ROADWORKS SUMMARY
CROYDON, CR90 9ET

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for CR90 9ET and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to CROYDON, CR90 9ET

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Until
24 Sep 2025
Details
View Map
Share
Follow
Streatham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Streatham Road, Streatham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 05:40.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 09:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Feb and 11 Sep 2025
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:21.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar 2025 and 8 Mar 2027
Details
View Map
Share
Duppas Hill Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Duppas Hill Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 8 March 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Mar 2025 at 12:33.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar 2025 and 8 Mar 2027
Details
View Map
Share
The Croydon Flyover

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on The Croydon Flyover, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 8 March 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 11:53.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Road, Whyteleafe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 27 Aug 2024 at 08:06.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Chipstead Valley Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Aug 2024 at 09:11.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Sep 2024 at 09:30.

Thames Water logo
LONG TERM
Between
8 Apr and 22 Sep 2025
Details
View Map
Share
Follow
Waddon Park Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Park Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.

Southern Gas Networks logo
LONG TERM
Until
15 Sep 2025
Details
View Map
Share
Follow
Marlpit Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Marlpit Lane, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:03.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Whyteleafe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Mar 2025 at 08:27.

Thames Water logo
LONG TERM
Between
11 Jun and 19 Sep 2025
Details
View Map
Share
Follow
Waddon Court Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Court Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Jun 2025 at 06:46.

London Borough Of Lambeth logo
LONG TERM
Between
16 Jun and 12 Sep 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:26.

London Borough Of Lambeth logo
LONG TERM
Between
16 Jun and 12 Sep 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:27.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 14 Oct 2025
Details
View Map
Share
Follow
Marlpit Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlpit Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 19 Mar 2025 at 16:36.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Jul and 11 Sep 2025
Details
View Map
Share
Howden Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Howden Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 11 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Feb 2025 at 15:51.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Dorset Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dorset Road, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:35.

Network Rail logo
LONG TERM
Between
14 Jul and 14 Nov 2025
Details
View Map
Share
Follow
West Street

Network Rail are proposing to carry out Works for Rail Purposes on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 15 Apr 2025 at 12:25.

London Borough Of Croydon logo
LONG TERM
Between
14 Jul and 15 Dec 2025
Details
View Map
Share
Follow
Park Lane

London Borough Of Croydon are proposing to carry out Highway improvement works on Park Lane, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:18.

London Borough Of Croydon logo
LONG TERM
Between
14 Jul and 15 Dec 2025
Details
View Map
Share
Follow
Park Lane

London Borough Of Croydon are proposing to carry out Highway improvement works on Park Lane, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Croydon on 9 Jul 2025 at 11:23.

London Borough Of Croydon logo
LONG TERM
Between
14 Jul and 15 Dec 2025
Details
View Map
Share
Follow
Wellesley Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Wellesley Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:14.

London Borough Of Croydon logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Wellesley Road

London Borough Of Croydon are carrying out Highway improvement works on Wellesley Road, Croydon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 28 Jul 2025 at 09:32.

Southern Gas Networks logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are carrying out Utility repair and maintenance works on London Road, Mitcham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 16:30.

Thames Water logo
LONG TERM
Between
14 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Lower Green West

Thames Water are proposing to carry out Disconnection or alteration of supply on Lower Green West, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:26.

Thames Water logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Lower Green West

Thames Water are carrying out Disconnection or alteration of supply on Lower Green West, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 09:50 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 09:53.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Jul and 1 Dec 2025
Details
View Map
Share
Whitehorse Lane

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Whitehorse Lane, South Norwood, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jan 2025 at 14:00.

Thames Water logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are carrying out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jul 2025 at 13:01.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jul and 10 Sep 2025
Details
View Map
Share
Follow
Bungalow Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 12:29.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Saxon Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Saxon Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Jul 2025 at 11:44.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Jul and 19 Sep 2025
Details
View Map
Share
South Norwood Hill

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Jul 2025 at 13:15.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Fishponds Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fishponds Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:21.

Southern Gas Networks logo
LONG TERM
Until
22 Sep 2025
Details
View Map
Share
Follow
Fishponds Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Fishponds Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 08:53 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 07:26.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Beech Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beech Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:49.

Southern Gas Networks logo
LONG TERM
Between
26 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Northey Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northey Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 10:15.

Southern Gas Networks logo
LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Northey Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Northey Avenue, Cheam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 July 2025 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 09:48.

Southern Gas Networks logo
LONG TERM
Between
26 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 10:19.

Southern Gas Networks logo
LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 July 2025 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 09:49.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Cornwall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cornwall Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 13:39.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 21 Sep 2025
Details
View Map
Share
Belmont Rise

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Belmont Rise, Cheam.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 21 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 11:03.

UK Power Networks South Eastern logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Springfield Road

UK Power Networks South Eastern are carrying out New service connection on Springfield Road, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 09:41.

UK Power Networks South Eastern logo
LONG TERM
Between
28 Jul 2025 and 30 Jan 2026
Details
View Map
Share
Pawsons Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2025 at 16:54.

Southern Gas Networks logo
LONG TERM
Until
24 Sep 2025
Details
View Map
Share
Follow
Vectis Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Vectis Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 05:41.

Transport for London (TfL) logo
LONG TERM
Until
1 Nov 2025
Details
View Map
Share
Follow
Elmers End Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Elmers End Road, Penge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 08:00 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Jul 2025 at 08:05.

Southern Gas Networks logo
LONG TERM
Between
3 Aug and 28 Sep 2025
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 August 2025 and run through until 28 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2025 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
3 Aug and 28 Sep 2025
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 August 2025 and run through until 28 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:07.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 10:17.

Transport for London (TfL) logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are carrying out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are carrying out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:06.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are carrying out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 22 Sep 2025
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:02.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Beech Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beech Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 07:23.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Beresford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beresford Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 07:09.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane South, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 13:23.

Southern Gas Networks logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane South

Southern Gas Networks are carrying out Utility repair and maintenance works on Sandy Lane South, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 09:15 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 09:48.

Southern Gas Networks logo
LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Mitcham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Mitcham Road, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:32 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 10:31.

London Borough Of Lambeth logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
High Trees

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 7 May 2025 at 09:59.

Southern Gas Networks logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Wilbury Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Wilbury Avenue, Cheam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 08:00 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 08:55.

Southern Gas Networks logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Beckett Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Beckett Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 16:45 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 08:35.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 13:46.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Edgar Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Edgar Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 08:11.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Edgar Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Edgar Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 07:19.

Southern Gas Networks logo
LONG TERM
Between
11 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Rochford Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochford Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:00.

Southern Gas Networks logo
LONG TERM
Between
11 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 08:34.

Southern Gas Networks logo
LONG TERM
Between
11 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:49.

UK Power Networks Eastern & London logo
LONG TERM
Between
11 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Jun 2025 at 09:41.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Westwood Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Westwood Hill, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2025 at 14:30 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:11.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Hayes Lane

Transport for London (TfL) are carrying out Highway repair and maintenance works on Hayes Lane, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 08:00 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2025 at 08:04.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Springfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Springfield Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Jun 2025 at 11:15.

UK Power Networks South Eastern logo
Between
13 Aug and 10 Sep 2025
Details
View Map
Share
Follow
St Saviour's Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on St Saviour's Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:03.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Westwood Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Westwood Hill, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 August 2025 at 13:05 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:10.

Southern Gas Networks logo
LONG TERM
Until
15 Sep 2025
Details
View Map
Share
Follow
Broadwater Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Broadwater Road, Tooting, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2025 at 07:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 07:26.

Southern Gas Networks logo
LONG TERM
Between
14 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Allenby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Allenby Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 10:34.

Southern Gas Networks logo
LONG TERM
Between
14 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Brantwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brantwood Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 09:59.

London Borough Of Sutton logo
Finishing
Tuesday
Details
View Map
Share
Follow
Richmond Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Richmond Road, Beddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 18 Jun 2025 at 14:03.

London Borough Of Sutton logo
LONG TERM
Between
15 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Richmond Road, Beddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 3 Jul 2025 at 15:13.

London Borough Of Sutton logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Sutton are carrying out Highway improvement works on Richmond Road, Beddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 15 Aug 2025 at 08:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 08:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 09:52.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Allenby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Allenby Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:21.

Southern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Allenby Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Allenby Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:06 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:14.

Southern Gas Networks logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Brantwood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Brantwood Road, Croydon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:05 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:16.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 16:12.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:03.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 14:47.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:46.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 12:36.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 14:30.

Southern Gas Networks logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:30 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 08:48.

UK Power Networks South Eastern logo
Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Follow
St Saviour's Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on St Saviour's Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Aug 2025 at 12:29.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 09:49.

Southern Gas Networks logo
Until
15 Sep 2025
Details
View Map
Share
Follow
Poplar Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Poplar Road, Wimbledon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:30 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 09:50.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:18.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:10.

Southern Gas Networks logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 09:30 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:02.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 13:43.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 16:32.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 14:36.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Northey Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northey Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 18:17.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:59.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Kingsdown Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Kingsdown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 11:35.

Southern Gas Networks logo
Between
25 Aug and 14 Sep 2025
Details
View Map
Share
Follow
Therapia Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Therapia Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 06:41.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 29 Sep 2025
Details
View Map
Share
Follow
St Stephen's Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Stephen's Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 11:59.

Southern Gas Networks logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:14.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:14.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Mount Ephraim Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 13:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Kingsdown Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Kingsdown Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 11:42.

Thames Water logo
LONG TERM
Between
26 Aug and 24 Nov 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:08.

London Borough Of Croydon logo
Between
26 Aug and 14 Sep 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 18 Aug 2025 at 15:05.

Southern Gas Networks logo
LONG TERM
Until
14 Oct 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 11:47 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:50.

Southern Gas Networks logo
Between
26 Aug and 23 Sep 2025
Details
View Map
Share
Lansdowne Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lansdowne Hill, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 23 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 13:31.

London Borough Of Croydon logo
Finishing
Today
Details
View Map
Share
Follow
Dulverton Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Dulverton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 24 Jun 2025 at 13:04.

Southern Gas Networks logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Tamworth Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Tamworth Lane, Mitcham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 14:15 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 08:50.

London Borough Of Bromley logo
Finishing
Today
Details
View Map
Share
Follow
Beckenham Road

London Borough Of Bromley are carrying out Highway improvement works on Beckenham Road, Beckenham.

The works started on 27 August 2025 at 12:08 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 15:14.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Anerley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Anerley Road, Penge.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 23:50 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 15:24.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 09:00 and could run through until 23 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 09:20.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Marlpit Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Marlpit Lane, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 11:30 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:54.

London Borough Of Croydon logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Monahan Avenue

London Borough Of Croydon are proposing to carry out Highway improvement works on Monahan Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 11:08.

London Borough Of Sutton logo
Between
28 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Chiltern Road

London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Chiltern Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 17 Jul 2025 at 08:00.

Southern Gas Networks logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Crossways

Southern Gas Networks are carrying out Utility repair and maintenance works on Crossways, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 11:30 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 11:45.

Southern Gas Networks logo
LONG TERM
Between
28 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 10:05.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Crockerton Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Crockerton Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 28 Aug 2025 at 08:07.

London Borough Of Croydon logo
Finishing
Friday
Details
View Map
Share
Follow
Byron Avenue

London Borough Of Croydon are proposing to carry out Highway improvement works on Byron Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 26 Jun 2025 at 07:26.

London Borough Of Croydon logo
Finishing
Friday
Details
View Map
Share
Follow
Purley Knoll

London Borough Of Croydon are proposing to carry out Highway improvement works on Purley Knoll, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 25 Jun 2025 at 14:23.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Norman Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 16:00.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Norman Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 13:24.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Prior Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prior Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:13.

Thames Water logo
Until
11 Sep 2025
Details
View Map
Share
Follow
Casewick Road

Thames Water are carrying out Utility repair and maintenance works on Casewick Road, Knight's Hill, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 10:00 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 12:37.

London Borough Of Croydon logo
Finishing
Monday
Details
View Map
Share
Follow
Hartley Hill

London Borough Of Croydon are proposing to carry out Highway improvement works on Hartley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 24 Jun 2025 at 13:10.

Southern Gas Networks logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 Jul 2025 at 16:53.

Southern Gas Networks logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 15:14.

Southern Gas Networks logo
Between
1 and 15 Sep 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:06.

Southern Gas Networks logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
South Rise

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Rise, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 16:58.

Southern Gas Networks logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Princes Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Princes Avenue, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:31.

Southern Gas Networks logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Princes Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Princes Avenue, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 11:40.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 16:20.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:48.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:04.

Southern Gas Networks logo
Between
1 and 15 Sep 2025
Details
View Map
Share
Follow
Crossways

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crossways, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 15:53.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Ashburton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashburton Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Jun 2025 at 14:03.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 7 Dec 2025
Details
View Map
Share
Factory Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jul 2025 at 10:06.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 7 Dec 2025
Details
View Map
Share
Follow
Factory Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:56.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 7 Dec 2025
Details
View Map
Share
Follow
Factory Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 09:02.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 7 Dec 2025
Details
View Map
Share
Follow
Factory Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:23.

Southern Gas Networks logo
LONG TERM
Until
7 Dec 2025
Details
View Map
Share
Follow
Factory Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Factory Lane, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 08:53.

UK Power Networks South Eastern logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Kingsley Road

UK Power Networks South Eastern were proposing to carry out New service connection on Kingsley Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Jul 2025 at 14:11.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Chatfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2025 at 15:14.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Chatfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Aug 2025 at 10:48.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Chatfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2025 at 11:44.

London Borough Of Croydon logo
LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 10 Jun 2025 at 09:48.

London Borough Of Croydon logo
LONG TERM
Between
1 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 18 Jun 2025 at 10:13.

London Borough Of Croydon logo
Between
1 and 28 Sep 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 10:00.

London Borough Of Croydon logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are carrying out Highway repair and maintenance works on Ampere Way, Croydon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 1 Sep 2025 at 08:01.

Southern Gas Networks logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Rochford Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Rochford Way, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:15 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:05.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Croxden Walk

Southern Gas Networks are carrying out New service connection on Croxden Walk, Morden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:00 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 09:05.

Southern Gas Networks logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Boxley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boxley Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 08:06.

Southern Gas Networks logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Boxley Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Boxley Road, Morden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 29 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 08:33.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 16:32.

Southern Gas Networks logo
Between
1 and 11 Sep 2025
Details
View Map
Share
Follow
Beulah Road

Southern Gas Networks are proposing to carry out New service connection on Beulah Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 11:41.

Thames Water logo
Finishing
Today
Details
View Map
Share
Oak Grove Road

Thames Water were proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 15:27.

London Borough Of Croydon logo
Finishing
Today
Details
View Map
Share
Westminster Avenue

London Borough Of Croydon were proposing to carry out Highway repair and maintenance works on Westminster Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 12 Aug 2025 at 11:39.

UK Power Networks Eastern & London logo
Between
1 and 15 Sep 2025
Details
View Map
Share
Follow
Croydon Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 13:39.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Fieldend Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Greenock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:26.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Churchmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Stockport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Woodmansterne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.

Southern Gas Networks logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Tudor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tudor Road, Anerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:26.

Southern Gas Networks logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Tudor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Tudor Road, Anerley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:10 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:19.

Southern Gas Networks logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Tudor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tudor Road, Anerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:49.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Seely Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seely Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:58.

Southern Gas Networks logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Thornlaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornlaw Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jun 2025 at 15:12.

Southern Gas Networks logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Thornlaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornlaw Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 09:16.

London Borough Of Lambeth logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 27 May 2025 at 14:20.

Southern Gas Networks logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Carson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carson Road, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 11:37.

Southern Gas Networks logo
Until
14 Sep 2025
Details
View Map
Share
Follow
Carson Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Carson Road, West Dulwich, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:50 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:25.

Transport for London (TfL) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 17:50.

London Borough Of Croydon logo
Finishing
Monday
Details
View Map
Share
Follow
Beckett Avenue

London Borough Of Croydon are proposing to carry out Highway improvement works on Beckett Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 11:09.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bensham Manor Road

Thames Water are proposing to carry out New service connection on Bensham Manor Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 07:48.

London Borough Of Croydon logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rockmount Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Rockmount Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 25 Jun 2025 at 09:55.

London Borough Of Croydon logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rockmount Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Rockmount Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 18 Aug 2025 at 15:12.

London Borough Of Lambeth logo
LONG TERM
Between
2 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 23 May 2025 at 14:25.

London Borough Of Lambeth logo
LONG TERM
Between
2 Sep and 1 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 30 May 2025 at 11:00.

UK Power Networks South Eastern logo
Between
3 and 18 Sep 2025
Details
View Map
Share
Court Wood Lane

UK Power Networks South Eastern were proposing to carry out New service connection on Court Wood Lane, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 12:02.

London Borough Of Lambeth logo
Between
3 and 10 Sep 2025
Details
View Map
Share
Follow
Hailsham Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Hailsham Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 29 Aug 2025 at 08:41.

London Borough Of Lambeth logo
Between
3 and 10 Sep 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 29 Aug 2025 at 08:41.

T-Mobile (UK) logo
LONG TERM
Between
5 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Commonside Close

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Commonside Close, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 13 Jun 2025 at 07:34.

Southern Gas Networks logo
LONG TERM
Between
5 Sep and 6 Oct 2025
Details
View Map
Share
Hawkes Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 12:01.

Southern Gas Networks logo
LONG TERM
Between
5 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Wilson Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:56.

Southern Gas Networks logo
LONG TERM
Between
5 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Wilson Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 09:55.

Southern Gas Networks logo
Between
5 and 23 Sep 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 08:23.

Southern Gas Networks logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:13.

Southern Gas Networks logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:26.

Southern Gas Networks logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
The Warren

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Warren, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:12.

Southern Gas Networks logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
The Warren

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Warren, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:25.

Southern Gas Networks logo
Between
8 and 23 Sep 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 15:09.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 20 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 20 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 09:25.

UK Power Networks South Eastern logo
LONG TERM
Between
8 Sep 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Pawsons Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Aug 2025 at 13:18.

Southern Gas Networks logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2025 at 12:11.

Southern Gas Networks logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:31.

Southern Gas Networks logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 16:21.

Southern Gas Networks logo
Between
8 and 29 Sep 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 11:59.

Southern Gas Networks logo
Between
8 and 21 Sep 2025
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:07.

Southern Gas Networks logo
Between
8 and 21 Sep 2025
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 15:14.

Southern Gas Networks logo
Between
8 and 21 Sep 2025
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:11.

London Borough Of Bromley logo
Between
9 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Croydon Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Croydon Road, Keston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 28 Jul 2025 at 17:13.

London Borough Of Merton logo
Between
9 and 12 Sep 2025
Details
View Map
Share
Follow
Lower Green West

London Borough Of Merton are proposing to carry out Highway improvement works on Lower Green West, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 31 Jul 2025 at 08:59.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Sep and 6 Nov 2025
Details
View Map
Share
Follow
Bungalow Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jul 2025 at 14:13.

Surrey County Council logo
Between
12 and 17 Sep 2025
Details
View Map
Share
Follow
Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Road, Whyteleafe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Aug 2025 at 07:07.

UK Power Networks South Eastern logo
Between
12 and 23 Sep 2025
Details
View Map
Share
South Norwood Hill

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 September 2025 and run through until 23 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jan 2025 at 13:59.

UK Power Networks Eastern & London logo
Between
12 and 29 Sep 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 20:12.

Southern Gas Networks logo
LONG TERM
Between
12 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:22.

Southern Gas Networks logo
LONG TERM
Between
12 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:55.

Southern Gas Networks logo
LONG TERM
Between
12 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:21.

Southern Gas Networks logo
LONG TERM
Between
12 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:53.

Southern Gas Networks logo
Between
12 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 11:16.

Southern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Chiltern Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chiltern Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 11:30.

Southern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Chiltern Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chiltern Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 14:40.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Woodcote Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Green, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 12:29.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Woodcote Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Green, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 13:32.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Woodcote Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Green, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Jul 2025 at 12:38.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Oaks Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 17:11.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Fir Tree Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fir Tree Grove, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 17:03.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 07:45.

London Borough Of Croydon logo
LONG TERM
Between
15 Sep 2025 and 30 Jan 2026
Details
View Map
Share
Follow
George Street

London Borough Of Croydon are proposing to carry out Highway improvement works on George Street, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:16.

London Borough Of Croydon logo
LONG TERM
Between
15 Sep 2025 and 30 Jan 2026
Details
View Map
Share
Follow
George Street

London Borough Of Croydon are proposing to carry out Highway improvement works on George Street, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 15 Jul 2025 at 09:58.

London Borough Of Croydon logo
Between
15 Sep and 12 Oct 2025
Details
View Map
Share
Ampere Way

London Borough Of Croydon were proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 08:11.

Thames Water logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Church Place

Thames Water are proposing to carry out New service connection on Church Place, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jul 2025 at 07:37.

Southern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 13:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 09:05.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Fieldgate Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldgate Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footpath only.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 05:49.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 09:05.

Southern Gas Networks logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Westminster Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westminster Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:59.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Hawkes Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 12:54.

Southern Gas Networks logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Belvedere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:49.

Southern Gas Networks logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Belvedere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:26.

Southern Gas Networks logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Belvedere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 13:39.

London Borough Of Merton logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 1 Jul 2025 at 07:50.

London Borough Of Merton logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 9 Jul 2025 at 08:30.

London Borough Of Merton logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 15 Jul 2025 at 10:46.

London Borough Of Merton logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 24 Jul 2025 at 07:40.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 08:11.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 09:26.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 14:42.

Southern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 15:31.

Thames Water logo
LONG TERM
Between
15 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:26.

London Borough Of Croydon logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Follow
Rockmount Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Rockmount Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 1 Sep 2025 at 11:55.

Southern Gas Networks logo
Between
17 and 25 Sep 2025
Details
View Map
Share
Follow
Croxden Walk

Southern Gas Networks are proposing to carry out New service connection on Croxden Walk, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 08:27.

Southern Gas Networks logo
Between
17 and 25 Sep 2025
Details
View Map
Share
Follow
Croxden Walk

Southern Gas Networks are proposing to carry out New service connection on Croxden Walk, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:58.

Surrey County Council logo
Between
18 and 20 Sep 2025
Details
View Map
Share
Chipstead Valley Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Jul 2025 at 07:30.

UK Power Networks South Eastern logo
Between
19 Sep and 6 Oct 2025
Details
View Map
Share
Court Wood Lane

UK Power Networks South Eastern were proposing to carry out New service connection on Court Wood Lane, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 12:00.

UK Power Networks South Eastern logo
Between
19 Sep and 6 Oct 2025
Details
View Map
Share
Featherbed Lane

UK Power Networks South Eastern were proposing to carry out New service connection on Featherbed Lane, Croydon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 12:00.

Southern Gas Networks logo
Between
19 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Martin Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 11:27.

Southern Gas Networks logo
LONG TERM
Between
21 Sep and 1 Dec 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 10:35.

London Borough Of Croydon logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Sanderstead Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sanderstead Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 May 2025 at 12:23.

London Borough Of Croydon logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Sanderstead Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sanderstead Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 11 Jun 2025 at 14:18.

London Borough Of Croydon logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Sundown Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sundown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 May 2025 at 12:25.

London Borough Of Croydon logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Sundown Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sundown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 11 Jun 2025 at 13:51.

London Borough Of Croydon logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Purley Oaks Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Purley Oaks Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 8 May 2025 at 10:31.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Farm Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Lane, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 12:07.

Southern Gas Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 12:19.

Southern Gas Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:27.

Southern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
The Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridge, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 12:05.

Southern Gas Networks logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 07:39.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 07:04.

Southern Gas Networks logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
The Newlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Newlands, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 15:47.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Glebe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 15 Dec 2025
Details
View Map
Share
Follow
Sandy Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Jun 2025 at 07:16.

London Borough Of Croydon logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Wentworth Road

London Borough Of Croydon were proposing to carry out Highway improvement works on Wentworth Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:29.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Cloister Gardens

BT were proposing to carry out Utility asset works on Cloister Gardens, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Jul 2025 at 12:02.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Cleaverholme Close

BT were proposing to carry out Utility asset works on Cleaverholme Close, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Jul 2025 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 11:38.

Thames Water logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Church Place

Thames Water are proposing to carry out New service connection on Church Place, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 07:11.

Southern Gas Networks logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Bond Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bond Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 15:56.

London Borough Of Wandsworth logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Amen Corner

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Amen Corner, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Jun 2025 at 09:31.

London Borough Of Wandsworth logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Amen Corner

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Amen Corner, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Jun 2025 at 08:04.

Thames Water logo
LONG TERM
Between
23 Sep 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Alton Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Alton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 12 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:54.

London Borough Of Croydon logo
Between
23 and 27 Sep 2025
Details
View Map
Share
Outram Road

London Borough Of Croydon were proposing to carry out Highway improvement works on Outram Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:29.

London Borough Of Croydon logo
Between
24 and 30 Sep 2025
Details
View Map
Share
Dulverton Road

London Borough Of Croydon were proposing to carry out Highway improvement works on Dulverton Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:30.

London Borough Of Croydon logo
Between
25 Sep and 1 Oct 2025
Details
View Map
Share
Monahan Avenue

London Borough Of Croydon were proposing to carry out Highway improvement works on Monahan Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:31.

London Borough Of Croydon logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Selsdon Park Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Selsdon Park Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 8 May 2025 at 10:30.

Thames Water logo
Between
25 and 30 Sep 2025
Details
View Map
Share
Follow
Park Street

Thames Water are proposing to carry out Utility repair and maintenance works on Park Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jul 2025 at 12:25.

London Borough Of Croydon logo
Between
26 Sep and 2 Oct 2025
Details
View Map
Share
Purley Knoll

London Borough Of Croydon were proposing to carry out Highway improvement works on Purley Knoll, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:31.

Transport for London (TfL) logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Spring Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Spring Park Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 08:43.

Transport for London (TfL) logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Wickham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wickham Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 09:35.

Transport for London (TfL) logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
West Way Gardens

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Way Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 08:42.

Transport for London (TfL) logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Verdayne Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Verdayne Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 08:42.

UK Power Networks South Eastern logo
LONG TERM
Between
26 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Whitehorse Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Whitehorse Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:23.

Southern Gas Networks logo
LONG TERM
Between
26 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 08:39.

Southern Gas Networks logo
LONG TERM
Between
26 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 08:39.

London Borough Of Wandsworth logo
Between
26 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Mitcham Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Jun 2025 at 09:31.

London Borough Of Wandsworth logo
Between
26 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Mitcham Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Jun 2025 at 08:02.

Southern Gas Networks logo
LONG TERM
Between
27 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:34.

Southern Gas Networks logo
LONG TERM
Between
27 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:12.

London Borough Of Croydon logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Byron Avenue

London Borough Of Croydon were proposing to carry out Highway improvement works on Byron Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:32.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Furzedown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Furzedown Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 10:33.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Furzedown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Furzedown Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 08:02.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:10.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:18.

Southern Gas Networks logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Avenue Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avenue Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 09:39.

Thames Water logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Lysander Road

Thames Water are proposing to carry out New service connection on Lysander Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:38.

Thames Water logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Lysander Road

Thames Water are proposing to carry out New service connection on Lysander Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 08:16.

London Borough Of Sutton logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 1 Jul 2025 at 11:55.

London Borough Of Sutton logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 3 Jul 2025 at 07:59.

London Borough Of Croydon logo
Between
29 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 22 Aug 2025 at 11:02.

London Borough Of Croydon logo
Between
29 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 16:09.

UK Power Networks South Eastern logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Dagnall Park

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagnall Park, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:40.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 13:18.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:44.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 10:21.

Thames Water logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Oak Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 18:43.

Thames Water logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Oak Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 15:44.

Cellnex OT UK logo
LONG TERM
Between
29 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Meaford Way

Cellnex OT UK are proposing to carry out Utility asset works on Meaford Way, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 12 Jun 2025 at 12:06.

Cellnex OT UK logo
LONG TERM
Between
29 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Meaford Way

Cellnex OT UK are proposing to carry out Utility asset works on Meaford Way, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 19 Jun 2025 at 11:29.

Southern Gas Networks logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Gateside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gateside Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 09:59.

London Borough Of Croydon logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Hartley Hill

London Borough Of Croydon were proposing to carry out Highway improvement works on Hartley Hill, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2025 and run through until 4 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:32.

Southern Gas Networks logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:57.

Thames Water logo
Between
30 Sep and 6 Oct 2025
Details
View Map
Share
Follow
St Julian's Farm Road

Thames Water are proposing to carry out Disconnection or alteration of supply on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 10:00.

Thames Water logo
Between
30 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Casewick Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Casewick Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:59.

London Borough Of Croydon logo
Between
1 and 6 Oct 2025
Details
View Map
Share
Beckett Avenue

London Borough Of Croydon were proposing to carry out Highway improvement works on Beckett Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:33.

UK Power Networks South Eastern logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Dagmar Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Dagmar Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 14:56.

Southern Gas Networks logo
LONG TERM
Between
3 Oct 2025 and 16 Mar 2026
Details
View Map
Share
Follow
Russell Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Russell Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 16 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:35.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Limpsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Limpsfield Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:38.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Village Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Village Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 08:45.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Penwortham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 10:11.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 07:03.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 13:01.

Southern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 12:03.

Southern Gas Networks logo
Between
6 and 26 Oct 2025
Details
View Map
Share
Follow
Lavender Vale

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lavender Vale, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 13:19.

BT logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Oak Avenue

BT are proposing to carry out Utility asset works on Oak Avenue, Shirley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Jul 2025 at 13:34.

BT logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Oak Avenue

BT are proposing to carry out Utility asset works on Oak Avenue, Shirley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Aug 2025 at 14:50.

London Borough Of Bromley logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Greenways

London Borough Of Bromley are proposing to carry out Highway improvement works on Greenways, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:42.

Southern Gas Networks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 12:08.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Melrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Melrose Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:33.

Thames Water logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out New service connection on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 13:39.

UK Power Networks Eastern & London logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Westow Hill

UK Power Networks Eastern & London were proposing to carry out New service connection on Westow Hill, Gipsy Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 09:56.

Thames Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 16:29.

Thames Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:10.

Thames Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:35.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Oct 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Pawsons Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 14:44.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Woodland Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Woodland Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Jul 2025 at 23:34.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Woodland Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Woodland Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 5 Aug 2025 at 09:57.

London Borough Of Croydon logo
Between
8 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Caterham Drive

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Caterham Drive, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 4 November 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Croydon on 18 Aug 2025 at 14:22.

BT logo
Between
9 and 13 Oct 2025
Details
View Map
Share
Follow
Abbey Road

BT are proposing to carry out Utility asset works on Abbey Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Aug 2025 at 13:41.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Purley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Purley Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:26.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Purley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Purley Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2025 at 15:19.

Southern Gas Networks logo
Between
13 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:10.

Southern Gas Networks logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Fairlawn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Road, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:08.

London Borough Of Croydon logo
Between
13 and 25 Oct 2025
Details
View Map
Share
Follow
Central Parade

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Central Parade, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 7 Aug 2025 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 22 Dec 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 12:38.

UK Power Networks South Eastern logo
Between
13 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Croham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croham Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Aug 2025 at 21:11.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Laburnum Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Laburnum Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 14:57.

Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Sydenham Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Sydenham Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Jul 2025 at 09:29.

London Borough Of Lambeth logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Emmanuel Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Emmanuel Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Jul 2025 at 11:26.

BT logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
The Gardens

BT are proposing to carry out Utility asset works on The Gardens, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 09:06.

Transport for London (TfL) logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:54.

London Borough Of Croydon logo
LONG TERM
Between
16 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Lansdowne Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Lansdowne Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:16.

London Borough Of Croydon logo
LONG TERM
Between
16 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Lansdowne Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Lansdowne Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 15 Jul 2025 at 09:59.

London Borough Of Croydon logo
LONG TERM
Between
16 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Dingwall Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Dingwall Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:17.

London Borough Of Croydon logo
LONG TERM
Between
16 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Dingwall Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Dingwall Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 15 Jul 2025 at 10:08.

Surrey County Council logo
LONG TERM
Between
17 Oct 2025 and 17 Mar 2026
Details
View Map
Share
Follow
Chipstead Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 17 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2025 at 14:49.

Transport for London (TfL) logo
LONG TERM
Between
19 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Streatham Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 10:09.

Southern Gas Networks logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 14:52.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Southway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:21.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:24.

Southern Gas Networks logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:19.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ingleton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 16:20.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Fullerton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 16:19.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 16:05.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 12:19.

London Borough Of Bromley logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Oakwood Avenue

London Borough Of Bromley are proposing to carry out Highway improvement works on Oakwood Avenue, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:44.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Westfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 08:31.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Westfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 16:04.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Blakeney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakeney Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 08:31.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Blakeney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakeney Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 16:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 12:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 16:17.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Gleneldon Road

London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:13.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Gleneldon Road

London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:16.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Gleneldon Road

London Borough Of Lambeth are proposing to carry out Works for road purposes on Gleneldon Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:22.

Southern Gas Networks logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 14:10.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Oct and 20 Nov 2025
Details
View Map
Share
Follow
Duppas Road

UK Power Networks South Eastern are proposing to carry out New service connection on Duppas Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 09:05.

Between
21 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Bell Green

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Jul 2025 at 07:10.

London Borough Of Croydon logo
Between
22 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 08:38.

London Borough Of Croydon logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 13 Aug 2025 at 10:10.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Onslow Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:42.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Onslow Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:26.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Blenheim Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 13:08.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Blenheim Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:23.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Milton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:36.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Milton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:27.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Stafford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stafford Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:33.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Stafford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stafford Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:20.

Thames Water logo
Between
25 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Lower Addiscombe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lower Addiscombe Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 12:45.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Bert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bert Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:57.

Thames Water logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Balham Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 08:57.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 10:46.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 12:17.

Southern Gas Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Southern Gas Networks are proposing to carry out New service connection on Chipstead Valley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 11:08.

Southern Gas Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Southern Gas Networks are proposing to carry out New service connection on Chipstead Valley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:48.

Southern Gas Networks logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Farm Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Lane, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 15:14.

Southern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
The Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridge, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 14:50.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Heathhurst Road

Southern Gas Networks are proposing to carry out New service connection on Heathhurst Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 11:53.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Heathhurst Road

Southern Gas Networks are proposing to carry out New service connection on Heathhurst Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 08:59.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out New service connection on Brambledown Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:06.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out New service connection on Brambledown Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 13:07.

Southern Gas Networks logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 16:31.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Aberdeen Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberdeen Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 07:06.

London Borough Of Merton logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cricket Green

London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 29 Oct 2024 at 16:15.

London Borough Of Merton logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cricket Green

London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Dec 2024 at 07:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 09:52.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:28.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:38.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 22:40.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:35.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 15:42.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Tierney Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Tierney Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 11:52.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Streatham Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 13:01.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:18.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:36.

UK Power Networks South Eastern logo
LONG TERM
Between
29 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Dagmar Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagmar Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 12:07.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:52.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:55.

UK Power Networks South Eastern logo
LONG TERM
Between
30 Oct 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Bungalow Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 15:10.

UK Power Networks South Eastern logo
LONG TERM
Between
31 Oct and 19 Dec 2025
Details
View Map
Share
South Norwood Hill

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 15:00.

London Borough Of Lambeth logo
Between
2 and 6 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 6 November 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Haydn Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydn Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 11:31.

Southern Gas Networks logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Cliff End

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff End, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:28.

Southern Gas Networks logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Cliff End

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff End, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:12.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Kayemoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kayemoor Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 13:28.

UK Power Networks South Eastern logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Croham Valley Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croham Valley Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Aug 2025 at 21:48.

London Borough Of Croydon logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Lodge Lane

London Borough Of Croydon are proposing to carry out Highway improvement works on Lodge Lane, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 20 Jun 2025 at 12:17.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 29 Dec 2025
Details
View Map
Share
Follow
Willis Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 29 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 13:28.

Southern Gas Networks logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Alberta Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:24.

Southern Gas Networks logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Southbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 14:32.

Southern Gas Networks logo
Between
3 and 20 Nov 2025
Details
View Map
Share
Follow
Southbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 08:57.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Lower Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Lower Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Jul 2025 at 08:22.

UK Power Networks South Eastern logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Leighton Street

UK Power Networks South Eastern are proposing to carry out Utility asset works on Leighton Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2025 at 11:28.

London Borough Of Croydon logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Bingham Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 08:31.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 3 Sep 2025 at 07:24.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 25 Jun 2025 at 11:05.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 23 Jul 2025 at 07:32.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 30 Jul 2025 at 12:57.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 7 Aug 2025 at 11:44.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 15 Aug 2025 at 15:06.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 16:37.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Canterbury Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 24 Jun 2025 at 12:53.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Canterbury Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 22 Jul 2025 at 14:11.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Canterbury Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 18 Aug 2025 at 14:51.

Between
3 and 27 Nov 2025
Details
View Map
Share
Follow
Bell Green

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Aug 2025 at 11:58.

Between
3 and 27 Nov 2025
Details
View Map
Share
Follow
Bell Green

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Aug 2025 at 10:40.

UK Power Networks South Eastern logo
Between
4 and 20 Nov 2025
Details
View Map
Share
Follow
Princess Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Princess Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2025 at 12:26.

BT logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Thesiger Road

BT are proposing to carry out Utility asset works on Thesiger Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Aug 2025 at 12:16.

BT logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Thesiger Road

BT are proposing to carry out Utility asset works on Thesiger Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Aug 2025 at 13:39.

Surrey County Council logo
Between
6 and 8 Nov 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2025 at 11:53.

Thames Water logo
LONG TERM
Between
7 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 13:12.

Southern Gas Networks logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 13:16.

Network Rail logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
Shorts Road

Network Rail are proposing to carry out Works for Rail Purposes on Shorts Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jul 2025 at 14:01.

Network Rail logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
Shorts Road

Network Rail are proposing to carry out Works for Rail Purposes on Shorts Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Aug 2025 at 12:09.

Thames Water logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Glenthorne Avenue

Thames Water are proposing to carry out New service connection on Glenthorne Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 13:38.

Thames Water logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out New service connection on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 12:31.

Thames Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 16:26.

Thames Water logo
Between
11 and 24 Nov 2025
Details
View Map
Share
Casewick Road

Thames Water were proposing to carry out Utility repair and maintenance works on Casewick Road, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 24 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 15:52.

Thames Water logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Willett Place

Thames Water are proposing to carry out Remedial works on Willett Place, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:14.

Southern Gas Networks logo
LONG TERM
Between
14 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Selcroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selcroft Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:17.

Southern Gas Networks logo
LONG TERM
Between
14 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Selcroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selcroft Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:16.

London Borough Of Croydon logo
Between
15 and 21 Nov 2025
Details
View Map
Share
Follow
Bingham Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 08:20.

UK Power Networks South Eastern logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Kings Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Kings Road, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2025 at 20:53.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 15:11.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Edgar Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Edgar Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:46.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:23.

UK Power Networks South Eastern logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Newhaven Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2025 at 12:43.

UK Power Networks South Eastern logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Newhaven Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2025 at 13:31.

London Borough Of Bromley logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Wickham Way

London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 15 Jul 2025 at 11:58.

Southern Gas Networks logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Bond Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bond Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 15:58.

UK Power Networks South Eastern logo
Between
19 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Violet Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Violet Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Aug 2025 at 20:50.

Network Rail logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Kent House Road

Network Rail are proposing to carry out Works for Rail Purposes on Kent House Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Aug 2025 at 08:08.

Southern Gas Networks logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Wontford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wontford Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 11:59.

Southern Gas Networks logo
Between
24 Nov and 21 Dec 2025
Details
View Map
Share
Follow
Hall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hall Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 16:30.

London Borough Of Croydon logo
Between
24 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Bingham Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 09:44.

Network Rail logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
South Eden Park Road

Network Rail are proposing to carry out Works for Rail Purposes on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Apr 2025 at 16:20.

Network Rail logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
South Eden Park Road

Network Rail are proposing to carry out Works for Rail Purposes on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 May 2025 at 16:34.

Network Rail logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
South Eden Park Road

Network Rail are proposing to carry out Works for Rail Purposes on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Jun 2025 at 13:07.

UK Power Networks Eastern & London logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Croydon Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Croydon Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 16:51.

Thames Water logo
LONG TERM
Between
25 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Waddon Close

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Close, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.

Southern Gas Networks logo
Between
28 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Purley Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:27.

Southern Gas Networks logo
Between
28 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Purley Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:09.

London Borough Of Lambeth logo
Between
30 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Hailsham Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Hailsham Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:44.

London Borough Of Lambeth logo
Between
30 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.

Thames Water logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out Utility asset works on Goodwin Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 12:11.

London Borough Of Bromley logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Greenways

London Borough Of Bromley are proposing to carry out Highway improvement works on Greenways, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 28 Aug 2025 at 11:59.

UK Power Networks South Eastern logo
LONG TERM
Between
1 Dec 2025 and 30 Jan 2026
Details
View Map
Share
Follow
South Norwood Hill

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 16:35.

Thames Water logo
Between
1 and 6 Dec 2025
Details
View Map
Share
Follow
Summerstown

Thames Water are proposing to carry out New service connection on Summerstown, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 09:34.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:26.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Faygate Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Faygate Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:02.

Transport for London (TfL) logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Marius Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:56.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:46.


Roadworks Map near to CROYDON, CR90 9ET (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to CROYDON, CR90 9ET (84 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
FACTORY LANE 
(0.1 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 1 Sep 2025 - 7 Dec 2025)
0.1
Details
Share
2
Southern Gas Networks logo
MAJOR
  
FACTORY LANE 
(0.1 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 1 Sep 2025 - 7 Dec 2025
0.1
Details
Share
Follow
3
Southern Gas Networks logo
MAJOR
  
FACTORY LANE 
(0.1 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 1 Sep 2025 - 7 Dec 2025
0.1
Details
Share
Follow
4
Southern Gas Networks logo
MAJOR
  
FACTORY LANE 
(0.1 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 1 Sep 2025 - 7 Dec 2025
0.1
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
FACTORY LANE 
(0.1 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 1 Sep 2025 08:00
(Scheduled: 1 Sep 2025 - 7 Dec 2025)
0.1
Details
Share
Follow
6
UK Power Networks South Eastern logo
MAJOR
  
KINGSLEY ROAD 
(0.2 miles)
UK Power Networks South Eastern
New service connection - Carriageway - Multi-way signals
Cancelled
(Scheduled: 1 Sep 2025 - 19 Sep 2025)
0.2
Details
Share
7
BT logo
SUMNER ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 2 Sep 2025 16:43
(Scheduled: 2 Sep 2025 - 4 Sep 2025)
0.2
Details
Share
Follow
8
London Borough Of Croydon logo
URGENT
  
THOMSON CRESCENT 
(0.3 miles)
London Borough Of Croydon
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
2 Sep 2025 09:54 - 10:04
0.3
Details
Share
9
London Borough Of Croydon logo
URGENT
  
THOMSON CRESCENT 
(0.3 miles)
London Borough Of Croydon
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
2 Sep 2025 09:42 - 09:44
0.3
Details
Share
10
London Borough Of Croydon logo
URGENT
  
THOMSON CRESCENT 
(0.3 miles)
London Borough Of Croydon
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
2 Sep 2025 08:28 - 09:26
0.3
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data