ROADWORKS SUMMARY
Parkfield Road, RUGBY, CV21 1EY
Introduction
View current and future planned roadworks and road closures for Parkfield Road, CV21 1EY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Parkfield Road, RUGBY, CV21 1EY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Parkfield Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
10 Apr 2023 and 30 Nov 2026
Warwickshire County Council are proposing to carry out roadworks on Coventry Road, Long Lawford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2023 and could run through until 30 November 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warwickshire County Council on 20 Jan 2023 at 15:51.
28 Oct 2024 and 6 Jan 2025
Severn Trent Water are proposing to carry out Utility asset works on Wood Street, Rugby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 1 Oct 2024 at 15:30.
28 Oct 2024 and 6 Jan 2025
Severn Trent Water were proposing to carry out Utility asset works on Wood Street, Rugby.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 6 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 13:17.
4 Nov 2024 and 15 Feb 2025
National Highways were proposing to carry out Works for road purposes on A45 J M45/b4429 Roundabout, Rugby.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 15 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Oct 2024 at 04:48.
4 Nov 2024 and 15 Feb 2025
National Highways are proposing to carry out Works for road purposes on Coventry Road, Thurlaston.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 23 Oct 2024 at 15:23.
4 Nov 2024 and 15 Feb 2025
National Highways are proposing to carry out Works for road purposes on Coventry Road, Thurlaston.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 28 Oct 2024 at 16:37.
15 Feb 2025
National Highways are carrying out Works for road purposes on Coventry Road, Thurlaston.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 20:00 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Nov 2024 at 16:38.
4 Nov 2024 and 12 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Ashlawn Road, Hillmorton, Rugby.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 12 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 14:30.
4 Nov 2024 and 24 Feb 2025
Severn Trent Water were proposing to carry out Utility asset works on Wood Street, Rugby.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 24 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 5 Sep 2024 at 09:35.
25 Nov and 4 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Coton Road, Churchover.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Sep 2024 at 11:05.
25 Nov and 4 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Coton Road, Churchover.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Sep 2024 at 11:17.
Thursday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Yelvertoft Road, Lilbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 23 Aug 2024 at 13:02.
27 Nov and 10 Dec 2024
BT are proposing to carry out Utility asset works on Footpath From Opp No52 To Opp No110 Hawlands, Brownsover, Rugby.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 27 November 2024 and could run through until 10 December 2024. The works will impact the verge and footpath.
This roadwork event was last updated by BT on 16 Oct 2024 at 14:14.
27 Nov and 10 Dec 2024
BT are proposing to carry out Utility asset works on Footpath From Opp No52 To Opp No110 Hawlands, Brownsover, Rugby.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 27 November 2024 and could run through until 10 December 2024. The works will impact the verge and footpath.
This roadwork event was last updated by BT on 16 Oct 2024 at 15:31.
2 and 4 Dec 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Toft Lane, Dunchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Aug 2024 at 10:58.
2 and 6 Dec 2024
Cadent Gas are proposing to carry out New service connection on Chapel Street, Newbold, Rugby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 15:51.
2 and 4 Dec 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Toft Lane, Dunchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 6 Nov 2024 at 14:49.
4 and 13 Dec 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Orchard Way, Bilton, Rugby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 6 Nov 2024 at 14:51.
4 and 13 Dec 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Orchard Way, Bilton, Rugby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Aug 2024 at 11:02.
4 and 13 Dec 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Barton Road, Bilton, Rugby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 6 Nov 2024 at 14:52.
4 and 13 Dec 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Barton Road, Bilton, Rugby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Aug 2024 at 11:01.
9 and 13 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Yelvertoft Road, Lilbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 Oct 2024 at 09:35.
2 Jan and 21 Apr 2025
Severn Trent Water were proposing to carry out Utility asset works on Wood Street, Rugby.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 21 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 09:17.
6 and 17 Jan 2025
Warwickshire County Council are proposing to carry out Statutory Infrastructure Works on Churchover Lane, Harborough Magna.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 4 Sep 2024 at 11:34.
6 and 17 Jan 2025
Warwickshire County Council are proposing to carry out Statutory Infrastructure Works on Churchover Lane, Harborough Magna.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 5 Sep 2024 at 11:35.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out New service connection on Chapel Street, Newbold, Rugby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 15:25.
6 Jan 2025 and 30 Jun 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Road, Rugby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:39.
6 Jan 2025 and 30 Jun 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Yates Avenue, Newbold, Rugby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:42.
6 and 17 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Limestone Hall Lane, Church Lawford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 19 Jul 2024 at 09:45.
6 Jan 2025 and 30 Jun 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Wood Street, Rugby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:41.
6 Jan and 28 Feb 2025
Severn Trent Water were proposing to carry out Utility asset works on Wood Street, Rugby.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 13:16.
6 Jan 2025 and 30 Jun 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Hunters Lane, Newbold, Rugby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:41.
6 Jan 2025 and 30 Jun 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Newbold Road, Newbold, Rugby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:39.
6 Jan 2025 and 30 Jun 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Road, Newbold, Rugby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:40.
6 Jan 2025 and 30 Jun 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Rugby Western Relief Road, Rugby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2024 at 16:39.
16 and 20 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rugby Road, Lilbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 17 Oct 2024 at 11:18.
16 and 20 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on The Green, Lilbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 17 Oct 2024 at 11:20.
16 and 20 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Yelvertoft Road, Lilbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 17 Oct 2024 at 11:21.
20 and 24 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Coronation Road, Church Lawford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:10.
22 and 24 Jan 2025
BT are proposing to carry out Utility asset works on Dyers Lane, Wolston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 15 Nov 2024 at 09:13.
27 and 29 Jan 2025
Severn Trent Water were proposing to carry out Remedial works on Church Walk, Rugby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 14:20.
3 Feb and 31 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Pinfold Street, New Bilton, Rugby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 24 Sep 2024 at 09:55.
3 Feb and 31 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Newland Street, New Bilton, Rugby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 24 Sep 2024 at 09:54.
3 Feb and 31 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Addison Road, New Bilton, Rugby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 24 Sep 2024 at 09:56.
3 Feb and 31 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Lawford Road, New Bilton, Rugby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 24 Sep 2024 at 09:54.
3 Feb and 31 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Jubilee Street, New Bilton, Rugby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 24 Sep 2024 at 09:56.
10 and 12 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Coton Road, Churchover.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 09:31.
10 and 12 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Bond End, Monks Kirby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 11:38.
10 and 14 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Coronation Road, Church Lawford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:12.
10 and 12 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Townsend Lane, Long Lawford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 15:00.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Murray Road, Rugby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 15:15.
15 and 17 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Hillmorton Lane, Lilbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Nov 2024 at 12:37.
17 and 19 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brockhurst Lane, Monks Kirby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 15:09.
17 and 19 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brockhurst Lane, Monks Kirby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 15:35.
17 and 20 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on High Street, Hillmorton, Rugby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Nov 2024 at 11:27.
18 and 20 Feb 2025
Severn Trent Water are proposing to carry out Remedial works on Church Walk, Bilton, Rugby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 11:19.
Roadworks Map near to Parkfield Road, RUGBY, CV21 1EY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Parkfield Road, RUGBY, CV21 1EY (12 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
(Scheduled: 20 Nov 2024 - 25 Nov 2024)
(Scheduled: 20 Nov 2024 - 25 Nov 2024)
(Scheduled: 22 Nov 2024 - 25 Nov 2024)
(Scheduled: 22 Nov 2024 - 25 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.