ROADWORKS SUMMARY
Back Buttsfield Terrace, HOUGHTON LE SPRING, DH4 7HN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Back Buttsfield Terrace, DH4 7HN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Back Buttsfield Terrace, HOUGHTON LE SPRING, DH4 7HN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Back Buttsfield Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Easington Street

Sunderland City Council are carrying out Highway repair and maintenance works on Easington Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:00 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 22 Sep 2023 at 11:05.

Northumbrian Water logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Galloping Green Road

Northumbrian Water are carrying out Utility repair and maintenance works on Galloping Green Road, Eighton Banks, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 11:24 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Dec 2024 at 09:55.

LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Washington Road

Sunderland City Council are carrying out Highway improvement works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 09:00 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Sunderland City Council on 9 Dec 2024 at 13:34.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Mortimer Street

Sunderland City Council are carrying out Highway improvement works on Mortimer Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2024 at 08:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 8 Nov 2024 at 07:17.

South Tyneside Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
A1290 Washington Road Slip Roads East And West Of A19

South Tyneside Council are carrying out Highway improvement works on A1290 Washington Road Slip Roads East And West Of A19, West Boldon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 10 Dec 2024 at 15:22.

South Tyneside Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
A1290 Washington Road Slip Roads East And West Of A19

South Tyneside Council are carrying out Highway improvement works on A1290 Washington Road Slip Roads East And West Of A19, West Boldon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 10 Dec 2024 at 15:10.

South Tyneside Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Downhill Lane

South Tyneside Council are carrying out Highway improvement works on Downhill Lane, West Boldon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 10 Dec 2024 at 15:42.

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Pallion New Road

Sunderland City Council are carrying out Highway improvement works on Pallion New Road, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 20 Nov 2024 at 08:00.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Exeter Street

Sunderland City Council are carrying out Highway improvement works on Exeter Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 08:30 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 07:12.

LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
European Way

Sunderland City Council are carrying out Highway improvement works on European Way, Pallion Industrial Estate, Sunderland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 09:00 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 18 Sep 2024 at 09:44.

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Oxford Street

Sunderland City Council are carrying out Highway improvement works on Oxford Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 12:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 28 Oct 2024 at 10:35.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Rowan Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rowan Avenue, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 19 Jul 2024 at 10:40.

LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Paul Watson Way

Sunderland City Council are carrying out Highway improvement works on Paul Watson Way, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 07:50 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 13 Nov 2024 at 07:57.

Northumbrian Water logo
LONG TERM
Between
18 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 3 Oct 2024 at 13:55.

Northumbrian Water logo
LONG TERM
Between
18 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 6 Nov 2024 at 13:44.

Northumbrian Water logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are carrying out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:18 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 19 Nov 2024 at 10:18.

LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Edwin Street

Sunderland City Council are proposing to carry out Highway improvement works on Edwin Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 06:20.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Edwin Street

Sunderland City Council are carrying out Highway improvement works on Edwin Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 09:03.

LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are proposing to carry out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 06:19.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are carrying out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 09:03.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Newcastle Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Newcastle Bank, Northside, Birtley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 14 Nov 2024 at 10:55.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Newcastle Bank

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Newcastle Bank, Northside, Birtley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:18 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Nov 2024 at 08:18.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 14 Nov 2024 at 10:16.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:16 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Nov 2024 at 08:16.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Long Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Long Bank, Eighton Banks, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 14 Nov 2024 at 10:19.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Long Bank

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Long Bank, Eighton Banks, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:18 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Nov 2024 at 08:18.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Durham Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Durham Road, Low Fell, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 14 Nov 2024 at 10:12.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Durham Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Durham Road, Low Fell, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:16 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Nov 2024 at 08:16.

Northumbrian Water logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 26 Nov 2024 at 14:13.

Northumbrian Water logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are carrying out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 6 Dec 2024 at 08:42.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Rowan Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Rowan Avenue, Harraton, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 7 February 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 11:28.

Northumbrian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ashbrooke Road

Northumbrian Water are carrying out Utility repair and maintenance works on Ashbrooke Road, Ashbrooke, Sunderland.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 14:00 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 3 Jan 2025 at 11:14.

Northumbrian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Aged Miners Homes

Northumbrian Water are carrying out Utility repair and maintenance works on Aged Miners Homes, Hetton-le-hole, Houghton-le-spring.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 December 2024 at 10:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 23 Dec 2024 at 12:11.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:03.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:58.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:50.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Richmond Street

Sunderland City Council are proposing to carry out Highway improvement works on Richmond Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Richmond Street

Sunderland City Council are proposing to carry out Highway improvement works on Richmond Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:05.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:59.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street North

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street North

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:00.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:04.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Stobart Street

Sunderland City Council are proposing to carry out Highway improvement works on Stobart Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Stobart Street

Sunderland City Council are proposing to carry out Highway improvement works on Stobart Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:59.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Saint Oswalds Terrace South Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saint Oswalds Terrace South Back, Shiney Row, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 27 Sep 2024 at 13:41.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Saint Oswalds Terrace South Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saint Oswalds Terrace South Back, Shiney Row, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 06:20.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rowan Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rowan Avenue, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 12:21.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 19 Jul 2024 at 10:37.

Northern Gas Networks logo
Between
6 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 12:42.

Northumbrian Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Knoulberry Road

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 13:41.

LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are proposing to carry out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 22 Oct 2024 at 13:51.

Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hay Street

Sunderland City Council are proposing to carry out roadworks on Hay Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 5 Dec 2024 at 09:38.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Mount Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Mount Lane, Springwell, Gateshead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 14:14.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Sandy Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Oct 2024 at 12:04.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Sandy Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 11:34.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Sandy Lane

Northumbrian Water were proposing to carry out Permanent reinstatement on Sandy Lane, Eighton Banks, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 11:35.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Sandy Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Dec 2024 at 09:56.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Sandy Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 3 Jan 2025 at 09:16.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 16 Oct 2024 at 13:51.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Dec 2024 at 15:32.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 12 Dec 2024 at 16:08.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
7 and 24 Jan 2025
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 2 Jan 2025 at 11:19.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
7 and 24 Jan 2025
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 18 Dec 2024 at 09:45.

Gateshead Metropolitan Borough Council logo
Between
9 and 14 Jan 2025
Details
View Map
Share
Follow
Rugby Gardens

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rugby Gardens, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Sep 2024 at 09:23.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
John Street

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on John Street, Hetton-le-hole, Houghton-le-spring.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 08:16.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
John Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on John Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:14.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
John Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on John Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Dec 2024 at 11:16.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Front Street South Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Front Street South Back, Fence Houses, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 07:09.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Front Street South Back

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Front Street South Back, Fence Houses, Houghton-le-spring.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 15:07.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Cheviot Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cheviot Lane, Ryhope, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Oct 2024 at 06:14.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Cheviot Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cheviot Lane, Ryhope, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Dec 2024 at 11:51.

Northern Powergrid (Northeast) logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Back Ryhope Street

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Back Ryhope Street, Ryhope, Sunderland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Dec 2024 at 13:44.

National Highways logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 23 Dec 2024 at 13:41.

National Highways logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jan 2025 at 08:40.

Energy Assets Pipelines logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 16 Oct 2024 at 13:48.

Northern Gas Networks logo
LONG TERM
Between
15 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 13:53.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lambton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lambton Lane, New Lambton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 13:36.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lambton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lambton Lane, New Lambton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Dec 2024 at 11:20.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Maria Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Maria Street, Silksworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 22 Oct 2024 at 11:52.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Maria Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Maria Street, Silksworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 31 Dec 2024 at 06:03.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Grasmere Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Grasmere Terrace, Columbia, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 10 Oct 2024 at 14:03.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Grasmere Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Grasmere Terrace, Columbia, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 31 Dec 2024 at 06:04.

Northumbrian Water logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 10 Dec 2024 at 10:09.

National Highways logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 23 Dec 2024 at 14:51.

National Highways logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jan 2025 at 08:42.

Northumbrian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Knoulberry Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 13:53.

Northumbrian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Knoulberry Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 18 Dec 2024 at 09:46.

Northumbrian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Knoulberry Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 19 Dec 2024 at 10:09.

Northumbrian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Knoulberry Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 20 Dec 2024 at 09:29.

Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hay Street

Sunderland City Council are proposing to carry out Highway improvement works on Hay Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 5 Dec 2024 at 09:36.

Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hay Street

Sunderland City Council are proposing to carry out Highway improvement works on Hay Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 5 Dec 2024 at 12:30.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 14:00.

Gateshead Metropolitan Borough Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Seaham Gardens

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Seaham Gardens, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Sep 2024 at 09:10.

Gateshead Metropolitan Borough Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Stanley Gardens

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stanley Gardens, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Sep 2024 at 09:16.

Gateshead Metropolitan Borough Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Ridgeway

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ridgeway, Leam Lane Estate, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 4 Dec 2024 at 12:32.

Gateshead Metropolitan Borough Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Ridgeway

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ridgeway, Leam Lane Estate, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 4 Dec 2024 at 13:00.

National Highways logo
LONG TERM
Between
14 Feb and 30 Jul 2025
Details
View Map
Share
Follow
Lumley New Road

National Highways are proposing to carry out Diversionary works on Lumley New Road, Castle Dene.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Dec 2024 at 15:32.

Northumbrian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Cambria Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cambria Street, South Hylton, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 13:33.

Northern Gas Networks logo
Between
18 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Wilson Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Street, Millfield, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 12:02.

Northern Gas Networks logo
Between
18 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Wilson Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Street, Millfield, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 11:39.

Northern Gas Networks logo
Between
22 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 11:42.

Northern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 09:10.

Northern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 11:58.

Northern Gas Networks logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Wilson Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Street, Millfield, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 09:11.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Oak Street (Side)

Durham County Council are proposing to carry out Highway repair and maintenance works on Oak Street (Side), Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 10:20.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Gill Crescent South (Side)

Durham County Council are proposing to carry out Highway repair and maintenance works on Gill Crescent South (Side), Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 08:53.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
School Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on School Terrace, Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 11:11.

Northumbrian Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Albert Road

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Albert Road, Millfield, Sunderland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Dec 2024 at 11:32.

Durham County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Park Road North

Durham County Council are proposing to carry out Highway repair and maintenance works on Park Road North, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 10 Dec 2024 at 14:30.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Dec 2024 at 14:34.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Dec 2024 at 17:08.

Network Rail logo
Between
15 and 17 Mar 2025
Details
View Map
Share
Waldridge Road

Network Rail were proposing to carry out Works for Rail Purposes on Waldridge Road, Chester-le-street.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 17 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Dec 2024 at 12:11.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct)

Durham County Council are proposing to carry out Highway repair and maintenance works on A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct), Chester Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 16 Dec 2024 at 13:58.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Clarence Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Clarence Terrace, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Dec 2024 at 11:07.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Osborne Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Osborne Road, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Dec 2024 at 11:01.

Northumbrian Water logo
Between
2 and 6 Apr 2025
Details
View Map
Share
Follow
Pine Street And Ravensworth Road Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Pine Street And Ravensworth Road Back, Birtley Central, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Jan 2025 at 10:11.


Roadworks Map near to Back Buttsfield Terrace, HOUGHTON LE SPRING, DH4 7HN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Jan 2025 16:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Back Buttsfield Terrace, HOUGHTON LE SPRING, DH4 7HN (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Netomnia logo
BAULKHAM HILLS, PENSHAW 
(0.4 miles)
Netomnia
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.4
Details
Share
Follow
2
Northumbrian Water logo
MAJOR
  
SAINT OSWALDS TERRACE SOUTH BACK, SHINEY ROW 
(0.7 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 6 Jan 2025 - 10 Jan 2025
0.7
Details
Share
Follow
3
Northumbrian Water logo
MAJOR
  
SAINT OSWALDS TERRACE SOUTH BACK, SHINEY ROW 
(0.7 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 6 Jan 2025 - 10 Jan 2025
0.7
Details
Share
Follow