ROADWORKS SUMMARY
Lesney Park, ERITH, DA8 3DS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lesney Park, DA8 3DS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lesney Park, ERITH, DA8 3DS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lesney Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 31 Jan 2026
Details
View Map
Share
Follow
Westwood Lane

Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.

Transport for London (TfL) logo
LONG TERM
Between
20 Feb 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Lakeside Close

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lakeside Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2024 and could run through until 20 February 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2024 at 13:16.

Thames Water logo
LONG TERM
Between
6 May 2024 and 13 May 2025
Details
View Map
Share
Longmead Drive

Thames Water were proposing to carry out New service connection on Longmead Drive, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2024 and run through until 13 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 15 Sep 2025
Details
View Map
Share
Hatherley Crescent

Thames Water were proposing to carry out New service connection on Hatherley Crescent, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

London Borough Of Bexley logo
LONG TERM
Between
5 Aug 2024 and 31 Jan 2025
Details
View Map
Share
Bronze Age Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Bronze Age Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2024 and run through until 31 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by London Borough Of Bexley on 30 Jul 2024 at 12:15.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 1 Dec 2025
Details
View Map
Share
Faraday Avenue

Thames Water were proposing to carry out New service connection on Faraday Avenue, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

Kent County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
West Hill

Kent County Council are carrying out Highway improvement works on West Hill, Dartford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 07:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 27 Aug 2024 at 08:15.

Kent County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Kent Road

Kent County Council are carrying out roadworks on Kent Road, Dartford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 27 Aug 2024 at 08:16.

Kent County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Spital Street

Kent County Council are carrying out Highway improvement works on Spital Street, Dartford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Oct 2024 at 07:29.

Kent County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Highfield Road North

Kent County Council are carrying out Highway improvement works on Highfield Road North, Dartford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 07:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 27 Aug 2024 at 08:15.

Thames Water logo
LONG TERM
Between
2 Sep 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Beechfield Road

Thames Water are proposing to carry out Utility asset works on Beechfield Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 14:44.

Thames Water logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Beechfield Road

Thames Water are carrying out Utility asset works on Beechfield Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:46.

Thames Water logo
LONG TERM
Until
2 Sep 2025
Details
View Map
Share
Follow
Lesney Park

Thames Water are carrying out Utility asset works on Lesney Park, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.

London Borough Of Bexley logo
LONG TERM
Between
9 Sep 2024 and 18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.

Thames Water logo
LONG TERM
Between
24 Oct 2024 and 19 Feb 2025
Details
View Map
Share
Follow
Gertrude Road

Thames Water are proposing to carry out Utility asset works on Gertrude Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 19 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:05.

Thames Water logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Gertrude Road

Thames Water are carrying out Utility asset works on Gertrude Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 12:30 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:09.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Gertrude Road

Thames Water were proposing to carry out Utility asset works on Gertrude Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:58.

Thames Water logo
LONG TERM
Until
4 Feb 2025
Details
View Map
Share
Follow
Wickham Street

Thames Water are carrying out Utility asset works on Wickham Street, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:20 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:25.

London Borough Of Bexley logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are carrying out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 15 Jan 2025 at 16:04.

Thames Water logo
LONG TERM
Between
20 Nov 2024 and 12 Feb 2025
Details
View Map
Share
Mayfield Road

Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:39.

Thurrock Council logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Burnley Road

Thurrock Council are carrying out Highway improvement works on Burnley Road, West Thurrock.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 11:30 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 14 Jan 2025 at 15:49.

Southern Gas Networks logo
LONG TERM
Until
28 Jan 2025
Details
View Map
Share
Follow
Preston Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Preston Drive, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 10:00 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jan 2025 at 16:31.

Thames Water logo
LONG TERM
Between
26 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Valley Road

Thames Water are proposing to carry out Utility asset works on Valley Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 10 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 09:39.

Thames Water logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Valley Road

Thames Water are carrying out Utility asset works on Valley Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 13:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jan 2025 at 14:06.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Preston Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Preston Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 15:30.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 12 May 2025
Details
View Map
Share
Hollies Avenue

Thames Water were proposing to carry out New service connection on Hollies Avenue, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 12 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Renwick Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Renwick Road, Barking.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Dec 2024 at 10:54.

Southern Gas Networks logo
LONG TERM
Between
10 Dec 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Berkeley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 17 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:06.

Southern Gas Networks logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Berkeley Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 13:00 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 14:18.

Thames Water logo
LONG TERM
Between
10 Dec 2024 and 21 Apr 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 21 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:04.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
North Cray Road

Southern Gas Networks are carrying out Utility repair and maintenance works on North Cray Road, Sidcup.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:30 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 13:03.

Southern Gas Networks logo
LONG TERM
Until
16 Feb 2025
Details
View Map
Share
Follow
Hurst Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hurst Road, Bexley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 13:00 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jan 2025 at 16:01.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Selborne Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selborne Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 15:34.

Southern Gas Networks logo
LONG TERM
Until
16 Feb 2025
Details
View Map
Share
Follow
Selborne Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Selborne Avenue, Bexley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 16:00 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jan 2025 at 07:10.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Montrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:55.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Montrose Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:23.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cavendish Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:53.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Cavendish Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:21.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Rutland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:58.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Rutland Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:21.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 13 Mar 2025
Details
View Map
Share
Follow
Welling Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:57.

Southern Gas Networks logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Welling Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Welling Way, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2025 at 13:25 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jan 2025 at 13:39.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Fairlawn Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 14:25.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Herbert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Herbert Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:31.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Herbert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Herbert Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:04.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Hudson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:28.

Southern Gas Networks logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Hudson Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hudson Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2025 at 17:30 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jan 2025 at 08:57.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Mayfair Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfair Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:22.

Southern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Mayfair Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Mayfair Avenue, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2025 at 17:30 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jan 2025 at 08:22.

Thames Water logo
LONG TERM
Between
2 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:25.

Thames Water logo
LONG TERM
Between
2 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:10.

Thames Water logo
LONG TERM
Between
2 Jan and 4 Mar 2025
Details
View Map
Share
Avenue Road

Thames Water were proposing to carry out Utility asset works on Avenue Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:02.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:21.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 10:35.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
West Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 14:06.

Thames Water logo
LONG TERM
Between
2 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 13:31.

Thames Water logo
LONG TERM
Between
2 Jan and 12 May 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 12 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.

Cadent Gas logo
Between
4 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Movers Lane

Cadent Gas are proposing to carry out Utility asset works on Movers Lane, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:36.

Cadent Gas logo
Between
4 Jan and 3 Feb 2025
Details
View Map
Share
Movers Lane

Cadent Gas were proposing to carry out Utility asset works on Movers Lane, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:23.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Sidcup Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:37.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Sidcup Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 12:33.

London Borough Of Bexley logo
Finishing
Friday
Details
View Map
Share
Follow
Old Farm Avenue Car Park

London Borough Of Bexley are proposing to carry out Section 50 on Old Farm Avenue Car Park, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 23 Dec 2024 at 09:13.

London Borough Of Bexley logo
Finishing
Friday
Details
View Map
Share
Follow
Old Farm Avenue Car Park

London Borough Of Bexley are carrying out Section 50 on Old Farm Avenue Car Park, Sidcup.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 9 Jan 2025 at 10:57.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Carisbrooke Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carisbrooke Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 15:31.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Carisbrooke Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Carisbrooke Avenue, Bexley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 17:30 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Jan 2025 at 09:49.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Carisbrooke Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Carisbrooke Avenue, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jan 2025 at 11:34.

Southern Gas Networks logo
LONG TERM
Until
6 Feb 2025
Details
View Map
Share
Follow
Esher Close

Southern Gas Networks are carrying out Utility repair and maintenance works on Esher Close, Bexley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 January 2025 at 17:30 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 16:55.

Between
6 and 26 Jan 2025
Details
View Map
Share
Bob Dunn Way

Riverside Energy Park were proposing to carry out Utility asset works on Bob Dunn Way, Dartford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 26 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 16 Dec 2024 at 11:35.

Between
6 and 29 Jan 2025
Details
View Map
Share
Follow
Brampton Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Brampton Road, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 6 Nov 2024 at 11:09.

Thurrock Council logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, West Thurrock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 20 Aug 2024 at 11:35.

Thurrock Council logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, West Thurrock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 13 Feb 2024 at 10:27.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:05.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 14:51.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:02.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 14:51.

Finishing
Today
Details
View Map
Share
Follow
Bexley Road

Riverside Energy Park are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 4 Dec 2024 at 15:42.

Finishing
Today
Details
View Map
Share
Follow
Bexley Road

Riverside Energy Park are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 16 Dec 2024 at 16:13.

Finishing
Today
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 4 Dec 2024 at 15:42.

Finishing
Today
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 16 Dec 2024 at 16:13.

Thames Water logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Bexley Road

Thames Water are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:27.

Thames Water logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Bexley Road

Thames Water are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:54.

Finishing
Today
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 12 Dec 2024 at 20:32.

Finishing
Today
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 4 Dec 2024 at 15:38.

LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Dec 2024 at 11:12.

London Borough Of Barking And Dagenham logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Woodward Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Woodward Road, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Dec 2024 at 11:04.

London Borough Of Barking And Dagenham logo
Until
26 Jan 2025
Details
View Map
Share
Follow
Woodward Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Woodward Road, Dagenham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Jan 2025 at 16:38.

Thames Water logo
LONG TERM
Between
7 Jan and 10 Apr 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:56.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Heathside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Heathside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:05.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Heathside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 11:51.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
College Road

Southern Gas Networks are carrying out Utility repair and maintenance works on College Road, Hextable.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 11:00 and could run through until 20 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 13:56.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rollo Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Rollo Road, Hextable.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 17:00 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 09:41.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Malyons Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Malyons Road, Hextable.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 17:00 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 09:42.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Welbeck Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:19.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Welbeck Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:19.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Chatsworth Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:00.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Chatsworth Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:20.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Collindale Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:20.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Mayplace Road West

Southern Gas Networks are carrying out Utility repair and maintenance works on Mayplace Road West, Bexleyheath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 01:00 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 10:11.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Burcharbro Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:44.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Martins Place

Southern Gas Networks are carrying out Utility repair and maintenance works on Martins Place, Thamesmead.

The works started on 13 January 2025 at 18:00 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 16:30.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cedar Avenue

Thames Water are carrying out Utility repair and maintenance works on Cedar Avenue, Sidcup.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 12:22 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jan 2025 at 14:59.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Wharfedale Road

Thames Water are carrying out Utility repair and maintenance works on Wharfedale Road, Dartford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2025 at 08:59 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 09:23.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Monmouth Road

Thames Water were proposing to carry out Utility repair and maintenance works on Monmouth Road, Dagenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:15.

Thames Water logo
LONG TERM
Between
16 Jan and 18 Apr 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:15.

Thames Water logo
LONG TERM
Until
18 Apr 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are carrying out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 08:00 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jan 2025 at 08:55.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Westwood Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Westwood Lane, Welling.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 January 2025 at 13:00 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 15:45.

Southern Gas Networks logo
LONG TERM
Between
17 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Bristow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.

Thames Water logo
Until
8 Feb 2025
Details
View Map
Share
Follow
Park Crescent

Thames Water are carrying out Utility asset works on Park Crescent, Erith.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2025 at 10:00 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 10:29.

Thames Water logo
Between
17 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Park Crescent

Thames Water are proposing to carry out Utility asset works on Park Crescent, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:29.

Thames Water logo
Until
8 Feb 2025
Details
View Map
Share
Follow
Park Crescent

Thames Water are carrying out Utility asset works on Park Crescent, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2025 at 14:30 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 15:38.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Rectory Lane

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Rectory Lane, Sidcup.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 January 2025 at 10:02 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jan 2025 at 10:14.

London Borough Of Bexley logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Follow
Cray Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Cray Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 14:40.

London Borough Of Bexley logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Follow
Cray Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Cray Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 10 Jan 2025 at 16:36.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Burnt Oak Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Burnt Oak Lane, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:15.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Chatsworth Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 10 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:17.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:15.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:42.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:13.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Crescent Road

Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 08:52.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Crescent Road

Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:40.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
New Road

London Borough Of Bexley are proposing to carry out Highway improvement works on New Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Oct 2024 at 16:50.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
New Road

London Borough Of Bexley are proposing to carry out Highway improvement works on New Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Jan 2025 at 13:42.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway improvement works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:51.

Thames Water logo
LONG TERM
Between
20 Jan and 23 Apr 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:50.

Southern Gas Networks logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Church Manorway

Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jan 2025 at 11:46.

Southern Gas Networks logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Church Manorway

Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jan 2025 at 16:23.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 20 Feb 2025
Details
View Map
Share
Church Manorway

Southern Gas Networks were proposing to carry out New service connection on Church Manorway, Erith.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 09:39.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Manorway

Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 12:59.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Manorway

Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 13:56.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Manorway

Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 12:16.

Transport for London (TfL) logo
Between
20 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Magellan Boulevard

Transport for London (TfL) are proposing to carry out Highway improvement works on Magellan Boulevard, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:02.

Transport for London (TfL) logo
Between
20 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Gallions Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallions Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:21.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:26.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:40.

Thames Water logo
LONG TERM
Between
22 Jan and 9 May 2025
Details
View Map
Share
Follow
Halt Robin Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 11:34.

Thames Water logo
LONG TERM
Between
22 Jan and 9 May 2025
Details
View Map
Share
Follow
Halt Robin Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 11:44.

Finishing
Saturday
Details
View Map
Share
Follow
Airfield Way

London Borough Of Havering are proposing to carry out Highway improvement works on Airfield Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 6 Dec 2024 at 16:27.

Finishing
Saturday
Details
View Map
Share
Follow
Airfield Way

London Borough Of Havering are proposing to carry out Highway improvement works on Airfield Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 16 Dec 2024 at 16:04.

Southern Gas Networks logo
LONG TERM
Between
23 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Elmwood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elmwood Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 13:30.

Southern Gas Networks logo
LONG TERM
Between
24 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Sherwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 16:02.

Southern Gas Networks logo
LONG TERM
Between
24 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Sherwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jan 2025 at 16:40.

Southern Gas Networks logo
LONG TERM
Between
24 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Falconwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Falconwood Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 16:03.

Southern Gas Networks logo
LONG TERM
Between
24 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Falconwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Falconwood Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jan 2025 at 16:40.

Thames Water logo
Between
27 Jan and 2 Feb 2025
Details
View Map
Share
Elm Road

Thames Water were proposing to carry out New service connection on Elm Road, Dartford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:25.

Southern Gas Networks logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Valentine Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 15:31.

Southern Gas Networks logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Valentine Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 16:33.

Southern Gas Networks logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Hurstwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurstwood Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 15:55.

Southern Gas Networks logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Hurstwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurstwood Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 16:08.

Southern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Collindale Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:11.

Southern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Hill Crest

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hill Crest, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:11.

London Borough Of Bexley logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Galloway Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Galloway Drive, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 15:29.

London Borough Of Bexley logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Galloway Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Galloway Drive, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 18 Dec 2024 at 11:58.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Fairlawn Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Jan 2025 at 16:48.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Burcharbro Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 14:48.

Thames Water logo
LONG TERM
Between
27 Jan and 29 May 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 13:28.

Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Foxlands Road

Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 3 Oct 2024 at 10:21.

Southern Gas Networks logo
LONG TERM
Between
29 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Old Farm Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:13.

Between
29 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Crook Log

Harlaxton Energy Networks are proposing to carry out Utility asset works on Crook Log, Bexleyheath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 6 Nov 2024 at 11:09.

Southern Gas Networks logo
LONG TERM
Between
30 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:14.

Southern Gas Networks logo
Between
30 Jan and 24 Feb 2025
Details
View Map
Share
Follow
The Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 14:56.

London Borough Of Bexley logo
Between
31 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Baugh Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Baugh Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 13:32.

London Borough Of Bexley logo
Between
31 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Baugh Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Baugh Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 10 Jan 2025 at 16:20.

Thames Water logo
LONG TERM
Between
1 Feb and 8 May 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:36.

Transport for London (TfL) logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jan 2025 at 08:35.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:51.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Penhill Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:33.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Penhill Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:22.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Penhill Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Jan 2025 at 07:45.

Thames Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Priory Road South

Thames Water are proposing to carry out Utility repair and maintenance works on Priory Road South, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 07:43.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Penhill Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 21 Oct 2024 at 18:42.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Blackfen Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:34.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Blackfen Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Jan 2025 at 07:47.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Blendon Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 21 Oct 2024 at 18:15.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Blendon Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Blendon Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:28.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Blendon Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Jan 2025 at 07:46.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Danson Underpass

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Danson Underpass, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:33.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Danson Underpass

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Danson Underpass, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:32.

London Borough Of Bexley logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Danson Underpass

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Danson Underpass, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Jan 2025 at 07:44.

Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Bob Dunn Way

Riverside Energy Park are proposing to carry out Utility asset works on Bob Dunn Way, Dartford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 18 Dec 2024 at 12:32.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:35.

Murphy Power Distribution logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Plumstead Road

Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 29 Oct 2024 at 13:35.

Murphy Power Distribution logo
LONG TERM
Between
3 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Plumstead Road

Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:23.

Murphy Power Distribution logo
LONG TERM
Between
3 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Plumstead Road

Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 8 Jan 2025 at 09:04.

Between
3 and 14 Feb 2025
Details
View Map
Share
Launders Lane

London Borough Of Havering were proposing to carry out Highway repair and maintenance works on Launders Lane, Rainham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 16 Jan 2025 at 12:21.

London Borough Of Bexley logo
Between
5 and 8 Feb 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 5 Nov 2024 at 11:17.

Southern Gas Networks logo
LONG TERM
Between
5 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Bellegrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellegrove Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:55.

Southern Gas Networks logo
Between
5 and 18 Feb 2025
Details
View Map
Share
Follow
Wickham Street

Southern Gas Networks are proposing to carry out Utility asset works on Wickham Street, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:55.

Southern Gas Networks logo
LONG TERM
Between
6 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:46.

Transport for London (TfL) logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:29.

Transport for London (TfL) logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:11.

Thames Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Knoll Road

Thames Water were proposing to carry out New service connection on Knoll Road, Bexley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 08:10.

Thames Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Knoll Road

Thames Water were proposing to carry out New service connection on Knoll Road, Bexley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 08:46.

Thames Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Knoll Road

Thames Water were proposing to carry out New service connection on Knoll Road, Bexley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jan 2025 at 15:30.

Thames Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Knoll Road

Thames Water were proposing to carry out Utility asset works on Knoll Road, Bexley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 15:44.

Thames Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Knoll Road

Thames Water are proposing to carry out Utility asset works on Knoll Road, Bexley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 15:45.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Wilmot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wilmot Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:54.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Elderslie Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elderslie Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 08:45.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Elderslie Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elderslie Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jan 2025 at 16:09.

Thames Water logo
Between
10 and 26 Feb 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jan 2025 at 08:27.

Southern Gas Networks logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Lavernock Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 15:12.

Southern Gas Networks logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Lavernock Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:40.

Southern Gas Networks logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Lavernock Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:16.

Thames Water logo
LONG TERM
Between
10 Feb and 31 Aug 2025
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 12:12.

Thames Water logo
LONG TERM
Between
10 Feb and 31 Aug 2025
Details
View Map
Share
Fraser Road

Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 11:53.

Thames Water logo
LONG TERM
Between
10 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Thornton Road

Thames Water are proposing to carry out Utility asset works on Thornton Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 14:21.

Southern Gas Networks logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Mulberry Way

Southern Gas Networks are proposing to carry out New service connection on Mulberry Way, Belvedere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 12:59.

Southern Gas Networks logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Mulberry Way

Southern Gas Networks are proposing to carry out New service connection on Mulberry Way, Belvedere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 13:56.

Southern Gas Networks logo
LONG TERM
Between
12 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Dale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:30.

Southern Gas Networks logo
LONG TERM
Between
12 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Dale Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale Close, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 13:48.

Transport for London (TfL) logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:36.

Transport for London (TfL) logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:15.

Thames Water logo
LONG TERM
Between
12 Feb and 7 Apr 2025
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:31.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Hood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hood Road, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 11:21.

London Borough Of Bexley logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
Blackfen Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 15:48.

London Borough Of Bexley logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 February 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 07:29.

Southern Gas Networks logo
Between
13 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Haslemere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haslemere Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 15:38.

Southern Gas Networks logo
LONG TERM
Between
14 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Elmwood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elmwood Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 15:56.

Southern Gas Networks logo
Between
15 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hook Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 11:01.

Southern Gas Networks logo
Between
15 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Shooters Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 16:02.

UK Power Networks Eastern & London logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Halt Robin Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jan 2025 at 12:08.

UK Power Networks Eastern & London logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Halt Robin Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jan 2025 at 14:43.

London Borough Of Bexley logo
Between
17 and 21 Feb 2025
Details
View Map
Share
North Cray Road

London Borough Of Bexley were proposing to carry out Highway improvement works on North Cray Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 12:00.

Thames Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Elm Road

Thames Water were proposing to carry out New service connection on Elm Road, Dartford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 11:34.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Danson Road

Thames Water were proposing to carry out Utility asset works on Danson Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 16:31.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 13:27.

Southern Gas Networks logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 12:45.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Long Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:37.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Long Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 12:44.

Thames Water logo
Between
17 and 26 Feb 2025
Details
View Map
Share
Follow
Berwick Road

Thames Water are proposing to carry out Utility repair and maintenance works on Berwick Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:25.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Bostall Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Bostall Lane, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:10.

Thames Water logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Mayfield Road

Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:44.

Thames Water logo
LONG TERM
Between
18 Feb and 28 Apr 2025
Details
View Map
Share
Gladeswood Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 28 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:39.

Thames Water logo
Between
18 and 23 Feb 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:34.

Thames Water logo
Between
18 and 23 Feb 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 11:39.

Thames Water logo
Between
18 and 23 Feb 2025
Details
View Map
Share
Abbey Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 09:30.

Kent County Council logo
Between
19 and 22 Feb 2025
Details
View Map
Share
Follow
Home Gardens

Kent County Council are proposing to carry out Highway improvement works on Home Gardens, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 29 Nov 2024 at 10:00.

Kent County Council logo
Between
19 and 22 Feb 2025
Details
View Map
Share
Follow
Home Gardens

Kent County Council are proposing to carry out Highway improvement works on Home Gardens, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 2 Dec 2024 at 07:55.

London Borough Of Bexley logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Central Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Central Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:37.

London Borough Of Bexley logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Wickham Street

London Borough Of Bexley are proposing to carry out Highway improvement works on Wickham Street, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:36.

London Borough Of Bexley logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Awliscombe Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Awliscombe Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:36.

London Borough Of Bexley logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Monkton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Monkton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:37.

London Borough Of Bexley logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Glenmore Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Glenmore Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:36.

London Borough Of Bexley logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Edison Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Edison Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:37.

Thames Water logo
LONG TERM
Between
20 Feb and 20 Jun 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 13:19.

Transport for London (TfL) logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
St Mary Street

Transport for London (TfL) are proposing to carry out Highway improvement works on St Mary Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 07:54.

Southern Gas Networks logo
Between
21 Feb and 21 Mar 2025
Details
View Map
Share
Shooters Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:00.

Southern Gas Networks logo
Between
21 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Shooters Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 14:52.

Southern Gas Networks logo
Between
21 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Shooters Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:22.

Southern Gas Networks logo
Between
23 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:08.

Transport for London (TfL) logo
LONG TERM
Between
24 Feb and 11 May 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway improvement works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 16:31.

Southern Gas Networks logo
Between
24 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Ancaster Street

Southern Gas Networks are proposing to carry out New service connection on Ancaster Street, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:41.

Southern Gas Networks logo
Between
24 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Ancaster Street

Southern Gas Networks are proposing to carry out New service connection on Ancaster Street, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 14:49.

Thurrock Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
West Thurrock Way

Thurrock Council are proposing to carry out Highway repair and maintenance works on West Thurrock Way, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 2 Oct 2024 at 09:19.

Thurrock Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Weston Avenue

Thurrock Council are proposing to carry out Highway repair and maintenance works on Weston Avenue, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 2 Oct 2024 at 09:19.

Thames Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Bostall Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Bostall Lane, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 10:28.

Thames Water logo
LONG TERM
Between
24 Feb and 12 Jun 2025
Details
View Map
Share
Lyndon Road

Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.

London Borough Of Bexley logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Overton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Overton Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Oct 2024 at 16:05.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Rainham Road South

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rainham Road South, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 3 Dec 2024 at 08:33.

Thames Water logo
Between
25 Feb and 1 Mar 2025
Details
View Map
Share
Abbey Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 1 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:39.

London Borough Of Bexley logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Howbury Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Howbury Lane, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Oct 2024 at 15:39.

Southern Gas Networks logo
Between
27 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Woodside Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodside Lane, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 15:46.

Kent County Council logo
Between
2 and 21 Mar 2025
Details
View Map
Share
Follow
Highfield Road

Kent County Council are proposing to carry out Highway improvement works on Highfield Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 11:03.

Kent County Council logo
Between
2 and 21 Mar 2025
Details
View Map
Share
Follow
West Hill

Kent County Council are proposing to carry out Highway improvement works on West Hill, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 11:03.

Kent County Council logo
Between
2 and 21 Mar 2025
Details
View Map
Share
Follow
Highfield Road North

Kent County Council are proposing to carry out Highway improvement works on Highfield Road North, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 11:00.

Kent County Council logo
Between
2 and 21 Mar 2025
Details
View Map
Share
Follow
Westgate Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Westgate Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 11:01.

London Borough Of Bexley logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Hurst Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 6 Jan 2025 at 09:48.

London Borough Of Bexley logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Selborne Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Selborne Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 6 Jan 2025 at 09:53.

Southern Gas Networks logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Elmwood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elmwood Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 14:00.

Transport for London (TfL) logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:21.

Southern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 16:55.

Southern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 16:52.

Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
River Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Dec 2024 at 15:51.

Thames Water logo
LONG TERM
Between
4 Mar and 26 May 2025
Details
View Map
Share
Lyndon Road

Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 26 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:00.

Transport for London (TfL) logo
Between
5 and 31 Mar 2025
Details
View Map
Share
Follow
Magellan Boulevard

Transport for London (TfL) are proposing to carry out Highway improvement works on Magellan Boulevard, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:54.

Transport for London (TfL) logo
Between
5 and 31 Mar 2025
Details
View Map
Share
Follow
Gallions Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallions Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:59.

Transport for London (TfL) logo
Between
6 and 8 Mar 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:44.

Transport for London (TfL) logo
Between
6 and 8 Mar 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 11:30.

Thames Water logo
LONG TERM
Between
6 Mar and 4 Jun 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 11:18.

Transport for London (TfL) logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jan 2025 at 14:33.

Transport for London (TfL) logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jan 2025 at 14:28.

Thames Water logo
Between
10 and 19 Mar 2025
Details
View Map
Share
Follow
Thornhill Avenue

Thames Water are proposing to carry out New service connection on Thornhill Avenue, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 09:02.

Southern Gas Networks logo
Between
11 and 25 Mar 2025
Details
View Map
Share
Follow
Mayplace Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayplace Avenue, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 12:48.

Southern Gas Networks logo
LONG TERM
Between
11 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Birling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 12:10.

London Borough Of Bexley logo
Between
17 and 22 Mar 2025
Details
View Map
Share
North Cray Road

London Borough Of Bexley were proposing to carry out Highway improvement works on North Cray Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 22 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 07:40.

Thames Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Ceres Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ceres Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Jan 2025 at 13:27.

UK Power Networks Eastern & London logo
Between
17 and 24 Mar 2025
Details
View Map
Share
Follow
Fulbrook Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulbrook Lane, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jan 2025 at 13:05.

London Borough Of Barking And Dagenham logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Downing Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Downing Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 13 Dec 2024 at 15:56.

Transport for London (TfL) logo
Between
20 Mar and 9 Apr 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 9 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:44.

Transport for London (TfL) logo
Between
20 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 9 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:27.

LONG TERM
Between
22 Mar and 30 May 2025
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Jan 2025 at 15:14.

Thames Water logo
LONG TERM
Between
23 Mar and 8 Aug 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jan 2025 at 14:34.

London Borough Of Bexley logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Follow
North Cray Road

London Borough Of Bexley are proposing to carry out Highway improvement works on North Cray Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Dec 2024 at 12:58.

London Borough Of Bexley logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Fairwater Avenue

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Fairwater Avenue, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 12:36.

London Borough Of Bexley logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Fairwater Avenue

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Fairwater Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Nov 2024 at 13:51.

UK Power Networks South Eastern logo
Between
26 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Shirehall Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Shirehall Road, Hawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Jan 2025 at 09:44.

UK Power Networks South Eastern logo
Between
26 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Shirehall Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Shirehall Road, Hawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Jan 2025 at 11:28.

Transport for London (TfL) logo
Between
27 Mar and 1 Apr 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jan 2025 at 14:57.

Transport for London (TfL) logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jan 2025 at 08:36.

Southern Gas Networks logo
Between
3 and 24 Apr 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jan 2025 at 14:28.

Southern Gas Networks logo
Between
4 and 18 Apr 2025
Details
View Map
Share
Station Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Station Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:18.

Transport for London (TfL) logo
LONG TERM
Between
6 Apr and 4 Jul 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway improvement works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 11:19.

Thames Water logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
The Green

Thames Water are proposing to carry out Disconnection or alteration of supply on The Green, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 14:02.

Thames Water logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
The Green

Thames Water are proposing to carry out Disconnection or alteration of supply on The Green, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:08.

Thames Water logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
The Green

Thames Water are proposing to carry out Disconnection or alteration of supply on The Green, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 10:55.

Thames Water logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
Church Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Church Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 14:03.

Thames Water logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
Church Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Church Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 12:12.

Thames Water logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Church Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 14:02.

Thames Water logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Church Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 14:48.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 26 May 2025
Details
View Map
Share
Old Farm Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 26 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:17.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 26 May 2025
Details
View Map
Share
Follow
Old Farm Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jan 2025 at 12:40.

Southern Gas Networks logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Sycamore Road

Southern Gas Networks are proposing to carry out New service connection on Sycamore Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 07:30.

Southern Gas Networks logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Sycamore Road

Southern Gas Networks are proposing to carry out New service connection on Sycamore Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 11:59.

Thames Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Hayes Road

Thames Water are proposing to carry out New service connection on Hayes Road, Horns Cross, Greenhithe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 08:58.

Thames Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Hayes Road

Thames Water are proposing to carry out New service connection on Hayes Road, Horns Cross, Greenhithe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:12.

Thames Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Priory Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Priory Hill, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:38.

G2 Energy IDNO logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Lyndon Avenue

G2 Energy IDNO are proposing to carry out Utility asset works on Lyndon Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 20 Dec 2024 at 14:15.

G2 Energy IDNO logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Lyndon Avenue

G2 Energy IDNO are proposing to carry out Utility asset works on Lyndon Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 13 Jan 2025 at 10:01.

Southern Gas Networks logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
The Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Dec 2024 at 10:50.

Thames Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Danson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Danson Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 15:43.

Southern Gas Networks logo
Between
7 Apr and 3 May 2025
Details
View Map
Share
Follow
Sun Court

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sun Court, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 3 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jan 2025 at 10:02.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 19 May 2025
Details
View Map
Share
Follow
Lincoln Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lincoln Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jan 2025 at 09:40.

Thames Water logo
Between
7 and 16 Apr 2025
Details
View Map
Share
Follow
Berwick Road

Thames Water are proposing to carry out Utility repair and maintenance works on Berwick Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 14:49.

Southern Gas Networks logo
Between
7 and 23 Apr 2025
Details
View Map
Share
Follow
Colyers Lane

Southern Gas Networks are proposing to carry out Utility asset works on Colyers Lane, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 11:26.

Southern Gas Networks logo
Between
7 and 23 Apr 2025
Details
View Map
Share
Follow
Myrtle Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Myrtle Close, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 15:28.

Southern Gas Networks logo
Between
7 and 23 Apr 2025
Details
View Map
Share
Follow
Myrtle Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Myrtle Close, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 11:26.

London Borough Of Bexley logo
Between
10 and 12 Apr 2025
Details
View Map
Share
Follow
North Cray Road

London Borough Of Bexley are proposing to carry out Highway improvement works on North Cray Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 Nov 2024 at 11:39.

Transport for London (TfL) logo
Between
10 and 28 Apr 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:03.

Transport for London (TfL) logo
Between
10 and 28 Apr 2025
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:28.

Thames Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
School Lane

Thames Water are proposing to carry out Utility repair and maintenance works on School Lane, Swanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 06:17.


Roadworks Map near to Lesney Park, ERITH, DA8 3DS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 19 Jan 2025 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lesney Park, ERITH, DA8 3DS (60 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
PARK CRESCENT 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 17 Jan 2025 - 21 Jan 2025)
0.1
Details
Share
2
Thames Water logo
URGENT
  
PARK CRESCENT 
(0.1 miles)
Thames Water
Utility asset works - Carriageway - Road closure
In Progress
Since: 17 Jan 2025 10:00
(Scheduled: 17 Jan 2025 - 8 Feb 2025)
0.1
Details
Share
Follow
3
Thames Water logo
MAJOR
  
PARK CRESCENT 
(0.1 miles)
Thames Water
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 17 Jan 2025 - 8 Feb 2025
0.1
Details
Share
Follow
4
Thames Water logo
MAJOR
  
PARK CRESCENT 
(0.1 miles)
Thames Water
Utility asset works - Carriageway - Road closure
In Progress
Since: 17 Jan 2025 14:30
(Scheduled: 17 Jan 2025 - 8 Feb 2025)
0.1
Details
Share
Follow
5
BT logo
WARD CLOSE 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 17 Jan 2025 09:30
(Scheduled: 17 Jan 2025 - 21 Jan 2025)
0.1
Details
Share
Follow
6
Thames Water logo
MAJOR
  
AVENUE ROAD 
(0.2 miles)
Thames Water
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 2 Jan 2025 - 30 Apr 2025
0.2
Details
Share
Follow
7
Thames Water logo
MAJOR
  
AVENUE ROAD 
(0.2 miles)
Thames Water
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 2 Jan 2025 - 30 Apr 2025
0.2
Details
Share
Follow
8
Thames Water logo
MAJOR
  
LESNEY PARK 
(0.2 miles)
Thames Water
Utility asset works - Carriageway - Road closure
In Progress
Since: 2 Sep 2024 08:00
(Scheduled: 2 Sep 2024 - 2 Sep 2025)
0.2
Details
Share
Follow
9
Thames Water logo
MAJOR
  
AVENUE ROAD 
(0.2 miles)
Thames Water
Utility asset works - Carriageway - Road closure
Cancelled
(Scheduled: 2 Jan 2025 - 4 Mar 2025)
0.2
Details
Share
10
Thames Water logo
MAJOR
  
BEECHFIELD ROAD 
(0.2 miles)
Thames Water
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 2 Sep 2024 - 2 Mar 2025
0.2
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data