ROADWORKS SUMMARY
Marlborough Park Avenue, SIDCUP, DA15 9DY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Marlborough Park Avenue, DA15 9DY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Marlborough Park Avenue, SIDCUP, DA15 9DY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Marlborough Park Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 13 Jan 2025
Details
View Map
Share
Follow
Willersley Avenue

Thames Water are proposing to carry out New service connection on Willersley Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 13 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:23.

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 31 Jan 2026
Details
View Map
Share
Follow
Westwood Lane

Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.

Thames Water logo
LONG TERM
Between
28 Aug 2023 and 12 Aug 2024
Details
View Map
Share
Follow
Wellington Avenue

Thames Water are proposing to carry out New service connection on Wellington Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2023 and could run through until 12 August 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:01.

Southern Gas Networks logo
LONG TERM
Until
13 May 2024
Details
View Map
Share
Follow
Nathan Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Nathan Way, Thamesmead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2023 at 08:30 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2024 at 15:01.

LONG TERM
Until
31 Aug 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2023 at 12:00 and could run through until 31 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 30 Jan 2024 at 09:28.

London Borough Of Bexley logo
LONG TERM
Until
17 May 2024
Details
View Map
Share
Follow
Bull Alley

London Borough Of Bexley are carrying out Section 50 on Bull Alley, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2023 at 10:00 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 18 Apr 2024 at 11:58.

Thames Water logo
LONG TERM
Between
30 Oct 2023 and 10 May 2024
Details
View Map
Share
Follow
Welling Way

Thames Water are proposing to carry out New service connection on Welling Way, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2023 and could run through until 10 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Apr 2023 at 11:02.

Royal Borough Of Greenwich logo
LONG TERM
Until
6 Nov 2024
Details
View Map
Share
Follow
Plumstead High Street

Royal Borough Of Greenwich are carrying out Highway repair and maintenance works on Plumstead High Street, Plumstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 11:00 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 12 Mar 2024 at 10:28.

LONG TERM
Between
6 Nov 2023 and 5 May 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 17:57.

LONG TERM
Until
31 Aug 2024
Details
View Map
Share
Follow
Connaught Bridge

London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 08:00 and could run through until 31 August 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 30 Jan 2024 at 09:56.

LONG TERM
Between
6 Nov 2023 and 5 May 2024
Details
View Map
Share
Follow
Connaught Bridge

London Borough Of Newham are proposing to carry out Highway improvement works on Connaught Bridge, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 17:58.

LONG TERM
Between
6 Nov 2023 and 5 May 2024
Details
View Map
Share
Follow
Connaught Bridge

London Borough Of Newham are proposing to carry out Highway improvement works on Connaught Bridge, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 18:01.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Thames Road

London Borough Of Newham are proposing to carry out Section 50 on Thames Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 4 Jan 2024 at 09:37.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Booth Road

London Borough Of Newham are proposing to carry out Section 50 on Booth Road, Silvertown, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:22.

LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 15 Apr 2024 at 13:12.

LONG TERM
Until
23 Jun 2024
Details
View Map
Share
Follow
Thames Road

Riverside Energy Park are carrying out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 January 2024 at 08:00 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Riverside Energy Park on 29 Feb 2024 at 09:58.

Thames Water logo
LONG TERM
Between
22 Jan and 6 May 2024
Details
View Map
Share
Follow
Stephenson Close

Thames Water are proposing to carry out New service connection on Stephenson Close, Welling.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 22 January 2024 and could run through until 6 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:49.

Southern Gas Networks logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Station Approach

Southern Gas Networks are carrying out Utility repair and maintenance works on Station Approach, Chislehurst.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 February 2024 at 14:30 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Apr 2024 at 15:30.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Landstead Road

Thames Water are carrying out Utility asset works on Landstead Road, Plumstead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 February 2024 at 08:40 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 09:21.

Transport for London (TfL) logo
LONG TERM
Between
20 Feb 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Lakeside Close

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lakeside Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2024 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 23 Feb 2024 at 11:06.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are carrying out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2024 at 22:00 and could run through until 3 May 2024. The works will impact the cycleway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2024 at 10:23.

Southern Gas Networks logo
LONG TERM
Until
20 May 2024
Details
View Map
Share
Follow
Blendon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Blendon Road, Bexley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2024 at 09:15 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2024 at 09:30.

LONG TERM
Between
14 Mar and 7 Jun 2024
Details
View Map
Share
Follow
Northend Road

Riverside Energy Park are proposing to carry out Utility asset works on Northend Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2024 and could run through until 7 June 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Riverside Energy Park on 7 Jun 2023 at 16:08.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Sedgebrook Road

Thames Water are proposing to carry out Utility asset works on Sedgebrook Road, Kidbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Dec 2023 at 16:31.

UK Power Networks Eastern & London logo
LONG TERM
Until
1 Jul 2024
Details
View Map
Share
Follow
Bedonwell Road

UK Power Networks Eastern & London are carrying out New service connection on Bedonwell Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 March 2024 at 08:00 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2024 at 11:16.

UK Power Networks Eastern & London logo
LONG TERM
Until
14 Oct 2024
Details
View Map
Share
Follow
Ightham Road

UK Power Networks Eastern & London are carrying out New service connection on Ightham Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 March 2024 at 08:00 and could run through until 14 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2024 at 14:34.

Thames Water logo
LONG TERM
Until
8 May 2024
Details
View Map
Share
Follow
Lakedale Road

Thames Water are carrying out Utility repair and maintenance works on Lakedale Road, Plumstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 March 2024 at 09:00 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 11:37.

London Borough Of Bromley logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Loop Road

London Borough Of Bromley are carrying out Highway improvement works on Loop Road, Chislehurst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 25 Apr 2024 at 16:57.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Upton Close

Transport for London (TfL) are carrying out Highway improvement works on Upton Close, Bexley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 04:00 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2024 at 15:42.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Highland Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Highland Road, Bexleyheath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:45 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 09:32.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Arnsberg Way

Transport for London (TfL) are carrying out Highway repair and maintenance works on Arnsberg Way, Bexleyheath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:45 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 09:33.

LONG TERM
Until
23 Jun 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are carrying out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:37 and could run through until 23 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 2 Apr 2024 at 08:58.

Thames Water logo
LONG TERM
Until
25 May 2024
Details
View Map
Share
Follow
Chinbrook Road

Thames Water are carrying out Disconnection or alteration of supply on Chinbrook Road, Grove Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 09:00 and could run through until 25 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 10:47.

Thames Water logo
LONG TERM
Until
25 May 2024
Details
View Map
Share
Follow
Grove Park Road

Thames Water are carrying out Disconnection or alteration of supply on Grove Park Road, Grove Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 09:00 and could run through until 25 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 10:47.

Thames Water logo
LONG TERM
Until
25 May 2024
Details
View Map
Share
Follow
Marvels Lane

Thames Water are carrying out Disconnection or alteration of supply on Marvels Lane, Grove Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 10:00 and could run through until 25 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 11:50.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Admaston Road

Thames Water are carrying out Utility asset works on Admaston Road, Plumstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 08:00 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 09:51.

London Borough Of Bexley logo
LONG TERM
Between
8 Apr and 17 May 2024
Details
View Map
Share
Follow
Church Manorway

London Borough Of Bexley are proposing to carry out Section 50 on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 5 Mar 2024 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
9 Apr and 23 Jun 2024
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The works will start on or after 9 April 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jan 2024 at 14:13.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
North Cray Road

Southern Gas Networks are carrying out Utility repair and maintenance works on North Cray Road, Sidcup.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 10:49 and could run through until 2 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2024 at 10:34.

UK Power Networks Eastern & London logo
Until
11 May 2024
Details
View Map
Share
Follow
Church Road

UK Power Networks Eastern & London are carrying out New service connection on Church Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 07:21 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Apr 2024 at 07:37.

Southern Gas Networks logo
Until
12 May 2024
Details
View Map
Share
Follow
Riverdale Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Riverdale Road, Bexley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:31 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Apr 2024 at 13:37.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 23 May 2024
Details
View Map
Share
Follow
Buckden Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckden Close, London.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 14 April 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 07:39.

Southern Gas Networks logo
LONG TERM
Until
2 Jun 2024
Details
View Map
Share
Follow
Alanthus Close

Southern Gas Networks are carrying out Utility repair and maintenance works on Alanthus Close, London.

These works are categorised as Major.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 16 April 2024 at 08:00 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2024 at 08:48.

Finishing
Thursday
Details
View Map
Share
Follow
Thames Road

Riverside Energy Park are proposing to carry out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Riverside Energy Park on 19 Sep 2023 at 15:02.

Thames Water logo
LONG TERM
Until
19 May 2024
Details
View Map
Share
Follow
Summerhouse Drive

Thames Water are carrying out Utility asset works on Summerhouse Drive, Bexley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 08:30 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 10:05.

Southern Gas Networks logo
Between
15 Apr and 5 May 2024
Details
View Map
Share
Follow
Camden Road To The South Glade Footpath205

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Camden Road To The South Glade Footpath205, Bexley.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 15 April 2024 and could run through until 5 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2024 at 15:18.

LONG TERM
Between
19 Apr and 8 Jun 2024
Details
View Map
Share
Follow
Northend Road

Riverside Energy Park are proposing to carry out New service connection on Northend Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 3 May 2023 at 09:47.

London Borough Of Bromley logo
Until
9 May 2024
Details
View Map
Share
Follow
Farnaby Road

London Borough Of Bromley are carrying out Highway improvement works on Farnaby Road, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 08:00 and could run through until 9 May 2024. The works will impact the footpath only.

This roadwork event was last updated by London Borough Of Bromley on 22 Apr 2024 at 09:16.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Days Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Days Lane, Sidcup.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 11:30 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2024 at 15:09.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Alabama Street

Thames Water are carrying out Utility repair and maintenance works on Alabama Street, Plumstead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 April 2024 at 08:15 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 09:34.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Mycenae Road

Thames Water are carrying out Utility repair and maintenance works on Mycenae Road, Blackheath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 April 2024 at 09:12 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Apr 2024 at 09:20.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lower Road

Thames Water are carrying out Utility repair and maintenance works on Lower Road, Erith.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 April 2024 at 09:28 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 11:08.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Gerda Road

Thames Water are carrying out Utility repair and maintenance works on Gerda Road, Eltham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 07:58 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 10:10.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Beckenham Lane

Thames Water are carrying out Utility repair and maintenance works on Beckenham Lane, Bromley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 08:36 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 10:43.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Mill Place

Thames Water were proposing to carry out Utility repair and maintenance works on Mill Place, Chislehurst.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 April 2024 and run through until 30 April 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 11:33.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Court Road

Thames Water are carrying out Utility repair and maintenance works on Court Road, Eltham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 09:57 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 13:36.

Transport for London (TfL) logo
Wednesday
Details
View Map
Share
Brownhill Road

Transport for London (TfL) carried out Highway repair and maintenance works on Brownhill Road, London.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 27 Apr 2024 and 1 May 2024 and were actually completed on 27 Apr 2024 between 00:45 and 00:46. The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Apr 2024 at 01:04.

Southern Gas Networks logo
Between
28 Apr and 22 May 2024
Details
View Map
Share
Follow
Melbourne Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Melbourne Close, Orpington.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 28 April 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2024 at 14:44.

Southern Gas Networks logo
Between
28 Apr and 12 May 2024
Details
View Map
Share
Follow
Montpelier Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montpelier Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Apr 2024 at 08:59.

Between
28 Apr and 25 May 2024
Details
View Map
Share
Follow
Thames Road

Riverside Energy Park are proposing to carry out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 25 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Riverside Energy Park on 19 Sep 2023 at 13:11.

Telefonica UK logo
Between
29 Apr and 16 May 2024
Details
View Map
Share
Follow
Hurst Road

Telefonica UK are proposing to carry out Utility asset works on Hurst Road, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 26 Apr 2024 at 10:59.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Apr 2024 at 13:57.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Vandyke Cross

BT are proposing to carry out Utility asset works on Vandyke Cross, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2024 at 11:18.

Thames Water logo
LONG TERM
Between
29 Apr and 10 Jun 2024
Details
View Map
Share
Follow
Crossbrook Road

Thames Water are proposing to carry out Utility asset works on Crossbrook Road, Kidbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2023 at 16:32.

Thames Water logo
Between
29 Apr and 19 May 2024
Details
View Map
Share
Follow
Hinstock Road

Thames Water are proposing to carry out Utility asset works on Hinstock Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2024 at 11:01.

Thames Water logo
LONG TERM
Between
3 May and 28 Jun 2024
Details
View Map
Share
Follow
Greenwood Road

Thames Water are proposing to carry out Utility asset works on Greenwood Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 12:05.

BT logo
Between
6 and 27 May 2024
Details
View Map
Share
Follow
Foots Cray High Street

BT are proposing to carry out Utility repair and maintenance works on Foots Cray High Street, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Apr 2024 at 14:26.

Thames Water logo
Between
6 and 8 May 2024
Details
View Map
Share
Follow
Ashgrove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ashgrove Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Feb 2024 at 07:40.

Thames Water logo
LONG TERM
Between
6 May 2024 and 13 May 2025
Details
View Map
Share
Follow
Longmead Drive

Thames Water are proposing to carry out New service connection on Longmead Drive, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:16.

Southern Gas Networks logo
LONG TERM
Between
6 May and 10 Jun 2024
Details
View Map
Share
Follow
Valentine Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2024 at 13:58.

London Borough Of Bexley logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
Blackfen Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 1 Feb 2024 at 15:54.

London Borough Of Bexley logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
Blackfen Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Apr 2024 at 15:37.

Thames Water logo
LONG TERM
Between
6 May and 14 Jul 2024
Details
View Map
Share
Follow
Chaucer Road

Thames Water are proposing to carry out Utility asset works on Chaucer Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Feb 2024 at 18:39.

Thames Water logo
Between
7 and 11 May 2024
Details
View Map
Share
Follow
Bellefield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bellefield Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 May 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 10:05.

LONG TERM
Between
7 May and 7 Jun 2024
Details
View Map
Share
Follow
Bugsbys Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bugsbys Way, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Apr 2024 at 12:33.

Thames Water logo
Between
12 and 15 May 2024
Details
View Map
Share
Follow
Cambria Close

Thames Water are proposing to carry out New service connection on Cambria Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 15 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 15:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 13 Jun 2024
Details
View Map
Share
Follow
Belvedere Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Belvedere Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2024 at 10:50.

Southern Gas Networks logo
LONG TERM
Between
12 May and 20 Jun 2024
Details
View Map
Share
Follow
Kenilworth Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kenilworth Gardens, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Apr 2024 at 08:27.

Between
12 and 27 May 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 25 Oct 2023 at 13:00.

UK Power Networks South Eastern logo
LONG TERM
Between
13 May and 6 Aug 2024
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 6 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Feb 2024 at 15:37.

London Borough Of Bexley logo
Between
13 and 16 May 2024
Details
View Map
Share
Follow
Ellenborough Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Ellenborough Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Feb 2024 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
13 May and 28 Jun 2024
Details
View Map
Share
Follow
White Horse Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on White Horse Hill, Chislehurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2024 at 09:49.

Transport for London (TfL) logo
LONG TERM
Between
13 May and 28 Jun 2024
Details
View Map
Share
Follow
Elmstead Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elmstead Lane, Chislehurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2024 at 09:32.

Transport for London (TfL) logo
LONG TERM
Between
13 May and 28 Jun 2024
Details
View Map
Share
Follow
William Barefoot Drive

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on William Barefoot Drive, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Feb 2024 at 18:29.

Transport for London (TfL) logo
LONG TERM
Between
13 May and 28 Jun 2024
Details
View Map
Share
Follow
Mottingham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mottingham Road, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2024 at 09:32.

Thames Water logo
Between
13 and 16 May 2024
Details
View Map
Share
Follow
Fairway

Thames Water are proposing to carry out New service connection on Fairway, Bexleyheath.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 07:32.

Thames Water logo
Between
13 and 17 May 2024
Details
View Map
Share
Follow
Lovel Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Lovel Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 15:45.

LONG TERM
Between
13 May and 22 Sep 2024
Details
View Map
Share
Follow
Northend Road

Riverside Energy Park are proposing to carry out Utility asset works on Northend Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 22 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 28 Feb 2024 at 09:38.

LONG TERM
Between
13 May and 23 Jun 2024
Details
View Map
Share
Follow
South Road

Riverside Energy Park are proposing to carry out Utility asset works on South Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 23 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 12 Feb 2024 at 09:03.

Network Rail logo
LONG TERM
Between
14 May and 23 Aug 2024
Details
View Map
Share
Follow
St Germans Place

Network Rail are proposing to carry out Works for Rail Purposes on St Germans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 23 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Apr 2024 at 15:30.

Thames Water logo
LONG TERM
Between
17 May and 6 Aug 2024
Details
View Map
Share
Follow
Bromley Hill

Thames Water are proposing to carry out Utility asset works on Bromley Hill, Bromley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 6 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 07:55.

Thames Water logo
Between
19 and 21 May 2024
Details
View Map
Share
Follow
Combedale Road

Thames Water are proposing to carry out Remedial works on Combedale Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 13:37.

Thames Water logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Bridge Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bridge Road, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 15:55.

UK Power Networks South Eastern logo
LONG TERM
Between
20 May and 18 Oct 2024
Details
View Map
Share
Follow
Cray Avenue

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.

These works are categorised as Major.

The works will start on or after 20 May 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Feb 2024 at 15:04.

UK Power Networks South Eastern logo
LONG TERM
Between
20 May and 3 Dec 2024
Details
View Map
Share
Follow
Sevenoaks Way

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Feb 2024 at 15:38.

Thames Water logo
Between
20 and 22 May 2024
Details
View Map
Share
Follow
Faraday Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Faraday Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 13:27.

Thames Water logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Coton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Coton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 13:10.

Thames Water logo
Between
20 May and 9 Jun 2024
Details
View Map
Share
Follow
Olven Road

Thames Water are proposing to carry out Utility asset works on Olven Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2024 at 11:03.

Royal Borough Of Greenwich logo
Between
20 May and 4 Jun 2024
Details
View Map
Share
Follow
Peartree Way

Royal Borough Of Greenwich are proposing to carry out Highway improvement works on Peartree Way, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 15 Apr 2024 at 10:22.

Royal Borough Of Greenwich logo
Between
20 May and 4 Jun 2024
Details
View Map
Share
Follow
Peartree Way

Royal Borough Of Greenwich are proposing to carry out Highway improvement works on Peartree Way, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 22 Apr 2024 at 09:27.

London Borough Of Bexley logo
Between
20 and 25 May 2024
Details
View Map
Share
Follow
Eastern Way

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Eastern Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 27 Feb 2024 at 12:14.

London Borough Of Bexley logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Eastern Way

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Eastern Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Apr 2024 at 10:25.

London Borough Of Bexley logo
Between
20 and 25 May 2024
Details
View Map
Share
Follow
Carlyle Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Carlyle Road, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 27 Feb 2024 at 11:58.

Between
24 and 30 May 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 25 Oct 2023 at 13:01.

BT logo
Between
25 May and 1 Jun 2024
Details
View Map
Share
Follow
Plumstead High Street

BT are proposing to carry out Utility asset works on Plumstead High Street, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 1 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Mar 2024 at 09:13.

BT logo
Between
25 May and 1 Jun 2024
Details
View Map
Share
Follow
Kentmere Road

BT are proposing to carry out Utility asset works on Kentmere Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Mar 2024 at 09:12.

Southern Gas Networks logo
Between
26 May and 16 Jun 2024
Details
View Map
Share
Follow
Iris Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Iris Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2024 at 12:21.

Thames Water logo
Between
27 May and 1 Jun 2024
Details
View Map
Share
Follow
Bromley Common

Thames Water are proposing to carry out Utility repair and maintenance works on Bromley Common, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 16:07.

Thames Water logo
Between
27 May and 1 Jun 2024
Details
View Map
Share
Follow
Magpie Hall Lane

Thames Water are proposing to carry out roadworks on Magpie Hall Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 14:30.

Thames Water logo
Between
27 and 30 May 2024
Details
View Map
Share
Follow
Southill Road

Thames Water are proposing to carry out New service connection on Southill Road, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 12:11.

Thames Water logo
Between
27 and 30 May 2024
Details
View Map
Share
Follow
Belmont Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Belmont Lane, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2024 at 15:10.

London Borough Of Bexley logo
Between
27 and 30 May 2024
Details
View Map
Share
Follow
Hook Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Hook Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 10 Jan 2024 at 08:57.

London Borough Of Bexley logo
Between
27 and 30 May 2024
Details
View Map
Share
Follow
Hook Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Hook Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 Feb 2024 at 11:58.

Southern Gas Networks logo
Between
27 May and 2 Jun 2024
Details
View Map
Share
Follow
Alderney Road

Southern Gas Networks are proposing to carry out New service connection on Alderney Road, Slade Green, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2024 at 09:40.

Thames Water logo
Between
27 May and 10 Jun 2024
Details
View Map
Share
Follow
Woolwich Church Street

Thames Water are proposing to carry out Utility asset works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Apr 2024 at 14:57.

Thames Water logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Foxbury Road

Thames Water are proposing to carry out New service connection on Foxbury Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2024 at 11:49.

Thames Water logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Avondale Road

Thames Water are proposing to carry out New service connection on Avondale Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 16:51.

Thames Water logo
Between
28 May and 16 Jun 2024
Details
View Map
Share
Follow
Chinbrook Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Chinbrook Road, Grove Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2024 at 09:37.

Thames Water logo
Between
28 May and 16 Jun 2024
Details
View Map
Share
Follow
Amblecote Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Amblecote Road, Grove Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2024 at 09:38.

Thames Water logo
Between
28 May and 16 Jun 2024
Details
View Map
Share
Follow
Marbrook Court

Thames Water are proposing to carry out Disconnection or alteration of supply on Marbrook Court, Grove Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2024 at 09:40.

Thames Water logo
Between
28 May and 3 Jun 2024
Details
View Map
Share
Follow
Gourock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gourock Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
28 May and 13 Jul 2024
Details
View Map
Share
Follow
Talehangers Close

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Talehangers Close, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 10:05.

Transport for London (TfL) logo
LONG TERM
Between
28 May and 13 Jul 2024
Details
View Map
Share
Follow
Crook Log

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Crook Log, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 10:04.

Transport for London (TfL) logo
LONG TERM
Between
28 May and 13 Jul 2024
Details
View Map
Share
Follow
Danson Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Danson Road, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 10:05.

Transport for London (TfL) logo
LONG TERM
Between
28 May and 13 Jul 2024
Details
View Map
Share
Follow
Brampton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brampton Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 08:28.

Transport for London (TfL) logo
LONG TERM
Between
28 May and 13 Jul 2024
Details
View Map
Share
Follow
Park View Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Park View Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 10:27.

London Borough Of Bexley logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Hook Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Hook Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Mar 2024 at 12:24.

Thames Water logo
Between
28 May and 3 Jun 2024
Details
View Map
Share
Follow
Nithdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Nithdale Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 11:07.

LONG TERM
Between
28 May and 4 Jul 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Riverside Energy Park on 19 Oct 2023 at 13:16.

London Borough Of Bexley logo
Between
29 and 31 May 2024
Details
View Map
Share
Follow
Waldrist Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Waldrist Way, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 Mar 2024 at 07:49.

UK Power Networks South Eastern logo
Between
31 May and 2 Jun 2024
Details
View Map
Share
Follow
Top Dartford Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Top Dartford Road, Hextable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Apr 2024 at 08:38.

Southern Gas Networks logo
LONG TERM
Between
3 Jun and 15 Jul 2024
Details
View Map
Share
Follow
Waring Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waring Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Mar 2024 at 16:43.

Thames Water logo
Between
3 and 9 Jun 2024
Details
View Map
Share
Follow
Downham Way

Thames Water are proposing to carry out Utility repair and maintenance works on Downham Way, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2024 at 09:56.

Kent County Council logo
Between
3 and 12 Jun 2024
Details
View Map
Share
Follow
Hawley Road

Kent County Council are proposing to carry out Highway improvement works on Hawley Road, Wilmington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 1 Feb 2024 at 14:08.

Kent County Council logo
Between
3 and 12 Jun 2024
Details
View Map
Share
Follow
Oakfield Lane

Kent County Council are proposing to carry out Highway improvement works on Oakfield Lane, Wilmington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 1 Feb 2024 at 14:08.

Kent County Council logo
Between
3 and 12 Jun 2024
Details
View Map
Share
Follow
Lowfield Street

Kent County Council are proposing to carry out Highway improvement works on Lowfield Street, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 1 Feb 2024 at 14:08.

London Borough Of Bexley logo
Between
3 and 6 Jun 2024
Details
View Map
Share
Follow
Lessness Park

London Borough Of Bexley are proposing to carry out Highway improvement works on Lessness Park, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 18 Mar 2024 at 11:41.

Southern Gas Networks logo
LONG TERM
Between
4 Jun and 9 Jul 2024
Details
View Map
Share
Follow
Wickham Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wickham Street, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 9 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2024 at 12:40.

Southern Gas Networks logo
LONG TERM
Between
4 Jun and 9 Jul 2024
Details
View Map
Share
Follow
Chaucer Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chaucer Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 9 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2024 at 16:32.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2024
Details
View Map
Share
Follow
Wellington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellington Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2024 at 11:37.

Southern Gas Networks logo
LONG TERM
Between
10 Jun and 29 Jul 2024
Details
View Map
Share
Follow
Suffolk Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Suffolk Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Mar 2024 at 16:43.

Thames Water logo
Between
10 and 18 Jun 2024
Details
View Map
Share
Follow
Oakfield Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Oakfield Lane, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 18 June 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 12 Mar 2024 at 12:12.

Thames Water logo
Between
10 and 18 Jun 2024
Details
View Map
Share
Follow
Wilmington Court Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wilmington Court Road, Wilmington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 18 June 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 10:50.

Thames Water logo
Between
10 and 14 Jun 2024
Details
View Map
Share
Follow
Gourock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gourock Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 11:27.

Thames Water logo
LONG TERM
Between
10 Jun and 22 Jul 2024
Details
View Map
Share
Follow
Kelbrook Road

Thames Water are proposing to carry out Utility asset works on Kelbrook Road, Kidbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2023 at 16:33.

Thames Water logo
Between
10 and 30 Jun 2024
Details
View Map
Share
Follow
Upton Road

Thames Water are proposing to carry out Utility asset works on Upton Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Mar 2024 at 10:40.

Southern Gas Networks logo
Between
12 and 26 Jun 2024
Details
View Map
Share
Follow
Woodside Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodside Lane, Bexley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2024 at 15:40.

Southern Gas Networks logo
LONG TERM
Between
13 Jun and 23 Aug 2024
Details
View Map
Share
Follow
Elmwood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elmwood Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 23 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2024 at 15:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
14 Jun and 26 Jul 2024
Details
View Map
Share
Follow
Belvedere Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Belvedere Road, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2024 at 15:38.

Between
15 and 23 Jun 2024
Details
View Map
Share
Follow
Crayford Way

Riverside Energy Park are proposing to carry out Utility asset works on Crayford Way, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 18 Apr 2024 at 09:28.

Transport for London (TfL) logo
LONG TERM
Between
16 Jun and 30 Aug 2024
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 16:16.

Southern Gas Networks logo
LONG TERM
Between
17 Jun and 29 Jul 2024
Details
View Map
Share
Follow
Middleton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Middleton Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Mar 2024 at 16:44.

Southern Gas Networks logo
LONG TERM
Between
17 Jun and 29 Jul 2024
Details
View Map
Share
Follow
Granton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Granton Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Mar 2024 at 16:44.

Thames Water logo
LONG TERM
Between
17 Jun and 29 Jul 2024
Details
View Map
Share
Follow
Bankside Close

Thames Water are proposing to carry out Utility asset works on Bankside Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 13:18.

Electricity Network Company logo
Between
17 Jun and 12 Jul 2024
Details
View Map
Share
Follow
West Street

Electricity Network Company are proposing to carry out Utility asset works on West Street, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Apr 2024 at 11:26.

UK Power Networks Eastern & London logo
Between
21 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Hythe Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Hythe Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 07:37.

Southern Gas Networks logo
Between
23 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Mottingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mottingham Road, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2024 at 09:07.

Thames Water logo
Between
23 Jun and 8 Jul 2024
Details
View Map
Share
Follow
Baldwyns Park

Thames Water are proposing to carry out Utility repair and maintenance works on Baldwyns Park, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 8 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2024 at 14:44.

Virgin Media logo
Between
24 and 26 Jun 2024
Details
View Map
Share
Follow
Chantry Lane

Virgin Media are proposing to carry out Utility asset works on Chantry Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 19 Mar 2024 at 07:19.

Southern Gas Networks logo
LONG TERM
Between
24 Jun and 29 Jul 2024
Details
View Map
Share
Follow
Dudsbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dudsbury Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2024 at 13:07.

ESP Electricity logo
Between
24 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Tredegar Road

ESP Electricity are proposing to carry out New service connection on Tredegar Road, Wilmington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 11 Apr 2024 at 10:05.

Southern Gas Networks logo
Between
24 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Longlands Park Crescent

Southern Gas Networks are proposing to carry out New service connection on Longlands Park Crescent, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2024 at 09:22.

Kent County Council logo
Between
24 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Hawley Road

Kent County Council are proposing to carry out Highway improvement works on Hawley Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jan 2024 at 14:24.

Southern Gas Networks logo
LONG TERM
Between
24 Jun and 29 Sep 2024
Details
View Map
Share
Follow
Hurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 29 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2024 at 14:43.

Southern Gas Networks logo
Between
24 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Knoll Road

Southern Gas Networks are proposing to carry out New service connection on Knoll Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 2 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2024 at 08:30.

Between
24 and 30 Jun 2024
Details
View Map
Share
Follow
Boundary Street

Riverside Energy Park are proposing to carry out Utility asset works on Boundary Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 30 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 28 Feb 2024 at 09:48.

Thames Water logo
LONG TERM
Between
24 Jun and 23 Sep 2024
Details
View Map
Share
Follow
Ripley Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ripley Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 13:51.

Thames Water logo
LONG TERM
Between
24 Jun and 23 Aug 2024
Details
View Map
Share
Follow
Stanmore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanmore Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 23 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 13:48.

Thames Water logo
LONG TERM
Between
24 Jun and 26 Jul 2024
Details
View Map
Share
Follow
Upper Sheridan Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Upper Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 12:53.

Thames Water logo
LONG TERM
Between
24 Jun and 2 Sep 2024
Details
View Map
Share
Follow
Gladeswood Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 2 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 09:20.

Southern Gas Networks logo
Between
25 Jun and 11 Jul 2024
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2024 at 08:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Jun and 25 Aug 2024
Details
View Map
Share
Follow
Parsonage Manorway

UK Power Networks Eastern & London are proposing to carry out New service connection on Parsonage Manorway, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 25 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 07:38.

Virgin Media logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
East Street

Virgin Media are proposing to carry out Utility asset works on East Street, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 Mar 2024 at 14:05.

Thames Water logo
LONG TERM
Between
28 Jun and 2 Aug 2024
Details
View Map
Share
Follow
Spurrell Avenue

Thames Water are proposing to carry out Utility asset works on Spurrell Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 11:06.

Thames Water logo
Between
30 Jun and 17 Jul 2024
Details
View Map
Share
Follow
Bromley Hill

Thames Water are proposing to carry out Utility asset works on Bromley Hill, Bromley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 07:48.

Thames Water logo
LONG TERM
Between
30 Jun and 25 Aug 2024
Details
View Map
Share
Follow
Wickham Street

Thames Water are proposing to carry out Utility asset works on Wickham Street, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 25 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Feb 2024 at 18:41.

LONG TERM
Between
30 Jun and 30 Nov 2024
Details
View Map
Share
Follow
Northend Road

Riverside Energy Park are proposing to carry out Utility asset works on Northend Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 30 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 5 Oct 2023 at 15:26.

LONG TERM
Between
30 Jun and 3 Aug 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 3 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Riverside Energy Park on 19 Oct 2023 at 13:13.

Transport for London (TfL) logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 10:04.

Transport for London (TfL) logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 10:05.

Southern Gas Networks logo
Between
1 and 29 Jul 2024
Details
View Map
Share
Follow
Sidcup Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2024 at 16:25.

Southern Gas Networks logo
LONG TERM
Between
1 Jul and 5 Aug 2024
Details
View Map
Share
Follow
Alexander Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 5 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Mar 2024 at 11:44.

Transport for London (TfL) logo
LONG TERM
Between
1 Jul and 2 Aug 2024
Details
View Map
Share
Follow
Picardy Manorway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Picardy Manorway, Belvedere.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jan 2024 at 11:23.

Thames Water logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Parker Street

Thames Water are proposing to carry out New service connection on Parker Street, North Woolwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:08.

Transport for London (TfL) logo
Between
4 and 9 Jul 2024
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 10:08.

Transport for London (TfL) logo
Between
4 and 9 Jul 2024
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 10:10.

Transport for London (TfL) logo
Between
4 and 9 Jul 2024
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 10:11.

Southern Gas Networks logo
LONG TERM
Between
8 Jul and 12 Aug 2024
Details
View Map
Share
Follow
Eynswood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eynswood Drive, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 12 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2024 at 14:04.

London Borough Of Bexley logo
Between
8 and 12 Jul 2024
Details
View Map
Share
Follow
Westwood Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Westwood Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 22 Mar 2024 at 13:28.

Transport for London (TfL) logo
Between
9 and 12 Jul 2024
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 10:14.

Transport for London (TfL) logo
Between
12 and 17 Jul 2024
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 17 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 10:18.

Transport for London (TfL) logo
Between
12 and 17 Jul 2024
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 17 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 10:19.

Thames Water logo
Between
14 and 29 Jul 2024
Details
View Map
Share
Follow
Recreation Road

Thames Water are proposing to carry out Utility repair and maintenance works on Recreation Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 14:41.

Southern Gas Networks logo
Between
14 Jul and 4 Aug 2024
Details
View Map
Share
Follow
Baldwyns Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Baldwyns Park, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2024 at 11:29.

Southern Gas Networks logo
LONG TERM
Between
14 Jul and 18 Aug 2024
Details
View Map
Share
Follow
Wansunt Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wansunt Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 18 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2024 at 12:23.

Southern Gas Networks logo
Between
15 Jul and 12 Aug 2024
Details
View Map
Share
Follow
Wingate Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wingate Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 12 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Mar 2024 at 16:44.

Thames Water logo
LONG TERM
Between
15 Jul and 2 Sep 2024
Details
View Map
Share
Follow
Bexley Lane

Thames Water are proposing to carry out New service connection on Bexley Lane, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 2 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2023 at 13:28.

London Borough Of Bexley logo
Between
15 and 19 Jul 2024
Details
View Map
Share
Follow
Bellegrove Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Bellegrove Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Apr 2024 at 10:14.

London Borough Of Bexley logo
Between
15 and 17 Jul 2024
Details
View Map
Share
Follow
Church Manorway

London Borough Of Bexley are proposing to carry out Highway improvement works on Church Manorway, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 17 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Apr 2024 at 14:54.

Thames Water logo
Between
16 and 22 Jul 2024
Details
View Map
Share
Follow
Muirkirk Road

Thames Water are proposing to carry out Utility repair and maintenance works on Muirkirk Road, Catford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 12:27.

Southern Gas Networks logo
Between
21 and 25 Jul 2024
Details
View Map
Share
Follow
Southlands Road

Southern Gas Networks are proposing to carry out New service connection on Southlands Road, Bickley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2024 at 11:24.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2024
Details
View Map
Share
Follow
Blackbrook Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackbrook Lane, Bickley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 22 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 May 2023 at 09:52.

Southern Gas Networks logo
Between
21 Jul and 8 Aug 2024
Details
View Map
Share
Follow
Church Row

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Row, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 8 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Jan 2024 at 17:28.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2024
Details
View Map
Share
Follow
Kemnal Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kemnal Road, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jan 2024 at 17:27.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2024
Details
View Map
Share
Follow
Bromley Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Lane, Chislehurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2023 at 17:16.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 5 Oct 2024
Details
View Map
Share
Follow
Kidbrooke Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kidbrooke Park Road, Kidbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 5 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Dec 2023 at 15:17.

Thames Water logo
Between
21 and 29 Jul 2024
Details
View Map
Share
Follow
Jenton Avenue

Thames Water are proposing to carry out New service connection on Jenton Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 14:44.

Thames Water logo
Between
21 and 25 Jul 2024
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out Utility repair and maintenance works on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2024 at 14:31.

Hutchinson 3G logo
Between
21 and 23 Jul 2024
Details
View Map
Share
Follow
Bronze Age Way

Hutchinson 3G are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 23 July 2024. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 11 Apr 2024 at 13:36.

Southern Gas Networks logo
Between
22 Jul and 14 Aug 2024
Details
View Map
Share
Follow
Homesdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homesdale Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 14 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2024 at 09:02.

Kent County Council logo
Between
22 Jul and 14 Aug 2024
Details
View Map
Share
Follow
Old Bexley Lane

Kent County Council are proposing to carry out Highway improvement works on Old Bexley Lane, Bexley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 14 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 19 Mar 2024 at 11:47.

Southern Gas Networks logo
Between
22 Jul and 19 Aug 2024
Details
View Map
Share
Follow
Old Bexley Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Bexley Lane, Bexley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 19 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2024 at 11:04.

Southern Gas Networks logo
LONG TERM
Between
22 Jul and 1 Sep 2024
Details
View Map
Share
Follow
Marlborough Park Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Park Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 1 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2024 at 10:38.

Thames Water logo
Between
22 Jul and 19 Aug 2024
Details
View Map
Share
Follow
Bournbrook Road

Thames Water are proposing to carry out Utility asset works on Bournbrook Road, Kidbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 19 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2023 at 16:32.

Southern Gas Networks logo
Between
22 Jul and 16 Aug 2024
Details
View Map
Share
Follow
Elsa Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elsa Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2024 at 10:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jul and 1 Sep 2024
Details
View Map
Share
Follow
Wilmount Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 1 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2024 at 14:59.

London Borough Of Bexley logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Sedgemere Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Sedgemere Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Apr 2024 at 09:57.

London Borough Of Bexley logo
Between
22 and 30 Jul 2024
Details
View Map
Share
Follow
Yarnton Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Yarnton Way, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 20 Mar 2024 at 09:06.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2024
Details
View Map
Share
Follow
Pickford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickford Lane, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 31 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2024 at 13:46.

Southern Gas Networks logo
Between
24 Jul and 11 Aug 2024
Details
View Map
Share
Follow
School Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on School Road, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jan 2024 at 09:33.

Southern Gas Networks logo
Between
24 Jul and 4 Aug 2024
Details
View Map
Share
Follow
Penhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penhill Road, Bexley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2024 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 7 Sep 2024
Details
View Map
Share
Follow
Manor Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Manor Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 7 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Dec 2023 at 16:38.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 1 Sep 2024
Details
View Map
Share
Follow
Hurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 1 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Dec 2023 at 16:05.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 7 Sep 2024
Details
View Map
Share
Follow
Parkwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkwood Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 7 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Dec 2023 at 14:36.

Southern Gas Networks logo
LONG TERM
Between
25 Jul and 26 Aug 2024
Details
View Map
Share
Follow
Pelham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pelham Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2024 and could run through until 26 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Apr 2024 at 15:30.


Roadworks Map near to Marlborough Park Avenue, SIDCUP, DA15 9DY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2024 14:08
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Marlborough Park Avenue, SIDCUP, DA15 9DY (21 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
MAJOR
  
WILLERSLEY AVENUE 
(0.1 miles)
Thames Water
New service connection - Carriageway - Multi-way signals
Planned
Scheduled: 24 Jul 2023 - 13 Jan 2025
0.1
Details
Share
Follow
2
Nexfibre Networks Limited logo
BURNT OAK LANE 
(0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 26 Apr 2024 - 29 Apr 2024
0.3
Details
Share
Follow
3
UK Power Networks Eastern & London logo
ELMCROFT AVENUE 
(0.3 miles)
UK Power Networks Eastern & London
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 22 Apr 2024 08:00
(Scheduled: 22 Apr 2024 - 3 May 2024)
0.3
Details
Share
Follow
4
Southern Gas Networks logo
EMERGENCY
  
DAYS LANE 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 22 Apr 2024 11:30
(Scheduled: 22 Apr 2024 - 28 Apr 2024)
0.4
Details
Share
Follow
5
London Borough Of Bexley logo
CORBYLANDS ROAD 
(0.5 miles)
London Borough Of Bexley
Remedial works - Footway - No carriageway incursion
In Progress
Since: 26 Apr 2024 07:00
(Scheduled: 26 Apr 2024 - 30 Apr 2024)
0.5
Details
Share
Follow
6
Thames Water logo
MAJOR
  
WELLINGTON AVENUE 
(0.5 miles)
Thames Water
New service connection - Carriageway - Multi-way signals
Planned
Scheduled: 28 Aug 2023 - 12 Aug 2024
0.5
Details
Share
Follow
7
UK Power Networks Eastern & London logo
BLACKFEN ROAD 
(0.6 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 27 Apr 2024 - 3 May 2024
0.6
Details
Share
Follow
8
Nexfibre Networks Limited logo
ABBEYHILL ROAD 
(0.7 miles)
Nexfibre Networks Limited
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 25 Apr 2024 - 9 May 2024
0.7
Details
Share
Follow
9
London Borough Of Bexley logo
WESTERHAM DRIVE 
(0.7 miles)
London Borough Of Bexley
Remedial works - Footway - No carriageway incursion
In Progress
Since: 26 Apr 2024 07:00
(Scheduled: 26 Apr 2024 - 30 Apr 2024)
0.7
Details
Share
Follow
10
BT logo
SHERWOOD CLOSE 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 26 Apr 2024 - 30 Apr 2024
0.7
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data