ROADWORKS SUMMARY
THORNTON HEATH, CR7 8UX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for CR7 8UX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to THORNTON HEATH, CR7 8UX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Wandsworth logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Totterdown Street

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Jun 2024 at 07:16.

Southern Gas Networks logo
LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Streatham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Streatham Road, Streatham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 09:38.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:00 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 16:10.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are carrying out roadworks on Balham Park Road, Balham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:49.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:00.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 13 Jun 2025
Details
View Map
Share
Follow
Waddon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 13 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:44.

Southern Gas Networks logo
LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
St James' Road

Southern Gas Networks are carrying out Utility repair and maintenance works on St James' Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 08:00 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 09:38.

Southern Gas Networks logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Warren Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Warren Avenue, Cheam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 11:30 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 16:43.

Southern Gas Networks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Sandy Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Sandy Lane, Cheam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 11:30 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 11:50.

Thames Water logo
LONG TERM
Between
27 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Beddington Farm Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Beddington Farm Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Jan 2025 at 12:31.

London Borough Of Sutton logo
LONG TERM
Between
15 Feb and 15 Jun 2025
Details
View Map
Share
Follow
Banstead Road South

London Borough Of Sutton are proposing to carry out Highway improvement works on Banstead Road South, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Sutton on 2 Jan 2025 at 08:14.

London Borough Of Sutton logo
LONG TERM
Between
15 Feb and 15 Jun 2025
Details
View Map
Share
Follow
Brighton Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Brighton Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Sutton on 2 Jan 2025 at 08:15.

London Borough Of Sutton logo
LONG TERM
Between
15 Feb and 15 Jun 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Sutton on 2 Jan 2025 at 08:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Feb and 11 Sep 2025
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:21.

Thames Water logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Raleigh Gardens

Thames Water are carrying out Disconnection or alteration of supply on Raleigh Gardens, Surrey, Mitcham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 08:00 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Feb 2025 at 09:39.

Southern Gas Networks logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Melrose Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Melrose Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 March 2025 at 13:00 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 11:30.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dulwich Common

Transport for London (TfL) are proposing to carry out Highway improvement works on Dulwich Common, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Jan 2025 at 20:24.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dulwich Common

Transport for London (TfL) are carrying out Highway improvement works on Dulwich Common, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Feb 2025 at 15:12.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are carrying out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2025 at 09:22.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Feb 2025 at 08:44.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are carrying out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:30.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
South Eden Park Road

London Borough Of Bromley are proposing to carry out Highway improvement works on South Eden Park Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Wickham Way

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 12:36.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
Wickham Way

London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
Stone Park Avenue

London Borough Of Bromley are proposing to carry out Highway improvement works on Stone Park Avenue, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
Wickham Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
Hayes Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Hayes Lane, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 4 Aug 2025
Details
View Map
Share
Wickham Way

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 4 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 11:59.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Wickham Way

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 12:34.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Wickham Road

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Road, Beckenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 12:30.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Wickham Road

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Road, Beckenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 12:37.

Transport for London (TfL) logo
LONG TERM
Between
17 Mar and 14 Jun 2025
Details
View Map
Share
Follow
Merantun Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Merantun Way, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 14 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 13:29.

Southern Gas Networks logo
LONG TERM
Between
24 Mar and 7 Jul 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 16:51.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar 2025 and 8 Mar 2027
Details
View Map
Share
Duppas Hill Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Duppas Hill Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 8 March 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Mar 2025 at 12:33.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar 2025 and 8 Mar 2027
Details
View Map
Share
The Croydon Flyover

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on The Croydon Flyover, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 8 March 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 11:53.

Thames Water logo
LONG TERM
Between
25 Mar and 27 Jun 2025
Details
View Map
Share
Follow
Alton Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Alton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 15:05.

Thames Water logo
LONG TERM
Between
25 Mar and 7 Jul 2025
Details
View Map
Share
Follow
Vicarage Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Vicarage Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:53.

Thames Water logo
LONG TERM
Between
26 Mar and 28 Jul 2025
Details
View Map
Share
Follow
Waddon Park Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Park Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 16:46.

UK Power Networks Eastern & London logo
LONG TERM
Until
11 Jun 2025
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2025 at 10:30 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 10:23.

London Borough Of Lambeth logo
LONG TERM
Between
31 Mar and 28 Jun 2025
Details
View Map
Share
Amesbury Avenue

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 28 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 1 May 2025 at 08:32.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Road, Whyteleafe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 27 Aug 2024 at 08:06.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Chipstead Valley Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Aug 2024 at 09:11.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Sep 2024 at 09:30.

Thames Water logo
LONG TERM
Between
1 Apr and 14 Jul 2025
Details
View Map
Share
Follow
Court Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Court Drive, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:54.

Transport for London (TfL) logo
LONG TERM
Between
1 Apr and 25 Jul 2025
Details
View Map
Share
Follow
Elmers End Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elmers End Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Feb 2025 at 08:13.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Apr and 16 Jun 2025
Details
View Map
Share
Saxon Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Saxon Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 16 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Apr 2025 at 10:36.

Thames Water logo
LONG TERM
Between
8 Apr and 22 Sep 2025
Details
View Map
Share
Follow
Waddon Park Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Park Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.

Thames Water logo
LONG TERM
Between
10 Apr and 12 Aug 2025
Details
View Map
Share
Follow
Waddon Park Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Park Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:46.

Thames Water logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
Waddon Park Avenue

Thames Water are carrying out Disconnection or alteration of supply on Waddon Park Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 08:00 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 11:07.

Thames Water logo
LONG TERM
Between
10 Apr and 15 Jul 2025
Details
View Map
Share
Follow
Alton Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Alton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:54.

Thames Water logo
LONG TERM
Between
10 Apr and 10 Jun 2025
Details
View Map
Share
Follow
Waddon Close

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Close, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 15:00.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Waddon Close

Thames Water are carrying out Disconnection or alteration of supply on Waddon Close, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 11:50 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 15:53.

Thames Water logo
LONG TERM
Between
10 Apr and 10 Jun 2025
Details
View Map
Share
Follow
Siddons Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Siddons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:53.

Thames Water logo
LONG TERM
Between
10 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Beddington Farm Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Beddington Farm Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 15:05.

Thames Water logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Beddington Farm Road

Thames Water are carrying out Disconnection or alteration of supply on Beddington Farm Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 11:43.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Sandy Lane South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane South, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 12:15.

UK Power Networks South Eastern logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are carrying out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 10:00 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Apr 2025 at 11:27.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
South Eden Park Road

London Borough Of Bromley are proposing to carry out Highway improvement works on South Eden Park Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 20 Feb 2025 at 16:05.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Wickham Way

London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 20 Feb 2025 at 16:05.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Stone Park Avenue

London Borough Of Bromley are proposing to carry out Highway improvement works on Stone Park Avenue, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 20 Feb 2025 at 16:05.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Wickham Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 20 Feb 2025 at 16:05.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Hayes Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Hayes Lane, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Feb 2025 at 19:00.

Southern Gas Networks logo
LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
Ardfern Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Ardfern Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2025 at 10:30 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 10:48.

Transport for London (TfL) logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Merantun Way

Transport for London (TfL) are carrying out Highway improvement works on Merantun Way, Colliers Wood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 08:47.

Southern Gas Networks logo
LONG TERM
Until
22 Jun 2025
Details
View Map
Share
Follow
Fairway

Southern Gas Networks are carrying out Utility repair and maintenance works on Fairway, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 April 2025 at 09:30 and could run through until 22 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 16:07.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Downside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Downside Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 2 Jan 2025 at 16:55.

Southern Gas Networks logo
LONG TERM
Between
21 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Pitt Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pitt Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Jan 2025 at 12:25.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Feb 2025 at 08:33.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Lessingham Avenue

Thames Water are carrying out roadworks on Lessingham Avenue, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:52.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Ansell Road

Thames Water are carrying out Utility asset works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:54.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Derinton Road

Thames Water are carrying out roadworks on Derinton Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:55.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Upper Tooting Road

Thames Water are carrying out Utility asset works on Upper Tooting Road, Tooting, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:00.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2025 at 12:50 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 13:40.

Southern Gas Networks logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Sandy Lane South

Southern Gas Networks are carrying out Utility repair and maintenance works on Sandy Lane South, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 09:30 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 09:48.

UK Power Networks South Eastern logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are carrying out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 May 2025 at 08:12.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Carshalton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carshalton Park Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 12:10.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Carshalton Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Carshalton Park Road, Carshalton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 13:03 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 13:39.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Duppas Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Duppas Road, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 10:20 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 29 May 2025 at 16:17.

Thames Water logo
LONG TERM
Between
30 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Commonside East

Thames Water are proposing to carry out Utility asset works on Commonside East, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 07:30.

Thames Water logo
LONG TERM
Between
30 Apr and 17 Jun 2025
Details
View Map
Share
Follow
Raleigh Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Raleigh Gardens, Surrey, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:35.

Thames Water logo
LONG TERM
Between
30 Apr and 17 Jun 2025
Details
View Map
Share
Raleigh Gardens

Thames Water were proposing to carry out Disconnection or alteration of supply on Raleigh Gardens, Surrey, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 April 2025 and run through until 17 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 12:16.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Heathdene Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 15:57.

Southern Gas Networks logo
LONG TERM
Between
5 May and 16 Jun 2025
Details
View Map
Share
Follow
Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jan 2025 at 15:34.

Southern Gas Networks logo
LONG TERM
Between
5 May and 15 Jun 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 13:07.

Thames Water logo
LONG TERM
Between
6 May and 22 Jul 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Feb 2025 at 10:13.

Thames Water logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Alton Road

Thames Water are carrying out Disconnection or alteration of supply on Alton Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 May 2025 at 09:30 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 07:35.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Bramley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Avenue, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 09:45.

Southern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Bramley Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Bramley Avenue, Croydon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 07:17 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 07:31.

Southern Gas Networks logo
LONG TERM
Until
24 Jun 2025
Details
View Map
Share
Follow
Grovelands Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Grovelands Road, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 12:00 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 13:03.

Southern Gas Networks logo
LONG TERM
Between
12 May and 13 Jun 2025
Details
View Map
Share
Hawthorn Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 15:57.

Thames Water logo
LONG TERM
Between
12 May and 2 Jul 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 12:22.

Thames Water logo
LONG TERM
Until
2 Jul 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are carrying out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:30 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 10:25.

Southern Gas Networks logo
LONG TERM
Between
12 May and 23 Jun 2025
Details
View Map
Share
Follow
Boswell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boswell Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jan 2025 at 11:11.

Southern Gas Networks logo
LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
The Green

Southern Gas Networks are carrying out Utility repair and maintenance works on The Green, Morden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:30 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 09:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 20 Jun 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 08:56.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 14:41.

Southern Gas Networks logo
LONG TERM
Between
13 May and 17 Jun 2025
Details
View Map
Share
Follow
Ashbourne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashbourne Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 14:35.

Southern Gas Networks logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Ashbourne Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Ashbourne Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 09:15 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 09:31.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are carrying out roadworks on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 11:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:55.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Tooting High Street

Thames Water are carrying out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works started on 13 May 2025 at 10:30 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:01.

UK Power Networks South Eastern logo
LONG TERM
Between
14 May and 13 Jun 2025
Details
View Map
Share
Follow
Chertsey Crescent

UK Power Networks South Eastern are proposing to carry out New service connection on Chertsey Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Mar 2025 at 07:43.

UK Power Networks South Eastern logo
LONG TERM
Between
14 May and 13 Jun 2025
Details
View Map
Share
Follow
Chertsey Crescent

UK Power Networks South Eastern are proposing to carry out New service connection on Chertsey Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Mar 2025 at 15:55.

UK Power Networks South Eastern logo
LONG TERM
Between
14 May and 13 Jun 2025
Details
View Map
Share
Follow
Chertsey Crescent

UK Power Networks South Eastern are proposing to carry out New service connection on Chertsey Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 May 2025 at 06:49.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Malden Road

Thames Water are carrying out Utility repair and maintenance works on Malden Road, Cheam.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 May 2025 at 08:40 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 12:08.

Southern Gas Networks logo
LONG TERM
Between
14 May and 18 Jun 2025
Details
View Map
Share
Follow
Ashbourne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashbourne Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:56.

Transport for London (TfL) logo
Until
14 Jun 2025
Details
View Map
Share
Follow
The Croydon Flyover

Transport for London (TfL) are carrying out Highway repair and maintenance works on The Croydon Flyover, Croydon.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 21:00 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:05.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Julien Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Julien Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Mar 2025 at 12:34.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Julien Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Julien Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 10:18.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Julien Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Julien Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 10:28.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Julien Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Julien Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 12:45.

London Borough Of Croydon logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
More Close

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on More Close, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 12 May 2025 at 10:48.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Grosvenor Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 14:24.

Southern Gas Networks logo
LONG TERM
Between
19 May and 6 Jul 2025
Details
View Map
Share
Follow
Carshalton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carshalton Park Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 13:10.

Southern Gas Networks logo
LONG TERM
Between
19 May and 6 Jul 2025
Details
View Map
Share
Follow
Carshalton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carshalton Park Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 11:36.

Thames Water logo
LONG TERM
Between
19 May and 2 Jul 2025
Details
View Map
Share
Follow
Trojan Way

Thames Water are proposing to carry out Disconnection or alteration of supply on Trojan Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 05:29.

Thames Water logo
LONG TERM
Until
2 Jul 2025
Details
View Map
Share
Follow
Trojan Way

Thames Water are carrying out Disconnection or alteration of supply on Trojan Way, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:05.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Combermere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Combermere Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:07.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Combermere Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Combermere Road, Morden.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 15:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 15 Aug 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 15 Aug 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 13:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:14.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:29.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 13:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:15.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Worsley Bridge Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Worsley Bridge Road, Beckenham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 19:14.

UK Power Networks Eastern & London logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Springfield Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Springfield Road, Sydenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 13:00 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:15.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 07:18.

Southern Gas Networks logo
Until
17 Jun 2025
Details
View Map
Share
Follow
Southwood Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Southwood Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:37 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 08:46.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 12:10.

Southern Gas Networks logo
LONG TERM
Between
23 May and 4 Jul 2025
Details
View Map
Share
Follow
Grovelands Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grovelands Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 11:38.

Southern Gas Networks logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Upland Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Upland Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 10:00 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 10:10.

Southern Gas Networks logo
LONG TERM
Between
23 May and 18 Jul 2025
Details
View Map
Share
Follow
Nicholson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nicholson Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 12:15.

Southern Gas Networks logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Nicholson Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Nicholson Road, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 08:40 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:22.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Aberconway Road

Thames Water are proposing to carry out Utility asset works on Aberconway Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 07:35.

Electricity Network Company logo
Finishing
Thursday
Details
View Map
Share
Follow
Holdernesse Road

Electricity Network Company are proposing to carry out Utility asset works on Holdernesse Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Feb 2025 at 10:13.

Electricity Network Company logo
Finishing
Thursday
Details
View Map
Share
Follow
Glenburnie Road

Electricity Network Company are proposing to carry out Utility asset works on Glenburnie Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 31 Jan 2025 at 14:55.

Southern Gas Networks logo
LONG TERM
Between
26 May and 18 Aug 2025
Details
View Map
Share
Follow
Marlpit Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlpit Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 07:16.

Southern Gas Networks logo
LONG TERM
Until
18 Aug 2025
Details
View Map
Share
Follow
Marlpit Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Marlpit Lane, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 08:22.

Southern Gas Networks logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 11:28.

Southern Gas Networks logo
LONG TERM
Between
26 May and 18 Jul 2025
Details
View Map
Share
Banstead Road South

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 18 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
26 May and 7 Jul 2025
Details
View Map
Share
Follow
Pitt Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pitt Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 11:26.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Dagmar Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagmar Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Apr 2025 at 14:39.

Southern Gas Networks logo
Between
26 May and 21 Jun 2025
Details
View Map
Share
Follow
Foxgrove Road

Southern Gas Networks are proposing to carry out Utility asset works on Foxgrove Road, Beckenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 21 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 14:15.

Southern Gas Networks logo
Between
27 May and 10 Jun 2025
Details
View Map
Share
Follow
Netley Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Netley Close, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 07:41.

Southern Gas Networks logo
Between
27 May and 10 Jun 2025
Details
View Map
Share
Follow
Netley Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Netley Close, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 08:04.

Southern Gas Networks logo
Between
27 May and 10 Jun 2025
Details
View Map
Share
Follow
Headley Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Headley Drive, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Mar 2025 at 09:58.

Southern Gas Networks logo
Between
27 May and 10 Jun 2025
Details
View Map
Share
Follow
Headley Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Headley Drive, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 07:53.

Southern Gas Networks logo
Until
23 Jun 2025
Details
View Map
Share
Follow
St Alban's Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on St Alban's Grove, Carshalton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 11:10.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Peterborough Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Peterborough Road, Carshalton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:54.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lawrie Park Road

Thames Water are carrying out roadworks on Lawrie Park Road, Sydenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 23:53 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:30.

Thames Water logo
Between
29 May and 11 Jun 2025
Details
View Map
Share
London Road

Thames Water were proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 May 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 12:18.

Southern Gas Networks logo
Between
30 May and 23 Jun 2025
Details
View Map
Share
Follow
Grosvenor Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Avenue, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 13:24.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
South Park Hill Road

Thames Water are carrying out Utility repair and maintenance works on South Park Hill Road, Croydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 12:17 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 06:52.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Whyteleafe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Mar 2025 at 08:27.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Queensway

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Queensway, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 09:11 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 10:22.

Southern Gas Networks logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Julien Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Julien Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 07:01.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Friday
Details
View Map
Share
Follow
Roke Road

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Roke Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 07:48 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 2 Jun 2025 at 07:48.

Southern Gas Networks logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Sunnymede Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Sunnymede Avenue, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:00 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 11:35.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Fairlawn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Road, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:36.

Southern Gas Networks logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 14:24.

Southern Gas Networks logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:37.

Southern Gas Networks logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Witley Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Witley Crescent, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 07:25.

Southern Gas Networks logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Burford Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burford Way, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 07:24.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Blenheim Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 14:27.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Park Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Park Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 11:31.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Erskine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Erskine Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 13:51.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Erskine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Erskine Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:26.

Southern Gas Networks logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
St Agathas Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Agathas Grove, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 14:22.

Southern Gas Networks logo
Until
27 Jun 2025
Details
View Map
Share
Follow
St Agathas Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on St Agathas Grove, Carshalton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:45 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 10:59.

Southern Gas Networks logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 10:44.

Southern Gas Networks logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Davidson Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Davidson Road, Croydon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Feb 2025 at 07:44.

UK Power Networks South Eastern logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Dagnall Park

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagnall Park, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 12:29.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Mayo Road

Southern Gas Networks were proposing to carry out New service connection on Mayo Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 11:41.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Thirsk Road

Southern Gas Networks are proposing to carry out New service connection on Thirsk Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 10:56.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Thirsk Road

Southern Gas Networks are carrying out New service connection on Thirsk Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:40 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:43.

Southern Gas Networks logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Penge Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Penge Road, Croydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:30 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 12:18.

Thames Water logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Upper Green West

Thames Water are carrying out Disconnection or alteration of supply on Upper Green West, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:30 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:41.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 11:21.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Western Road, Mitcham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:30 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 10:27.

London Borough Of Lambeth logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Jun 2025 at 14:57.

London Borough Of Lambeth logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Jun 2025 at 16:23.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Selborne Road

Thames Water are proposing to carry out New service connection on Selborne Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 10:15.

Thames Water logo
Between
3 and 16 Jun 2025
Details
View Map
Share
Follow
Bramcote Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 15:37.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Sylverdale Road

BT are proposing to carry out Utility asset works on Sylverdale Road, Purley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 May 2025 at 16:00.

London Borough Of Bromley logo
Finishing
Friday
Details
View Map
Share
Follow
St David's Close

London Borough Of Bromley are proposing to carry out Highway improvement works on St David's Close, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 13 May 2025 at 13:48.

Thames Water logo
Between
4 and 24 Jun 2025
Details
View Map
Share
Follow
Bramcote Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 06:58.

Thames Water logo
Between
4 and 24 Jun 2025
Details
View Map
Share
Follow
Cricket Green

Thames Water are proposing to carry out Disconnection or alteration of supply on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 06:57.

Southern Gas Networks logo
Between
6 and 30 Jun 2025
Details
View Map
Share
Follow
Grosvenor Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Avenue, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 15:33.

Southern Gas Networks logo
LONG TERM
Between
6 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 07:28.

Southern Gas Networks logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Lavender Vale

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lavender Vale, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Feb 2025 at 16:09.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Willis Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 10:22.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Blenheim Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:22.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Park Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 15:31.

Southern Gas Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Dennett Road

Southern Gas Networks are proposing to carry out New service connection on Dennett Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 11:35.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Pitt Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pitt Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:47.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Pawsons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 16:16.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Pawsons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 10:09.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Pawsons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 11:25.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Pawsons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:49.

Southern Gas Networks logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Sandringham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandringham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 16:18.

Southern Gas Networks logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Sandringham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandringham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 12:57.

UK Power Networks South Eastern logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Newhaven Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Apr 2025 at 14:39.

Southern Gas Networks logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Seneca Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Seneca Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 16:29.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:20.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 08:28.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 09:43.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Oak Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 17:03.

London Borough Of Croydon logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Westminster Avenue

London Borough Of Croydon were proposing to carry out Highway repair and maintenance works on Westminster Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 11:13.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Oakfield Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Oakfield Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 May 2025 at 19:06.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Oakfield Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Oakfield Road, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 15:05.

UK Power Networks Eastern & London logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 May 2025 at 19:06.

UK Power Networks Eastern & London logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:43.

UK Power Networks Eastern & London logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 13:04.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Gleneldon Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Gleneldon Mews, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 23:40.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Selsdon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Selsdon Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 13:53.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Selsdon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Selsdon Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 07:57.

London Borough Of Lambeth logo
LONG TERM
Between
9 Jun and 1 Aug 2025
Details
View Map
Share
Follow
High Trees

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Jun 2025 at 07:50.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Utility asset works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:16.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Utility asset works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 11:02.

London Borough Of Croydon logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Downlands Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Downlands Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 26 Mar 2025 at 14:25.

Thames Water logo
LONG TERM
Between
11 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Waddon Court Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Court Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 09:02.

Thames Water logo
LONG TERM
Between
11 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Waddon Court Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Court Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 15:44.

Southern Gas Networks logo
Between
13 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 13:02.

Southern Gas Networks logo
Between
13 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:50.

Southern Gas Networks logo
LONG TERM
Between
13 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Tybenham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tybenham Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 06:45.

Southern Gas Networks logo
LONG TERM
Between
13 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Kenley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kenley Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 06:43.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Tithepit Shaw Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Tithepit Shaw Lane, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Mar 2025 at 10:07.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Tithepit Shaw Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Tithepit Shaw Lane, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Mar 2025 at 14:43.

Southern Gas Networks logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Woodcote Valley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Valley Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 15:31.

Southern Gas Networks logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Woodcote Valley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Valley Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 12:30.

Southern Gas Networks logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Woodcote Valley Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Valley Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 13:20.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Fairlawn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Road, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 12:33.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Fairway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 15:17.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Fairway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 13:23.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Fairway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 13:36.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:48.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 1 Aug 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 15:22.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 1 Aug 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Feb 2025 at 17:25.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Beresford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beresford Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 16:51.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Beresford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beresford Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 16:04.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Kayemoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kayemoor Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 16:30.

Southern Gas Networks logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 15:07.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Eaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eaton Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Feb 2025 at 11:59.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Eaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eaton Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 11:10.

London Borough Of Sutton logo
Between
16 and 29 Jun 2025
Details
View Map
Share
Follow
Elgin Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Elgin Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 17 Jan 2025 at 16:48.

London Borough Of Sutton logo
Between
16 and 29 Jun 2025
Details
View Map
Share
Follow
Elgin Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Elgin Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 20 Jan 2025 at 15:51.

London Borough Of Sutton logo
Between
16 and 29 Jun 2025
Details
View Map
Share
Follow
Ross Parade

London Borough Of Sutton are proposing to carry out Highway improvement works on Ross Parade, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 13 Mar 2025 at 14:30.

London Borough Of Sutton logo
Between
16 and 29 Jun 2025
Details
View Map
Share
Follow
Clarendon Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Clarendon Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 13 Mar 2025 at 14:29.

London Borough Of Sutton logo
Between
16 and 29 Jun 2025
Details
View Map
Share
Follow
St Michaels Road

London Borough Of Sutton are proposing to carry out Highway improvement works on St Michaels Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 13 Mar 2025 at 14:31.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Carew Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out roadworks on Carew Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Apr 2025 at 11:55.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Bandon Rise

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out roadworks on Bandon Rise, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Apr 2025 at 11:56.

London Borough Of Sutton logo
Between
16 and 29 Jun 2025
Details
View Map
Share
Follow
Clyde Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Clyde Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 13 Mar 2025 at 14:28.

London Borough Of Croydon logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Roman Way

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Roman Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 24 Apr 2025 at 12:35.

London Borough Of Croydon logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Mitcham Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Mitcham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 24 Apr 2025 at 12:40.

Southern Gas Networks logo
Between
16 and 29 Jun 2025
Details
View Map
Share
Follow
Sandringham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandringham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 10:18.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Melrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Melrose Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 08:53.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Circle Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Circle Gardens, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 06:44.

BT logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Phipp's Bridge Road

BT are proposing to carry out Utility asset works on Phipp's Bridge Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 May 2025 at 13:57.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Gateside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gateside Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 09:21.

Thames Water logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Leigham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Leigham Avenue, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 14:44.

London Borough Of Lambeth logo
LONG TERM
Between
16 Jun and 12 Sep 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:26.

London Borough Of Lambeth logo
LONG TERM
Between
16 Jun and 12 Sep 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:27.

UK Power Networks South Eastern logo
LONG TERM
Between
17 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Chertsey Crescent

UK Power Networks South Eastern are proposing to carry out New service connection on Chertsey Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 May 2025 at 10:40.

London Borough Of Croydon logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Oakfield Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Oakfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 11:53.

London Borough Of Croydon logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Oakfield Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Oakfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 12:42.

London Borough Of Croydon logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Long Lane

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Long Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:43.

London Borough Of Croydon logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Long Lane

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Long Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 26 Mar 2025 at 14:30.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Jun and 13 Aug 2025
Details
View Map
Share
Bungalow Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 June 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 14:44.

UK Power Networks Eastern & London logo
Between
18 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 08:28.

Southern Gas Networks logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Beckett Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beckett Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 11:54.

London Borough Of Croydon logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Hayes Lane

London Borough Of Croydon are proposing to carry out Highway improvement works on Hayes Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 09:21.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Southway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:37.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:35.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 06:48.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 3 Aug 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 11:08.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 27 Jul 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:37.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 25 Jul 2025
Details
View Map
Share
The Warren

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on The Warren, Carshalton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 15:24.

Southern Gas Networks logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Sandy Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 15:28.

Southern Gas Networks logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Onslow Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 15:33.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 25 Jul 2025
Details
View Map
Share
Beeches Walk

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 15:25.

Southern Gas Networks logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2025 at 11:46.

Southern Gas Networks logo
Between
23 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Avenue Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avenue Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 12:07.

Southern Gas Networks logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
The Newlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Newlands, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Feb 2025 at 16:50.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Netley Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Netley Close, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Apr 2025 at 08:39.

Southern Gas Networks logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Headley Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Headley Drive, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Apr 2025 at 08:44.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 25 Jul 2025
Details
View Map
Share
Banstead Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 15:25.

Southern Gas Networks logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Witley Crescent

Southern Gas Networks are proposing to carry out New service connection on Witley Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:16.

Southern Gas Networks logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Witley Crescent

Southern Gas Networks are proposing to carry out New service connection on Witley Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Apr 2025 at 09:39.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Chatfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Apr 2025 at 10:07.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Chatfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 1 May 2025 at 09:29.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Chatfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 May 2025 at 12:57.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Chatfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2025 at 12:54.

Cellnex OT UK logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility asset works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 1 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 11 Apr 2025 at 11:23.

Cellnex OT UK logo
LONG TERM
Between
23 Jun and 17 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility asset works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 17 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 15 Apr 2025 at 11:05.

Cellnex OT UK logo
LONG TERM
Between
23 Jun and 17 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility asset works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 17 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 17 Apr 2025 at 14:50.

Cellnex OT UK logo
LONG TERM
Between
23 Jun and 17 Aug 2025
Details
View Map
Share
Follow
Meaford Way

Cellnex OT UK are proposing to carry out Utility asset works on Meaford Way, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 1 May 2025 at 08:51.

Southern Gas Networks logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 08:13.

Southern Gas Networks logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 08:26.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 09:19.

Thames Water logo
Between
24 Jun and 14 Jul 2025
Details
View Map
Share
Bramcote Avenue

Thames Water were proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:33.

Thames Water logo
Between
24 Jun and 14 Jul 2025
Details
View Map
Share
Cricket Green

Thames Water were proposing to carry out Disconnection or alteration of supply on Cricket Green, Mitcham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:35.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Tooting High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 09:10.

Transport for London (TfL) logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Brudenell Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Brudenell Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:48.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Brudenell Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Brudenell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:28.

Transport for London (TfL) logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Beechcroft Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Beechcroft Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:51.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Beechcroft Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Beechcroft Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:27.

Transport for London (TfL) logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Topsham Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Topsham Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:49.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Topsham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Topsham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:28.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Mandrake Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Mandrake Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:52.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Mandrake Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Mandrake Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:27.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Upper Tooting Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Upper Tooting Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 09:11.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Upper Tooting Park

Transport for London (TfL) were proposing to carry out Highway improvement works on Upper Tooting Park, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:55.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:57.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:36.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Marius Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 15:36.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:42.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 3 July 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 11:04.

London Borough Of Sutton logo
Between
25 and 28 Jun 2025
Details
View Map
Share
Follow
Stafford Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Stafford Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 17 Feb 2025 at 15:21.

London Borough Of Sutton logo
Between
25 and 28 Jun 2025
Details
View Map
Share
Follow
Stafford Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Stafford Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 18 Feb 2025 at 17:02.

Thames Water logo
Between
25 Jun and 15 Jul 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 22:58.

Thames Water logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Cedars Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cedars Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 18:02.

London Borough Of Croydon logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Heath Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Heath Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:55.

London Borough Of Croydon logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Beulah Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Beulah Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:39.

London Borough Of Southwark logo
Between
26 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Jasper Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Jasper Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2025 at 10:49.

Transport for London (TfL) logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Ritherdon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ritherdon Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:26.

Transport for London (TfL) logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Upper Tooting Park

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Tooting Park, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 15:34.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 14 Oct 2025
Details
View Map
Share
Follow
Marlpit Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlpit Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Mar 2025 at 16:36.

Southern Gas Networks logo
Between
30 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Smitham Downs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Smitham Downs Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 08:42.

Southern Gas Networks logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 10:00.

Southern Gas Networks logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 06:44.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
West Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 08:19.

Southern Gas Networks logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 12:32.

Southern Gas Networks logo
Between
30 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Shirley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shirley Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 16:21.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Beechwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beechwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 08:48.

Southern Gas Networks logo
Between
30 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Sandy Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 12:08.

Southern Gas Networks logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Mulgrave Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mulgrave Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 16:40.

Southern Gas Networks logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Mulgrave Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mulgrave Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 18:22.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 18 Aug 2025
Details
View Map
Share
Downside Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Downside Road, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 18 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 10:04.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Hillcroome Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hillcroome Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 10:24.

Southern Gas Networks logo
Between
30 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Kings Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 11:04.

London Borough Of Sutton logo
Between
30 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Clyde Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Clyde Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 17 Jan 2025 at 16:25.

London Borough Of Sutton logo
Between
30 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Clyde Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Clyde Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 20 Jan 2025 at 19:23.

Southern Gas Networks logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Woodstock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodstock Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 11:31.

Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Old School Place

GTC Pipelines are proposing to carry out Utility asset works on Old School Place, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 29 Apr 2025 at 09:20.

Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Old School Place

GTC Pipelines are proposing to carry out Utility asset works on Old School Place, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 27 May 2025 at 07:09.

Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Old School Place

GTC Pipelines are proposing to carry out Utility asset works on Old School Place, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 29 May 2025 at 09:22.

Thames Water logo
Between
30 Jun and 5 Jul 2025
Details
View Map
Share
Bensham Manor Road

Thames Water were proposing to carry out New service connection on Bensham Manor Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 5 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 15:43.

Thames Water logo
Between
30 Jun and 5 Jul 2025
Details
View Map
Share
Bensham Manor Road

Thames Water were proposing to carry out New service connection on Bensham Manor Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 5 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 13:56.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 11 Aug 2025
Details
View Map
Share
Follow
Boswell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boswell Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 10:56.

Thames Water logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 08:38.

Southern Gas Networks logo
Between
30 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 10:35.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Norfolk House Road

Thames Water are proposing to carry out Utility repair and maintenance works on Norfolk House Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:51.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Norfolk House Road

Thames Water are proposing to carry out Utility repair and maintenance works on Norfolk House Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 10:30.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:13.

London Borough Of Lambeth logo
LONG TERM
Between
30 Jun and 25 Aug 2025
Details
View Map
Share
Follow
Tulse Hill

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 14 May 2025 at 09:27.

London Borough Of Lambeth logo
LONG TERM
Between
30 Jun and 25 Aug 2025
Details
View Map
Share
Follow
Tulse Hill

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 May 2025 at 10:51.

Southern Gas Networks logo
Between
3 and 18 Jul 2025
Details
View Map
Share
Follow
Avenue Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avenue Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 13:30.

Transport for London (TfL) logo
Between
4 and 21 Jul 2025
Details
View Map
Share
Follow
Wellesley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wellesley Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Apr 2025 at 14:49.

Transport for London (TfL) logo
Between
4 and 12 Jul 2025
Details
View Map
Share
Follow
Station Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Station Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Apr 2025 at 14:49.

Southern Gas Networks logo
Between
6 and 25 Jul 2025
Details
View Map
Share
Follow
Onslow Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 10:25.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Wilbury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilbury Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 16:14.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Warren Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 16:13.

Southern Gas Networks logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Onslow Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 13:27.

Southern Gas Networks logo
Between
7 and 23 Jul 2025
Details
View Map
Share
Follow
Belmont Rise

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belmont Rise, Cheam.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 23 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 12:34.

Southern Gas Networks logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Manor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Manor Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 19:06.

Southern Gas Networks logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Manor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Manor Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 10:16.

Southern Gas Networks logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Arundel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arundel Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 07:09.

Southern Gas Networks logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Arundel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arundel Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 09:17.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Grange Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grange Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Feb 2025 at 11:29.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Grange Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grange Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 09:03.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Downside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Downside Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:30.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Worcester Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worcester Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 15:08.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Worcester Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worcester Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:17.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Mulgrave Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Mulgrave Road, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 1 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Mar 2025 at 15:33.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mulgrave Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mulgrave Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 15:24.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mulgrave Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mulgrave Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 15:49.

Southern Gas Networks logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mulgrave Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mulgrave Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:15.

Southern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Woodstock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodstock Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 15:28.

Thames Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Havelock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Havelock Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 10:21.

Thames Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Havelock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Havelock Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 06:49.

London Borough Of Bromley logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
South Eden Park Road

London Borough Of Bromley are proposing to carry out Highway improvement works on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 17 Feb 2025 at 11:10.

London Borough Of Croydon logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Sutherland Road

London Borough Of Croydon were proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 13:31.

Southern Gas Networks logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:13.

Southern Gas Networks logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 10:03.

Southern Gas Networks logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 16:09.

London Borough Of Wandsworth logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Mitcham Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 9 May 2025 at 07:52.

UK Power Networks Eastern & London logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Gleneldon Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Gleneldon Mews, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 09:35.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Rothschild Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rothschild Street, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 10:48.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Rothschild Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rothschild Street, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 16:07.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Rothschild Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rothschild Street, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:59.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Knight's Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Knight's Hill, Knight's Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 16:07.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Knight's Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Knight's Hill, Knight's Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:56.

Transport for London (TfL) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:05.

Transport for London (TfL) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:05.

Thames Water logo
LONG TERM
Between
8 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Siddons Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Siddons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:54.

Thames Water logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Westfield Road

Thames Water are proposing to carry out New service connection on Westfield Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 08:47.

Southern Gas Networks logo
Between
9 and 16 Jul 2025
Details
View Map
Share
Follow
Sydenham Hill

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydenham Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 10:29.

Southern Gas Networks logo
LONG TERM
Between
10 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Hook Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 11 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 10:03.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Jul and 11 Sep 2025
Details
View Map
Share
Howden Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Howden Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 11 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Feb 2025 at 15:51.

BT logo
Between
11 and 16 Jul 2025
Details
View Map
Share
Follow
Cherry Tree Walk

BT are proposing to carry out Utility asset works on Cherry Tree Walk, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 21:04.

BT logo
Between
11 and 16 Jul 2025
Details
View Map
Share
Follow
Cherry Tree Walk

BT are proposing to carry out Utility asset works on Cherry Tree Walk, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 May 2025 at 11:49.

BT logo
Between
11 and 16 Jul 2025
Details
View Map
Share
Follow
Cherry Tree Walk

BT are proposing to carry out Utility asset works on Cherry Tree Walk, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 May 2025 at 18:53.

Transport for London (TfL) logo
Between
13 and 28 Jul 2025
Details
View Map
Share
Follow
Wellesley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wellesley Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:07.

Transport for London (TfL) logo
Between
13 and 22 Jul 2025
Details
View Map
Share
Follow
Station Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Station Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 10:39.

Southern Gas Networks logo
LONG TERM
Between
14 Jul and 1 Sep 2025
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:01.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Smitham Bottom Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Smitham Bottom Lane, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 11 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:01.

London Borough Of Sutton logo
Between
14 and 27 Jul 2025
Details
View Map
Share
Banstead Road South

London Borough Of Sutton were proposing to carry out Highway improvement works on Banstead Road South, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 27 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 1 May 2025 at 15:55.

Southern Gas Networks logo
Between
14 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Dorset Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dorset Road, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 09:30.

Southern Gas Networks logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Dorset Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dorset Road, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:35.

Southern Gas Networks logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Dorset Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dorset Road, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:51.

Southern Gas Networks logo
Between
14 Jul and 10 Aug 2025
Details
View Map
Share
Follow
York Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 09:30.

Southern Gas Networks logo
Between
14 and 26 Jul 2025
Details
View Map
Share
Follow
York Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:36.

Southern Gas Networks logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Shirley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shirley Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 12:09.

Southern Gas Networks logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
The Newlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Newlands, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 15:27.

Southern Gas Networks logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
The Newlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Newlands, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Mar 2025 at 16:02.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Witley Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Witley Crescent, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 10:55.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Burford Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burford Way, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 10:57.

Southern Gas Networks logo
Between
14 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Peaches Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peaches Close, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 10:07.

Southern Gas Networks logo
Between
14 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Peaches Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peaches Close, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 10:59.

London Borough Of Sutton logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Banstead Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Banstead Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 1 May 2025 at 16:03.

London Borough Of Sutton logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Banstead Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Banstead Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 May 2025 at 16:23.

Southern Gas Networks logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 16:30.

Network Rail logo
Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
Demesne Road

Network Rail are proposing to carry out Works for Rail Purposes on Demesne Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Apr 2025 at 14:57.

Network Rail logo
LONG TERM
Between
14 Jul and 14 Nov 2025
Details
View Map
Share
Follow
West Street

Network Rail are proposing to carry out Works for Rail Purposes on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Apr 2025 at 12:25.

London Borough Of Croydon logo
LONG TERM
Between
14 Jul and 15 Dec 2025
Details
View Map
Share
Follow
Park Lane

London Borough Of Croydon are proposing to carry out Highway improvement works on Park Lane, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:18.

London Borough Of Croydon logo
LONG TERM
Between
14 Jul and 15 Dec 2025
Details
View Map
Share
Follow
Wellesley Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Wellesley Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:14.

BT logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Lower Addiscombe Road

BT were proposing to carry out Utility asset works on Lower Addiscombe Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 14:23.

BT logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Lower Addiscombe Road

BT are proposing to carry out Utility asset works on Lower Addiscombe Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 14:24.

Southern Gas Networks logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Sandringham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandringham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 11:26.

London Borough Of Merton logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Croydon Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Croydon Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 25 Mar 2025 at 15:04.

London Borough Of Merton logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Croydon Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Croydon Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 28 Mar 2025 at 09:07.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Kingswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingswood Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 09:02.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Den Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 09:02.

Southern Gas Networks logo
Between
14 Jul and 12 Aug 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 07:28.

Thames Water logo
LONG TERM
Between
14 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Lower Green West

Thames Water are proposing to carry out Disconnection or alteration of supply on Lower Green West, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:26.

Thames Water logo
LONG TERM
Between
14 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Lower Green West

Thames Water are proposing to carry out Disconnection or alteration of supply on Lower Green West, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 08:53.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Jul and 1 Dec 2025
Details
View Map
Share
Whitehorse Lane

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Whitehorse Lane, South Norwood, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jan 2025 at 14:00.

Southern Gas Networks logo
Between
14 and 27 Jul 2025
Details
View Map
Share
Follow
Fieldgate Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldgate Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footpath only.

This roadwork event was last updated by Southern Gas Networks on 20 Jan 2025 at 09:10.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 10:08.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:04.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 12:55.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:12.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Remedial works on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:24.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Remedial works on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:41.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 10:32.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:18.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Hawarden Grove

Thames Water were proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 10:34.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:23.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Remedial works on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:42.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 10:32.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:16.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:11.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Remedial works on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:23.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Remedial works on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:42.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 10:32.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:18.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Guernsey Grove

Thames Water were proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 10:34.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:11.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 10:07.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:06.

London Borough Of Croydon logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Sanderstead Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sanderstead Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:38.

London Borough Of Croydon logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Sanderstead Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sanderstead Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Apr 2025 at 14:14.

London Borough Of Croydon logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Sundown Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sundown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:53.

London Borough Of Croydon logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Sundown Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sundown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Apr 2025 at 14:15.

London Borough Of Croydon logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Purley Oaks Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Purley Oaks Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:55.

London Borough Of Croydon logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Purley Oaks Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Purley Oaks Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Apr 2025 at 14:16.

Thames Water logo
Between
15 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Bramcote Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:02.

Thames Water logo
Between
15 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Cricket Green

Thames Water are proposing to carry out Disconnection or alteration of supply on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:02.

London Borough Of Croydon logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Reeves Corner

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Reeves Corner, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 10:48.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jul and 10 Sep 2025
Details
View Map
Share
Follow
Bungalow Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 12:29.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jul and 10 Sep 2025
Details
View Map
Share
Follow
Bungalow Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 May 2025 at 16:27.

BT logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Kelsey Lane

BT are proposing to carry out Utility asset works on Kelsey Lane, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 2 Jun 2025 at 12:48.

UK Power Networks Eastern & London logo
Between
16 and 23 Jul 2025
Details
View Map
Share
Follow
Burrell Row

UK Power Networks Eastern & London are proposing to carry out New service connection on Burrell Row, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 12:48.

UK Power Networks Eastern & London logo
Between
16 and 23 Jul 2025
Details
View Map
Share
Follow
Burrell Row

UK Power Networks Eastern & London are proposing to carry out New service connection on Burrell Row, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 16:18.

Southern Gas Networks logo
LONG TERM
Between
17 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Arkwright Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arkwright Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:04.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Southern Gas Networks logo
LONG TERM
Between
20 Jul and 2 Sep 2025
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 July 2025 and run through until 2 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 15:04.

Southern Gas Networks logo
Between
20 Jul and 10 Aug 2025
Details
View Map
Share
Little Woodcote Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Little Woodcote Lane, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 July 2025 and run through until 10 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Jan 2025 at 10:10.

Southern Gas Networks logo
Between
20 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Purley Bury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Bury Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 09:51.

Southern Gas Networks logo
Between
20 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Yew Tree Walk

Southern Gas Networks are proposing to carry out roadworks on Yew Tree Walk, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
20 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Purley Downs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Downs Road, South Croydon, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 10:01.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Cullesden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cullesden Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 12:33.

Southern Gas Networks logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Smitham Downs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Smitham Downs Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 11:08.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Sanderstead Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sanderstead Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 08:44.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Sanderstead Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sanderstead Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 15:38.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Purley Downs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Downs Road, South Croydon, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 08:38.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Sundown Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sundown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 08:43.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Yew Tree Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yew Tree Walk, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:05.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Purley Downs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Downs Road, South Croydon, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 11:20.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
South Rise

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Rise, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:18.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
South Rise

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Rise, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Mar 2025 at 16:56.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Fullerton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jan 2025 at 16:24.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Harbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harbury Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jan 2025 at 16:27.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Radcliffe Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radcliffe Gardens, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Jan 2025 at 15:04.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Radcliffe Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radcliffe Gardens, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 16:11.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Staplehurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplehurst Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 16:52.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Staplehurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplehurst Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 13:48.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 16:30.

Southern Gas Networks logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Violet Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Violet Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:46.

Southern Gas Networks logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Goodwin Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Goodwin Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:17.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Stoughton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoughton Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 09:26.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chatsworth Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 09:26.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
St Michael's Road

Thames Water are proposing to carry out New service connection on St Michael's Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:28.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Mitcham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitcham Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 15:35.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Kimberley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kimberley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 10:09.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Bert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bert Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 10:10.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 15:21.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Eastfields Road

Thames Water are proposing to carry out Utility asset works on Eastfields Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 08:19.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Eastfields Road

Thames Water are proposing to carry out Utility asset works on Eastfields Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2025 at 12:48.

Southern Gas Networks logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Carolina Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carolina Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 11:21.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:12.

Southern Gas Networks logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Foxgrove Road

Southern Gas Networks are proposing to carry out Utility asset works on Foxgrove Road, Beckenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 12:53.

Southern Gas Networks logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Foxgrove Road

Southern Gas Networks are proposing to carry out Utility asset works on Foxgrove Road, Beckenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Feb 2025 at 09:45.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Churchmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:41.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Churchmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:33.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Stockport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:40.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Stockport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:29.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Woodmansterne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:42.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Woodmansterne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:31.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Island Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Island Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:15.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Island Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Island Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 10:10.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Island Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Island Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 16:18.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:14.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 10:03.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 09:56.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 8 Sep 2025
Details
View Map
Share
Follow
Fishponds Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fishponds Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:21.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Derby Hill

Thames Water were proposing to carry out New service connection on Derby Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 13:42.

Transport for London (TfL) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 12:31.

Transport for London (TfL) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 12:33.

Transport for London (TfL) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 12:29.

London Borough Of Croydon logo
LONG TERM
Between
22 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Little Roke Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Little Roke Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Apr 2025 at 08:09.

London Borough Of Croydon logo
LONG TERM
Between
22 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Little Roke Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Little Roke Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 23 Apr 2025 at 09:36.

Network Rail logo
LONG TERM
Between
22 Jul and 31 Aug 2025
Details
View Map
Share
Follow
West Street

Network Rail are proposing to carry out Works for Rail Purposes on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 May 2025 at 14:33.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Kingswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingswood Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 09:52.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Kingswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingswood Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:16.

Southern Gas Networks logo
Between
22 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Kingswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingswood Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 17:38.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Den Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 09:52.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Den Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:16.

Southern Gas Networks logo
Between
22 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Den Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 16:17.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Westwood Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 7 Mar 2025 at 11:20.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Westwood Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 13 Mar 2025 at 16:23.

Southern Gas Networks logo
Between
23 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Goodwin Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Goodwin Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 11:06.

Southern Gas Networks logo
Between
23 and 30 Jul 2025
Details
View Map
Share
Follow
Pine Avenue

Southern Gas Networks are proposing to carry out New service connection on Pine Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 08:21.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:19.

London Borough Of Merton logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Eveline Road

London Borough Of Merton are proposing to carry out Highway improvement works on Eveline Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 28 Mar 2025 at 09:18.

London Borough Of Merton logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Eveline Road

London Borough Of Merton are proposing to carry out Highway improvement works on Eveline Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 8 Apr 2025 at 13:59.

Thames Water logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Green Lane

Thames Water were proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 14:40.

Thames Water logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Green Lane

Thames Water were proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 15:28.

Thames Water logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility asset works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:28.

Thames Water logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility asset works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 11:33.

Thames Water logo
LONG TERM
Between
23 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Green Lane

Thames Water are proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:17.

Thames Water logo
LONG TERM
Between
23 Jul and 28 Aug 2025
Details
View Map
Share
Green Lane

Thames Water were proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 12:30.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 8 Sep 2025
Details
View Map
Share
Follow
Beech Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beech Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:49.

Southern Gas Networks logo
LONG TERM
Between
26 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Northey Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northey Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 10:15.

Southern Gas Networks logo
LONG TERM
Between
26 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 10:19.

Southern Gas Networks logo
Between
27 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Smitham Downs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Smitham Downs Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 15:36.

Southern Gas Networks logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Purley Bury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Bury Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:07.

Southern Gas Networks logo
Between
28 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Kendall Avenue South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kendall Avenue South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:53.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Belmont Rise

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belmont Rise, Cheam.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 16:03.

Southern Gas Networks logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Devonshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Devonshire Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 07:29.

Southern Gas Networks logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Oaks Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Feb 2025 at 16:55.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 08:56.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 13:57.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 14:20.

Southern Gas Networks logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Fir Tree Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fir Tree Grove, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 14:16.

London Borough Of Croydon logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
London Road

London Borough Of Croydon were proposing to carry out Highway improvement works on London Road, Croydon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 27 Mar 2025 at 13:14.

London Borough Of Croydon logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Canterbury Road

London Borough Of Croydon were proposing to carry out Highway improvement works on Canterbury Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 27 Mar 2025 at 13:15.

Thames Water logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
South Eden Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 21:04.

Southern Gas Networks logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Kimberley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kimberley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 14:17.

Southern Gas Networks logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Kimberley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kimberley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 12:40.

Southern Gas Networks logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Bert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bert Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 12:42.

UK Power Networks South Eastern logo
Between
28 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Auckland Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Auckland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Apr 2025 at 12:27.

Thames Water logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jan 2025 at 08:57.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 11:23.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:57.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Vectis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vectis Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:57.

Thames Water logo
Between
28 Jul and 5 Aug 2025
Details
View Map
Share
Auckland Hill

Thames Water were proposing to carry out New service connection on Auckland Hill, Gipsy Hill, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 15:52.

Network Rail logo
Between
28 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Leigham Vale

Network Rail are proposing to carry out Works for Rail Purposes on Leigham Vale, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 May 2025 at 13:02.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Thurlow Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thurlow Park Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:08.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Thurlow Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thurlow Park Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 12:05.

Thames Water logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Thurlow Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thurlow Park Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:06.

London Borough Of Merton logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Green Lane

London Borough Of Merton are proposing to carry out Highway improvement works on Green Lane, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Apr 2025 at 08:03.

London Borough Of Merton logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Green Lane

London Borough Of Merton are proposing to carry out Highway improvement works on Green Lane, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 14 Apr 2025 at 09:18.

London Borough Of Merton logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Green Lane

London Borough Of Merton are proposing to carry out Highway improvement works on Green Lane, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 16 Apr 2025 at 08:53.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 1 Nov 2025
Details
View Map
Share
Follow
Elmers End Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elmers End Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 11:29.

London Borough Of Croydon logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Selsdon Park Road

London Borough Of Croydon were proposing to carry out Highway repair and maintenance works on Selsdon Park Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 30 Apr 2025 at 12:00.

Thames Water logo
Between
30 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manor Road, Wallington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 12:29.

Thames Water logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ashburton Avenue

Thames Water are proposing to carry out New service connection on Ashburton Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:01.

Thames Water logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Glenthorne Avenue

Thames Water are proposing to carry out New service connection on Glenthorne Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:49.

Southern Gas Networks logo
Between
31 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:49.

Southern Gas Networks logo
Between
31 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Edgar Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Edgar Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:53.

Southern Gas Networks logo
LONG TERM
Between
31 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 13:03.

Thames Water logo
Between
31 Jul and 13 Aug 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 08:04.

Thames Water logo
Between
2 and 6 Aug 2025
Details
View Map
Share
Follow
Carlwell Street

Thames Water are proposing to carry out roadworks on Carlwell Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 07:26.

Thames Water logo
Between
2 and 6 Aug 2025
Details
View Map
Share
Follow
Tooting High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:13.

Southern Gas Networks logo
LONG TERM
Between
3 Aug and 28 Sep 2025
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 August 2025 and run through until 28 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 15:02.

Southern Gas Networks logo
Between
3 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Woodcote Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 09:12.

Southern Gas Networks logo
Between
3 and 31 Aug 2025
Details
View Map
Share
Follow
Stoats Nest Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoats Nest Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 12:32.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:07.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:06.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 22 Sep 2025
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:02.

Southern Gas Networks logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Sanderstead Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sanderstead Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 13:02.

Southern Gas Networks logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Purley Downs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Downs Road, South Croydon, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 09:12.

Southern Gas Networks logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Sundown Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sundown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 09:08.

Southern Gas Networks logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Sundown Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sundown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 09:44.

London Borough Of Croydon logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Purley Oaks Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Purley Oaks Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 28 Apr 2025 at 06:42.

Southern Gas Networks logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Ingleton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jan 2025 at 16:27.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Beresford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beresford Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 07:09.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Beresford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beresford Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 09:20.

Southern Gas Networks logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Violet Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Violet Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:35.

Southern Gas Networks logo
Between
4 and 25 Aug 2025
Details
View Map
Share
Follow
Violet Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Violet Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:45.

Southern Gas Networks logo
Between
4 and 10 Aug 2025
Details
View Map
Share
Follow
Aberdeen Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberdeen Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 11:02.

Southern Gas Networks logo
Between
4 and 10 Aug 2025
Details
View Map
Share
Follow
Aberdeen Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberdeen Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 15:19.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Morland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Morland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 13:13.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Morland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Morland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:13.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Morland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Morland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 12:49.

Thames Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Brabourne Rise

Thames Water are proposing to carry out roadworks on Brabourne Rise, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2025 at 18:37.

Thames Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Romanhurst Gardens

Thames Water are proposing to carry out roadworks on Romanhurst Gardens, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2025 at 18:37.

Thames Water logo
Between
4 and 24 Aug 2025
Details
View Map
Share
Follow
Whitehorse Road

Thames Water are proposing to carry out Utility repair and maintenance works on Whitehorse Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:01.

Thames Water logo
Between
4 and 24 Aug 2025
Details
View Map
Share
Follow
Whitehorse Road

Thames Water are proposing to carry out Utility asset works on Whitehorse Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 08:55.

Southern Gas Networks logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Carew Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Carew Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 06:02.

Thames Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Osborne Road

Thames Water are proposing to carry out Remedial works on Osborne Road, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:25.

Southern Gas Networks logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 15:56.

UK Power Networks Eastern & London logo
Between
4 and 20 Aug 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 08:57.

London Borough Of Merton logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Dorset Road

London Borough Of Merton are proposing to carry out Highway improvement works on Dorset Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 14 Apr 2025 at 09:15.

London Borough Of Merton logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Dorset Road

London Borough Of Merton are proposing to carry out Highway improvement works on Dorset Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 17 Apr 2025 at 11:28.

Thames Water logo
Between
4 and 12 Aug 2025
Details
View Map
Share
Follow
Auckland Hill

Thames Water are proposing to carry out New service connection on Auckland Hill, Gipsy Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 15:59.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Derby Hill

Thames Water are proposing to carry out New service connection on Derby Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 14:22.

London Borough Of Lambeth logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
High Trees

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 7 May 2025 at 09:59.

Southern Gas Networks logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Weir Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weir Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 20:57.

Southern Gas Networks logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Weir Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weir Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 10:25.

London Borough Of Croydon logo
Between
7 and 9 Aug 2025
Details
View Map
Share
Follow
South Norwood Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on South Norwood Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:59.

London Borough Of Croydon logo
Between
7 and 9 Aug 2025
Details
View Map
Share
Follow
South Norwood Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on South Norwood Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 1 Apr 2025 at 06:57.

London Borough Of Croydon logo
Between
7 and 9 Aug 2025
Details
View Map
Share
Follow
Grange Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Grange Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:52.

London Borough Of Croydon logo
Between
7 and 9 Aug 2025
Details
View Map
Share
Follow
Grange Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Grange Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 1 Apr 2025 at 06:51.

Southern Gas Networks logo
Between
10 and 31 Aug 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 09:59.

Southern Gas Networks logo
Between
11 and 30 Aug 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:05.

Southern Gas Networks logo
Between
11 and 24 Aug 2025
Details
View Map
Share
Follow
Cornwall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cornwall Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 16:58.

Southern Gas Networks logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Lavender Vale

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lavender Vale, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:26.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Haling Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haling Park Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:49.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Southbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:19.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Southbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 15:20.

Network Rail logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Stanhope Grove

Network Rail are proposing to carry out Works for Rail Purposes on Stanhope Grove, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Apr 2025 at 15:35.

Network Rail logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Stanhope Grove

Network Rail are proposing to carry out Works for Rail Purposes on Stanhope Grove, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 May 2025 at 16:34.

Southern Gas Networks logo
LONG TERM
Between
11 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 08:34.

Thames Water logo
Between
11 and 17 Aug 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 13:49.

Thames Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Eastfields Road

Thames Water are proposing to carry out Utility asset works on Eastfields Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 14:32.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Carolina Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carolina Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:24.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Fieldend Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:41.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Fieldend Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:36.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Greenock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:41.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Greenock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:38.

London Borough Of Southwark logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Croxted Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Croxted Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 May 2025 at 16:23.

London Borough Of Merton logo
Between
13 and 16 Aug 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Merton are proposing to carry out Highway improvement works on Church Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Apr 2025 at 07:59.

Southern Gas Networks logo
LONG TERM
Between
14 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Allenby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Allenby Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 10:34.

Southern Gas Networks logo
LONG TERM
Between
14 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Brantwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brantwood Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 09:59.

Thames Water logo
Between
14 and 16 Aug 2025
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2025 at 14:10.

Southern Gas Networks logo
Between
15 and 31 Aug 2025
Details
View Map
Share
Follow
Farm Fields

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Fields, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 06:15.

Southern Gas Networks logo
Between
15 and 31 Aug 2025
Details
View Map
Share
Follow
Purley Oaks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Oaks Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 06:18.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 09:52.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:03.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 14:47.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:46.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 12:36.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 14:30.

London Borough Of Croydon logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Dunheved Road North

London Borough Of Croydon were proposing to carry out Highway improvement works on Dunheved Road North, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 27 Mar 2025 at 13:16.

Southern Gas Networks logo
Between
18 and 31 Aug 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:06.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:18.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:10.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 16:30.

Energy Assets Pipelines logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Merton Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Merton Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 21 May 2025 at 11:36.

Energy Assets Pipelines logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Merton Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Merton Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 29 May 2025 at 15:20.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Merton Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Merton Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 21 May 2025 at 11:37.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Merton Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Merton Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 29 May 2025 at 15:24.

London Borough Of Croydon logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Lodge Lane

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Lodge Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 1 Apr 2025 at 06:36.

Thames Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Abercairn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abercairn Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 15:08.

Thames Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Abercairn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abercairn Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:37.

London Borough Of Croydon logo
Between
22 and 29 Aug 2025
Details
View Map
Share
Follow
Wentworth Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Wentworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 28 May 2025 at 15:00.

BT logo
Between
23 and 31 Aug 2025
Details
View Map
Share
Follow
Avenue Park Road

BT are proposing to carry out Utility asset works on Avenue Park Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 12:37.

BT logo
Between
23 and 31 Aug 2025
Details
View Map
Share
Follow
Birkbeck Hill

BT are proposing to carry out Utility asset works on Birkbeck Hill, Thurlow Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 12:37.

Thames Water logo
Between
23 and 27 Aug 2025
Details
View Map
Share
Follow
Balham Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 16:40.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 13:43.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 16:32.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 14:36.

Southern Gas Networks logo
Between
25 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Northey Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northey Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 18:17.

Southern Gas Networks logo
Between
25 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:59.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 29 Sep 2025
Details
View Map
Share
Follow
St Stephen's Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Stephen's Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 09:07.

Thames Water logo
Between
25 and 30 Aug 2025
Details
View Map
Share
Follow
Green Lane

Thames Water are proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 23:48.

Cellnex OT UK logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility repair and maintenance works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 15 Apr 2025 at 11:08.

Cellnex OT UK logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility repair and maintenance works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 17 Apr 2025 at 14:55.

Cellnex OT UK logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Meaford Way

Cellnex OT UK are proposing to carry out Utility repair and maintenance works on Meaford Way, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 1 May 2025 at 08:51.

Thames Water logo
Between
25 and 31 Aug 2025
Details
View Map
Share
Follow
St Julian's Farm Road

Thames Water are proposing to carry out Utility asset works on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 11:02.

Thames Water logo
Between
25 Aug and 6 Sep 2025
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 13:43.

Southern Gas Networks logo
Between
26 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Southern Gas Networks are proposing to carry out New service connection on Chipstead Valley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 14:48.

UK Power Networks South Eastern logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Plough Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Plough Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 13 May 2025 at 10:30.

Thames Water logo
LONG TERM
Between
26 Aug and 24 Nov 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:08.

London Borough Of Croydon logo
Between
26 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Outram Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Outram Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 07:14.

Southern Gas Networks logo
Between
26 Aug and 23 Sep 2025
Details
View Map
Share
Follow
Lansdowne Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Hill, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 14:29.

London Borough Of Croydon logo
Between
27 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Dulverton Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Dulverton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 07:19.

Thames Water logo
Between
27 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Westwood Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Westwood Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 06:29.

London Borough Of Croydon logo
Between
28 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Monahan Avenue

London Borough Of Croydon are proposing to carry out Highway improvement works on Monahan Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 11:08.

London Borough Of Croydon logo
Between
28 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Monahan Avenue

London Borough Of Croydon are proposing to carry out Highway improvement works on Monahan Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 30 May 2025 at 07:11.

London Borough Of Croydon logo
Between
29 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Byron Avenue

London Borough Of Croydon are proposing to carry out Highway improvement works on Byron Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 07:31.

London Borough Of Croydon logo
Between
29 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Purley Knoll

London Borough Of Croydon are proposing to carry out Highway improvement works on Purley Knoll, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 May 2025 at 07:27.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Prior Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prior Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:13.


Roadworks Map near to THORNTON HEATH, CR7 8UX (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 08:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to THORNTON HEATH, CR7 8UX (77 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks South Eastern logo
FACTORY LANE 
(0.1 miles)
UK Power Networks South Eastern
Disconnection or alteration of supply - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 9 Jun 2025
0.1
Details
Share
Follow
2
Transport for London (TfL) logo
PURLEY WAY 
(0.3 miles)
Transport for London (TfL)
Highway repair and maintenance works - Footway - Multi-way signals
Planned
Scheduled: 3 Jun 2025 - 4 Jun 2025
0.3
Details
Share
Follow
3
Thames Water logo
MAJOR
  
BEDDINGTON FARM ROAD 
(0.3 miles)
Thames Water
Disconnection or alteration of supply - Footway, Carriageway - Road closure
In Progress
Since: 10 Apr 2025 09:30
(Scheduled: 10 Apr 2025 - 13 Jun 2025)
0.3
Details
Share
Follow
4
Thames Water logo
MAJOR
  
BEDDINGTON FARM ROAD 
(0.3 miles)
Thames Water
Disconnection or alteration of supply - Footway, Carriageway - Road closure
Planned
Scheduled: 10 Apr 2025 - 22 Jul 2025
0.3
Details
Share
Follow
5
Transport for London (TfL) logo
BEDDINGTON FARM ROAD 
(0.3 miles)
Transport for London (TfL)
Highway repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 3 Jun 2025 - 4 Jun 2025
0.3
Details
Share
Follow
6
Virgin Media logo
WADDON NEW ROAD 
(0.3 miles)
Virgin Media
Permanent reinstatement - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 4 Jun 2025
0.3
Details
Share
Follow
7
London Borough Of Croydon logo
URGENT
  
PEMDEVON ROAD 
(0.3 miles)
London Borough Of Croydon
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 3 Jun 2025 07:35
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
0.3
Details
Share
Follow
8
Thames Water logo
CLARENDON ROAD 
(0.4 miles)
Thames Water
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.4
Details
Share
Follow
9
Thames Water logo
MAJOR
  
SIDDONS ROAD 
(0.4 miles)
Thames Water
Disconnection or alteration of supply - Footway, Carriageway - Road closure
Planned
Scheduled: 10 Apr 2025 - 10 Jun 2025
0.4
Details
Share
Follow
10
Thames Water logo
WADDON NEW ROAD 
(0.4 miles)
Thames Water
Remedial works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 13:35
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data