ROADWORKS SUMMARY
Hillbury Gardens, WARLINGHAM, CR6 9TQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hillbury Gardens, CR6 9TQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hillbury Gardens, WARLINGHAM, CR6 9TQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hillbury Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Surrey County Council are carrying out Highway improvement works on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 07:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Oct 2024 at 09:17.

Surrey County Council logo
LONG TERM
Between
26 Feb and 20 Dec 2024
Details
View Map
Share
Follow
Croydon Road

Surrey County Council are proposing to carry out Highway improvement works on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Feb 2024 at 12:05.

Thames Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Steeple Heights Drive

Thames Water are carrying out Utility repair and maintenance works on Steeple Heights Drive, Biggin Hill.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 March 2024 at 11:32 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Mar 2024 at 14:54.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 31 Mar 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 13:27.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
12 Aug and 17 Dec 2024
Details
View Map
Share
Follow
Pendell Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Statutory Infrastructure Works on Pendell Road, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Feb 2024 at 09:27.

Southern Gas Networks logo
LONG TERM
Between
12 Aug 2024 and 23 May 2025
Details
View Map
Share
Follow
Hollymead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollymead Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 23 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 13:44.

Southern Gas Networks logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Hollymead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hollymead Road, Chipstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:00.

Southern Gas Networks logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Oxted Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Oxted Road, Godstone.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 11:00 and could run through until 4 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:39.

Thames Water logo
LONG TERM
Between
26 Aug 2024 and 28 Feb 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2024 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 09:15.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 23 Dec 2024
Details
View Map
Share
Follow
Court Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 10:41.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Violet Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Violet Lane, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 10:47.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Copthorne Rise

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Copthorne Rise, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 09:17.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Copthorne Rise

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Copthorne Rise, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 11:55.

Southern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Copthorne Rise

Southern Gas Networks are carrying out Utility repair and maintenance works on Copthorne Rise, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:00 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:43.

Thames Water logo
LONG TERM
Between
14 Oct 2024 and 21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 14:41.

Thames Water logo
LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are carrying out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 12:15 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:42.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 09:41.

Thames Water logo
LONG TERM
Between
15 Oct 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Courtney Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Courtney Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:49.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 09:13.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 10:35.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Kendall Avenue South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kendall Avenue South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 15:02.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2024 at 15:12.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 16:05.

UK Power Networks South Eastern logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Purley Rise

UK Power Networks South Eastern are carrying out New service connection on Purley Rise, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 08:28.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Chipstead Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chipstead Way, Woodmansterne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 09:39.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2024 at 07:54.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 09:38.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:13.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 12:33.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 07:00.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 11:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 10:37.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:20.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Pendell Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Pendell Road, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
East Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill, Oxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Jul 2024 at 14:57.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Limpsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2024 at 12:07.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Albury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Albury Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:24.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Gatton Bottom

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Bottom, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:22.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Coulsdon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 24 Jul 2024 at 09:00.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Mitchley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitchley Avenue, South Croydon, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 11:56.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 15:02.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Layton Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layton Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:29.

Southern Gas Networks logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Layton Crescent

Southern Gas Networks are carrying out Utility repair and maintenance works on Layton Crescent, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 13:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 13:23.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Little Woodcote Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Little Woodcote Lane, Carshalton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:16.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Kendall Avenue South

Southern Gas Networks are carrying out Utility repair and maintenance works on Kendall Avenue South, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:25 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:32.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Church Road, Purley, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:44 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:18.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Haling Park Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haling Park Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:22.

Surrey County Council logo
LONG TERM
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Westerham Road

Surrey County Council are proposing to carry out Works for road purposes on Westerham Road, Limpsfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 12:36.

Surrey County Council logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Westerham Road

Surrey County Council are carrying out Works for road purposes on Westerham Road, Limpsfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 09:25.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Mitchley Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitchley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 12:04.

Southern Gas Networks logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:45 and could run through until 30 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 13:02.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Rectory Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rectory Park, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 11:58.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Violet Gardens

Southern Gas Networks are carrying out Utility repair and maintenance works on Violet Gardens, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 14:25 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 14:30.

Southern Gas Networks logo
Between
18 Nov and 16 Dec 2024
Details
View Map
Share
Coldharbour Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Coldharbour Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 08:49.

Thames Water logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Lynwood Gardens

Thames Water are carrying out Disconnection or alteration of supply on Lynwood Gardens, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:30 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:36.

Surrey County Council logo
LONG TERM
Between
19 Nov 2024 and 19 May 2025
Details
View Map
Share
Follow
Tithepit Shaw Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tithepit Shaw Lane, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:37.

Surrey County Council logo
Until
4 Dec 2024
Details
View Map
Share
Follow
Tithepit Shaw Lane

Surrey County Council are carrying out Highway repair and maintenance works on Tithepit Shaw Lane, Warlingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 20:00 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 08:16.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 08:54.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 08:12.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 10:41.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Westfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 12:11.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 09:04.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:07.

London Borough Of Croydon logo
Finishing
Today
Details
View Map
Share
Follow
Dingwall Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Dingwall Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Croydon on 8 Nov 2024 at 11:54.

London Borough Of Croydon logo
Today
Details
View Map
Share
Dingwall Road

London Borough Of Croydon carried out Highway repair and maintenance works on Dingwall Road, Croydon.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 25 Nov 2024 and 27 Nov 2024 and were actually completed between 25 Nov 2024 (22:00) and 27 Nov 2024 (05:00). The works impacted the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Croydon on 27 Nov 2024 at 07:30.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Brighton Road

Thames Water were proposing to carry out New service connection on Brighton Road, South Croydon, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 13:05.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Brighton Road

Thames Water are proposing to carry out New service connection on Brighton Road, South Croydon, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:32.

Southern Gas Networks logo
Between
28 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Haling Park Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haling Park Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 15:55.

Southern Gas Networks logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Underwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Underwood Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 07:48.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Borrowdale Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Borrowdale Drive, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2024 at 08:24.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:02.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:24.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 06:46.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Church Lane

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Church Lane, Oxted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Sep 2024 at 13:11.

Southern Gas Networks logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Glebe Hyrst

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Hyrst, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 12:19.

Surrey County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 07:03.

Surrey County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 14:22.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 17:26.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:03.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 13:45.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Oct 2024 at 10:20.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 12:19.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 11:24.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Brook Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:01.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:23.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2024 at 15:01.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 14:17.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 13:05.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:34.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 15:03.

Surrey County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Clareville Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.

Surrey County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Elmore Road

Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:28.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Elmore Road

Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:50.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 14:54.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 07:45.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
How Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Jul 2024 at 19:08.

London Borough Of Bromley logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Polesteeple Hill

London Borough Of Bromley are proposing to carry out Highway improvement works on Polesteeple Hill, Biggin Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 15:01.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 15:43.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Hartley Down

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hartley Down, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 15:12.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Hartley Down

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hartley Down, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 11:50.

London Borough Of Bromley logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Wood Lodge Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Wood Lodge Lane, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.

Thames Water logo
LONG TERM
Between
7 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Benson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Benson Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:57.

UK Power Networks South Eastern logo
Between
10 and 29 Jan 2025
Details
View Map
Share
Follow
Queensway

UK Power Networks South Eastern are proposing to carry out New service connection on Queensway, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Nov 2024 at 16:30.

Surrey County Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Rook Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rook Lane, Chaldon, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 09:34.

Surrey County Council logo
LONG TERM
Between
13 Jan and 13 Jul 2025
Details
View Map
Share
The Green

Surrey County Council were proposing to carry out Highway repair and maintenance works on The Green, Warlingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 10:59.

Surrey County Council logo
LONG TERM
Between
13 Jan and 13 Jul 2025
Details
View Map
Share
Limpsfield Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 11:07.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Jail Lane

Thames Water were proposing to carry out New service connection on Jail Lane, Biggin Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 10:14.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
North Down

BT were proposing to carry out Utility asset works on North Down, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Oct 2024 at 13:05.

Surrey County Council logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Clareville Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.

Surrey County Council logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Birch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:29.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Birch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:20.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:25.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 07:27.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Oct 2024 at 15:16.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 13:43.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Sandy Lane South

UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Sandy Lane South, Wallington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 10:16.

Southern Gas Networks logo
Between
21 Jan and 3 Feb 2025
Details
View Map
Share
Follow
How Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 13:03.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 24 Mar 2025
Details
View Map
Share
Follow
West Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on West Hill, Oxted.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 16:14.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 24 Mar 2025
Details
View Map
Share
Follow
Church Lane

UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Lane, Oxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 15:59.

London Borough Of Bromley logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Addington Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Addington Road, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 4 Nov 2024 at 11:44.

UK Power Networks South Eastern logo
Between
30 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Plough Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Plough Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Nov 2024 at 08:58.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Brook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:16.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 5 May 2025
Details
View Map
Share
Follow
Tupwood Scrubbs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:43.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 5 May 2025
Details
View Map
Share
Follow
Tupwood Scrubbs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 13:44.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Tupwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Lane, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 08:47.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Tupwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Lane, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 13:38.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Court Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 08:48.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Court Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 13:20.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Sylverdale Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Sylverdale Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:23.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Godstone Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Godstone Road, Kenley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:17.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
St James Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on St James Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:20.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Godstone Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Godstone Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:14.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Windham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Windham Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:21.

Southern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Rowdown Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rowdown Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:01.

Southern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
King Henry's Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Henry's Drive, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 15:33.

Transport for London (TfL) logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Edridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:24.

Thames Water logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Selsdon Road

Thames Water are proposing to carry out New service connection on Selsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:14.

Southern Gas Networks logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:16.

Southern Gas Networks logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Nelson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nelson Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:29.

Surrey County Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Outwood Lane

Surrey County Council are proposing to carry out Highway improvement works on Outwood Lane, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:08.

Southern Gas Networks logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Belvedere Road

Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.

Southern Gas Networks logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Belvedere Road

Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:20.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Sanderstead Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sanderstead Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:57.

Transport for London (TfL) logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Pump Pail South

Transport for London (TfL) are proposing to carry out Highway improvement works on Pump Pail South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 13:07.

Transport for London (TfL) logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
Wellesley Road

Transport for London (TfL) are proposing to carry out Utility asset works on Wellesley Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 11:02.

Transport for London (TfL) logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
George Street

Transport for London (TfL) are proposing to carry out Highway improvement works on George Street, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 11:22.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:48.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Stanley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Street, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:49.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:48.

Southern Gas Networks logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:26.

Southern Gas Networks logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 11:29.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Jail Lane

Thames Water were proposing to carry out New service connection on Jail Lane, Biggin Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:10.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Jail Lane

Thames Water are proposing to carry out New service connection on Jail Lane, Biggin Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:11.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Merrymeet

Surrey County Council are proposing to carry out Highway repair and maintenance works on Merrymeet, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 11:02.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Tonbridge Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tonbridge Close, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 11:10.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Downlands Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Downlands Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 10:43.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hall Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:41.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hall Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:02.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Featherbed Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Featherbed Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 07:01.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Selsdon Road

Southern Gas Networks are proposing to carry out New service connection on Selsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 12:55.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out New service connection on Chatsworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 07:01.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out New service connection on Chatsworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:10.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out New service connection on Chatsworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 15:33.

Transport for London (TfL) logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Pump Pail North

Transport for London (TfL) are proposing to carry out Highway improvement works on Pump Pail North, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:42.

UK Power Networks South Eastern logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 11:56.

UK Power Networks South Eastern logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
Sandy Lane South

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Sandy Lane South, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 11:53.

Southern Gas Networks logo
Between
20 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Harestone Valley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harestone Valley Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:00.

BT logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Sylverdale Road

BT are proposing to carry out Utility asset works on Sylverdale Road, Purley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 09:45.

Southern Gas Networks logo
Between
24 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:39.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Chaldon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chaldon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 12:40.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:30.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Stowell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stowell Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:02.

BT logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Brabazon Avenue

BT are proposing to carry out Utility asset works on Brabazon Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Nov 2024 at 14:52.


Roadworks Map near to Hillbury Gardens, WARLINGHAM, CR6 9TQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hillbury Gardens, WARLINGHAM, CR6 9TQ (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
LIMPSFIELD ROAD 
(0.5 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 18 Nov 2024 10:26
(Scheduled: 18 Nov 2024 - 29 Nov 2024)
0.5
Details
Share
Follow
2
Surrey County Council logo
GODSTONE ROAD 
(0.7 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 25 Nov 2024 20:00
(Scheduled: 25 Nov 2024 - 7 Dec 2024)
0.7
Details
Share
Follow
3
Virgin Media logo
URGENT
  
STATION ROAD 
(0.8 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
25 Nov 2024 14:15 - 14:55
0.8
Details
Share
4
Southern Gas Networks logo
EMERGENCY
  
GODSTONE ROAD 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 24 Nov 2024 21:30
(Scheduled: 24 Nov 2024 - 6 Dec 2024)
0.8
Details
Share
Follow
5
Surrey County Council logo
MAJOR
  
TITHEPIT SHAW LANE 
(0.9 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 19 Nov 2024 - 19 May 2025
0.9
Details
Share
Follow
6
Surrey County Council logo
MAJOR
  
TITHEPIT SHAW LANE 
(0.9 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 20 Nov 2024 20:00
(Scheduled: 19 Nov 2024 - 4 Dec 2024)
0.9
Details
Share
Follow
7
Surrey County Council logo
MAJOR
  
CROYDON ROAD 
(0.9 miles)
Surrey County Council
Works for road purposes - Footway - Two-way signals
In Progress
Since: 16 Sep 2024 07:00
(Scheduled: 16 Sep 2024 - 13 Dec 2024)
0.9
Details
Share
Follow
8
UK Power Networks South Eastern logo
FARLEIGH ROAD 
(0.9 miles)
UK Power Networks South Eastern
New service connection - Footway - Two-way signals
Planned
Scheduled: 21 Nov 2024 - 27 Nov 2024
0.9
Details
Share
Follow
9
UK Power Networks South Eastern logo
FARLEIGH ROAD 
(0.9 miles)
UK Power Networks South Eastern
New service connection - Footway - Two-way signals
Planned
Scheduled: 27 Nov 2024 - 29 Nov 2024
0.9
Details
Share
Follow
10
Surrey County Council logo
EMERGENCY
  
CHURCH ROAD 
(0.9 miles)
Surrey County Council
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 9 Oct 2024 11:20
(Scheduled: 9 Oct 2024 - 28 Nov 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.