ROADWORKS SUMMARY
Hallam Fields Road, ILKESTON, DE7 4FY
Introduction
View current and future planned roadworks and road closures for Hallam Fields Road, DE7 4FY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hallam Fields Road, ILKESTON, DE7 4FY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hallam Fields Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 May 2024
Derbyshire County Council are carrying out Highway improvement works on Market Place, Heanor.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2024 at 00:00 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 3 Apr 2024 at 13:52.
2 Jun 2024
Nottingham City Council are carrying out Highway improvement works on Western Boulevard, Nottingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 00:00 and could run through until 2 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 8 Mar 2024 at 11:34.
11 Jul 2024
Severn Trent Water are carrying out Utility asset works on Sawley Road, Wilne Cross, Breaston.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 January 2024 at 09:50 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 16 Apr 2024 at 10:33.
11 Jul 2024
Severn Trent Water are carrying out Utility asset works on Sawley Road, Draycott, Derby.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 January 2024 at 09:50 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 16 Apr 2024 at 10:33.
13 May 2024
Cadent Gas are carrying out Utility asset works on Western Boulevard, Nottingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 February 2024 at 15:09 and could run through until 13 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Feb 2024 at 15:10.
29 Feb and 31 May 2024
Derbyshire County Council are proposing to carry out Section 50 on Market Place, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 February 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 3 Apr 2024 at 13:51.
29 Feb and 31 May 2024
Derbyshire County Council are proposing to carry out Section 50 on Market Place, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 February 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 3 Apr 2024 at 13:51.
12 May 2024
Severn Trent Water are carrying out Utility asset works on Woodhouse Way, Nottingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 06:00 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Apr 2024 at 11:56.
30 Sep 2024
Derbyshire County Council are carrying out Highway repair and maintenance works on Wilsthorpe Road, Long Eaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 25 Apr 2024 at 11:26.
30 Sep 2024
Derbyshire County Council are carrying out Highway repair and maintenance works on Derby Road, Stanley, Ilkeston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 25 Apr 2024 at 10:35.
1 Apr and 30 Sep 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Queens Drive, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 13 Feb 2024 at 11:45.
1 Apr and 30 Sep 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Main Road, Smalley, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 22 Feb 2024 at 15:40.
30 Sep 2024
Derbyshire County Council are carrying out Highway repair and maintenance works on Heanor Road, Smalley, Ilkeston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 25 Apr 2024 at 14:05.
30 Sep 2024
Derbyshire County Council are carrying out Highway repair and maintenance works on Heanor Road, Heanor.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 25 Apr 2024 at 14:05.
31 May 2024
Nottinghamshire County Council are carrying out Works for road purposes on Chilwell Lane, Bramcote.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 April 2024 at 10:36 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 16 Apr 2024 at 12:15.
Monday
Cadent Gas are carrying out Utility asset works on Bar Lane, Nottingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 April 2024 at 11:20 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 13:06.
17 May 2024
Severn Trent Water are carrying out Utility asset works on Sawley Road, Breaston, Derby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:49 and could run through until 17 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 8 Apr 2024 at 08:49.
17 May 2024
Nottinghamshire County Council are carrying out Works for road purposes on Toton Lane, Stapleford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 07:00 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 8 Apr 2024 at 14:33.
31 May 2024
Severn Trent Water are carrying out Utility asset works on Newmanleys Road (South), Eastwood.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:00 and could run through until 31 May 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Severn Trent Water on 15 Apr 2024 at 08:29.
9 Jun 2024
Cadent Gas are carrying out Utility asset works on Draycott Road, Sawley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 April 2024 at 09:46 and could run through until 9 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 10:00.
22 Apr and 13 May 2024
Cadent Gas are proposing to carry out Utility asset works on Exbourne Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Feb 2024 at 11:44.
Wednesday
Nottinghamshire County Council are carrying out Works for road purposes on West End, Beeston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 08:40 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 24 Apr 2024 at 09:41.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Harrow Road, Nottingham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 08:15 and could run through until 30 April 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 08:30.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Nottingham Road, Nuthall.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 11:36 and could run through until 30 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 09:34.
28 Apr and 19 May 2024
Cadent Gas are proposing to carry out Utility asset works on Repton Road, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 13:55.
28 Apr and 26 May 2024
Cadent Gas are proposing to carry out Utility asset works on Wyvern Avenue, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 26 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2023 at 08:28.
29 Apr and 10 May 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lawson Avenue, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 26 Feb 2024 at 11:36.
Wednesday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mansfield Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 Jan 2024 at 13:04.
Thursday
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Lime Lane, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the verge only.
This roadwork event was last updated by Derbyshire County Council on 11 Apr 2024 at 07:34.
Friday
Nottinghamshire County Council are proposing to carry out Works for road purposes on Stapleford Road, Trowell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 24 Apr 2024 at 07:35.
Friday
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Heanor Gate Road, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 17:10.
Friday
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Burnt House Road, Common Side, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 17:15.
5 and 20 May 2024
Cadent Gas are proposing to carry out Utility asset works on Beresford Road, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 13:57.
6 and 31 May 2024
Nottinghamshire County Council are proposing to carry out Highway improvement works on Barton Lane, Attenborough.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 20 Mar 2024 at 08:49.
6 May and 21 Jun 2024
Derbyshire County Council are proposing to carry out Highway improvement works on Ilkeston Road, Marlpool, Heanor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 16 Feb 2024 at 16:24.
7 and 15 May 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on School Lane, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 19 Apr 2024 at 10:13.
7 May 2024 and 7 May 2025
National Highways are proposing to carry out Works for road purposes on Middleton Boulevard, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 7 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Apr 2024 at 08:42.
7 and 17 May 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lower Dunstead Road, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 22 Mar 2024 at 15:19.
8 May and 5 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Whiting Avenue, Toton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 08:06.
10 and 15 May 2024
Western Power Distribution (East Midlands) are proposing to carry out Disconnection or alteration of supply on Mellors Way, Nottingham.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2024 and could run through until 15 May 2024. The works will impact the verge only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Apr 2024 at 11:26.
10 and 13 May 2024
Nottinghamshire County Council are proposing to carry out Section 50 on Nottingham Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 18 Apr 2024 at 13:48.
12 May and 6 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Meynell Road, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.
13 and 24 May 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Corporation Road, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 19 Mar 2024 at 10:03.
13 and 17 May 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Victoria Street, Kimberley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 30 Jan 2024 at 11:32.
15 May and 10 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Carrfield Avenue, Toton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 08:04.
19 May and 16 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Repton Road, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 14:01.
19 May and 20 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Lynden Avenue, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Nov 2023 at 15:49.
20 and 23 May 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Conway Street, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Apr 2024 at 06:46.
20 and 25 May 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Bye Pass Road, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 5 Mar 2024 at 15:16.
21 May and 18 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Twyford Road, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 13:43.
21 May and 6 Oct 2024
National Highways are proposing to carry out Works for road purposes on Wollaton Vale, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 6 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Mar 2024 at 10:32.
22 and 24 May 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Feb 2024 at 12:31.
25 May and 2 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Nuthall Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Feb 2024 at 10:03.
26 May and 28 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Ingleby Road, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 13:44.
27 and 30 May 2024
Severn Trent Water are proposing to carry out New service connection on Bramcote Avenue, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Feb 2024 at 11:43.
28 and 30 May 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Toton Lane, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 15 Mar 2024 at 09:45.
28 May and 2 Jun 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Peache Way, Bramcote.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Feb 2024 at 08:47.
28 May and 2 Jun 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Chilwell Lane, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Feb 2024 at 08:30.
3 and 6 Jun 2024
Severn Trent Water are proposing to carry out New service connection on Bramcote Avenue, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 28 Feb 2024 at 11:05.
3 and 7 Jun 2024
Cadent Gas are proposing to carry out New service connection on Church Lane, Cossall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Mar 2024 at 10:12.
3 Jun and 12 Jul 2024
Severn Trent Water are proposing to carry out Utility asset works on Nottingham Road, Nuthall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 8 Mar 2024 at 07:38.
5 and 7 Jun 2024
BT are proposing to carry out Utility asset works on Sawley Road, Breaston, Derby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Apr 2024 at 11:44.
6 and 10 Jun 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Weston Street, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 26 Mar 2024 at 13:43.
9 and 15 Jun 2024
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Chapel Street, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 15 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Apr 2024 at 13:52.
10 and 17 Jun 2024
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Barton Street, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Mar 2024 at 07:43.
10 and 13 Jun 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Grove Avenue, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 26 Feb 2024 at 12:02.
10 Jun and 8 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Beeston Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 11:18.
10 and 28 Jun 2024
Severn Trent Water are proposing to carry out Utility asset works on Newmanleys Road (South), Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Severn Trent Water on 13 Mar 2024 at 12:31.
17 and 21 Jun 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Inham Road, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 9 Apr 2024 at 07:28.
17 and 19 Jun 2024
Severn Trent Water are proposing to carry out New service connection on Godfrey Street, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Mar 2024 at 15:31.
18 and 20 Jun 2024
Network Rail are proposing to carry out Works for Rail Purposes on Station Street, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Feb 2024 at 11:28.
18 and 20 Jun 2024
Network Rail are proposing to carry out Works for Rail Purposes on Coronation Road, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 31 Jan 2024 at 15:06.
19 Jun 2024 and 24 Jan 2025
National Highways are proposing to carry out Works for road purposes on Abbey Street, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Apr 2024 at 08:41.
24 Jun and 22 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Montpelier Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 12:13.
24 and 26 Jun 2024
Severn Trent Water are proposing to carry out New service connection on Godfrey Street, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Apr 2024 at 08:45.
26 Jun and 12 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Marlborough Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 11:19.
27 and 29 Jun 2024
Severn Trent Water are proposing to carry out New service connection on Marlborough Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 29 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 28 Mar 2024 at 12:07.
1 Jul and 2 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Acton Road, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 14:26.
1 and 23 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Acton Street, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 23 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 14:19.
1 and 17 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Claude Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 11:17.
1 and 20 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wollaton Vale, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 12:32.
1 and 20 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Coventry Lane, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 11:55.
1 and 20 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Trowell Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 12:32.
1 and 20 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Bilborough Road, Trowell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 11:54.
1 and 20 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Trowell Moor, Trowell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 11:54.
1 Jul and 25 Aug 2024
Nottingham City Council are proposing to carry out Highway improvement works on Nuthall Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 25 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Feb 2024 at 08:06.
1 and 3 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Millership Way, Cossall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 3 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 15 Apr 2024 at 13:52.
8 and 13 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Newthorpe Common, Newthorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 13 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 16 Apr 2024 at 13:47.
8 and 13 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 13 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 16 Apr 2024 at 13:47.
8 and 12 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on New Road, Greasley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 07:46.
14 Jul and 11 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Banks Road, Toton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:18.
14 and 28 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Leyland Close, Toton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:18.
14 and 28 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Seaburn Road, Toton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:18.
14 and 28 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Sandown Road, Toton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:17.
15 and 19 Jul 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hillside Road, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Apr 2024 at 10:59.
15 and 17 Jul 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Narrow Lane, Watnall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 17 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 27 Mar 2024 at 09:04.
15 Jul and 15 Sep 2024
Derbyshire County Council are proposing to carry out Highway improvement works on Elnor Street, Langley Mill, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 15 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 18 Apr 2024 at 15:01.
21 Jul and 6 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Denison Street, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 6 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Dec 2023 at 12:20.
21 Jul and 3 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Wollaton Road, Beeston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Dec 2023 at 13:03.
21 Jul and 11 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Sidney Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Dec 2023 at 12:23.
22 and 24 Jul 2024
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Mar 2024 at 10:46.
22 and 24 Jul 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Evelyn Street, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 25 Apr 2024 at 12:19.
22 Jul and 7 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Middleton Boulevard, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 7 August 2024. The works will impact the cycleway only.
This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 11:17.
22 and 24 Jul 2024
Severn Trent Water are proposing to carry out Remedial works on Main Street, Newthorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Apr 2024 at 14:03.
23 and 26 Jul 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mill Road, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 26 Apr 2024 at 09:40.
Roadworks Map near to Hallam Fields Road, ILKESTON, DE7 4FY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hallam Fields Road, ILKESTON, DE7 4FY (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 26 Apr 2024 - 2 May 2024)
Contains public sector information licensed under the Open Government Licence v3.0.