lane

Cadent Gas were proposing to carry out Utility asset works on Crown Lane, Iverley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 21 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 10:30.

Cadent Gas logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Crown Lane

Cadent Gas were proposing to carry out Utility asset works on Crown Lane, Iverley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 21 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 11:06.

Cadent Gas logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Woodman Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Woodman Lane, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 07:44.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Grange Lane

Cadent Gas were proposing to carry out Utility asset works on Grange Lane, Stourbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 14:59.

Cadent Gas logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Stone Lane

Cadent Gas were proposing to carry out Utility asset works on Stone Lane, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 16:51.

Cadent Gas logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Stone Lane

Cadent Gas are proposing to carry out Utility asset works on Stone Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 18:22.

Cadent Gas logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Stone Lane

Cadent Gas are proposing to carry out Utility asset works on Stone Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:07.

Severn Trent Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Lower High Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lower High Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 May 2025 at 10:19.

Severn Trent Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Lower High Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lower High Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 May 2025 at 11:16.

Severn Trent Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Lower High Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lower High Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Apr 2025 at 11:09.

Severn Trent Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Lower High Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Lower High Street, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 May 2025 at 09:51.

Severn Trent Water logo
Between
7 and 18 Jul 2025
Details
View Map
Share
High Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on High Street, Cradley Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Jun 2025 at 09:06.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Level Street

Transport for West Midlands (TfWM) are proposing to carry out Utility asset works on Level Street, Brierley Hill.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 13 Mar 2025 at 09:35.

Cadent Gas logo
Between
10 and 30 Jul 2025
Details
View Map
Share
Wollescote Road

Cadent Gas were proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 09:48.

Cadent Gas logo
Between
10 and 30 Jul 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:22.

Cadent Gas logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Lyndholm Road

Cadent Gas are proposing to carry out Utility asset works on Lyndholm Road, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 08:19.

Cadent Gas logo
LONG TERM
Between
14 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Chester Road North

Cadent Gas are proposing to carry out Utility asset works on Chester Road North, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 15:01.

Severn Trent Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Coventry Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coventry Street, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Apr 2025 at 14:47.

Severn Trent Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Coventry Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Coventry Street, Kidderminster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 May 2025 at 11:58.

Worcestershire County Council logo
Between
14 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Thicknall Farm Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Thicknall Farm Lane, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 2 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 6 May 2025 at 13:37.

Cadent Gas logo
Between
14 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Nuthatch Drive

Cadent Gas are proposing to carry out Utility asset works on Nuthatch Drive, Quarry Bank.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:33.

Severn Trent Water logo
Between
14 and 25 Jul 2025
Details
View Map
Share
High Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on High Street, Cradley Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Apr 2025 at 15:36.

Worcestershire County Council logo
Between
15 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Hill Pool

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hill Pool, Chaddesley Corbett, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 4 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 7 May 2025 at 09:24.

Between
15 and 21 Jul 2025
Details
View Map
Share
Follow
Redlake Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Redlake Road, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 15 Apr 2025 at 13:25.

Cadent Gas logo
Between
17 and 30 Jul 2025
Details
View Map
Share
Follow
Kidderminster Road South

Cadent Gas are proposing to carry out Utility asset works on Kidderminster Road South, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 12:30.

Cadent Gas logo
LONG TERM
Between
17 Jul 2025 and 16 Jan 2026
Details
View Map
Share
Worcester Road

Cadent Gas were proposing to carry out Utility asset works on Worcester Road, West Hagley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 July 2025 and run through until 16 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 10:34.

Cadent Gas logo
Between
17 and 31 Jul 2025
Details
View Map
Share
Follow
Ryefield Close

Cadent Gas are proposing to carry out Utility asset works on Ryefield Close, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 14:30.

Cadent Gas logo
LONG TERM
Between
17 Jul and 11 Sep 2025
Details
View Map
Share
Follow
Newfield Road

Cadent Gas are proposing to carry out Utility asset works on Newfield Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 14:30.

Cadent Gas logo
Between
17 and 31 Jul 2025
Details
View Map
Share
Follow
Thicknall Rise

Cadent Gas are proposing to carry out Utility asset works on Thicknall Rise, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 15:00.

Cadent Gas logo
Between
17 and 31 Jul 2025
Details
View Map
Share
Follow
Woodchester

Cadent Gas are proposing to carry out Utility asset works on Woodchester, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 18:30.

Cadent Gas logo
LONG TERM
Between
17 Jul and 9 Oct 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 9 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 18:30.

Cadent Gas logo
Between
18 Jul and 1 Aug 2025
Details
View Map
Share
Follow
The Compa

Cadent Gas are proposing to carry out Utility asset works on The Compa, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 17:10.

Cadent Gas logo
Between
18 Jul and 1 Aug 2025
Details
View Map
Share
Follow
The Compa

Cadent Gas are proposing to carry out Utility asset works on The Compa, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 18:22.

Cadent Gas logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Offmore Lane

Cadent Gas are proposing to carry out Utility asset works on Offmore Lane, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 08:49.

Cadent Gas logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Blakeshall Lane

Cadent Gas were proposing to carry out Utility asset works on Blakeshall Lane, Wolverley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 16:45.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:26.

Cadent Gas logo
LONG TERM
Between
21 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Greenfinch Road

Cadent Gas are proposing to carry out Utility asset works on Greenfinch Road, Wollescote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:47.

Cadent Gas logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Stone Lane

Cadent Gas are proposing to carry out Utility asset works on Stone Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 16:11.

Cadent Gas logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Cranbourne Road

Cadent Gas are proposing to carry out Utility asset works on Cranbourne Road, Oldswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 09:06.

Cadent Gas logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Cranbourne Road

Cadent Gas were proposing to carry out Utility asset works on Cranbourne Road, Oldswinford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 10:50.

Cadent Gas logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Hagley Road

Cadent Gas are proposing to carry out Utility asset works on Hagley Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 08:03.

LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Huntingtree Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Huntingtree Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 24 Apr 2025 at 12:44.

LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Lutley Mill Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lutley Mill Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 24 Apr 2025 at 10:47.

LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Stourbridge Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stourbridge Road, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 31 Mar 2025 at 09:44.

LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Stockwell Avenue

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stockwell Avenue, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 31 Mar 2025 at 09:10.

LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Stockwell Avenue

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stockwell Avenue, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 22 Apr 2025 at 14:30.

LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Acres Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Acres Road, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 31 Mar 2025 at 09:10.

LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Acres Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Acres Road, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 22 Apr 2025 at 14:29.

LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Camp Hill

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Camp Hill, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 Mar 2025 at 10:02.

LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Brook Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brook Street, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 31 Mar 2025 at 11:41.

Between
22 and 31 Jul 2025
Details
View Map
Share
Follow
Love Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Love Lane, Oldswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 15 Apr 2025 at 13:19.

Cadent Gas logo
LONG TERM
Between
22 Jul and 17 Oct 2025
Details
View Map
Share
Stourbridge Road

Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Halesowen.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:07.

Cadent Gas logo
LONG TERM
Between
22 Jul and 17 Oct 2025
Details
View Map
Share
Stourbridge Road

Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Halesowen.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:48.

Cadent Gas logo
LONG TERM
Between
22 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Stourbridge Road

Cadent Gas are proposing to carry out Utility asset works on Stourbridge Road, Halesowen.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:47.

Worcestershire County Council logo
Between
23 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Kidderminster Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Kidderminster Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 13 Mar 2025 at 09:08.

Between
24 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Stourbridge Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stourbridge Road, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 2 Apr 2025 at 09:00.

Cadent Gas logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Grange Lane

Cadent Gas are proposing to carry out Utility asset works on Grange Lane, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 07:39.

South Staffordshire Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Colley Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Colley Lane, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 23 Apr 2025 at 15:30.

Cadent Gas logo
LONG TERM
Between
28 Jul and 8 Sep 2025
Details
View Map
Share
Hillfields Road

Cadent Gas were proposing to carry out Utility asset works on Hillfields Road, Brierley Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 15:45.

Cadent Gas logo
LONG TERM
Between
28 Jul and 8 Sep 2025
Details
View Map
Share
Hillfields Road

Cadent Gas were proposing to carry out Utility asset works on Hillfields Road, Brierley Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 15:25.

Western Power Distribution (West Midlands) logo
Between
1 and 31 Aug 2025
Details
View Map
Share
Follow
Earls Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Earls Way, Halesowen.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 May 2025 at 13:40.

Western Power Distribution (West Midlands) logo
Between
1 and 31 Aug 2025
Details
View Map
Share
Follow
Earls Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Earls Way, Halesowen.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 May 2025 at 13:31.

Between
1 and 11 Aug 2025
Details
View Map
Share
Follow
Brook Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brook Street, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 2 Apr 2025 at 08:42.

Severn Trent Water logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Valley Road

Severn Trent Water were proposing to carry out Utility asset works on Valley Road, Bournheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 15 Apr 2025 at 16:34.

Severn Trent Water logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Valley Road

Severn Trent Water were proposing to carry out Utility asset works on Valley Road, Bournheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Apr 2025 at 09:37.

Severn Trent Water logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Valley Road

Severn Trent Water are proposing to carry out Utility asset works on Valley Road, Bournheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 12 May 2025 at 14:37.

Severn Trent Water logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Valley Road

Severn Trent Water were proposing to carry out Utility asset works on Valley Road, Bournheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 12 May 2025 at 14:39.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Villiers Street

Cadent Gas are proposing to carry out Utility asset works on Villiers Street, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 08:44.

Cadent Gas logo
LONG TERM
Between
4 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Lorne Street

Cadent Gas are proposing to carry out Utility asset works on Lorne Street, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:13.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Offmore Road

Cadent Gas are proposing to carry out Utility asset works on Offmore Road, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 22:30.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Grosvenor Avenue

Cadent Gas are proposing to carry out Utility asset works on Grosvenor Avenue, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:32.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Offmore Lane

Cadent Gas are proposing to carry out Utility asset works on Offmore Lane, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:11.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Elm Road

Cadent Gas are proposing to carry out Utility asset works on Elm Road, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:31.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Lyndholm Road

Cadent Gas are proposing to carry out Utility asset works on Lyndholm Road, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:10.

Cadent Gas logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Chester Road North

Cadent Gas are proposing to carry out Utility asset works on Chester Road North, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:07.

Severn Trent Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Queens Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Queens Hill, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Apr 2025 at 15:37.

Severn Trent Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Queens Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Queens Hill, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 14:31.

Severn Trent Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Walton Rise

Severn Trent Water were proposing to carry out Utility asset works on Walton Rise, Clent.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway, verge and footpath.

This roadwork event was last updated by Severn Trent Water on 29 Apr 2025 at 09:56.

Cadent Gas logo
LONG TERM
Between
4 Aug and 10 Oct 2025
Details
View Map
Share
Wolverley Village

Cadent Gas were proposing to carry out Utility asset works on Wolverley Village, Wolverley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 15:45.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Union Street

Cadent Gas are proposing to carry out Utility asset works on Union Street, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Dec 2024 at 08:04.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Union Street

Cadent Gas are proposing to carry out Utility asset works on Union Street, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:26.

Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Belle Vale

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Belle Vale, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 14 May 2025 at 12:21.

Western Power Distribution (West Midlands) logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Lower High Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Lower High Street, Cradley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Jun 2025 at 09:16.

Western Power Distribution (West Midlands) logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Silverthorne Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Silverthorne Lane, Cradley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 May 2025 at 15:56.

Western Power Distribution (West Midlands) logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Lower High Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Lower High Street, Cradley Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Jun 2025 at 14:09.

Between
6 and 15 Aug 2025
Details
View Map
Share
Follow
Huntingtree Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Huntingtree Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 6 May 2025 at 11:55.

Cadent Gas logo
Between
8 and 29 Aug 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 09:56.

Cadent Gas logo
LONG TERM
Between
11 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Chaddesley Road

Cadent Gas are proposing to carry out Utility asset works on Chaddesley Road, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:12.

Cadent Gas logo
Between
11 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Chaddesley Road

Cadent Gas are proposing to carry out Utility asset works on Chaddesley Road, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 08:57.

Cadent Gas logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Woodman Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Woodman Lane, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 14:12.

Cadent Gas logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Woodman Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Woodman Lane, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 17:00.

Staffordshire County Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
The Compa

Staffordshire County Council are proposing to carry out Highway improvement works on The Compa, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Apr 2025 at 10:37.

Staffordshire County Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
The Compa

Staffordshire County Council are proposing to carry out Highway improvement works on The Compa, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Apr 2025 at 15:32.

Severn Trent Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Heath Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heath Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 May 2025 at 10:24.

Staffordshire County Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Greensforge Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Greensforge Lane, Stourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Apr 2025 at 10:37.

Staffordshire County Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Greensforge Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Greensforge Lane, Stourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Apr 2025 at 15:32.

Staffordshire County Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Apr 2025 at 09:59.

Worcestershire County Council logo
Between
13 and 27 Aug 2025
Details
View Map
Share
Follow
Worcester Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Worcester Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 8 May 2025 at 13:30.

Cadent Gas logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Dodford Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Dodford Road, Bournheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:00.

Cadent Gas logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Holmcroft Road

Cadent Gas are proposing to carry out Utility asset works on Holmcroft Road, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 09:17.

Western Power Distribution (West Midlands) logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
New Wood Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on New Wood Lane, Blakedown, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 May 2025 at 15:21.

Between
18 and 28 Aug 2025
Details
View Map
Share
Follow
Lutley Mill Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lutley Mill Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 6 May 2025 at 11:56.

South Staffordshire Water logo
Between
18 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Stourdell Road

South Staffordshire Water are proposing to carry out Utility asset works on Stourdell Road, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 13 May 2025 at 14:24.

Cadent Gas logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Remedial works on Vicarage Road, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:27.

Cadent Gas logo
Between
21 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Amblecote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:06.

Cadent Gas logo
Between
21 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Hillfields Road

Cadent Gas are proposing to carry out Utility asset works on Hillfields Road, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:40.

Cadent Gas logo
Between
25 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Brookland Road

Cadent Gas are proposing to carry out Utility asset works on Brookland Road, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:59.

Cadent Gas logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Nuthatch Drive

Cadent Gas are proposing to carry out Utility asset works on Nuthatch Drive, Quarry Bank.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 10:31.

Cadent Gas logo
Between
26 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Somerleyton Avenue

Cadent Gas are proposing to carry out Utility asset works on Somerleyton Avenue, Kidderminster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 09:14.

BT logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
The Alders

BT are proposing to carry out Utility asset works on The Alders, Romsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 May 2025 at 09:46.

BT logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
St Kenelms Road

BT are proposing to carry out Utility asset works on St Kenelms Road, Romsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 May 2025 at 09:45.

Between
26 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Bassnage Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bassnage Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 30 May 2025 at 12:11.

Between
26 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Severn Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Severn Road, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 30 May 2025 at 11:34.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
31 Aug and 19 Oct 2025
Details
View Map
Share
Follow
Level Street

Transport for West Midlands (TfWM) are proposing to carry out Utility asset works on Level Street, Brierley Hill.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 13 Mar 2025 at 09:36.


Roadworks Map near to Broadwater Drive, STOURBRIDGE, DY9 0JU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 09:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Broadwater Drive, STOURBRIDGE, DY9 0JU (17 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
NEWFIELD ROAD 
(0.1 miles)
Cadent Gas
Utility asset works - Verge - No carriageway incursion
Planned
Scheduled: 29 May 2025 - 22 Sep 2025
0.1
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
THICKNALL RISE 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 29 May 2025 08:00
(Scheduled: 29 May 2025 - 12 Jun 2025)
0.2
Details
Share
Follow
3
Worcestershire County Council logo
MAJOR
  
KIDDERMINSTER ROAD 
(0.2 miles)
Worcestershire County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 26 May 2025 - 9 Jun 2025
0.2
Details
Share
Follow
4
Cadent Gas logo
RYEFIELD CLOSE 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 30 May 2025 09:30
(Scheduled: 26 May 2025 - 12 Jun 2025)
0.2
Details
Share
Follow
5
Severn Trent Water logo
WORCESTER ROAD 
(0.3 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.3
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
NEWFIELD ROAD 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 15 May 2025 09:30
(Scheduled: 15 May 2025 - 10 Jul 2025)
0.4
Details
Share
Follow
7
Virgin Media logo
PARK ROAD 
(0.4 miles)
Virgin Media
Utility asset works - Verge - No carriageway incursion
Complete
2 Jun 2025 14:22 - 15:26
0.4
Details
Share
8
BT logo
URGENT
  
SUMMERVALE ROAD 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
30 May 2025 09:25 - 14:27
0.4
Details
Share
9
Worcestershire County Council logo
WILLOW CLOSE 
(0.5 miles)
Worcestershire County Council
Highway repair and maintenance works - Footway - Road closure
Planned
Scheduled: 3 Jun 2025 - 6 Jun 2025
0.5
Details
Share
Follow
10
Severn Trent Water logo
KIDDERMINSTER ROAD 
(0.6 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Lane closure
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.