ROADWORKS SUMMARY
Habberley Lane, KIDDERMINSTER, DY11 5JY
Introduction
View current and future planned roadworks and road closures for Habberley Lane, DY11 5JY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Habberley Lane, KIDDERMINSTER, DY11 5JY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Habberley Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Aug 2025
Worcestershire County Council are carrying out Highway repair and maintenance works on Lea Lane, Cookley, Kidderminster.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2021 at 00:01 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 2 Sep 2024 at 09:34.
7 Feb 2025
The Environment Agency are carrying out Statutory Infrastructure Works on Stourport Road, Bewdley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 October 2023 at 05:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 25 Apr 2024 at 08:38.
4 Sep 2023 and 7 Feb 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Stourport Road, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2023 and could run through until 7 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Worcestershire County Council on 27 Jun 2023 at 10:54.
2 Oct 2023 and 28 Feb 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Beales Corner, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2023 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Worcestershire County Council on 4 Jul 2023 at 10:53.
27 Oct 2025
The Environment Agency are carrying out Statutory Infrastructure Works on Beales Corner, Bewdley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 October 2023 at 06:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 13 Aug 2024 at 14:17.
20 Jan 2024 and 22 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Park Street, Kidderminster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2024 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 23 Oct 2024 at 10:32.
27 Jul 2025
Worcestershire County Council are carrying out Highway improvement works on Bewdley By Pass, Bewdley.
The works started on 26 July 2024 at 13:00 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 26 Jul 2024 at 13:45.
Friday
Worcestershire County Council are carrying out Highway repair and maintenance works on The Ringway, Kidderminster.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 November 2024 at 07:30 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 27 Nov 2024 at 15:48.
18 Nov 2024 and 29 Aug 2025
The Environment Agency are proposing to carry out Statutory Infrastructure Works on Beales Corner, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 11 Nov 2024 at 14:59.
18 Nov 2024 and 29 Aug 2025
The Environment Agency are proposing to carry out Statutory Infrastructure Works on Stourport Road, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 11 Nov 2024 at 14:59.
30 May 2025
Worcestershire County Council are carrying out roadworks on Dunley Road, Stourport On Severn.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 15:00 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 07:45.
Tomorrow
Worcestershire County Council are carrying out Highway improvement works on Husum Way, Kidderminster.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:30 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 10 Dec 2024 at 13:38.
Friday
Worcestershire County Council are carrying out Highway repair and maintenance works on Ribbesford Road, Bewdley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 11 Dec 2024 at 14:07.
Monday
Staffordshire County Council are carrying out Highway improvement works on Heronsgate Road, Kinver.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 15:29 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 15:42.
Today
Nexfibre Networks Limited are carrying out Utility asset works on Wyre Hill, Bewdley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 08:30 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 17 Dec 2024 at 09:47.
Friday
Nexfibre Networks Limited are proposing to carry out Utility asset works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 11 Nov 2024 at 10:09.
Friday
Nexfibre Networks Limited are proposing to carry out Utility asset works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 8 Nov 2024 at 15:12.
Friday
Severn Trent Water are proposing to carry out New service connection on Droitwich Road, Hartlebury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Sep 2024 at 10:51.
Friday
Severn Trent Water are proposing to carry out New service connection on Droitwich Road, Hartlebury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 09:31.
Friday
Nexfibre Networks Limited were proposing to carry out Utility asset works on Park Lane, Bewdley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 7 Nov 2024 at 16:20.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hyde Lane, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Sep 2024 at 13:36.
2 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Willowfield Drive, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:49.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Red Hill, Kinver Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 17:44.
6 and 10 Jan 2025
BT are proposing to carry out Utility asset works on Wilden Top Road, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 Oct 2024 at 11:59.
6 and 10 Jan 2025
BT are proposing to carry out Utility asset works on Summerway Lane, Torton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 26 Sep 2024 at 10:50.
6 and 10 Jan 2025
BT are proposing to carry out Utility asset works on Summerway Lane, Torton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 4 Nov 2024 at 13:18.
6 and 8 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 13 Nov 2024 at 13:48.
6 and 8 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 14 Nov 2024 at 13:35.
6 and 8 Jan 2025
Nexfibre Networks Limited are proposing to carry out Remedial works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 3 Dec 2024 at 15:09.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sladd Lane, Wolverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 25 Sep 2024 at 15:04.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sladd Lane, Wolverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 09:52.
6 and 10 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Hyde Lane, Kinver.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:56.
6 Jan and 7 Feb 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Habberley Road, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Pipelines on 18 Oct 2024 at 13:45.
6 Jan and 7 Feb 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Habberley Road, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Pipelines on 7 Oct 2024 at 15:29.
10 and 13 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on B4194 From Clogs Bank End To Dowles Road Start, Buttonoak, Kinlet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Sep 2024 at 15:21.
13 Jan and 31 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stone Lane, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 09:42.
13 and 15 Jan 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on High Street, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 17 Sep 2024 at 10:26.
20 and 22 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Hyde Lane, Kinver.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:48.
20 and 22 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 12:00.
20 and 22 Jan 2025
Severn Trent Water were proposing to carry out Disconnection or alteration of supply on Raven Street, Stourport On Severn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 14:36.
20 and 22 Jan 2025
Nexfibre Networks Limited are proposing to carry out Remedial works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 10:37.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Heronsgate Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 15:49.
27 Jan and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Compa, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 15:37.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Enville Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:28.
27 and 29 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Raven Street, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 08:13.
27 and 29 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Raven Street, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 13:01.
27 and 29 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Torton Lane, Torton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 14:05.
27 and 29 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Torton Lane, Torton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 10:20.
3 and 5 Feb 2025
Cadent Gas are proposing to carry out New service connection on Raven Street, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 13:41.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Enville Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 09:19.
10 and 12 Feb 2025
BT are proposing to carry out Utility asset works on Barnetts Lane, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 29 Nov 2024 at 14:30.
10 Feb and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Layamon Walk, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Oct 2024 at 08:29.
10 Feb and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hermitage Way, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Oct 2024 at 08:31.
10 and 12 Feb 2025
Cadent Gas are proposing to carry out New service connection on Raven Street, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:57.
10 Feb and 15 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Windermere Way, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:17.
10 and 12 Feb 2025
BT are proposing to carry out Utility asset works on Barnetts Lane, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 18 Nov 2024 at 15:52.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 14:48.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Dec 2024 at 13:27.
17 and 21 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 08:35.
17 Feb and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Layamon Walk, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Dec 2024 at 08:58.
17 Feb and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hermitage Way, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Dec 2024 at 08:57.
17 and 21 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 11:06.
17 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Arley Lane, Arley, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 10:01.
17 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Arley Lane, Arley, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Dec 2024 at 09:20.
20 and 22 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Caunsall Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 13:32.
24 and 26 Feb 2025
South Staffordshire Water were proposing to carry out Utility repair and maintenance works on Horse Bridge Lane, Kinver.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 10 Nov 2024 at 16:24.
24 Feb and 21 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Kidderminster Road South, Hagley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:28.
24 and 28 Feb 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Heronsgate Road, Kinver.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 10:27.
3 and 6 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Churchill Lane, Blakedown, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 12:52.
3 and 5 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Drakelow Lane, Wolverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Nov 2024 at 12:24.
3 and 5 Mar 2025
Western Power Distribution (West Midlands) were proposing to carry out New service connection on Drakelow Lane, Wolverley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Dec 2024 at 14:14.
4 and 6 Mar 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Horse Bridge Lane, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 17 Dec 2024 at 15:00.
10 and 23 Mar 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Load Street, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 1 Aug 2024 at 11:15.
17 and 19 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lye Head Road, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 14:27.
17 and 31 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Inn Lane, Hartlebury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 19 Nov 2024 at 09:14.
17 and 31 Mar 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Inn Lane, Hartlebury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 18 Nov 2024 at 12:11.
17 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Kidderminster Road, Bewdley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:30.
17 Mar and 4 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Kidderminster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:24.
17 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Stourbridge Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 07:54.
Roadworks Map near to Habberley Lane, KIDDERMINSTER, DY11 5JY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Habberley Lane, KIDDERMINSTER, DY11 5JY (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 10 Dec 2024 - 20 Dec 2024)
(Scheduled: 9 Dec 2024 - 30 Dec 2024)
(Scheduled: 13 Dec 2024 - 18 Dec 2024)