ROADWORKS SUMMARY
Church Walk, DONCASTER, DN12 4AJ
Introduction
View current and future planned roadworks and road closures for Church Walk, DN12 4AJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Church Walk, DONCASTER, DN12 4AJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Church Walk are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Oct 2024 and 6 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Cliff Hill, Maltby, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 6 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Oct 2024 at 09:56.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Emley Drive, Scawsby, Doncaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 09:56.
9 Dec 2024 and 24 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Eskdale Walk, Scawsby, Doncaster.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 24 January 2025. The works were due to impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 15:51.
16 Dec 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Emley Drive, Scawsby, Doncaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 16:03.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Victoria Road, Balby, Doncaster.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 December 2024 at 13:24 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Dec 2024 at 14:26.
2 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Emley Drive, Scawsby, Doncaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 12:20.
2 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Emley Drive, Scawsby, Doncaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Dec 2024 at 09:36.
Thursday
Yorkshire Water are carrying out Utility repair and maintenance works on Crossgate, Mexborough, Doncaster.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2025 at 08:32 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 3 Jan 2025 at 10:49.
Wednesday
Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Cadeby, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 1 Nov 2024 at 15:35.
Friday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Netherfield Lane, Parkgate, Rotherham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 January 2025 at 09:30 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Jan 2025 at 09:49.
Friday
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pear Tree Avenue, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Oct 2024 at 10:27.
Friday
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pear Tree Avenue, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Dec 2024 at 12:27.
6 and 17 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Paddock Drive, Sunnyside, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:14.
6 and 17 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Paddock Drive, Sunnyside, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 14:24.
Friday
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Park Lane, Thrybergh, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 09:59.
6 Jan and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Carr Lodge Spine Road, Balby, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:30.
6 Jan and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Carr Lodge Spine Road, Balby, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 00:10.
6 Jan and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Woodfield Way, Balby, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 16:09.
6 Jan and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Woodfield Way, Balby, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:16.
Wednesday
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Main Street, Cadeby, Doncaster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 14:28.
6 and 31 Jan 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Balby Carr Bank, Balby, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 26 Nov 2024 at 14:53.
6 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Emley Drive, Scawsby, Doncaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Dec 2024 at 11:10.
6 Jan and 2 Feb 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barnsley Road, Marr, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 19 Nov 2024 at 10:11.
6 Jan and 2 Feb 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barnsley Road, Hickleton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 19 Nov 2024 at 10:10.
Friday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Castle Street, Conisbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 10:07.
Friday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Castle Street, Conisbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 09:35.
Friday
Quickline Commucations are proposing to carry out Utility asset works on Pastures Lane, Cadeby, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 13:23.
Friday
Quickline Commucations are proposing to carry out Utility asset works on Pastures Lane, Cadeby, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 16 Oct 2024 at 11:06.
8 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eskdale Walk, Scawsby, Doncaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 9 Oct 2024 at 09:00.
8 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eskdale Walk, Scawsby, Doncaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 15 Oct 2024 at 16:21.
9 and 29 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Church Street, Mexborough, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Dec 2024 at 10:09.
9 and 29 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Church Street, Mexborough, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Dec 2024 at 10:22.
13 Jan and 21 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Doncaster Road, Thrybergh, Rotherham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Nov 2024 at 12:50.
13 Jan and 21 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Doncaster Road, Thrybergh, Rotherham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 10:53.
13 and 17 Jan 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Castle Hill From Castle Street To Low Road, Conisbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 17 Sep 2024 at 16:09.
13 and 17 Jan 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Castle Hill From Castle Street To Low Road, Conisbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 19 Dec 2024 at 10:43.
13 and 17 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on St Johns Road, Swinton, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 08:05.
13 and 29 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Church Street, Mexborough, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Dec 2024 at 13:29.
13 Jan and 3 Feb 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Greenfield Lane, Balby, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 19 Nov 2024 at 12:18.
13 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eskdale Walk, Scawsby, Doncaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 10:08.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Searby Road, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footpath only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:28.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Elsham Close, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:42.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Elsham Close, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:21.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:00.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:29.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 13:49.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 11:00.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 16:35.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 13:36.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 08:46.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 10:02.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 13:36.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 08:44.
14 and 20 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Common Lane, Clifton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 11:16.
14 and 20 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Common Lane, Clifton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 15:22.
14 and 16 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Main Street, Cadeby, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Nov 2024 at 12:30.
14 and 16 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Main Street, Cadeby, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Nov 2024 at 14:18.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Mill Lane, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 07:50.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Mill Lane, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 28 Oct 2024 at 13:55.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Newhill Road, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 07:50.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Newhill Road, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 15:06.
18 and 26 Jan 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barnsley Road, Marr, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 13 Dec 2024 at 10:19.
18 and 26 Jan 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barnsley Road, Hickleton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 13 Dec 2024 at 10:20.
20 and 24 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Searby Road, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footpath only.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 08:35.
20 and 31 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on St Andrews Close, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:56.
20 and 24 Jan 2025
Quickline Commucations were proposing to carry out Utility repair and maintenance works on Holme Hall Lane, Stainton, Doncaster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 16 Oct 2024 at 13:31.
20 and 24 Jan 2025
Quickline Commucations were proposing to carry out Utility repair and maintenance works on Holme Hall Lane, Stainton, Doncaster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 13:34.
20 and 24 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Holme Hall Lane, Stainton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 11:17.
20 and 24 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Holme Hall Lane, Stainton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 15:23.
20 Jan and 5 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Addison Road, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Nov 2024 at 20:05.
20 Jan and 5 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Addison Road, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 09:11.
20 Jan and 5 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Mexborough, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Nov 2024 at 20:06.
20 Jan and 5 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Mexborough, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 00:10.
20 Jan and 5 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Nov 2024 at 20:04.
20 Jan and 5 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 09:12.
20 and 22 Jan 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hound Hill Lane, Adwick Upon Dearne, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 18 Dec 2024 at 15:26.
20 and 22 Jan 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hound Hill Lane, Adwick Upon Dearne, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 19 Dec 2024 at 10:11.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:21.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:18.
21 and 27 Jan 2025
Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:06.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:25.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:19.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 08:35.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:24.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:19.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Elder Drive, Sunnyside, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:13.
27 and 31 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Poplar Avenue, Thrybergh, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 10:54.
27 and 31 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Poplar Avenue, Thrybergh, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 12:54.
27 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Pym Road, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Nov 2024 at 20:03.
27 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eskdale Walk, Scawsby, Doncaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 23 Dec 2024 at 09:15.
27 and 31 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Street Lane, Brodsworth, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Quickline Commucations on 22 Nov 2024 at 14:28.
27 and 31 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Street Lane, Brodsworth, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Quickline Commucations on 24 Nov 2024 at 19:47.
29 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Searby Road, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:47.
2 and 9 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Works for road purposes on Common Lane, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Nov 2024 at 10:56.
2 and 23 Feb 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Greenfield Lane, Hexthorpe, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 9 Dec 2024 at 09:43.
2 and 23 Feb 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Urban Road, Hexthorpe, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 9 Dec 2024 at 09:40.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Woodfield Way, Balby, Doncaster.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 08:34.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on College Road, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 12:04.
3 and 6 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Cadeby, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 8 Nov 2024 at 10:21.
3 and 6 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Cadeby, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 11 Nov 2024 at 15:48.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Mexborough Road, Adwick Upon Dearne, Doncaster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:38.
3 Feb and 25 Apr 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Lorne Road, Thurnscoe, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 25 Nov 2024 at 15:51.
4 and 6 Feb 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on The Green, Old Denaby, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 9 Dec 2024 at 15:34.
4 and 6 Feb 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on The Green, Old Denaby, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 14:57.
5 and 7 Feb 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Micklebring Lane, Micklebring, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 9 Dec 2024 at 15:50.
5 and 7 Feb 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Micklebring Lane, Micklebring, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 31 Dec 2024 at 13:52.
6 Feb and 6 May 2025
Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.
6 Feb and 6 May 2025
Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:47.
7 and 11 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Cockhill Field Lane Ru138, Braithwell, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 26 Nov 2024 at 11:56.
7 and 11 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Cockhill Field Lane Ru138, Braithwell, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 29 Nov 2024 at 12:02.
10 and 14 Feb 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Thrybergh Lane, Thrybergh, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 08:48.
10 and 14 Feb 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Thrybergh Lane, Thrybergh, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 10:03.
10 and 12 Feb 2025
Quickline Commucations were proposing to carry out Utility repair and maintenance works on Crossland Street, Swinton, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 12 Dec 2024 at 12:05.
11 and 17 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Old Doncaster Road, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Nov 2024 at 10:58.
11 and 17 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Old Doncaster Road, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Dec 2024 at 09:26.
16 Feb and 9 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Conisbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 2 Jan 2025 at 09:43.
17 Feb and 17 Mar 2025
Yorkshire Water are proposing to carry out Utility asset works on Mill Lane, Harlington, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 Dec 2024 at 13:29.
17 Feb and 17 Mar 2025
Yorkshire Water are proposing to carry out Utility asset works on Mill Lane, Harlington, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 15:30.
24 and 28 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Doncaster Road, Harlington, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:59.
27 Feb and 27 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:53.
27 Feb and 27 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Flanderwell Lane, Sunnyside, Rotherham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:45.
27 Feb and 27 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Osberton Street, Wadworth, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:06.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lichfield Gardens, Edlington, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:10.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Grainger Close, Edlington, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:08.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bower Vale, Edlington, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:09.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Crookhill Close, Edlington, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:07.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Thornlea Court, Edlington, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:06.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Farm Court, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:12.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fontwell Drive, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:11.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Epsom Close, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:11.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wetherby Drive, Mexborough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:12.
28 Feb and 31 Mar 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Windsor Close, Harlington, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:14.
3 and 6 Mar 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on St Johns Road, Swinton, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Dec 2024 at 13:13.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Daw Lane, Wadworth, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Nov 2024 at 15:29.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Elder Grove, Conisbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 8 Nov 2024 at 08:57.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Broomhouse Lane, Edlington, Doncaster.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Nov 2024 at 09:57.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sheldon Avenue, Conisbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 8 Nov 2024 at 08:56.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birch Grove, Conisbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Nov 2024 at 15:30.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Roberts Avenue, Conisbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 8 Nov 2024 at 08:56.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High Road, Warmsworth, Doncaster.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 6 Nov 2024 at 09:07.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Nursery Lane, Sprotbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 9 Dec 2024 at 09:31.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hound Hill Lane, Adwick Upon Dearne, Doncaster.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Nov 2024 at 14:33.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cadeby Road, Sprotbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 9 Dec 2024 at 09:30.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Boat Lane, Sprotbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 9 Dec 2024 at 09:31.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Main Street, Sprotbrough, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 9 Dec 2024 at 09:30.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mexborough Road, Adwick Upon Dearne, Doncaster.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Nov 2024 at 14:35.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Urban Road, Hexthorpe, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Nov 2024 at 09:55.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Urban Road, Hexthorpe, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Nov 2024 at 09:55.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Flowitt Street, Hexthorpe, Doncaster.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Nov 2024 at 09:12.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ramsden Road, Hexthorpe, Doncaster.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Nov 2024 at 09:13.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barnsley Road, Marr, Doncaster.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 6 Nov 2024 at 08:00.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barnsley Road, Scawsby, Doncaster.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 6 Nov 2024 at 09:31.
1 Apr and 31 Aug 2025
Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barnsley Road, Hickleton, Doncaster.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Doncaster Metropolitan Borough Council on 6 Nov 2024 at 09:08.
Roadworks Map near to Church Walk, DONCASTER, DN12 4AJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Church Walk, DONCASTER, DN12 4AJ (9 Events)