ROADWORKS SUMMARY
Beech Rise, NORTHWICH, CW8 2SD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Beech Rise, CW8 2SD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Beech Rise, NORTHWICH, CW8 2SD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Beech Rise are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
24 Apr 2025
Details
View Map
Share
Follow
Murdishaw Avenue

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Murdishaw Avenue, Runcorn.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 24 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Apr 2024 at 11:49.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 16 Feb 2024 at 13:40.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are carrying out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 11:59.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Daresbury Bypass

Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:37.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bd

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 12:43.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Busway Palace Fields Dc

Halton Borough Council were proposing to carry out Highway repair and maintenance works on Busway Palace Fields Dc, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 10 Oct 2024 at 13:47.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Palace Fields Avenue

Halton Borough Council are proposing to carry out Highway improvement works on Palace Fields Avenue, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 23 Oct 2024 at 08:21.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bc

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bc, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:23.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Bb

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:20.

ManWeb logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Queensgate

ManWeb are proposing to carry out Utility repair and maintenance works on Queensgate, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ManWeb on 2 Dec 2024 at 14:51.

ManWeb logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Queensgate

ManWeb are proposing to carry out Utility repair and maintenance works on Queensgate, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ManWeb on 19 Nov 2024 at 14:59.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are carrying out Utility asset works on Chester Road, Frodsham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 10:25 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 08:31.

Halton Borough Council logo
LONG TERM
Between
10 Feb and 18 Apr 2025
Details
View Map
Share
East Lane

Halton Borough Council were proposing to carry out Highway improvement works on East Lane, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 10:44.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Orchard Close

Cadent Gas are proposing to carry out Utility asset works on Orchard Close, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:21.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Howey Lane

Cadent Gas are proposing to carry out Utility asset works on Howey Lane, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.

Cadent Gas logo
Between
10 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:31.

Cadent Gas logo
LONG TERM
Between
10 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.

ManWeb logo
LONG TERM
Between
11 Feb and 31 Mar 2025
Details
View Map
Share
Queensgate

ManWeb were proposing to carry out Utility repair and maintenance works on Queensgate, Northwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 February 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 19 Nov 2024 at 14:33.

ManWeb logo
Finishing
Monday
Details
View Map
Share
Follow
Onston Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Onston Lane, Crowton, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 20 Nov 2024 at 11:34.

ManWeb logo
Finishing
Monday
Details
View Map
Share
Follow
Onston Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Onston Lane, Crowton, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 20 Nov 2024 at 12:57.

ManWeb logo
Finishing
Tuesday
Details
View Map
Share
Follow
Onston Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Onston Lane, Crowton, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 28 Nov 2024 at 10:09.

ManWeb logo
Finishing
Tuesday
Details
View Map
Share
Follow
Onston Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Onston Lane, Crowton, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 28 Nov 2024 at 15:09.

ManWeb logo
Finishing
Tuesday
Details
View Map
Share
Follow
Onston Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Onston Lane, Crowton, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Nov 2024 at 09:50.

ManWeb logo
Finishing
Tuesday
Details
View Map
Share
Follow
Onston Lane

ManWeb are carrying out Utility repair and maintenance works on Onston Lane, Crowton, Northwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 16:35 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 18 Feb 2025 at 07:55.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Bradley Lane

Cadent Gas are carrying out roadworks on Bradley Lane, Frodsham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:27 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 11:49.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are carrying out Utility repair and maintenance works on Vicarage Lane, Frodsham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:14 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 11:44.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Manley Road

Cadent Gas are carrying out roadworks on Manley Road, Frodsham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:46 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 11:53.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Kingsley Road

Cadent Gas are carrying out roadworks on Kingsley Road, Frodsham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:37 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 11:51.

Halton Borough Council logo
Until
7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Bb

Halton Borough Council are carrying out Highway improvement works on Busway Windmill Hill Bb, Runcorn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 08:00 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 20 Feb 2025 at 08:42.

Halton Borough Council logo
Until
7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bd

Halton Borough Council are carrying out Highway improvement works on Busway Norton Bd, Runcorn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 08:00 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 20 Feb 2025 at 08:44.

Halton Borough Council logo
Until
7 Mar 2025
Details
View Map
Share
Follow
Palace Fields Avenue

Halton Borough Council are carrying out Highway improvement works on Palace Fields Avenue, Runcorn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 08:00 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 20 Feb 2025 at 08:45.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Marsh Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Marsh Lane, Norley, Northwich.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 11:27 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Feb 2025 at 12:42.

Halton Borough Council logo
Until
7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bc

Halton Borough Council are carrying out Highway improvement works on Busway Norton Bc, Runcorn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 08:00 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 20 Feb 2025 at 08:43.

Cadent Gas logo
LONG TERM
Between
24 Feb and 27 Mar 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 14:10.

Cheshire West And Chester Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Church Street

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Church Street, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 13 Feb 2025 at 11:46.

Cadent Gas logo
Between
3 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 15:59.

ManWeb logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Queensgate

ManWeb are proposing to carry out Utility repair and maintenance works on Queensgate, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 30 Jan 2025 at 14:21.

Cheshire West And Chester Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Church Street

Cheshire West And Chester Council were proposing to carry out Highway improvement works on Church Street, Frodsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 30 Jan 2025 at 08:11.

Cheshire West And Chester Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Church Street

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Church Street, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 28 Oct 2024 at 15:31.

Cadent Gas logo
Between
3 and 23 Mar 2025
Details
View Map
Share
Follow
Howey Lane

Cadent Gas are proposing to carry out Utility asset works on Howey Lane, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 13:32.

ManWeb logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Queensgate

ManWeb are proposing to carry out Utility repair and maintenance works on Queensgate, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 3 Feb 2025 at 16:01.

Cadent Gas logo
Between
3 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 13:29.

ManWeb logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Queensgate

ManWeb are proposing to carry out Utility repair and maintenance works on Queensgate, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 5 Feb 2025 at 13:54.

ManWeb logo
Between
5 and 12 Mar 2025
Details
View Map
Share
Follow
Queensgate

ManWeb are proposing to carry out Utility repair and maintenance works on Queensgate, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 24 Jan 2025 at 11:22.

ManWeb logo
Between
5 and 12 Mar 2025
Details
View Map
Share
Follow
Queensgate

ManWeb are proposing to carry out Utility repair and maintenance works on Queensgate, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 14 Feb 2025 at 13:18.

Cadent Gas logo
Between
10 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:18.

BT logo
On
11 Mar 2025
Details
View Map
Share
Follow
Newton Bank

BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 March 2025 and are due to last for only one day. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Dec 2024 at 10:51.

United Utilities Water (formerly North West Water) logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Townfield Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Townfield Lane, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Jan 2025 at 13:31.

United Utilities Water (formerly North West Water) logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Townfield Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Townfield Lane, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Jan 2025 at 09:38.

BT logo
On
11 Mar 2025
Details
View Map
Share
Newton Bank

BT were proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 11 March 2025 The works were due to impact the verge only.

This roadwork event was last updated by BT on 16 Dec 2024 at 12:57.

BT logo
On
11 Mar 2025
Details
View Map
Share
Follow
Newton Bank

BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 March 2025 and are due to last for only one day. The works will impact the verge only.

This roadwork event was last updated by BT on 23 Dec 2024 at 11:39.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 23 May 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 13 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 11:02.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 15 Aug 2025
Details
View Map
Share
Daresbury Bypass

Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 13 March 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

ManWeb logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
New Pale Road

ManWeb are proposing to carry out Utility repair and maintenance works on New Pale Road, Manley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 28 Jan 2025 at 16:24.

ManWeb logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
New Pale Road

ManWeb are proposing to carry out Utility repair and maintenance works on New Pale Road, Manley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 17 Feb 2025 at 10:28.

ManWeb logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
New Pale Road

ManWeb are proposing to carry out Utility repair and maintenance works on New Pale Road, Manley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Jan 2025 at 13:51.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jan 2025 at 11:36.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Feb 2025 at 15:54.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Jan 2025 at 15:11.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Jan 2025 at 15:39.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Jan 2025 at 14:31.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Jan 2025 at 11:36.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Jan 2025 at 13:10.

ManWeb logo
Between
7 and 22 Apr 2025
Details
View Map
Share
Darwin Street

ManWeb were proposing to carry out Utility repair and maintenance works on Darwin Street, Northwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 4 Feb 2025 at 09:45.

ManWeb logo
Between
7 and 22 Apr 2025
Details
View Map
Share
Follow
Darwin Street

ManWeb are proposing to carry out Utility repair and maintenance works on Darwin Street, Northwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 11 Feb 2025 at 15:12.

ManWeb logo
Between
7 and 22 Apr 2025
Details
View Map
Share
Follow
Darwin Street

ManWeb are proposing to carry out Utility repair and maintenance works on Darwin Street, Northwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Feb 2025 at 10:27.

ManWeb logo
LONG TERM
Between
14 Apr and 30 May 2025
Details
View Map
Share
Queensgate

ManWeb were proposing to carry out Utility repair and maintenance works on Queensgate, Northwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 24 Jan 2025 at 10:24.

ManWeb logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Cassia Green

ManWeb were proposing to carry out Utility repair and maintenance works on Cassia Green, Marton, Winsford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Jan 2025 at 14:34.

ManWeb logo
LONG TERM
Between
14 Apr and 30 May 2025
Details
View Map
Share
Chester Road

ManWeb were proposing to carry out Utility repair and maintenance works on Chester Road, Northwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 30 Jan 2025 at 15:53.

ManWeb logo
Between
15 and 23 Apr 2025
Details
View Map
Share
Follow
New Pale Road

ManWeb are proposing to carry out Utility repair and maintenance works on New Pale Road, Manley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 22 Jan 2025 at 15:51.

ManWeb logo
LONG TERM
Between
15 Apr and 2 Jun 2025
Details
View Map
Share
Follow
Chester Road

ManWeb are proposing to carry out Utility repair and maintenance works on Chester Road, Northwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 21 Jan 2025 at 13:53.

ManWeb logo
Between
15 and 23 Apr 2025
Details
View Map
Share
Follow
New Pale Road

ManWeb are proposing to carry out Utility repair and maintenance works on New Pale Road, Manley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 21 Jan 2025 at 14:37.

United Utilities Water (formerly North West Water) logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Stockham Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Stockham Lane, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 20:47.

ManWeb logo
Between
29 Apr and 13 May 2025
Details
View Map
Share
Follow
Darwin Street

ManWeb are proposing to carry out Utility repair and maintenance works on Darwin Street, Northwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 7 Feb 2025 at 14:39.


Roadworks Map near to Beech Rise, NORTHWICH, CW8 2SD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 22 Feb 2025 12:53
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Beech Rise, NORTHWICH, CW8 2SD (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.