ROADWORKS SUMMARY
James Street, RUGBY, CV21 2SL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for James Street, CV21 2SL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to James Street, RUGBY, CV21 2SL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for James Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Warwickshire County Council logo
LONG TERM
Between
10 Apr 2023 and 30 Nov 2026
Details
View Map
Share
Follow
Coventry Road

Warwickshire County Council are proposing to carry out roadworks on Coventry Road, Long Lawford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2023 and could run through until 30 November 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warwickshire County Council on 20 Jan 2023 at 15:51.

Severn Trent Water logo
LONG TERM
Between
28 Oct 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Wood Street

Severn Trent Water are proposing to carry out Utility asset works on Wood Street, Rugby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 1 Oct 2024 at 15:30.

Severn Trent Water logo
LONG TERM
Between
28 Oct 2024 and 6 Jan 2025
Details
View Map
Share
Wood Street

Severn Trent Water were proposing to carry out Utility asset works on Wood Street, Rugby.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 13:17.

National Highways logo
LONG TERM
Between
4 Nov 2024 and 15 Feb 2025
Details
View Map
Share
A45 J M45/b4429 Roundabout

National Highways were proposing to carry out Works for road purposes on A45 J M45/b4429 Roundabout, Rugby.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Oct 2024 at 04:48.

National Highways logo
LONG TERM
Between
4 Nov 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Coventry Road

National Highways are proposing to carry out Works for road purposes on Coventry Road, Thurlaston.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 23 Oct 2024 at 15:23.

National Highways logo
LONG TERM
Between
4 Nov 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Coventry Road

National Highways are proposing to carry out Works for road purposes on Coventry Road, Thurlaston.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 28 Oct 2024 at 16:37.

National Highways logo
LONG TERM
Until
15 Feb 2025
Details
View Map
Share
Follow
Coventry Road

National Highways are carrying out Works for road purposes on Coventry Road, Thurlaston.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 20:00 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Nov 2024 at 16:38.

Cadent Gas logo
LONG TERM
Between
4 Nov 2024 and 12 Feb 2025
Details
View Map
Share
Ashlawn Road

Cadent Gas were proposing to carry out Utility asset works on Ashlawn Road, Hillmorton, Rugby.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 14:30.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 24 Feb 2025
Details
View Map
Share
Wood Street

Severn Trent Water were proposing to carry out Utility asset works on Wood Street, Rugby.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 24 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 5 Sep 2024 at 09:35.

Severn Trent Water logo
LONG TERM
Between
2 Jan and 21 Apr 2025
Details
View Map
Share
Wood Street

Severn Trent Water were proposing to carry out Utility asset works on Wood Street, Rugby.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 21 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 09:17.

Severn Trent Water logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Wood Street

Severn Trent Water were proposing to carry out Utility asset works on Wood Street, Rugby.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 13:16.

Warwickshire County Council logo
LONG TERM
Between
6 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Hunters Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Hunters Lane, Newbold, Rugby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:41.

Warwickshire County Council logo
LONG TERM
Between
6 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Leicester Road

Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Road, Rugby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:39.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Chapel Street

Cadent Gas are proposing to carry out New service connection on Chapel Street, Newbold, Rugby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 15:25.

Warwickshire County Council logo
LONG TERM
Between
6 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Yates Avenue

Warwickshire County Council are proposing to carry out Highway improvement works on Yates Avenue, Newbold, Rugby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:42.

Warwickshire County Council logo
LONG TERM
Between
6 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Wood Street

Warwickshire County Council are proposing to carry out Highway improvement works on Wood Street, Rugby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:41.

Network Rail logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Limestone Hall Lane

Network Rail are proposing to carry out Works for Rail Purposes on Limestone Hall Lane, Church Lawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 19 Jul 2024 at 09:45.

Network Rail logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Limestone Hall Lane

Network Rail are proposing to carry out Works for Rail Purposes on Limestone Hall Lane, Church Lawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Dec 2024 at 10:06.

Warwickshire County Council logo
LONG TERM
Between
6 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Newbold Road

Warwickshire County Council are proposing to carry out Highway improvement works on Newbold Road, Newbold, Rugby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:39.

Warwickshire County Council logo
LONG TERM
Between
6 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Leicester Road

Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Road, Newbold, Rugby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:40.

Warwickshire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Churchover Lane

Warwickshire County Council are proposing to carry out Statutory Infrastructure Works on Churchover Lane, Harborough Magna.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 4 Sep 2024 at 11:34.

Warwickshire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Churchover Lane

Warwickshire County Council are proposing to carry out Statutory Infrastructure Works on Churchover Lane, Harborough Magna.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 5 Sep 2024 at 11:35.

Warwickshire County Council logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Coventry Road

Warwickshire County Council are proposing to carry out Statutory Infrastructure Works on Coventry Road, Thurlaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 16 Dec 2024 at 16:48.

Warwickshire County Council logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Coventry Road

Warwickshire County Council are proposing to carry out Statutory Infrastructure Works on Coventry Road, Thurlaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 13 Dec 2024 at 11:54.

Warwickshire County Council logo
LONG TERM
Between
6 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Rugby Western Relief Road

Warwickshire County Council are proposing to carry out Highway improvement works on Rugby Western Relief Road, Rugby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:39.

West Northamptonshire Council logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Yelvertoft Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Yelvertoft Road, Lilbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 17 Oct 2024 at 11:21.

West Northamptonshire Council logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
The Green

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on The Green, Lilbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 17 Oct 2024 at 11:20.

West Northamptonshire Council logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Rugby Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rugby Road, Lilbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 17 Oct 2024 at 11:18.

West Northamptonshire Council logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Lilbourne Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Lilbourne Road, Clay Coton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 17 Oct 2024 at 11:23.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Coronation Road

Network Rail were proposing to carry out Works for Rail Purposes on Coronation Road, Church Lawford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Nov 2024 at 13:13.

Severn Trent Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Church Walk

Severn Trent Water were proposing to carry out Remedial works on Church Walk, Rugby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 14:20.

Network Rail logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Coronation Road

Network Rail are proposing to carry out Works for Rail Purposes on Coronation Road, Church Lawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 12:08.

Anglian Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Barby Road

Anglian Water are proposing to carry out Remedial works on Barby Road, Braunston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 14:52.

Network Rail logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Coronation Road

Network Rail were proposing to carry out Works for Rail Purposes on Coronation Road, Church Lawford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Nov 2024 at 13:14.

Cadent Gas logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Townsend Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Townsend Lane, Long Lawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 10:11.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Coton Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Coton Road, Churchover.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 09:31.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Murray Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Murray Road, Rugby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 09:39.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Murray Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Murray Road, Rugby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 15:15.

West Northamptonshire Council logo
Between
14 and 16 Feb 2025
Details
View Map
Share
Follow
Barby Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Barby Road, Kilsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Dec 2024 at 09:56.

West Northamptonshire Council logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Hillmorton Lane

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Hillmorton Lane, Lilbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Dec 2024 at 11:56.

Warwickshire County Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
High Street

Warwickshire County Council are proposing to carry out Highway improvement works on High Street, Hillmorton, Rugby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 8 Nov 2024 at 11:27.

Severn Trent Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Church Walk

Severn Trent Water are proposing to carry out Remedial works on Church Walk, Bilton, Rugby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 15:56.

Severn Trent Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Church Walk

Severn Trent Water are proposing to carry out Remedial works on Church Walk, Bilton, Rugby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 10:53.

West Northamptonshire Council logo
Between
22 and 24 Feb 2025
Details
View Map
Share
Follow
Hillmorton Lane

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Hillmorton Lane, Lilbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 26 Nov 2024 at 11:41.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Houlton Way

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Houlton Way, Rugby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 11:40.

Severn Trent Water logo
Between
24 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Cawston Lane

Severn Trent Water are proposing to carry out roadworks on Cawston Lane, Dunchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 15:05.

Network Rail logo
Between
25 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Coronation Road

Network Rail are proposing to carry out Works for Rail Purposes on Coronation Road, Church Lawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Dec 2024 at 09:33.

Cityfibre Metro Networks logo
Between
28 Feb and 2 Mar 2025
Details
View Map
Share
Follow
A5 From J A426 Roundabout To Start Of Dualling North Of M6

Cityfibre Metro Networks are proposing to carry out New service connection on A5 From J A426 Roundabout To Start Of Dualling North Of M6, Rugby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 2 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Dec 2024 at 11:17.

Warwickshire County Council logo
LONG TERM
Between
2 Mar and 15 Aug 2025
Details
View Map
Share
Coventry Road

Warwickshire County Council were proposing to carry out Highway improvement works on Coventry Road, Thurlaston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 15 August 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Warwickshire County Council on 10 Dec 2024 at 11:56.

Network Rail logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Coronation Road

Network Rail were proposing to carry out Works for Rail Purposes on Coronation Road, Church Lawford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Nov 2024 at 13:14.

Western Power Distribution (East Midlands) logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
The Locks

Western Power Distribution (East Midlands) are proposing to carry out New service connection on The Locks, Hillmorton, Rugby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Dec 2024 at 12:12.

Severn Trent Water logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Coton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coton Road, Churchover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 13:26.

Western Power Distribution (East Midlands) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Yelvertoft Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Yelvertoft Road, Lilbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Dec 2024 at 15:11.


Roadworks Map near to James Street, RUGBY, CV21 2SL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to James Street, RUGBY, CV21 2SL (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
LITTLE CHURCH STREET, CALDECOTT 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
0.2
Details
Share
2
BT logo
HILLMORTON ROAD 
(0.3 miles)
BT
Remedial works - Footway - No carriageway incursion
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.3
Details
Share
Follow
3
Severn Trent Water logo
MAJOR
  
WOOD STREET 
(0.3 miles)
Severn Trent Water
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 4 Nov 2024 - 24 Feb 2025)
0.3
Details
Share
4
Severn Trent Water logo
MAJOR
  
WOOD STREET 
(0.3 miles)
Severn Trent Water
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 28 Oct 2024 - 6 Jan 2025)
0.3
Details
Share
5
Severn Trent Water logo
MAJOR
  
WOOD STREET 
(0.3 miles)
Severn Trent Water
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 28 Oct 2024 - 6 Jan 2025
0.3
Details
Share
Follow
6
BT logo
WOODBRIDGE COURT, NEWBOLD 
(0.3 miles)
BT
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 19 Dec 2024
0.3
Details
Share
Follow
7
Murphy Power Distribution logo
RAILWAY TERRACE 
(0.4 miles)
Murphy Power Distribution
Utility asset works - Footway - Multi-way signals
Cancelled
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
8
ESP Electricity logo
RAILWAY TERRACE 
(0.4 miles)
ESP Electricity
Utility asset works - Footway - Multi-way signals
Cancelled
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
9
G2 Energy IDNO logo
RAILWAY TERRACE 
(0.4 miles)
G2 Energy IDNO
Utility asset works - Footway - Multi-way signals
Cancelled
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
10
G2 Energy IDNO logo
RAILWAY TERRACE 
(0.4 miles)
G2 Energy IDNO
Utility asset works - Footway - Multi-way signals
Planned
Scheduled: 16 Dec 2024 - 31 Dec 2024
0.4
Details
Share
Follow