ROADWORKS SUMMARY
Rawcliffe Bridge, GOOLE, DN14 8SR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for DN14 8SR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Rawcliffe Bridge, GOOLE, DN14 8SR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Between
5 Jul 2024 and 4 Dec 2025
Details
View Map
Share
Follow
Greenland Lane

National Highways are proposing to carry out Works for road purposes on Greenland Lane, East Cowick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2024 and could run through until 4 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 8 Jul 2024 at 07:34.

East Riding Of Yorkshire Council logo
LONG TERM
Between
16 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Dunhill Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Dunhill Road, Goole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 13 Aug 2024 at 16:39.

Yorkshire Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Silver Street

Yorkshire Water are carrying out Utility repair and maintenance works on Silver Street, Thorne, Doncaster.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 13:11.

Yorkshire Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Wike Gate Road

Yorkshire Water are carrying out Utility repair and maintenance works on Wike Gate Road, Thorne, Doncaster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 September 2024 at 17:01 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 14:25.

East Riding Of Yorkshire Council logo
LONG TERM
Between
27 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Dunhill Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Dunhill Road, Goole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 9 Sep 2024 at 13:42.

East Riding Of Yorkshire Council logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Dunhill Road

East Riding Of Yorkshire Council are carrying out Highway improvement works on Dunhill Road, Goole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 00:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 2 Oct 2024 at 09:57.

East Riding Of Yorkshire Council logo
LONG TERM
Between
30 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Dunhill Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Dunhill Road, Goole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 13 Aug 2024 at 17:56.

Yorkshire Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Ellison Street

Yorkshire Water are proposing to carry out Utility asset works on Ellison Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 09:26.

Yorkshire Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
South Parade

Yorkshire Water are proposing to carry out Utility asset works on South Parade, Thorne, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 14:33.

Yorkshire Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Bridge Street

Yorkshire Water are proposing to carry out Utility asset works on Bridge Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 09:29.

Yorkshire Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Bridge Street

Yorkshire Water are proposing to carry out Utility asset works on Bridge Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Oct 2024 at 12:07.

Yorkshire Water logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Bridge Street

Yorkshire Water are carrying out Utility asset works on Bridge Street, Thorne, Doncaster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 08:30 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Nov 2024 at 08:54.

Yorkshire Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Church Street

Yorkshire Water were proposing to carry out Utility asset works on Church Street, Thorne, Doncaster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 15:18.

Yorkshire Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Horse Fair Green

Yorkshire Water were proposing to carry out roadworks on Horse Fair Green, Thorne, Doncaster.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 15:17.

Yorkshire Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
South Parade

Yorkshire Water are carrying out Utility asset works on South Parade, Thorne, Doncaster.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 08:30 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Nov 2024 at 08:55.

Yorkshire Water logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Ellison Street

Yorkshire Water are carrying out Utility asset works on Ellison Street, Thorne, Doncaster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 08:30 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Nov 2024 at 08:54.

Yorkshire Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Ellison Street

Yorkshire Water are proposing to carry out Utility asset works on Ellison Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Oct 2024 at 12:08.

East Riding Of Yorkshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Carlisle Street Access To Rear Argyle Street

East Riding Of Yorkshire Council are carrying out Highway improvement works on Carlisle Street Access To Rear Argyle Street, Goole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:08 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 19 Nov 2024 at 08:16.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Aire Street

Yorkshire Water are carrying out Utility repair and maintenance works on Aire Street, Goole.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 12:25 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 14:38.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Calder Street

Yorkshire Water are carrying out Utility repair and maintenance works on Calder Street, Goole.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 12:25 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 15:40.

Yorkshire Water logo
Finishing
Thursday
Details
View Map
Share
Follow
King Edward Road

Yorkshire Water are carrying out Utility repair and maintenance works on King Edward Road, Thorne, Doncaster.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 10:48 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 14:00.

Yorkshire Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Chester Court Road

Yorkshire Water are carrying out Utility repair and maintenance works on Chester Court Road, Camblesforth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 10:50 and could run through until 28 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 14:16.

East Riding Of Yorkshire Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
North Street

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on North Street, Barmby On The Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 14 Nov 2024 at 15:55.

East Riding Of Yorkshire Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
North Street

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on North Street, Barmby On The Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 6 Nov 2024 at 15:20.

Yorkshire Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Ellison Street

Yorkshire Water are proposing to carry out Utility asset works on Ellison Street, Thorne, Doncaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 30 Aug 2024 at 15:47.

Northern Powergrid (Yorkshire) logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Follow
Third Avenue Access Road To Fourth Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Third Avenue Access Road To Fourth Avenue, Goole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Oct 2024 at 10:15.

Northern Powergrid (Yorkshire) logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Follow
Third Avenue Access Road To Fourth Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Third Avenue Access Road To Fourth Avenue, Goole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 08:59.

Northern Powergrid (Yorkshire) logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Third Avenue Access Road To Fourth Avenue

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Third Avenue Access Road To Fourth Avenue, Goole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 10 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Oct 2024 at 07:55.

Cadent Gas logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Remedial works on Union Road, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:03.

BT logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Park Road

BT are proposing to carry out Utility asset works on Park Road, Moorends, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Oct 2024 at 08:53.

Northern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Goole Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Goole Road, Hook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Jul 2024 at 13:05.

Cadent Gas logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Millfield Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Millfield Road, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 13:22.

Vodafone logo
Between
1 and 16 Feb 2025
Details
View Map
Share
Follow
St Johns Court

Vodafone are proposing to carry out Statutory Infrastructure Works on St Johns Court, Goole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 20 Nov 2024 at 15:57.

Vodafone logo
Between
1 and 16 Feb 2025
Details
View Map
Share
Follow
St Johns Court

Vodafone are proposing to carry out Statutory Infrastructure Works on St Johns Court, Goole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 21 Nov 2024 at 11:28.

Network Rail logo
Between
16 and 18 Feb 2025
Details
View Map
Share
Follow
Marshland Road

Network Rail are proposing to carry out Works for Rail Purposes on Marshland Road, Moorends, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2024 at 10:34.

Network Rail logo
Between
16 and 18 Feb 2025
Details
View Map
Share
Follow
Moorends Road

Network Rail are proposing to carry out Works for Rail Purposes on Moorends Road, Moorends, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2024 at 10:34.

Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wike Gate Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wike Gate Road, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 29 Oct 2024 at 08:43.


Roadworks Map near to Rawcliffe Bridge, GOOLE, DN14 8SR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 00:29
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Rawcliffe Bridge, GOOLE, DN14 8SR (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
National Highways logo
MAJOR
  
GREENLAND LANE 
(0.7 miles)
National Highways
Works for road purposes - Carriageway - Road closure
Planned
Scheduled: 5 Jul 2024 - 4 Dec 2025
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.