ROADWORKS SUMMARY
Cookson Terrace, CHESTER LE STREET, DH2 2AN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cookson Terrace, DH2 2AN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cookson Terrace, CHESTER LE STREET, DH2 2AN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cookson Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Gateshead Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Durham Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Durham Road, Birtley Central, Birtley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 26 Nov 2024 at 14:11.

Gateshead Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Durham Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Durham Road, Birtley Central, Birtley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 26 Nov 2024 at 14:18.

Northumbrian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Galloping Green Road

Northumbrian Water are carrying out Utility repair and maintenance works on Galloping Green Road, Eighton Banks, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 11:24 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 24 Oct 2024 at 10:13.

Network Rail logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Wesley Terrace

Network Rail are carrying out Works for Rail Purposes on Wesley Terrace, Chester-le-street.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 May 2024 at 07:00 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 May 2024 at 06:41.

Durham County Council logo
LONG TERM
Between
14 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Dryburn Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Dryburn Road, Framwellgate Moor.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 18 Nov 2024 at 09:16.

Northumbrian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Sandy Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 9 Oct 2024 at 11:36.

Northumbrian Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Road Through Belmont Industrial Estate

Northumbrian Water are carrying out Utility repair and maintenance works on Road Through Belmont Industrial Estate, Belmont.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 19:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 09:59.

Northern Gas Networks logo
LONG TERM
Between
11 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Rowan Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rowan Avenue, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 19 Jul 2024 at 10:40.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Durham Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Durham Road, Low Fell, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 14 Nov 2024 at 10:12.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Long Bank

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Long Bank, Eighton Banks, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:18 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Nov 2024 at 08:18.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Long Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Long Bank, Eighton Banks, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 14 Nov 2024 at 10:19.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:16 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Nov 2024 at 08:16.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 14 Nov 2024 at 10:16.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Newcastle Bank

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Newcastle Bank, Northside, Birtley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:18 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Nov 2024 at 08:18.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Newcastle Bank

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Newcastle Bank, Northside, Birtley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 14 Nov 2024 at 10:55.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Durham Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Durham Road, Low Fell, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:16 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Nov 2024 at 08:16.

Northern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Rothbury Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rothbury Road, Newton Hall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2024 at 10:26.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Front Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Front Street, Chester-le-street.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 10:33 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 08:27.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Rowan Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Rowan Avenue, Harraton, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 7 February 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 11:28.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Easedale Gardens From Harlow Green Lane To Long Bank

Northern Gas Networks are carrying out Utility repair and maintenance works on Easedale Gardens From Harlow Green Lane To Long Bank, Gateshead.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 11:35 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 14:02.

National Highways logo
Finishing
Today
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Dec 2024 at 16:03.

National Highways logo
Finishing
Today
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are carrying out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 20:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Dec 2024 at 10:18.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Stanley Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2024 at 15:32.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2024 at 13:46.

Northumbrian Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Saint Oswalds Terrace South Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saint Oswalds Terrace South Back, Shiney Row, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 06:20.

National Highways logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
A690 (From Junction 62 Interchange To C12a Pittington Road)

National Highways are proposing to carry out Works for road purposes on A690 (From Junction 62 Interchange To C12a Pittington Road), Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 16:46.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Mount Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Mount Lane, Springwell, Gateshead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 14:14.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Sandy Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 11:34.

Northumbrian Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Knoulberry Road

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 13:41.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 16 Oct 2024 at 13:51.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 19 Jul 2024 at 10:37.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rowan Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rowan Avenue, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 12:21.

Nexfibre Networks Limited logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Shafto Terrace

Nexfibre Networks Limited are proposing to carry out Permanent reinstatement on Shafto Terrace, Craghead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 15 Oct 2024 at 08:41.

National Highways logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
A690 (From Junction 62 Interchange To C12a Pittington Road)

National Highways are proposing to carry out Works for road purposes on A690 (From Junction 62 Interchange To C12a Pittington Road), Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Oct 2024 at 15:16.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Sandy Lane

Northumbrian Water were proposing to carry out Permanent reinstatement on Sandy Lane, Eighton Banks, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 11:35.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Sandy Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Eighton Banks, Gateshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Oct 2024 at 12:04.

Northumbrian Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Saint Oswalds Terrace South Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saint Oswalds Terrace South Back, Shiney Row, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 27 Sep 2024 at 13:41.

National Highways logo
Between
7 and 11 Jan 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 12 Dec 2024 at 16:08.

National Highways logo
Between
7 and 11 Jan 2025
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Dec 2024 at 15:32.

National Highways logo
Between
8 and 14 Jan 2025
Details
View Map
Share
Follow
A690 (From Gilesgate Roundabout To Junc 62 Carrville Interchange)

National Highways are proposing to carry out Works for road purposes on A690 (From Gilesgate Roundabout To Junc 62 Carrville Interchange), Gilesgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 16:46.

National Highways logo
Between
8 and 14 Jan 2025
Details
View Map
Share
Follow
A690 (From Gilesgate Roundabout To Junc 62 Carrville Interchange)

National Highways are proposing to carry out Works for road purposes on A690 (From Gilesgate Roundabout To Junc 62 Carrville Interchange), Gilesgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Oct 2024 at 15:15.

Energy Assets Pipelines logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 16 Oct 2024 at 13:48.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Front Street South Back

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Front Street South Back, Fence Houses, Houghton-le-spring.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 15:07.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Front Street South Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Front Street South Back, Fence Houses, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 07:09.

Durham County Council logo
Between
13 and 23 Jan 2025
Details
View Map
Share
Follow
Rothbury Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Rothbury Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 15 Nov 2024 at 14:26.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lambton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lambton Lane, New Lambton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Dec 2024 at 11:20.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Grasmere Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Grasmere Terrace, Columbia, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 10 Oct 2024 at 14:03.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lambton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lambton Lane, New Lambton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 13:36.

Durham County Council logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Anthony Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Anthony Street, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 4 Dec 2024 at 15:53.

Durham County Council logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Anthony Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Anthony Street, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Nov 2024 at 10:38.

Northern Gas Networks logo
LONG TERM
Between
21 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 26 March 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 10:14.

Northumbrian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Knoulberry Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 14:42.

Northumbrian Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Knoulberry Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 13:53.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 14:00.

Gateshead Metropolitan Borough Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Seaham Gardens

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Seaham Gardens, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Sep 2024 at 09:10.

Gateshead Metropolitan Borough Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Stanley Gardens

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stanley Gardens, Wrekenton, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Sep 2024 at 09:16.

National Highways logo
LONG TERM
Between
14 Feb and 30 Jul 2025
Details
View Map
Share
Follow
Lumley New Road

National Highways are proposing to carry out Diversionary works on Lumley New Road, Castle Dene.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Dec 2024 at 15:32.

Durham County Council logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
South Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on South Crescent, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 11 Dec 2024 at 12:00.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
School Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on School Terrace, Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 11:11.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Gill Crescent South (Side)

Durham County Council are proposing to carry out Highway repair and maintenance works on Gill Crescent South (Side), Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 08:53.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Oak Street (Side)

Durham County Council are proposing to carry out Highway repair and maintenance works on Oak Street (Side), Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 10:20.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Dartmouth Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dartmouth Avenue, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 11:07.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Padstow Gardens Nos 1 To 17 Footpaths

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Padstow Gardens Nos 1 To 17 Footpaths, Chowdene, Gateshead.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 08:35.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Dec 2024 at 17:08.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Dec 2024 at 14:34.

Durham County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Park Road North

Durham County Council are proposing to carry out Highway repair and maintenance works on Park Road North, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 10 Dec 2024 at 14:30.

Durham County Council logo
Between
13 and 22 Mar 2025
Details
View Map
Share
Follow
Finchale Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Finchale Road, Framwellgate Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 7 Nov 2024 at 08:48.

Network Rail logo
Between
15 and 17 Mar 2025
Details
View Map
Share
Follow
Waldridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Waldridge Road, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Dec 2024 at 09:47.


Roadworks Map near to Cookson Terrace, CHESTER LE STREET, DH2 2AN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cookson Terrace, CHESTER LE STREET, DH2 2AN (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Network Rail logo
MAJOR
  
WESLEY TERRACE 
(0.1 miles)
Network Rail
Works for Rail Purposes - Carriageway - Road closure
In Progress
Since: 1 May 2024 07:00
(Scheduled: 1 May 2024 - 1 Jan 2025)
0.1
Details
Share
Follow
2
Northern Gas Networks logo
EMERGENCY
  
FRONT STREET 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 6 Dec 2024 - 18 Dec 2024)
0.3
Details
Share
3
Northern Gas Networks logo
EMERGENCY
  
FRONT STREET 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
6 Dec 2024 17:18 - 12 Dec 2024 12:56
0.3
Details
Share
4
Northern Gas Networks logo
EMERGENCY
  
FRONT STREET 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 9 Dec 2024 10:33
(Scheduled: 9 Dec 2024 - 18 Dec 2024)
0.3
Details
Share
Follow
5
Northern Powergrid (Northeast) logo
MIDDLE CHARE 
(0.3 miles)
Northern Powergrid (Northeast)
Utility asset works - Footway, Verge, Footpath - No carriageway incursion
In Progress
Since: 16 Dec 2024 08:45
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.3
Details
Share
Follow
6
Northern Powergrid (Northeast) logo
URGENT
  
WYNYARD 
(0.4 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Complete
13 Dec 2024 10:30 - 16 Dec 2024 15:00
0.4
Details
Share
7
Northumbrian Water logo
WYNYARD 
(0.4 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Give and take
Cancelled
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
8
Northern Powergrid (Northeast) logo
URGENT
  
HIGHFIELD RISE 
(0.7 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 17 Dec 2024 11:25
(Scheduled: 17 Dec 2024 - 23 Dec 2024)
0.7
Details
Share
Follow
9
Durham County Council logo
BEECHWOODS 
(0.8 miles)
Durham County Council
Highway repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 16 Dec 2024 09:00
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.8
Details
Share
Follow
10
Northumbrian Water logo
URGENT
  
NORTHLANDS 
(0.9 miles)
Northumbrian Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
Complete
11 Dec 2024 09:56 - 17 Dec 2024 15:00
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.