ROADWORKS SUMMARY
Haybridge Mews, STOURBRIDGE, DY9 0GL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Haybridge Mews, DY9 0GL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Haybridge Mews, STOURBRIDGE, DY9 0GL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Haybridge Mews are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Worcestershire County Council logo
LONG TERM
Until
30 Aug 2025
Details
View Map
Share
Follow
Lea Lane

Worcestershire County Council are carrying out Highway repair and maintenance works on Lea Lane, Cookley, Kidderminster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2021 at 00:01 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 2 Sep 2024 at 09:34.

LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Belle Vale

Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Belle Vale, Cradley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 January 2024 at 09:00 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 5 Jun 2024 at 09:56.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Church Hill

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Hill, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:34.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mill Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:35.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Level Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Level Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:49.

Cadent Gas logo
LONG TERM
Between
23 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Jul 2024 at 13:13.

Cadent Gas logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are carrying out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 12:37 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:38.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Dunstall Road

Cadent Gas are carrying out Utility asset works on Dunstall Road, Halesowen.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:57.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Pinewoods Avenue

Cadent Gas are proposing to carry out Utility asset works on Pinewoods Avenue, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:21.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Pinewoods Avenue

Cadent Gas are carrying out Utility asset works on Pinewoods Avenue, Hagley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:20.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are carrying out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 16:00.

Cadent Gas logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 11:17.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are carrying out Utility asset works on Wentworth Road, Wollaston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 10:05.

Cadent Gas logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Somerset Drive

Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 09:51.

Cadent Gas logo
LONG TERM
Between
12 Nov and 16 Dec 2024
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Wollaston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 15:22.

Severn Trent Water logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Gibbet Lane

Severn Trent Water were proposing to carry out New service connection on Gibbet Lane, Whittington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 16:45.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
High Street

Staffordshire County Council were proposing to carry out Highway improvement works on High Street, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 08:48.

South Staffordshire Water logo
Finishing
Today
Details
View Map
Share
Follow
High Street

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on High Street, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 29 Aug 2024 at 14:13.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Briery Road

Cadent Gas were proposing to carry out Utility asset works on Briery Road, Halesowen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:11.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Enville Road

Staffordshire County Council are proposing to carry out Highway improvement works on Enville Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 12:52.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Dordale Road

Severn Trent Water were proposing to carry out New service connection on Dordale Road, Bournheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Sep 2024 at 11:04.

Worcestershire County Council logo
Between
4 and 18 Dec 2024
Details
View Map
Share
Follow
Holy Cross Green

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Holy Cross Green, Holy Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Oct 2024 at 12:23.

Worcestershire County Council logo
Between
4 and 18 Dec 2024
Details
View Map
Share
Follow
Holy Cross Green To Broome Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Holy Cross Green To Broome Lane, Holy Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 7 Oct 2024 at 12:24.

Worcestershire County Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Pinewoods Avenue

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Pinewoods Avenue, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 1 Oct 2024 at 12:19.

Worcestershire County Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Pinewoods Avenue

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Pinewoods Avenue, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 27 Nov 2024 at 15:18.

Sandwell Metropolitan Borough Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Claremont Street

Sandwell Metropolitan Borough Council are proposing to carry out Works for road purposes on Claremont Street, Cradley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Sep 2024 at 14:45.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:57.

Severn Trent Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Dordale Road

Severn Trent Water are proposing to carry out New service connection on Dordale Road, Bournheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Sep 2024 at 14:47.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Red Hill

Staffordshire County Council were proposing to carry out Highway improvement works on Red Hill, Kinver Edge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 10:38.

Cadent Gas logo
Between
12 and 27 Dec 2024
Details
View Map
Share
Follow
Briery Road

Cadent Gas are proposing to carry out Utility asset works on Briery Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 16:30.

Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Farm Road, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Sep 2024 at 10:05.

Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Farm Road, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 14 Oct 2024 at 12:35.

Between
19 and 23 Dec 2024
Details
View Map
Share
Follow
Poplar Crescent

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Crescent, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 08:58.

Between
19 and 23 Dec 2024
Details
View Map
Share
Follow
Poplar Crescent

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Crescent, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 10:51.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Hyde Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hyde Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Sep 2024 at 13:36.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Yarnold Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Yarnold Lane, Dodford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 08:17.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Yarnold Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Yarnold Lane, Dodford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 14:39.

Cadent Gas logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Broome Lane

Cadent Gas were proposing to carry out Utility asset works on Broome Lane, Broome, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 11:12.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Worcester Road

Cadent Gas were proposing to carry out New service connection on Worcester Road, Clent.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:33.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Worcester Road

Cadent Gas are proposing to carry out New service connection on Worcester Road, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:05.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Worcester Road

Cadent Gas were proposing to carry out Utility asset works on Worcester Road, Clent.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 11:25.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Field Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Field Lane, Clent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 16:11.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Field Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Field Lane, Clent.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 15:49.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2024 at 09:54.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:29.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:47.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Red Hill

Staffordshire County Council are proposing to carry out Highway improvement works on Red Hill, Kinver Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 17:44.

Cadent Gas logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Banners Lane

Cadent Gas are proposing to carry out Utility asset works on Banners Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 11:33.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Hyde Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Hyde Lane, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:56.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Barrack Lane

Cadent Gas were proposing to carry out Utility asset works on Barrack Lane, Cradley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:58.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Engine Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Engine Lane, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 10:00.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Engine Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Engine Lane, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 08:36.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Somerset Drive

Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 12:48.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tack Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 15:05.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tack Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 11:22.

Between
8 and 21 Jan 2025
Details
View Map
Share
Follow
Barrack Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barrack Lane, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Oct 2024 at 07:09.

Between
8 and 21 Jan 2025
Details
View Map
Share
Follow
Blue Ball Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Blue Ball Lane, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Oct 2024 at 07:13.

Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Old Hall Close

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Hall Close, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 15:38.

Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Old Hall Close

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Hall Close, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 12:08.

South Staffordshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
High Street

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on High Street, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 17 Sep 2024 at 10:26.

Staffordshire County Council logo
LONG TERM
Between
13 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Stone Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Stone Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 09:42.

Cadent Gas logo
LONG TERM
Between
17 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Banners Lane

Cadent Gas are proposing to carry out Utility asset works on Banners Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 10:14.

Cadent Gas logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 12:00.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Randle Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Randle Road, Oldswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:19.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Randle Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Randle Road, Oldswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 07:46.

Staffordshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Hyde Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Hyde Lane, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:48.

Cadent Gas logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Pennine Way

Cadent Gas were proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:47.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
James Scott Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on James Scott Road, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 11:57.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:11.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:06.

Cadent Gas logo
LONG TERM
Between
21 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.

Cadent Gas logo
Between
21 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.

South Staffordshire Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Long Innage

South Staffordshire Water are proposing to carry out Remedial works on Long Innage, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 10:43.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Oak Park Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 14:35.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Oak Park Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 11:33.

Cadent Gas logo
LONG TERM
Between
22 Jan and 11 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:47.

Cadent Gas logo
Between
24 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Old Ham Lane

Cadent Gas are proposing to carry out Utility asset works on Old Ham Lane, Pedmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:38.

Cadent Gas logo
Between
24 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Leys Road

Cadent Gas are proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:52.

Staffordshire County Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
The Compa

Staffordshire County Council are proposing to carry out Highway improvement works on The Compa, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 15:37.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Enville Road

Staffordshire County Council are proposing to carry out Highway improvement works on Enville Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:28.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:32.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:49.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 12:19.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:07.

Cadent Gas logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Pennine Way

Cadent Gas were proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:19.

Severn Trent Water logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Firs Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Firs Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 13:30.

Cadent Gas logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Long Innage

Cadent Gas are proposing to carry out Utility repair and maintenance works on Long Innage, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:50.

Cadent Gas logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:08.

Cadent Gas logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:49.

Cadent Gas logo
Between
7 Feb and 6 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:46.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Barnetts Lane

BT are proposing to carry out Utility asset works on Barnetts Lane, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 18 Nov 2024 at 15:52.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Barnetts Lane

BT are proposing to carry out Utility asset works on Barnetts Lane, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 29 Nov 2024 at 14:30.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
10 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Hamilton Avenue

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hamilton Avenue, Halesowen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Sep 2024 at 07:25.

Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Studley Gate

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Studley Gate, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 5 Nov 2024 at 12:02.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Furnace Hill

Cadent Gas are proposing to carry out Utility asset works on Furnace Hill, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:51.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Pennine Way

Cadent Gas are proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:20.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:42.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:57.

South Staffordshire Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
High Street

South Staffordshire Water were proposing to carry out Utility repair and maintenance works on High Street, Cradley Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 12 Nov 2024 at 09:21.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Lawnswood Road

Cadent Gas are proposing to carry out Utility asset works on Lawnswood Road, Wordsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 07:31.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Follow
Worcester Lane

Network Rail are proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Worcester Lane

Network Rail were proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Follow
Redlake Road

Network Rail are proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Redlake Road

Network Rail were proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Racecourse Lane

Network Rail were proposing to carry out Works for Rail Purposes on Racecourse Lane, Norton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Nov 2024 at 11:00.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Worcester Road

Cadent Gas were proposing to carry out Utility asset works on Worcester Road, West Hagley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:30.

South Staffordshire Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Grange Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Grange Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 23 Sep 2024 at 14:37.

Western Power Distribution (West Midlands) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Redwood Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 11:06.

Western Power Distribution (West Midlands) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Redwood Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Dec 2024 at 15:47.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Furnace Hill

Cadent Gas are proposing to carry out Utility asset works on Furnace Hill, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:18.

Cadent Gas logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Long Innage

Cadent Gas are proposing to carry out Utility repair and maintenance works on Long Innage, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:39.

Cadent Gas logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:13.

Cadent Gas logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:40.

Worcestershire County Council logo
Between
20 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Park Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 14:56.

Worcestershire County Council logo
Between
20 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Park Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 11 Nov 2024 at 09:59.

Worcestershire County Council logo
Between
20 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Hall Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 13:13.

Worcestershire County Council logo
Between
20 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Hall Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 13 Nov 2024 at 15:39.

Severn Trent Water logo
Between
20 and 22 Feb 2025
Details
View Map
Share
Follow
Caunsall Road

Severn Trent Water are proposing to carry out New service connection on Caunsall Road, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 13:32.

Cadent Gas logo
Between
20 Feb and 10 Mar 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Brockmoor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:07.

Worcestershire County Council logo
Between
21 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Drayton Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Drayton, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:32.

Worcestershire County Council logo
Between
21 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Drayton Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Drayton, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 15:31.

Worcestershire County Council logo
Between
21 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Drayton Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:33.

Worcestershire County Council logo
Between
21 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Drayton Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 15:29.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Kidderminster Road South

Cadent Gas were proposing to carry out Utility asset works on Kidderminster Road South, Hagley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:28.

South Staffordshire Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Horse Bridge Lane

South Staffordshire Water were proposing to carry out Utility repair and maintenance works on Horse Bridge Lane, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 10 Nov 2024 at 16:24.

Cadent Gas logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:45.

Cadent Gas logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:41.

Worcestershire County Council logo
Between
26 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Clattercut Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Chaddesley Corbett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 13:07.

Worcestershire County Council logo
Between
26 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Clattercut Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Chaddesley Corbett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 13:51.

Worcestershire County Council logo
Between
26 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Hill Pool

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hill Pool, Chaddesley Corbett, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 15:57.

Worcestershire County Council logo
Between
26 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Hill Pool

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hill Pool, Chaddesley Corbett, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 13:39.

Worcestershire County Council logo
Between
26 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Egg Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Egg Lane, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:20.

Worcestershire County Council logo
Between
26 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Egg Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Egg Lane, Belbroughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 15:35.

Cadent Gas logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:14.

Cadent Gas logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:41.

Western Power Distribution (West Midlands) logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Churchill Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Churchill Lane, Blakedown, Kidderminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 25 Nov 2024 at 12:47.

Western Power Distribution (West Midlands) logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Drakelow Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Drakelow Lane, Wolverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Nov 2024 at 12:24.

Western Power Distribution (West Midlands) logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Drakelow Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Drakelow Lane, Wolverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 13:17.

Cadent Gas logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:43.

Cadent Gas logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:41.

Severn Trent Water logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Seagers Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Seagers Lane, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 09:05.


Roadworks Map near to Haybridge Mews, STOURBRIDGE, DY9 0GL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Haybridge Mews, STOURBRIDGE, DY9 0GL (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Worcestershire County Council logo
KIDDERMINSTER ROAD 
(0.4 miles)
Worcestershire County Council
Highway repair and maintenance works - Footway - Lane closure
In Progress
Since: 2 Dec 2024 09:30
(Scheduled: 2 Dec 2024 - 4 Dec 2024)
0.4
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
PINEWOODS AVENUE 
(0.8 miles)
Cadent Gas
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 4 Oct 2024 10:00
(Scheduled: 2 Oct 2024 - 20 Dec 2024)
0.8
Details
Share
Follow
3
Cadent Gas logo
PINEWOODS CLOSE 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 29 Nov 2024 08:00
(Scheduled: 25 Nov 2024 - 12 Dec 2024)
0.8
Details
Share
Follow
4
Cadent Gas logo
MAJOR
  
PINEWOODS AVENUE 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 4 Nov 2024 - 6 Dec 2024
0.9
Details
Share
Follow
5
Cadent Gas logo
MAJOR
  
PINEWOODS AVENUE 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
In Progress
Since: 4 Nov 2024 08:00
(Scheduled: 4 Nov 2024 - 20 Dec 2024)
0.9
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
OUNTY JOHN LANE 
(1.0 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 2 Dec 2024 - 19 Dec 2024
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.