ROADWORKS SUMMARY
Main Road, WEYMOUTH, DT3 6EE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Main Road, DT3 6EE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Main Road, WEYMOUTH, DT3 6EE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Main Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wessex Water logo
LONG TERM
Between
11 Aug and 25 Oct 2025
Details
View Map
Share
Follow
Church Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Street, Weymouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wessex Water on 3 Jun 2025 at 16:56.

Dorset Council logo
LONG TERM
Between
15 Sep and 12 Dec 2025
Details
View Map
Share
Follow
St Thomas Street

Dorset Council are proposing to carry out Highway improvement works on St Thomas Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 20 Mar 2025 at 15:05.

Wessex Water logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Church Street

Wessex Water are carrying out Utility repair and maintenance works on Church Street, Weymouth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:00 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 16 Sep 2025 at 09:47.

Dorset Council logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Church Street

Dorset Council are carrying out Highway improvement works on Church Street, Weymouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:34 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 15 Sep 2025 at 08:40.

Dorset Council logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Church Street

Dorset Council are proposing to carry out Highway improvement works on Church Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 24 Jun 2025 at 15:03.

Dorset Council logo
LONG TERM
Between
15 Sep and 12 Dec 2025
Details
View Map
Share
Follow
St Thomas Street

Dorset Council are proposing to carry out Highway improvement works on St Thomas Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 14 Aug 2025 at 14:15.

Wessex Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Maiden Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Maiden Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 15 Jul 2025 at 15:40.

Dorset Council logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Maiden Street

Dorset Council were proposing to carry out Section 50 on Maiden Street, Weymouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 18 Sep 2025 at 14:22.

Wessex Water logo
Between
13 and 20 Oct 2025
Details
View Map
Share
Follow
Kings Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Kings Road, Dorchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 7 Aug 2025 at 16:05.

Wessex Water logo
Between
13 and 20 Oct 2025
Details
View Map
Share
Kings Road

Wessex Water were proposing to carry out Utility repair and maintenance works on Kings Road, Dorchester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 20 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 10 Jul 2025 at 11:15.

Wessex Internet logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Access To Knighton Heath

Wessex Internet are proposing to carry out Utility asset works on Access To Knighton Heath, Lewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 18 Sep 2025 at 16:16.

Wessex Internet logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Access To Knighton Heath

Wessex Internet are proposing to carry out Utility asset works on Access To Knighton Heath, Lewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 21 Aug 2025 at 12:11.

Dorset Council logo
Between
20 and 23 Oct 2025
Details
View Map
Share
New Street

Dorset Council were proposing to carry out Section 50 on New Street, Weymouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 18 Sep 2025 at 14:22.

Dorset Council logo
Between
22 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Queens Avenue

Dorset Council are proposing to carry out Highway improvement works on Queens Avenue, Dorchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 13 May 2025 at 16:10.

Dorset Council logo
Between
22 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Queens Avenue

Dorset Council are proposing to carry out Highway improvement works on Queens Avenue, Dorchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 24 Apr 2025 at 13:05.

Wessex Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Church Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 9 Sep 2025 at 15:50.

Wessex Water logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Kings Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Kings Road, Dorchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Sep 2025 at 14:39.

Wessex Water logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Kings Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Kings Road, Dorchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 9 Sep 2025 at 15:10.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Moreton Road

BT are proposing to carry out Utility asset works on Moreton Road, Owermoigne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Sep 2025 at 17:07.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Moreton Road

BT are proposing to carry out Utility asset works on Moreton Road, Crossways.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Sep 2025 at 17:05.

Wessex Water logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Church Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 10 Jun 2025 at 11:40.

Wessex Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Lower Way

Wessex Water are proposing to carry out Utility repair and maintenance works on Lower Way, Chickerell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 23 Jul 2025 at 16:01.

Wessex Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Lower Way

Wessex Water are proposing to carry out Utility repair and maintenance works on Lower Way, Chickerell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 14 Aug 2025 at 14:25.

Wessex Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Lower Way

Wessex Water are proposing to carry out Utility repair and maintenance works on Lower Way, Chickerell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 9 Sep 2025 at 16:05.

Wessex Water logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Maiden Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Maiden Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 3 Sep 2025 at 14:10.

Dorset Council logo
LONG TERM
Between
3 Nov 2025 and 6 Apr 2026
Details
View Map
Share
Follow
North Quay

Dorset Council are proposing to carry out Highway improvement works on North Quay, Weymouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 23 Jul 2025 at 16:05.

Wessex Internet logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Access To Knighton Heath

Wessex Internet were proposing to carry out Utility asset works on Access To Knighton Heath, Lewell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 14 November 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 21 Aug 2025 at 12:09.

Wessex Water logo
LONG TERM
Between
11 Nov 2025 and 20 Feb 2026
Details
View Map
Share
Follow
A353 Warmwell Roundabout To Osmington Mills Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on A353 Warmwell Roundabout To Osmington Mills Lane, Poxwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 20 February 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 16 Jul 2025 at 11:10.

Wessex Water logo
LONG TERM
Between
11 Nov 2025 and 20 Feb 2026
Details
View Map
Share
A353 Warmwell Roundabout To Osmington Mills Lane

Wessex Water were proposing to carry out Utility repair and maintenance works on A353 Warmwell Roundabout To Osmington Mills Lane, Poxwell.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 20 February 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 18 Jun 2025 at 15:17.

Wessex Water logo
LONG TERM
Between
11 Nov 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Grove Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Grove Hill, Osmington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Jul 2025 at 13:46.

Wessex Water logo
LONG TERM
Between
11 Nov 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Grove Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Grove Hill, Osmington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 16 Jul 2025 at 11:10.

Wessex Water logo
LONG TERM
Between
11 Nov 2025 and 20 Feb 2026
Details
View Map
Share
Follow
A353 Warmwell Roundabout To Osmington Mills Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on A353 Warmwell Roundabout To Osmington Mills Lane, Poxwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 20 February 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 22 Jul 2025 at 13:46.

BT logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
East Street

BT are proposing to carry out Utility asset works on East Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Sep 2025 at 16:00.

Network Rail logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Follow
Lower Lewell Farm Junction To Woodsford Signals Railway Crossing

Network Rail are proposing to carry out Works for Rail Purposes on Lower Lewell Farm Junction To Woodsford Signals Railway Crossing, Woodsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Sep 2025 at 09:45.

Network Rail logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Follow
From West Stafford Bypass Through Lewell

Network Rail are proposing to carry out Works for Rail Purposes on From West Stafford Bypass Through Lewell, Lewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Mar 2025 at 15:50.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Moreton Road

BT were proposing to carry out Utility asset works on Moreton Road, Crossways.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 26 November 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 4 Sep 2025 at 17:03.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Moreton Road

BT were proposing to carry out Utility asset works on Moreton Road, Owermoigne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 26 November 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 4 Sep 2025 at 17:06.

Wessex Water logo
LONG TERM
Between
1 Dec 2025 and 27 Feb 2026
Details
View Map
Share
Nottington Lane Northern Spur To Borough Boundary

Wessex Water were proposing to carry out Utility repair and maintenance works on Nottington Lane Northern Spur To Borough Boundary, Weymouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 27 February 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Aug 2025 at 08:12.

Wessex Water logo
LONG TERM
Between
1 Dec 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Nottington Lane Northern Spur To Borough Boundary

Wessex Water are proposing to carry out Utility repair and maintenance works on Nottington Lane Northern Spur To Borough Boundary, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 27 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 10 Sep 2025 at 15:10.

Dorset Council logo
Between
4 and 8 Dec 2025
Details
View Map
Share
Follow
Church Street

Dorset Council are proposing to carry out Highway improvement works on Church Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 4 Jun 2025 at 16:15.

Dorset Council logo
Between
4 and 8 Dec 2025
Details
View Map
Share
Follow
Church Street

Dorset Council are proposing to carry out Highway improvement works on Church Street, Weymouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 20 May 2025 at 16:30.


Roadworks Map near to Main Road, WEYMOUTH, DT3 6EE (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 19 Sep 2025 00:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Main Road, WEYMOUTH, DT3 6EE (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
OSMINGTON HILL 
(0.9 miles)
BT
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 15 Sep 2025 - 19 Sep 2025
0.9
Details
Share
Follow
2
BT logo
PRESTON ROAD 
(1.0 miles)
BT
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 15 Sep 2025 - 19 Sep 2025
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.