ROADWORKS SUMMARY
Waystone Lane, STOURBRIDGE, DY9 0BH
Introduction
View current and future planned roadworks and road closures for Waystone Lane, DY9 0BH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Waystone Lane, STOURBRIDGE, DY9 0BH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Waystone Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
19 Aug 2025
Worcestershire County Council are carrying out Highway improvement works on Redditch Road, Stoke Heath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 07:00 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 16 Jan 2024 at 08:49.
31 May 2026
Worcestershire County Council are carrying out Highway improvement works on Redditch Road, Stoke Heath.
The works started on 22 January 2024 at 08:00 and could run through until 31 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 5 Apr 2024 at 15:48.
31 May 2026
Worcestershire County Council are carrying out Highway improvement works on Bromsgrove Eastern Bypass, Bromsgrove.
The works started on 22 January 2024 at 08:00 and could run through until 31 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 4 Apr 2024 at 13:06.
31 May 2026
Worcestershire County Council are carrying out Highway improvement works on Bromsgrove Highway, Bromsgrove.
The works started on 22 January 2024 at 08:00 and could run through until 31 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 4 Apr 2024 at 13:13.
20 Feb 2026
Worcestershire County Council are carrying out Highway improvement works on Bromsgrove Eastern Bypass, Bromsgrove.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 January 2024 at 07:30 and could run through until 20 February 2026. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 30 Jan 2024 at 09:22.
8 Oct 2025
Worcestershire County Council are carrying out Highway improvement works on Stratford Road, Bromsgrove.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 June 2024 at 07:30 and could run through until 8 October 2025. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 10 Sep 2024 at 15:47.
Tomorrow
Cadent Gas are carrying out Utility asset works on Racecourse Lane, Norton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 September 2024 at 12:37 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:38.
1 Oct 2024 and 31 Mar 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Bromsgrove Eastern Bypass, Bromsgrove.
These works are categorised as Major.
The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Worcestershire County Council on 13 Sep 2024 at 16:59.
31 Mar 2025
Worcestershire County Council are carrying out Highway improvement works on Bromsgrove Eastern Bypass, Bromsgrove.
These works are categorised as Major.
The works started on 1 October 2024 at 07:30 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 1 Oct 2024 at 13:14.
8 Oct 2024 and 25 Apr 2025
Worcestershire County Council were proposing to carry out Highway repair and maintenance works on New Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 October 2024 and run through until 25 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 8 Oct 2024 at 08:52.
8 Oct 2024 and 25 Apr 2025
Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Bromsgrove Eastern Bypass, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 October 2024 and run through until 25 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 8 Oct 2024 at 08:52.
18 Oct 2024 and 18 Jul 2026
Worcestershire County Council were proposing to carry out Highway improvement works on Stoke Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 October 2024 and run through until 18 July 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 11 Sep 2024 at 09:11.
Sunday
Cadent Gas are carrying out Utility asset works on Perryfields Road, Bromsgrove.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:56.
1 Nov 2024 and 6 Apr 2025
Worcestershire County Council were proposing to carry out Highway improvement works on Bromsgrove Eastern Bypass, Bromsgrove.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 6 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Oct 2024 at 09:57.
Friday
Cadent Gas are carrying out Utility asset works on Pinewoods Avenue, Hagley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:20.
Friday
Cadent Gas are carrying out Utility asset works on Wollescote Road, Stourbridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 15:52.
24 Nov 2024 and 31 Oct 2025
Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Bromsgrove Eastern Bypass, Bromsgrove.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2024 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 19 Nov 2024 at 10:06.
25 Nov 2024 and 31 Oct 2025
Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Stoke Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 19 Nov 2024 at 10:35.
25 Nov 2024 and 31 Oct 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Bromsgrove Eastern Bypass, Bromsgrove.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 13:22.
31 Oct 2025
Worcestershire County Council are carrying out Highway repair and maintenance works on Bromsgrove Eastern Bypass, Bromsgrove.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 07:30 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 25 Nov 2024 at 09:17.
Friday
Severn Trent Water were proposing to carry out Utility asset works on Rocky Lane, Bournheath.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 14:36.
Tomorrow
Worcestershire County Council are carrying out Highway improvement works on Husum Way, Kidderminster.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:30 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 10 Dec 2024 at 13:38.
Tuesday
Worcestershire County Council are carrying out Highway repair and maintenance works on Holy Cross Green, Holy Cross.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 07:30 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 10 Dec 2024 at 08:57.
Tuesday
Worcestershire County Council are carrying out Highway repair and maintenance works on Holy Cross Green To Broome Lane, Holy Cross.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 07:00 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 10 Dec 2024 at 08:57.
Tuesday
Worcestershire County Council are carrying out Highway repair and maintenance works on Spadesbourne Road, Lickey End.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 07:00 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 13 Dec 2024 at 08:38.
Friday
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Pinewoods Avenue, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 1 Oct 2024 at 12:19.
Friday
Worcestershire County Council are carrying out Highway repair and maintenance works on Pinewoods Avenue, Hagley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 9 Dec 2024 at 09:08.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Greenhill, Burcot.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 16:03 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 18:00.
Friday
Severn Trent Water are proposing to carry out New service connection on Droitwich Road, Hartlebury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Sep 2024 at 10:51.
Friday
Severn Trent Water are proposing to carry out New service connection on Droitwich Road, Hartlebury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 09:31.
27 Dec 2024 and 17 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Bant Mill Road, Bromsgrove.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 December 2024 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 08:48.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Timberhonger Lane, Timberhonger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 08:09.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Timberhonger Lane, Timberhonger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 14:42.
6 and 15 Jan 2025
Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Charford Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 5 Dec 2024 at 08:17.
6 Jan 2025 and 6 Feb 2026
Worcestershire County Council were proposing to carry out Highway improvement works on Bromsgrove Eastern Bypass, Bromsgrove.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 6 February 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 8 Nov 2024 at 13:14.
6 Jan 2025 and 15 Jan 2026
Worcestershire County Council are proposing to carry out Highway improvement works on Bromsgrove Eastern Bypass, Bromsgrove.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 13:47.
6 Jan 2025 and 6 Feb 2026
Worcestershire County Council are proposing to carry out Highway improvement works on Bromsgrove Eastern Bypass, Bromsgrove.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 15:55.
6 and 15 Jan 2025
Worcestershire County Council are proposing to carry out Highway improvement works on New Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 25 Oct 2024 at 14:37.
6 Jan and 25 Mar 2025
Worcestershire County Council are proposing to carry out Section 50 on Perryfields Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 30 Oct 2024 at 15:20.
6 Jan and 9 Apr 2025
Worcestershire County Council are proposing to carry out Section 50 on Perryfields Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 20 Nov 2024 at 15:54.
6 and 24 Jan 2025
Severn Trent Water were proposing to carry out Utility asset works on Rocky Lane, Bournheath.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 15:41.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Yarnold Lane, Dodford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 08:17.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Yarnold Lane, Dodford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 14:39.
6 and 17 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Broome Lane, Broome, Stourbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 11:12.
6 and 10 Jan 2025
Cadent Gas were proposing to carry out New service connection on Worcester Road, Clent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:33.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out New service connection on Worcester Road, Clent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:05.
6 Jan and 14 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Worcester Road, Clent.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 11:25.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Field Lane, Clent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 16:11.
6 and 8 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Field Lane, Clent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 15:49.
6 Jan and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2024 at 09:54.
6 Jan and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:29.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 08:22.
8 and 10 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Brookhouse Road, Barnt Green.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Sep 2024 at 11:13.
13 and 17 Jan 2025
Worcestershire County Council were proposing to carry out Highway improvement works on Bromsgrove Eastern Bypass, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Nov 2024 at 08:15.
13 Jan and 7 Mar 2025
BT are proposing to carry out Utility asset works on Albert Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Nov 2024 at 11:13.
13 Jan and 13 Jun 2025
Worcestershire County Council were proposing to carry out Highway improvement works on New Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 20 Nov 2024 at 14:36.
13 Jan and 13 Jun 2025
Worcestershire County Council were proposing to carry out Highway improvement works on Bant Mill Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 20 Nov 2024 at 14:38.
13 Jan and 13 Jun 2025
Worcestershire County Council were proposing to carry out Highway improvement works on Fordhouse Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 20 Nov 2024 at 14:37.
15 and 17 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 15:54.
16 and 24 Jan 2025
Worcestershire County Council are proposing to carry out Highway improvement works on New Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 29 Oct 2024 at 14:30.
16 and 24 Jan 2025
Worcestershire County Council are proposing to carry out Highway improvement works on New Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 4 Nov 2024 at 12:33.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Churchfields, Bromsgrove.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2024 at 08:23.
21 and 23 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Lunnon Lane, Droitwich Spa.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 11:42.
21 Jan and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.
21 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.
24 Jan and 11 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Old Ham Lane, Pedmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:38.
27 Jan and 21 Apr 2025
BT were proposing to carry out Utility asset works on Albert Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 6 Nov 2024 at 10:08.
27 and 29 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Torton Lane, Torton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 14:05.
27 and 29 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Torton Lane, Torton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 10:20.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Churchfields Road, Bromsgrove.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2024 at 08:22.
3 Feb and 11 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Catshill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:24.
3 and 5 Feb 2025
Cadent Gas are proposing to carry out Remedial works on Holy Cross Lane, Holy Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 12:49.
10 Feb and 5 May 2025
BT were proposing to carry out Utility asset works on Albert Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 11 Nov 2024 at 11:35.
10 and 12 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Greenhill, Burcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 15:20.
10 and 12 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Walton Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 08:24.
10 and 12 Feb 2025
BT are proposing to carry out Utility asset works on Barnetts Lane, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 18 Nov 2024 at 15:52.
10 and 12 Feb 2025
BT are proposing to carry out Utility asset works on Barnetts Lane, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 29 Nov 2024 at 14:30.
11 Feb and 5 May 2025
BT are proposing to carry out Utility asset works on Albert Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 5 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Nov 2024 at 14:05.
14 and 21 Feb 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Littleheath Lane, Lickey End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 20 Nov 2024 at 14:15.
16 and 23 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.
16 and 23 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.
16 and 23 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.
16 and 23 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.
16 and 23 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Racecourse Lane, Norton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 11:00.
17 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 13:25.
17 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 8 Nov 2024 at 14:30.
17 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clive Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 12 Nov 2024 at 10:14.
17 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clive Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 13 Nov 2024 at 11:18.
17 Feb and 24 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Kidderminster Road, Bromsgrove.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 24 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 13:49.
17 and 20 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 12:50.
17 and 20 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Bromsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 15:24.
17 and 21 Feb 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Alcester Road, Lickey End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 27 Aug 2024 at 14:51.
17 Feb and 7 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Worcester Road, West Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:30.
20 Feb and 1 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 14:56.
20 Feb and 1 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Park Road, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 11 Nov 2024 at 09:59.
20 Feb and 3 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 13:13.
20 Feb and 3 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hall Lane, Hagley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 13 Nov 2024 at 15:39.
21 Feb and 6 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Drayton, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:32.
21 Feb and 6 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:33.
24 and 26 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brookhouse Road, Barnt Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:01.
24 and 26 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brookhouse Road, Barnt Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Oct 2024 at 15:54.
24 Feb and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Stourbridge Road, Catshill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 13:55.
24 Feb and 21 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Kidderminster Road South, Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:28.
26 Feb and 11 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Rushock, Droitwich Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 13:08.
26 Feb and 11 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Rushock, Droitwich Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 13:52.
26 Feb and 11 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 13:07.
26 Feb and 11 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Clattercut Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 13:51.
26 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hill Pool, Chaddesley Corbett, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 15:57.
26 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hill Pool, Chaddesley Corbett, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 13:39.
26 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Egg Lane, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:20.
26 Feb and 7 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Egg Lane, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 15:35.
3 and 5 Mar 2025
Severn Trent Water were proposing to carry out New service connection on Fockbury Road, Dodford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 11:55.
3 Mar and 2 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Lodge Ford Hill, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Dec 2024 at 11:20.
3 Mar and 2 May 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Fox Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 17 Dec 2024 at 11:46.
3 and 6 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Churchill Lane, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 12:52.
3 Mar and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:00.
3 Mar and 18 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:43.
5 and 7 Mar 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Greenhill, Burcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 March 2025 and run through until 7 March 2025. The works were due to impact the verge only.
This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 12:21.
7 and 20 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Drayton, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 13 Dec 2024 at 13:34.
7 and 20 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Drayton Road, Belbroughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 13 Dec 2024 at 12:33.
10 and 21 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Berry Lane, Upton Warren.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Nov 2024 at 13:12.
10 and 21 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Berry Lane, Upton Warren.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 2 Dec 2024 at 11:16.
10 and 12 Mar 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Greenhill, Burcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the verge only.
This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 09:45.
10 and 28 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Pennine Road, Bromsgrove.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 10:23.
10 and 28 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Pennine Road, Bromsgrove.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 09:02.
10 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Pennine Road, Bromsgrove.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 14:52.
10 and 13 Mar 2025
Cadent Gas are proposing to carry out New service connection on Barley Mow Lane, Catshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 14:40.
17 Mar and 11 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Bant Mill Road, Bromsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:30.
17 and 28 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Compton Road, Pedmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 14:42.
Roadworks Map near to Waystone Lane, STOURBRIDGE, DY9 0BH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.