ROADWORKS SUMMARY
Tor View Rise, MATLOCK, DE4 3RA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Tor View Rise, DE4 3RA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Tor View Rise, MATLOCK, DE4 3RA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tor View Rise are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Derbyshire County Council logo
LONG TERM
Between
20 May 2020 and 13 Dec 2024
Details
View Map
Share
Follow
Lees Road

Derbyshire County Council are proposing to carry out Highway improvement works on Lees Road, Stanton Lees.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2020 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 14 Nov 2023 at 09:40.

Derbyshire County Council logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Leashaw

Derbyshire County Council are carrying out Highway repair and maintenance works on Leashaw, Holloway, Matlock.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2023 at 09:00 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 21 Jun 2024 at 15:11.

Derbyshire County Council logo
LONG TERM
Until
20 May 2025
Details
View Map
Share
Follow
White Tor Road

Derbyshire County Council are carrying out Highway repair and maintenance works on White Tor Road, Starkholmes, Matlock.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2023 at 08:00 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 24 Nov 2023 at 17:00.

Severn Trent Water logo
LONG TERM
Between
20 Sep 2024 and 20 Mar 2026
Details
View Map
Share
Follow
Breamfield Lane

Severn Trent Water are proposing to carry out Highway repair and maintenance works on Breamfield Lane, Wirksworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 20 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 13 Aug 2024 at 11:56.

Severn Trent Water logo
LONG TERM
Until
20 Mar 2026
Details
View Map
Share
Follow
Breamfield Lane

Severn Trent Water are carrying out Highway repair and maintenance works on Breamfield Lane, Wirksworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 08:00 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Sep 2024 at 09:52.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Nottingham Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Nottingham Road, Tansley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 5 Aug 2024 at 16:36.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Thatchers Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Thatchers Lane, Tansley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 5 Aug 2024 at 16:35.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Thatchers Lane

Western Power Distribution (East Midlands) are carrying out Utility asset works on Thatchers Lane, Tansley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 17:05 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Oct 2024 at 08:59.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Nottingham Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Nottingham Road, Tansley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 17:05 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Oct 2024 at 09:00.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, The Cliff, Tansley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 5 Aug 2024 at 16:36.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Alfreton Road, The Cliff, Tansley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 17:05 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Oct 2024 at 08:59.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Greenaway Lane

Severn Trent Water are carrying out Utility repair and maintenance works on Greenaway Lane, Hackney.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 11:31 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 14:46.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
The Hill

Western Power Distribution (East Midlands) are carrying out Utility asset works on The Hill, Cromford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 17:18 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Nov 2024 at 11:35.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
4 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Follow
The Hill

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on The Hill, Cromford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 10:29.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Wensley Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Wensley Road, Winster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 16 Aug 2024 at 16:35.

Derbyshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Unnamed Section Of A5012 From Moor Lane To Griffe Grange Farm

Derbyshire County Council are proposing to carry out Works for road purposes on Unnamed Section Of A5012 From Moor Lane To Griffe Grange Farm, Grange Mill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Derbyshire County Council on 24 Oct 2024 at 15:24.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Wensley Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Wensley Road, Winster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 15 Aug 2024 at 15:21.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Elton Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Elton Road, Winster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 16 Aug 2024 at 09:01.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Elton Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Elton Road, Winster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 16 Aug 2024 at 16:34.

Gigaclear logo
Finishing
Monday
Details
View Map
Share
Follow
Wensley Road

Gigaclear are proposing to carry out New service connection on Wensley Road, Winster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 22 Aug 2024 at 14:39.

Gigaclear logo
Finishing
Monday
Details
View Map
Share
Follow
Elton Road

Gigaclear are proposing to carry out New service connection on Elton Road, Winster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 22 Aug 2024 at 12:08.

Severn Trent Water logo
Finishing
Tuesday
Details
View Map
Share
Hindersitch Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Hindersitch Lane, Matlock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 November 2024 and run through until 19 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Aug 2024 at 14:56.

Severn Trent Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Hindersitch Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hindersitch Lane, Matlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Sep 2024 at 12:38.

Severn Trent Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Hindersitch Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hindersitch Lane, Matlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Aug 2024 at 15:32.

Gigaclear logo
Between
21 and 25 Nov 2024
Details
View Map
Share
Follow
Main Road

Gigaclear are proposing to carry out New service connection on Main Road, Darley Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 29 Aug 2024 at 11:27.

Derbyshire County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Unnamed Section Of A5012 From Moor Lane To Griffe Grange Farm

Derbyshire County Council are proposing to carry out Works for road purposes on Unnamed Section Of A5012 From Moor Lane To Griffe Grange Farm, Grange Mill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 19:13.

Severn Trent Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Toadmoor Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Toadmoor Lane, Belper.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Aug 2024 at 16:09.

BT logo
Between
28 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Hindersitch Lane

BT are proposing to carry out Utility asset works on Hindersitch Lane, Whatstandwell, Matlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 3 Oct 2024 at 15:21.

BT logo
Between
28 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Hindersitch Lane

BT are proposing to carry out Utility asset works on Hindersitch Lane, Whatstandwell, Matlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 2 Sep 2024 at 16:04.

Severn Trent Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Moor Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Moor Lane, Kirk Ireton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Sep 2024 at 17:38.

Severn Trent Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Moor Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Moor Lane, Kirk Ireton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Sep 2024 at 16:35.

Severn Trent Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Aldwark

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Aldwark, Grange Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 16:23.

Severn Trent Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Aldwark

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Aldwark, Grange Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 11:40.

Western Power Distribution (East Midlands) logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Unnamed Section Of A5012 From Moor Lane To Griffe Grange Farm

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Unnamed Section Of A5012 From Moor Lane To Griffe Grange Farm, Grange Mill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Nov 2024 at 12:14.

Derbyshire County Council logo
LONG TERM
Between
6 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Via Gellia Road

Derbyshire County Council are proposing to carry out Works for road purposes on Via Gellia Road, Bonsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 14:02.

Severn Trent Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Chadwick Nick Lane

Severn Trent Water are proposing to carry out Utility asset works on Chadwick Nick Lane, Crich, Matlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2024 at 17:29.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Wenslees

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Wenslees, Darley Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 13:12.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Wenslees

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wenslees, Darley Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 18:13.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Wenslees

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wenslees, Darley Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 12:43.

Severn Trent Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Chadwick Nick Lane

Severn Trent Water are proposing to carry out Utility asset works on Chadwick Nick Lane, Crich, Matlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 16:37.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hallmoor Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hallmoor Road, Darley Dale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 15:31.

Derbyshire County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Lickpenny Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Lickpenny Lane, Butterley, Ashover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 10 Oct 2024 at 09:51.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hallmoor Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hallmoor Road, Darley Dale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 10:01.

Derbyshire County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Lickpenny Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Lickpenny Lane, Butterley, Ashover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Oct 2024 at 13:50.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Snitterton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Snitterton Road, Snitterton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Oct 2024 at 17:45.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Snitterton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Snitterton Road, Snitterton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 14:45.

Severn Trent Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Gorses

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gorses, Belper.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Nov 2024 at 11:16.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Hallmoor Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hallmoor Road, Darley Dale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 20:05.


Roadworks Map near to Tor View Rise, MATLOCK, DE4 3RA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Tor View Rise, MATLOCK, DE4 3RA (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (East Midlands) logo
MAJOR
  
THE HILL 
(0.1 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 4 Nov 2024 - 7 Feb 2025
0.1
Details
Share
Follow
2
Western Power Distribution (East Midlands) logo
MAJOR
  
THE HILL 
(0.1 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway - Two-way signals
In Progress
Since: 4 Nov 2024 17:18
(Scheduled: 4 Nov 2024 - 7 Feb 2025)
0.1
Details
Share
Follow
3
Western Power Distribution (East Midlands) logo
MAJOR
  
HAWTHORN DRIVE 
(0.1 miles)
Western Power Distribution (East Midlands)
Utility asset works - Carriageway - Some carriageway incursion
Planned
Scheduled: 4 Nov 2024 - 7 Feb 2025
0.1
Details
Share
Follow
4
Western Power Distribution (East Midlands) logo
MAJOR
  
HAWTHORN DRIVE 
(0.1 miles)
Western Power Distribution (East Midlands)
Utility asset works - Carriageway - Some carriageway incursion
In Progress
Since: 4 Nov 2024 17:18
(Scheduled: 4 Nov 2024 - 7 Feb 2025)
0.1
Details
Share
Follow
5
Western Power Distribution (East Midlands) logo
MAJOR
  
BEECH WALK 
(0.1 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 4 Nov 2024 - 7 Feb 2025
0.1
Details
Share
Follow
6
Western Power Distribution (East Midlands) logo
MAJOR
  
BEECH WALK 
(0.1 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 4 Nov 2024 17:18
(Scheduled: 4 Nov 2024 - 7 Feb 2025)
0.1
Details
Share
Follow
7
Gigaclear logo
STEEPLE GRANGE 
(0.8 miles)
Gigaclear
New service connection - Footway - Two-way signals
Complete
11 Nov 2024 13:00 - 16:35
0.8
Details
Share
8
Connect Fibre (Fibre Assets) logo
DERBY ROAD 
(0.9 miles)
Connect Fibre (Fibre Assets)
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.