ROADWORKS SUMMARY
Ambleside, WEYMOUTH, DT3 5HH
Introduction
View current and future planned roadworks and road closures for Ambleside, DT3 5HH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Ambleside, WEYMOUTH, DT3 5HH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ambleside are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Sunday
Dorset Council are carrying out Highway improvement works on Rodwell Trail South, Wyke Regis, Weymouth.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 July 2024 at 09:01 and could run through until 24 November 2024. The works will impact the footway only.
This roadwork event was last updated by Dorset Council on 24 Sep 2024 at 09:16.
10 Dec 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Turnstone Close, Weymouth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 13:35 and could run through until 10 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Oct 2024 at 14:18.
28 Oct and 9 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Doves, Weymouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Oct 2024 at 15:40.
28 Oct and 9 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Turnstone Close, Weymouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Oct 2024 at 15:40.
29 Nov 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Dorchester Road, Broadwey, Weymouth.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 11:07 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 10:15.
Monday
Wessex Water were proposing to carry out Utility repair and maintenance works on Brandy Row, Portland.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wessex Water on 9 Oct 2024 at 14:45.
Monday
Wessex Water are proposing to carry out Utility repair and maintenance works on Chiswell, Portland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 25 Sep 2024 at 15:20.
5 Nov 2024 and 25 Mar 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Brandy Row, Portland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 25 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 29 Aug 2024 at 13:16.
5 Nov 2024 and 25 Mar 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Chiswell, Portland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 25 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 29 Aug 2024 at 13:16.
5 Nov 2024 and 25 Mar 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Brandy Row, Portland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wessex Water on 29 Aug 2024 at 13:16.
29 Nov 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Cambridge Road, Granby Industrial Estate, Chickerell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 22:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 13:10.
Southern Gas Networks carried out Utility repair and maintenance works on Cross Road, Weymouth.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 16 Nov 2024 and 25 Nov 2024 and were actually completed between 16 Nov 2024 (02:54) and 21 Nov 2024 (16:53). The works impacted the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 16:55.
Tomorrow
Scottish Hydro Electric Power Dis are carrying out New service connection on Radipole Lane, Southill, Weymouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:01 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 08:14.
Tomorrow
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Radipole Lane, Southill, Weymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Oct 2024 at 15:45.
18 Nov and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Granby Way, Chickerell.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 15:26.
Monday
BT are proposing to carry out Utility asset works on Coombe Valley Road, Bincombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the verge only.
This roadwork event was last updated by BT on 17 Sep 2024 at 15:00.
Monday
BT are proposing to carry out Utility asset works on Coombe Valley Road, Weymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the verge only.
This roadwork event was last updated by BT on 17 Sep 2024 at 15:00.
25 and 29 Nov 2024
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Rodwell Street, Weymouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Oct 2024 at 13:27.
26 and 29 Nov 2024
Dorset Council are proposing to carry out Highway improvement works on Rodden Lane, Rodden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Dorset Council on 18 Nov 2024 at 10:15.
26 and 29 Nov 2024
Dorset Council are proposing to carry out Highway improvement works on Rodden Lane, Rodden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Dorset Council on 18 Nov 2024 at 10:55.
26 and 29 Nov 2024
Dorset Council were proposing to carry out Highway improvement works on Rodden Lane, Rodden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Dorset Council on 14 Nov 2024 at 15:55.
2 and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Radipole Lane, Westham, Weymouth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 15:31.
2 and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wessex Roundabout, Weymouth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 12:11.
2 and 6 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Rodwell Street, Weymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:30.
2 Jan and 28 Mar 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Chiswell, Portland.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 17 Oct 2024 at 12:20.
2 Jan and 28 Mar 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Brandy Row, Portland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 15 Oct 2024 at 15:35.
6 and 8 Jan 2025
Dorset Council are proposing to carry out Highway improvement works on Causeway, Weymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dorset Council on 18 Nov 2024 at 10:05.
6 and 8 Jan 2025
Dorset Council are proposing to carry out Highway improvement works on Causeway, Weymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dorset Council on 19 Nov 2024 at 08:35.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Cove Row, Weymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 10:10.
13 and 15 Jan 2025
BT are proposing to carry out Utility asset works on Castletown, Portland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 15 Oct 2024 at 15:56.
17 Jan and 17 Mar 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Brandy Row, Portland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 25 Sep 2024 at 15:15.
27 and 31 Jan 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Franchise Street, Weymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wessex Water on 23 Oct 2024 at 10:45.
27 and 31 Jan 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Franchise Street, Weymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wessex Water on 15 Oct 2024 at 16:05.
27 and 29 Jan 2025
BT are proposing to carry out Utility asset works on Castletown, Portland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 14 Nov 2024 at 10:25.
3 Feb and 9 May 2025
Dorset Council are proposing to carry out Highway improvement works on Langton Avenue, Weymouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Dorset Council on 7 Nov 2024 at 09:10.
17 Feb and 17 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cambridge Road, Granby Industrial Estate, Chickerell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:05.
Roadworks Map near to Ambleside, WEYMOUTH, DT3 5HH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Ambleside, WEYMOUTH, DT3 5HH (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 Nov 2024 - 21 Nov 2024)
(Scheduled: 18 Nov 2024 - 22 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.