ROADWORKS SUMMARY
Cedar Court, DURHAM, DH6 3EH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cedar Court, DH6 3EH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Cedar Court, DURHAM, DH6 3EH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cedar Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Caroline Street South Back

Sunderland City Council are proposing to carry out Highway improvement works on Caroline Street South Back, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 21 Feb 2024 at 13:20.

Northumbrian Water logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Church View

Northumbrian Water are carrying out Utility repair and maintenance works on Church View, Ludworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 13:00 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Jul 2024 at 12:14.

Northumbrian Water logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Moor Crescent

Northumbrian Water are carrying out Utility repair and maintenance works on Moor Crescent, Ludworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 13:00 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Jul 2024 at 12:14.

ESP Electricity logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
B1283 (From A181 Junc To Kidd Avenue Junc)

ESP Electricity are carrying out Utility asset works on B1283 (From A181 Junc To Kidd Avenue Junc), Sherburn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 27 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ESP Electricity on 10 Sep 2024 at 11:24.

Durham County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
A690 (From Junction 62 Interchange To C12a Pittington Road)

Durham County Council are proposing to carry out Highway repair and maintenance works on A690 (From Junction 62 Interchange To C12a Pittington Road), Belmont.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Aug 2024 at 11:56.

Durham County Council logo
LONG TERM
Between
2 Sep and 31 Oct 2024
Details
View Map
Share
Follow
The Links

Durham County Council are proposing to carry out Highway repair and maintenance works on The Links, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 4 Apr 2024 at 08:01.

ESP Electricity logo
LONG TERM
Until
7 Oct 2024
Details
View Map
Share
Follow
Front Street

ESP Electricity are carrying out Utility asset works on Front Street, Sherburn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 September 2024 at 08:00 and could run through until 7 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ESP Electricity on 6 Sep 2024 at 08:11.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
C60 (From North Side Shadforth To C60/c65 Junc)

Northumbrian Water are carrying out Utility repair and maintenance works on C60 (From North Side Shadforth To C60/c65 Junc), Shadforth.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 23:30 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 19 Sep 2024 at 10:52.

LONG TERM
Until
25 Oct 2024
Details
View Map
Share
Follow
Scott Terrace West Rear

Sunderland City Council are carrying out Highway improvement works on Scott Terrace West Rear, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 08:00 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 12 Sep 2024 at 08:48.

Durham County Council logo
Between
20 and 29 Sep 2024
Details
View Map
Share
Follow
Thinford Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Thinford Road, Metal Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Aug 2024 at 11:57.

Durham County Council logo
Between
20 and 29 Sep 2024
Details
View Map
Share
Follow
Thinford Road Roundabout

Durham County Council are proposing to carry out Highway repair and maintenance works on Thinford Road Roundabout, Metal Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Aug 2024 at 11:58.

Durham County Council logo
Between
20 and 29 Sep 2024
Details
View Map
Share
Follow
A688 (From Thinford Road Roundabout To Coxhoe Interchange)

Durham County Council are proposing to carry out Highway repair and maintenance works on A688 (From Thinford Road Roundabout To Coxhoe Interchange), Tursdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Aug 2024 at 12:00.

Durham County Council logo
Between
20 and 29 Sep 2024
Details
View Map
Share
Follow
Thinford Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Thinford Lane, Spennymoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Aug 2024 at 11:59.

Durham County Council logo
Until
7 Oct 2024
Details
View Map
Share
Follow
The Village

Durham County Council are carrying out Highway repair and maintenance works on The Village, Castle Eden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 10:00 and could run through until 7 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 18 Sep 2024 at 10:57.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Doxford Terrace South

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Doxford Terrace South, Murton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Jul 2024 at 13:18.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Doxford Terrace South

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Doxford Terrace South, Murton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 27 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 19 Sep 2024 at 10:18.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Doxford Terrace South

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Doxford Terrace South, Murton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 19 Sep 2024 at 11:30.

Northumbrian Water logo
LONG TERM
Between
23 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Barnard Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Barnard Avenue, Ludworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Sep 2024 at 13:35.

Durham County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Hawthorn Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on Hawthorn Crescent, Gilesgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Sep 2024 at 10:38.

Durham County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Hawthorn Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on Hawthorn Crescent, Gilesgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Jul 2024 at 14:42.

Durham County Council logo
Between
26 Sep and 1 Oct 2024
Details
View Map
Share
Follow
Ryan Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Ryan Terrace, Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 1 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 13 Sep 2024 at 16:23.

Durham County Council logo
Between
3 and 9 Oct 2024
Details
View Map
Share
Follow
Cemetery Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Cemetery Road, Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 3 Sep 2024 at 10:11.

Durham County Council logo
LONG TERM
Between
9 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Salters Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Salters Lane, Shotton Colliery.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 9 Sep 2024 at 12:38.

Durham County Council logo
Between
14 and 23 Oct 2024
Details
View Map
Share
Follow
Thinford Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Thinford Road, Metal Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Aug 2024 at 14:40.

Durham County Council logo
Between
14 and 23 Oct 2024
Details
View Map
Share
Follow
Thinford Road Roundabout

Durham County Council are proposing to carry out Highway repair and maintenance works on Thinford Road Roundabout, Metal Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Aug 2024 at 14:41.

Durham County Council logo
Between
14 and 23 Oct 2024
Details
View Map
Share
Follow
A688 (From Thinford Road Roundabout To Coxhoe Interchange)

Durham County Council are proposing to carry out Highway repair and maintenance works on A688 (From Thinford Road Roundabout To Coxhoe Interchange), Tursdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Aug 2024 at 14:42.

Durham County Council logo
Between
14 and 23 Oct 2024
Details
View Map
Share
Follow
Thinford Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Thinford Lane, Spennymoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Aug 2024 at 14:42.

Between
25 Oct and 13 Nov 2024
Details
View Map
Share
Follow
Victoria Street

Sunderland City Council are proposing to carry out Highway improvement works on Victoria Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 18 Jul 2024 at 12:38.

Durham County Council logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Eastbound Link Road Between A181 And Salters Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Eastbound Link Road Between A181 And Salters Lane, Wingate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 9 Sep 2024 at 12:37.

Durham County Council logo
LONG TERM
Between
1 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Front Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 29 Aug 2024 at 10:48.

Durham County Council logo
LONG TERM
Between
1 Nov and 20 Dec 2024
Details
View Map
Share
Follow
B1279 (From Hartlepool Street Junc To Front Street Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on B1279 (From Hartlepool Street Junc To Front Street Junc), Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 29 Aug 2024 at 10:50.

Durham County Council logo
LONG TERM
Between
1 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Woodlands Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Woodlands Avenue, Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 29 Aug 2024 at 10:29.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Cambridge Road

BT are proposing to carry out Utility asset works on Cambridge Road, Peterlee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 31 Jul 2024 at 15:09.

Durham County Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
St Cuthberts Road

Durham County Council are proposing to carry out Highway repair and maintenance works on St Cuthberts Road, Peterlee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 29 Aug 2024 at 15:37.

Durham County Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Cemetery Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Cemetery Road, Wheatley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Apr 2024 at 07:05.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
New Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on New Street, Sherburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 20 Sep 2024 at 16:05.


Roadworks Map near to Cedar Court, DURHAM, DH6 3EH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Sep 2024 01:26
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cedar Court, DURHAM, DH6 3EH (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Durham County Council logo
COOPERS CLOSE 
(0.3 miles)
Durham County Council
Highway repair and maintenance works - Carriageway - Give and take
In Progress
Since: 11 Sep 2024 09:00
(Scheduled: 11 Sep 2024 - 24 Sep 2024)
0.3
Details
Share
Follow
2
Northumbrian Water logo
URGENT
  
QUILSTYLE ROAD 
(1.0 miles)
Northumbrian Water
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 18 Sep 2024 08:44
(Scheduled: 18 Sep 2024 - 24 Sep 2024)
1.0
Details
Share
Follow