ROADWORKS SUMMARY
Commonside East, MITCHAM, CR4 1HA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Commonside East, CR4 1HA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Commonside East, MITCHAM, CR4 1HA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Commonside East are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Sunday
Details
View Map
Share
Trinity Road

Thames Tideway Tunnel carried out Utility asset works on Trinity Road, Wandsworth, London.

These works were categorised as Major.

A lane was closed for some or all of the period.

The works were originally planned between 15 Feb 2021 and 21 Sep 2025 and were actually completed between 5 Mar 2021 (14:50) and 18 Sep 2025 (10:00). The works impacted the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 18 Sep 2025 at 10:29.

London Borough Of Wandsworth logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.

Southern Gas Networks logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Streatham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Streatham Road, Streatham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 05:40.

London Borough Of Wandsworth logo
LONG TERM
Until
27 Mar 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 27 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 08:43.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Salcott Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:42.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Winsham Grove

Thames Water were proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:42.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Jedburgh Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:41.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar 2025 and 8 Mar 2027
Details
View Map
Share
Duppas Hill Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Duppas Hill Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 8 March 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Mar 2025 at 12:33.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar 2025 and 8 Mar 2027
Details
View Map
Share
The Croydon Flyover

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on The Croydon Flyover, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 8 March 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 11:53.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Waddon Park Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Park Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.

Southern Gas Networks logo
LONG TERM
Between
12 May and 9 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 08:13.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 15:02.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Waddon Court Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Court Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Jun 2025 at 06:46.

Network Rail logo
LONG TERM
Between
14 Jul and 14 Nov 2025
Details
View Map
Share
Follow
West Street

Network Rail are proposing to carry out Works for Rail Purposes on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 15 Apr 2025 at 12:25.

London Borough Of Croydon logo
LONG TERM
Between
14 Jul and 15 Dec 2025
Details
View Map
Share
Follow
Park Lane

London Borough Of Croydon are proposing to carry out Highway improvement works on Park Lane, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:18.

London Borough Of Croydon logo
LONG TERM
Between
14 Jul and 15 Dec 2025
Details
View Map
Share
Follow
Park Lane

London Borough Of Croydon are proposing to carry out Highway improvement works on Park Lane, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Croydon on 9 Jul 2025 at 11:23.

London Borough Of Croydon logo
LONG TERM
Between
14 Jul and 15 Dec 2025
Details
View Map
Share
Follow
Wellesley Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Wellesley Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:14.

London Borough Of Croydon logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Wellesley Road

London Borough Of Croydon are carrying out Highway improvement works on Wellesley Road, Croydon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 28 Jul 2025 at 09:32.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Jul and 1 Dec 2025
Details
View Map
Share
Whitehorse Lane

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Whitehorse Lane, South Norwood, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jan 2025 at 14:00.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Jul and 12 Dec 2025
Details
View Map
Share
Follow
Falcon Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 22 May 2025 at 08:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Saxon Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Saxon Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Jul 2025 at 11:44.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
South Norwood Hill

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Jul 2025 at 13:15.

Southern Gas Networks logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Fishponds Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Fishponds Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 08:53 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 08:37.

Southern Gas Networks logo
LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 08:00 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 08:51.

London Borough Of Wandsworth logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Falcon Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 08:00 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 09:33.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Northey Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northey Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 10:15.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Northey Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Northey Avenue, Cheam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 July 2025 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 13:51.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 10:19.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 July 2025 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 09:49.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Belmont Rise

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Belmont Rise, Cheam.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 21 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 11:03.

UK Power Networks South Eastern logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Springfield Road

UK Power Networks South Eastern are carrying out New service connection on Springfield Road, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 09:41.

UK Power Networks South Eastern logo
LONG TERM
Between
28 Jul 2025 and 30 Jan 2026
Details
View Map
Share
Pawsons Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2025 at 16:54.

Southern Gas Networks logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Vectis Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Vectis Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 05:41.

Transport for London (TfL) logo
LONG TERM
Until
1 Nov 2025
Details
View Map
Share
Follow
Elmers End Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Elmers End Road, Penge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 08:00 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Jul 2025 at 08:05.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:07.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 10:17.

Transport for London (TfL) logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are carrying out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are carrying out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:06.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are carrying out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Beech Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beech Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 07:23.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane South, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 13:23.

Southern Gas Networks logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane South

Southern Gas Networks are carrying out Utility repair and maintenance works on Sandy Lane South, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 09:15 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 09:48.

Southern Gas Networks logo
LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Mitcham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Mitcham Road, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:32 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 10:31.

London Borough Of Lambeth logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
High Trees

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 7 May 2025 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:28.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Hillsboro Road

Thames Water are carrying out roadworks on Hillsboro Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:51.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are carrying out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:50.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Glengarry Road

Thames Water are carrying out Remedial works on Glengarry Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:50.

Thames Water logo
LONG TERM
Between
5 Aug 2025 and 5 Jan 2026
Details
View Map
Share
Follow
Salcott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

Thames Water logo
LONG TERM
Between
5 Aug and 16 Oct 2025
Details
View Map
Share
Follow
Jedburgh Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

Southern Gas Networks logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Wilbury Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Wilbury Avenue, Cheam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 08:00 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 08:55.

Southern Gas Networks logo
LONG TERM
Between
11 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Rochford Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochford Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:00.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 08:34.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:49.

Thames Water logo
LONG TERM
Between
12 Aug and 8 Oct 2025
Details
View Map
Share
Follow
Winsham Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.

Thames Water logo
LONG TERM
Between
12 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Mysore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Springfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Springfield Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Jun 2025 at 11:15.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Allenby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Allenby Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 10:34.

Thames Water logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Harbut Road

Thames Water are carrying out Utility repair and maintenance works on Harbut Road, Battersea, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 August 2025 at 10:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 14:57.

London Borough Of Sutton logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Richmond Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Richmond Road, Beddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Sutton on 3 Jul 2025 at 15:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 08:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 09:52.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Westwood Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Westwood Hill, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 09:00 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 12:02.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Allenby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Allenby Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:21.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:03.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 14:47.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:46.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 12:36.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 14:30.

Southern Gas Networks logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:22.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 09:49.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:18.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:10.

Southern Gas Networks logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 09:30 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:02.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 13:43.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 16:32.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 14:36.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Fullbrooks Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Fullbrooks Avenue, Worcester Park.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 12:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 12:49.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 29 Sep 2025
Details
View Map
Share
Follow
St Stephen's Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Stephen's Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 11:59.

Thames Water logo
LONG TERM
Between
26 Aug and 24 Nov 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:08.

Southern Gas Networks logo
LONG TERM
Until
14 Oct 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 11:47 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:50.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Lansdowne Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lansdowne Hill, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 23 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 13:31.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 09:00 and could run through until 23 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 09:20.

London Borough Of Sutton logo
Finishing
Today
Details
View Map
Share
Follow
Chiltern Road

London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Chiltern Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 17 Jul 2025 at 08:00.

Southern Gas Networks logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Crossways

Southern Gas Networks are carrying out Utility repair and maintenance works on Crossways, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 11:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:24.

Southern Gas Networks logo
LONG TERM
Between
28 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 10:05.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Norman Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 16:00.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Norman Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 13:24.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Prior Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prior Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:13.

Southern Gas Networks logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Princes Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Princes Avenue, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:31.

Southern Gas Networks logo
LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
Princes Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Princes Avenue, Carshalton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 13:00 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 15:01.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 16:20.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:48.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:04.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Ardrossan Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ardrossan Gardens, Worcester Park.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 11:48.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Ardrossan Gardens

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ardrossan Gardens, Worcester Park.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 21 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Ashburton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashburton Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Jun 2025 at 14:03.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 7 Dec 2025
Details
View Map
Share
Factory Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jul 2025 at 10:06.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 7 Dec 2025
Details
View Map
Share
Follow
Factory Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:56.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 7 Dec 2025
Details
View Map
Share
Follow
Factory Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 09:02.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 7 Dec 2025
Details
View Map
Share
Follow
Factory Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:23.

Southern Gas Networks logo
LONG TERM
Until
7 Dec 2025
Details
View Map
Share
Follow
Factory Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Factory Lane, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 08:53.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Kingsley Road

UK Power Networks South Eastern were proposing to carry out New service connection on Kingsley Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Jul 2025 at 14:11.

London Borough Of Croydon logo
LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 10 Jun 2025 at 09:48.

London Borough Of Croydon logo
LONG TERM
Between
1 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 18 Jun 2025 at 10:13.

London Borough Of Croydon logo
Between
1 and 28 Sep 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 10:00.

London Borough Of Croydon logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are carrying out Highway repair and maintenance works on Ampere Way, Croydon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 1 Sep 2025 at 08:01.

Southern Gas Networks logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Rochford Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Rochford Way, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:15 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:05.

Southern Gas Networks logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Boxley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boxley Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 08:06.

Southern Gas Networks logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Boxley Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Boxley Road, Morden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 29 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 08:33.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 16:32.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Fieldend Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Greenock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:26.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Churchmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Stockport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Woodmansterne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Seely Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seely Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:58.

London Borough Of Lambeth logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 27 May 2025 at 14:20.

Thames Water logo
LONG TERM
Between
1 Sep and 13 Oct 2025
Details
View Map
Share
Lordship Lane

Thames Water were proposing to carry out Utility asset works on Lordship Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:00.

Thames Water logo
LONG TERM
Until
13 Oct 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are carrying out Utility asset works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 14:15 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 16:03.

Transport for London (TfL) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 17:50.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 13:04.

Southern Gas Networks logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 07:30 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 07:58.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are carrying out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 August 2025 at 08:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Sep 2025 at 09:55.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Strasburg Road

Cadent Gas are proposing to carry out Utility asset works on Strasburg Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 15:26.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Ravenet Street

Cadent Gas are proposing to carry out Utility asset works on Ravenet Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 15:27.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Newtown Street

Cadent Gas are proposing to carry out Utility asset works on Newtown Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 15:27.

London Borough Of Lambeth logo
LONG TERM
Between
2 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 23 May 2025 at 14:25.

London Borough Of Lambeth logo
LONG TERM
Between
2 Sep and 1 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 30 May 2025 at 11:00.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Traps Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Traps Lane, New Malden.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 23:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 08:40.

T-Mobile (UK) logo
LONG TERM
Between
5 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Commonside Close

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Commonside Close, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 13 Jun 2025 at 07:34.

Southern Gas Networks logo
LONG TERM
Between
5 Sep and 6 Oct 2025
Details
View Map
Share
Hawkes Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 12:01.

Southern Gas Networks logo
LONG TERM
Between
5 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Wilson Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:56.

Southern Gas Networks logo
LONG TERM
Between
5 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Wilson Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 09:55.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:13.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
The Warren

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Warren, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:12.

Southern Gas Networks logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are carrying out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 13:00 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:26.

Southern Gas Networks logo
LONG TERM
Until
20 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are carrying out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 16:45 and could run through until 20 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 08:40.

UK Power Networks South Eastern logo
LONG TERM
Between
8 Sep 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Pawsons Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Aug 2025 at 13:18.

Southern Gas Networks logo
Between
8 and 29 Sep 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 11:59.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:07.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 15:14.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:11.

London Borough Of Wandsworth logo
Finishing
Tuesday
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Openview, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Sep 2025 at 16:37.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:35.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:36.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:02.

UK Power Networks Eastern & London logo
Between
8 Sep and 4 Oct 2025
Details
View Map
Share
Sudlow Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Sudlow Road, Wandsworth, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 4 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2025 at 15:18.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Plough Road

Thames Water are proposing to carry out Utility repair and maintenance works on Plough Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:25.

Cadent Gas logo
Between
8 and 29 Sep 2025
Details
View Map
Share
Follow
Strasburg Road

Cadent Gas are proposing to carry out Utility asset works on Strasburg Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:02.

Cadent Gas logo
Between
8 and 29 Sep 2025
Details
View Map
Share
Follow
Ravenet Street

Cadent Gas are proposing to carry out Utility asset works on Ravenet Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:00.

Cadent Gas logo
Between
8 and 29 Sep 2025
Details
View Map
Share
Follow
Newtown Street

Cadent Gas are proposing to carry out Utility asset works on Newtown Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:00.

Southern Gas Networks logo
Until
6 Oct 2025
Details
View Map
Share
Follow
South Rise

Southern Gas Networks are carrying out Utility repair and maintenance works on South Rise, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 09:26.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Westwood Hill

Southern Gas Networks are carrying out Permanent reinstatement on Westwood Hill, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 12:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 12:04.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Carslake Road

Thames Water are carrying out Utility repair and maintenance works on Carslake Road, Putney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 18:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 14:49.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Sep and 6 Nov 2025
Details
View Map
Share
Follow
Bungalow Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jul 2025 at 14:13.

UK Power Networks South Eastern logo
Finishing
Tuesday
Details
View Map
Share
South Norwood Hill

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 September 2025 and run through until 23 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jan 2025 at 13:59.

UK Power Networks Eastern & London logo
Between
12 and 29 Sep 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 20:12.

Southern Gas Networks logo
LONG TERM
Between
12 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:22.

Southern Gas Networks logo
LONG TERM
Between
12 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:55.

Southern Gas Networks logo
LONG TERM
Between
12 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:21.

Southern Gas Networks logo
LONG TERM
Between
12 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:53.

Southern Gas Networks logo
Between
12 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 11:16.

Southern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Chiltern Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chiltern Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 11:30.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Woodcote Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Green, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 12:29.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Woodcote Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Green, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 13:32.

Southern Gas Networks logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Woodcote Green

Southern Gas Networks are carrying out Utility repair and maintenance works on Woodcote Green, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:30 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 11:21.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Upper Selsdon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Upper Selsdon Road, Croydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 19:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 10:11.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Oaks Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 17:11.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Fir Tree Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fir Tree Grove, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 17:03.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 07:45.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Cedar Road, Sutton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Sep 2025 at 07:08.

London Borough Of Croydon logo
LONG TERM
Between
15 Sep 2025 and 30 Jan 2026
Details
View Map
Share
Follow
George Street

London Borough Of Croydon are proposing to carry out Highway improvement works on George Street, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:16.

London Borough Of Croydon logo
LONG TERM
Between
15 Sep 2025 and 30 Jan 2026
Details
View Map
Share
Follow
George Street

London Borough Of Croydon are proposing to carry out Highway improvement works on George Street, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 15 Jul 2025 at 09:58.

London Borough Of Croydon logo
Between
15 Sep and 12 Oct 2025
Details
View Map
Share
Ampere Way

London Borough Of Croydon were proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 08:11.

Southern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 13:02.

London Borough Of Croydon logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Beulah Crescent

London Borough Of Croydon are proposing to carry out Section 50 on Beulah Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 10 Sep 2025 at 12:47.

London Borough Of Croydon logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
Beulah Crescent

London Borough Of Croydon are carrying out Section 50 on Beulah Crescent, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 15 Sep 2025 at 10:50.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Fieldgate Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldgate Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footpath only.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 05:49.

Thames Water logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Western Road

Thames Water are carrying out Disconnection or alteration of supply on Western Road, Mitcham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 08:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 08:28.

Southern Gas Networks logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Westminster Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westminster Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:59.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Hawkes Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 12:54.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Belvedere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:49.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Belvedere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:26.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Belvedere Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Belvedere Road, Anerley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:20 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 10:38.

London Borough Of Merton logo
Finishing
Today
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 1 Jul 2025 at 07:50.

London Borough Of Merton logo
Finishing
Today
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 9 Jul 2025 at 08:30.

London Borough Of Merton logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 15 Jul 2025 at 10:46.

London Borough Of Merton logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are carrying out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 20:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 16 Sep 2025 at 08:07.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 08:11.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 09:26.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 14:42.

Southern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 15:24.

Thames Water logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are carrying out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 11:00 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 12:07.

Thames Water logo
Until
13 Oct 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are carrying out Utility repair and maintenance works on Barry Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 18:00 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 08:11.

Cadent Gas logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Strasburg Road

Cadent Gas are proposing to carry out Utility asset works on Strasburg Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 15:23.

Cadent Gas logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Ravenet Street

Cadent Gas are proposing to carry out Utility asset works on Ravenet Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 15:21.

Cadent Gas logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Newtown Street

Cadent Gas were proposing to carry out Utility asset works on Newtown Street, Battersea, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 10:50.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Capri Road

Thames Water are carrying out Utility repair and maintenance works on Capri Road, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 10:41 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 11:59.

Thames Water logo
Until
29 Sep 2025
Details
View Map
Share
Follow
Milford Gardens

Thames Water are carrying out Utility repair and maintenance works on Milford Gardens, Croydon.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 09:52 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 12:13.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Buckingham Avenue

Thames Water are carrying out Utility repair and maintenance works on Buckingham Avenue, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 21:09 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:37.

London Borough Of Croydon logo
Finishing
Today
Details
View Map
Share
Follow
Rockmount Road

London Borough Of Croydon are carrying out Highway repair and maintenance works on Rockmount Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 09:30 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 16 Sep 2025 at 09:43.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
St Mary's Road

Southern Gas Networks are carrying out Utility repair and maintenance works on St Mary's Road, Wimbledon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 17:30 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 09:54.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Belvedere Drive

Southern Gas Networks are carrying out roadworks on Belvedere Drive, Wimbledon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 17:30 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 09:55.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Follow
Queensmere Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Queensmere Road, Southfields, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 08:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 18 Sep 2025 at 16:00.

Thames Water logo
Until
14 Oct 2025
Details
View Map
Share
Follow
Larkhall Rise

Thames Water are carrying out Utility repair and maintenance works on Larkhall Rise, Clapham Town, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 10:00 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 11:33.

Thames Water logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Malden Way

Thames Water are carrying out Utility repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 08:35 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 09:59.

Southern Gas Networks logo
Between
17 and 25 Sep 2025
Details
View Map
Share
Follow
Croxden Walk

Southern Gas Networks are proposing to carry out New service connection on Croxden Walk, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 08:27.

Southern Gas Networks logo
Between
17 and 25 Sep 2025
Details
View Map
Share
Follow
Croxden Walk

Southern Gas Networks are proposing to carry out New service connection on Croxden Walk, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:58.

Transport for London (TfL) logo
Monday
Details
View Map
Share
Purley Way

Transport for London (TfL) carried out Highway repair and maintenance works on Purley Way, Croydon.

A lane was closed for some or all of the period.

The works were originally planned between 18 Sep 2025 and 22 Sep 2025 and were actually completed on 18 Sep 2025 between 20:32 and 20:41. The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 20:49.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:23.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are carrying out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 08:00 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 08:02.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:24.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are carrying out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 08:00 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 08:02.

Southern Gas Networks logo
Between
19 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Martin Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 11:27.

Thames Water logo
LONG TERM
Between
19 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Tarbert Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Tarbert Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.

London Borough Of Hammersmith & Fulham logo
Between
19 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Woolneigh Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 14:54.

London Borough Of Hammersmith & Fulham logo
Between
19 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Woolneigh Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 15:40.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
19 Sep and 20 Nov 2025
Details
View Map
Share
Follow
Woolneigh Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 09:25.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
19 Sep and 20 Nov 2025
Details
View Map
Share
Woolneigh Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 20 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 14:58.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
19 Sep and 20 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 09:25.

Southern Gas Networks logo
LONG TERM
Between
21 Sep and 1 Dec 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 10:35.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Farm Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Lane, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 12:07.

Southern Gas Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 12:19.

Southern Gas Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:27.

Southern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
The Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridge, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 12:05.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Warren Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 07:04.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 30 Nov 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:59.

Southern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
The Warren

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Warren, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:56.

Southern Gas Networks logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
The Newlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Newlands, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 15:47.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Glebe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 15 Dec 2025
Details
View Map
Share
Follow
Sandy Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Jun 2025 at 07:16.

London Borough Of Croydon logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Wentworth Road

London Borough Of Croydon were proposing to carry out Highway improvement works on Wentworth Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:29.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Cloister Gardens

BT were proposing to carry out Utility asset works on Cloister Gardens, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Jul 2025 at 12:02.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Cleaverholme Close

BT were proposing to carry out Utility asset works on Cleaverholme Close, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Jul 2025 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 12:18.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Church Place

Thames Water are proposing to carry out New service connection on Church Place, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 07:11.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Bond Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bond Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 15:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 15:00.

London Borough Of Wandsworth logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Amen Corner

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Amen Corner, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Jun 2025 at 09:31.

London Borough Of Wandsworth logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Amen Corner

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Amen Corner, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Jun 2025 at 08:04.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 2 Nov 2025
Details
View Map
Share
Follow
St Anns Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:01.

Thames Water logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Abbeville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 13:52.

Thames Water logo
LONG TERM
Between
23 Sep 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Alton Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Alton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 12 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:54.

London Borough Of Croydon logo
Between
23 and 27 Sep 2025
Details
View Map
Share
Outram Road

London Borough Of Croydon were proposing to carry out Highway improvement works on Outram Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:29.

Thames Water logo
LONG TERM
Between
23 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Adderley Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Adderley Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:46.

Thames Water logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Stephendale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Stephendale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 14:55.

Thames Water logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Stephendale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Stephendale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 08:41.

London Borough Of Croydon logo
Between
25 Sep and 1 Oct 2025
Details
View Map
Share
Monahan Avenue

London Borough Of Croydon were proposing to carry out Highway improvement works on Monahan Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:31.

Thames Water logo
Between
25 and 30 Sep 2025
Details
View Map
Share
Follow
Park Street

Thames Water are proposing to carry out Utility repair and maintenance works on Park Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jul 2025 at 12:25.

London Borough Of Croydon logo
Between
26 Sep and 2 Oct 2025
Details
View Map
Share
Purley Knoll

London Borough Of Croydon were proposing to carry out Highway improvement works on Purley Knoll, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:31.

Transport for London (TfL) logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Spring Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Spring Park Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 08:43.

Transport for London (TfL) logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Wickham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wickham Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 09:35.

Transport for London (TfL) logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
West Way Gardens

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Way Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 08:42.

Transport for London (TfL) logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Verdayne Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Verdayne Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 08:42.

UK Power Networks South Eastern logo
LONG TERM
Between
26 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Whitehorse Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Whitehorse Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:23.

Southern Gas Networks logo
LONG TERM
Between
26 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 08:39.

Southern Gas Networks logo
LONG TERM
Between
26 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 08:39.

London Borough Of Wandsworth logo
Between
26 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Mitcham Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Jun 2025 at 09:31.

London Borough Of Wandsworth logo
Between
26 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Mitcham Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Jun 2025 at 08:02.

Murphy Power Distribution logo
Between
26 and 29 Sep 2025
Details
View Map
Share
Follow
Hoyle Road

Murphy Power Distribution are proposing to carry out Utility asset works on Hoyle Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 4 Sep 2025 at 08:41.

Murphy Power Distribution logo
Between
26 and 29 Sep 2025
Details
View Map
Share
Follow
Hoyle Road

Murphy Power Distribution are proposing to carry out Utility asset works on Hoyle Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 4 Sep 2025 at 09:35.

Murphy Power Distribution logo
Between
26 and 29 Sep 2025
Details
View Map
Share
Follow
Tooting High Street

Murphy Power Distribution are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Murphy Power Distribution on 3 Sep 2025 at 14:21.

Murphy Power Distribution logo
Between
26 and 29 Sep 2025
Details
View Map
Share
Follow
Tooting High Street

Murphy Power Distribution are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Murphy Power Distribution on 16 Sep 2025 at 13:27.

Southern Gas Networks logo
LONG TERM
Between
27 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:34.

Southern Gas Networks logo
LONG TERM
Between
27 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:12.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Furzedown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Furzedown Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 10:33.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:10.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Chiltern Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chiltern Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:57.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:58.

Southern Gas Networks logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Avenue Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avenue Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 09:39.

Southern Gas Networks logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Arundel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arundel Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:22.

Southern Gas Networks logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Arundel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arundel Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:24.

Thames Water logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Lysander Road

Thames Water are proposing to carry out New service connection on Lysander Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:38.

Thames Water logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Lysander Road

Thames Water are proposing to carry out New service connection on Lysander Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 08:16.

London Borough Of Sutton logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 1 Jul 2025 at 11:55.

London Borough Of Sutton logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Langley Park Road

London Borough Of Sutton were proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 8 Sep 2025 at 10:53.

London Borough Of Sutton logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 11 Sep 2025 at 15:12.

London Borough Of Croydon logo
Between
29 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 22 Aug 2025 at 11:02.

London Borough Of Croydon logo
Between
29 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 16:09.

Southern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Peterborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peterborough Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 15:29.

UK Power Networks South Eastern logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Dagnall Park

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagnall Park, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:40.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 13:18.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:44.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 10:21.

Thames Water logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Oak Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 18:43.

Thames Water logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Oak Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 15:44.

Cellnex OT UK logo
LONG TERM
Between
29 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Meaford Way

Cellnex OT UK are proposing to carry out Utility asset works on Meaford Way, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 12 Jun 2025 at 12:06.

Cellnex OT UK logo
LONG TERM
Between
29 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Meaford Way

Cellnex OT UK are proposing to carry out Utility asset works on Meaford Way, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 19 Jun 2025 at 11:29.

Southern Gas Networks logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 13:01.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 13:02.

Southern Gas Networks logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Gateside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gateside Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 09:59.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Atheldene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 08:15.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Atheldene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 07:45.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:56.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 09:46.

Electricity Network Company logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Oakshaw Road

Electricity Network Company are proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Jul 2025 at 08:19.

Electricity Network Company logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Oakshaw Road

Electricity Network Company are proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 Jul 2025 at 10:13.

Thames Water logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Plough Lane

Thames Water are proposing to carry out Utility asset works on Plough Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:56.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:45.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:04.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
West Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on West Hill Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 15:07.

Southern Gas Networks logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:47.

Southern Gas Networks logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:03.

Thames Water logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Harbut Road

Thames Water were proposing to carry out Utility repair and maintenance works on Harbut Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 10:24.

Thames Water logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Yelverton Road

Thames Water are proposing to carry out Utility asset works on Yelverton Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:35.

Thames Water logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Yelverton Road

Thames Water are proposing to carry out Utility asset works on Yelverton Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 14:18.

Network Rail logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 May 2025 at 09:03.

Network Rail logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Aug 2025 at 22:28.

Southern Gas Networks logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:57.

Thames Water logo
Between
30 Sep and 6 Oct 2025
Details
View Map
Share
Follow
St Julian's Farm Road

Thames Water are proposing to carry out Disconnection or alteration of supply on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 10:00.

Thames Water logo
Between
30 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Casewick Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Casewick Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:59.

Network Rail logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Ferndale Road

Network Rail are proposing to carry out Works for Rail Purposes on Ferndale Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Jul 2025 at 10:32.

Thames Water logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Glenrosa Street

Thames Water are proposing to carry out Utility repair and maintenance works on Glenrosa Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 14:55.

Thames Water logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Glenrosa Street

Thames Water are proposing to carry out Utility repair and maintenance works on Glenrosa Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 08:41.

London Borough Of Hammersmith & Fulham logo
Between
30 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Townmead Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Townmead Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 17 Sep 2025 at 10:26.

UK Power Networks South Eastern logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Dagmar Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Dagmar Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 14:56.

Thames Water logo
LONG TERM
Between
2 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Tregarvon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Tregarvon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:48.

London Borough Of Wandsworth logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Grant Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Grant Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Jun 2025 at 08:42.

London Borough Of Hammersmith & Fulham logo
Between
2 and 30 Oct 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Sep 2025 at 14:33.

Transport for London (TfL) logo
Between
2 and 13 Oct 2025
Details
View Map
Share
Battersea Park Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2025 and run through until 13 October 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:08.

Transport for London (TfL) logo
Between
2 and 9 Oct 2025
Details
View Map
Share
Cambridge Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2025 and run through until 9 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:20.

Southern Gas Networks logo
LONG TERM
Between
3 Oct 2025 and 16 Mar 2026
Details
View Map
Share
Follow
Russell Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Russell Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 16 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:35.

Murphy Power Distribution logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Hoyle Road

Murphy Power Distribution are proposing to carry out Utility asset works on Hoyle Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 4 Sep 2025 at 08:40.

Murphy Power Distribution logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Hoyle Road

Murphy Power Distribution are proposing to carry out Utility asset works on Hoyle Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 4 Sep 2025 at 09:36.

Murphy Power Distribution logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Tooting High Street

Murphy Power Distribution are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Murphy Power Distribution on 3 Sep 2025 at 14:22.

Murphy Power Distribution logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Tooting High Street

Murphy Power Distribution are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Murphy Power Distribution on 16 Sep 2025 at 13:26.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Penwortham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 10:11.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 07:03.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 13:01.

Southern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 12:03.

Southern Gas Networks logo
Between
6 and 26 Oct 2025
Details
View Map
Share
Follow
Lavender Vale

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lavender Vale, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 13:19.

London Borough Of Sutton logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 10 Sep 2025 at 14:45.

London Borough Of Sutton logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 11 Sep 2025 at 15:12.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Howard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Howard Road, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:32.

Southern Gas Networks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 12:44.

Southern Gas Networks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:30.

Southern Gas Networks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 16:26.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Melrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Melrose Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:33.

UK Power Networks Eastern & London logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Westow Hill

UK Power Networks Eastern & London were proposing to carry out New service connection on Westow Hill, Gipsy Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 09:56.

Thames Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 16:29.

Thames Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:10.

Thames Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:35.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Waverton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:55.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Longstaff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 12:34.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Longstaff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:42.

Thames Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Southfields Road

Thames Water are proposing to carry out New service connection on Southfields Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 12:32.

Thames Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 09:43.

Thames Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 08:57.

Thames Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
The Pavement

Thames Water were proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 15:28.

Thames Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Stephendale Road

Thames Water are proposing to carry out New service connection on Stephendale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 07:51.

Southern Gas Networks logo
Between
7 and 21 Oct 2025
Details
View Map
Share
Follow
Furzedown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Furzedown Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 21 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:56.

Southern Gas Networks logo
Between
7 and 21 Oct 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 21 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:57.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Oct 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Pawsons Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 14:44.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Woodland Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Woodland Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Jul 2025 at 23:34.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Woodland Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Woodland Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 5 Aug 2025 at 09:57.

Transport for London (TfL) logo
Between
7 and 18 Oct 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 18 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:00.

BT logo
Between
9 and 13 Oct 2025
Details
View Map
Share
Abbey Road

BT were proposing to carry out Utility asset works on Abbey Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 October 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2025 at 09:35.

London Borough Of Hammersmith & Fulham logo
Between
9 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 09:15.

Transport for London (TfL) logo
Between
9 and 18 Oct 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 18 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:54.

Transport for London (TfL) logo
Between
9 and 15 Oct 2025
Details
View Map
Share
Follow
Colestown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Colestown Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:09.

Transport for London (TfL) logo
Between
9 and 17 Oct 2025
Details
View Map
Share
Follow
Colestown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Colestown Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:18.

Transport for London (TfL) logo
Between
9 and 15 Oct 2025
Details
View Map
Share
Follow
Banbury Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Banbury Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:10.

Transport for London (TfL) logo
Between
9 and 17 Oct 2025
Details
View Map
Share
Follow
Banbury Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Banbury Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:16.

Transport for London (TfL) logo
Between
9 and 15 Oct 2025
Details
View Map
Share
Follow
Bridge Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Bridge Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:17.

Transport for London (TfL) logo
Between
9 and 17 Oct 2025
Details
View Map
Share
Follow
Bridge Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Bridge Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:14.

Transport for London (TfL) logo
Between
9 and 17 Oct 2025
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:41.

Transport for London (TfL) logo
Between
9 and 17 Oct 2025
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:20.

Transport for London (TfL) logo
Between
9 and 15 Oct 2025
Details
View Map
Share
Follow
Rosenau Crescent

Transport for London (TfL) are proposing to carry out Highway improvement works on Rosenau Crescent, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:16.

Transport for London (TfL) logo
Between
9 and 15 Oct 2025
Details
View Map
Share
Follow
Rosenau Crescent

Transport for London (TfL) are proposing to carry out Highway improvement works on Rosenau Crescent, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:10.

Transport for London (TfL) logo
Between
9 and 16 Oct 2025
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:56.

Transport for London (TfL) logo
Between
9 and 15 Oct 2025
Details
View Map
Share
Follow
Kersley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kersley Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:24.

Transport for London (TfL) logo
Between
9 and 16 Oct 2025
Details
View Map
Share
Follow
Kersley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kersley Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:58.

Transport for London (TfL) logo
Between
9 and 15 Oct 2025
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 12:51.

Thames Water logo
LONG TERM
Between
10 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Bowood Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Bowood Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:01.

Transport for London (TfL) logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:02.

Transport for London (TfL) logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:33.

Transport for London (TfL) logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:12.

Transport for London (TfL) logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
11 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:31.

Transport for London (TfL) logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 13:57.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Purley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Purley Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:26.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Purley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Purley Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2025 at 15:19.

Thames Water logo
Between
12 and 16 Oct 2025
Details
View Map
Share
Follow
Balham Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 12:24.

Southern Gas Networks logo
Between
13 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:10.

Southern Gas Networks logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Fairlawn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Road, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:08.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 22 Dec 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 12:38.

UK Power Networks South Eastern logo
Between
13 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Croham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croham Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Aug 2025 at 21:11.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Laburnum Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Laburnum Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 14:57.

London Borough Of Lambeth logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Emmanuel Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Emmanuel Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Jul 2025 at 11:26.

Southern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 14:42.

Southern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 14:10.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Wilna Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:55.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Wilna Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 07:23.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Inman Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Inman Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:56.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Inman Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Inman Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 14:41.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Dingwall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dingwall Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 14:04.

Thames Water logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Abbeville Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 09:00.

Thames Water logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Abbeville Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 07:11.

Thames Water logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Abbeville Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 07:17.

Thames Water logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Abbeville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 07:31.

Transport for London (TfL) logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 17:21.

Transport for London (TfL) logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 08:30.

London Borough Of Lambeth logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Cottage Grove

London Borough Of Lambeth are proposing to carry out Core Sampling on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 9 Jul 2025 at 15:59.

London Borough Of Southwark logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Lordship Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 14:33.

Transport for London (TfL) logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 14:37.

Transport for London (TfL) logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 17:21.

Transport for London (TfL) logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 08:33.

Transport for London (TfL) logo
Between
15 and 18 Oct 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out roadworks on Malden Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 15:37.

Transport for London (TfL) logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:54.

Electricity Network Company logo
Between
15 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Garratt Lane

Electricity Network Company are proposing to carry out Utility asset works on Garratt Lane, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Jul 2025 at 08:31.

London Borough Of Croydon logo
LONG TERM
Between
16 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Lansdowne Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Lansdowne Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:16.

London Borough Of Croydon logo
LONG TERM
Between
16 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Lansdowne Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Lansdowne Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 15 Jul 2025 at 09:59.

London Borough Of Croydon logo
LONG TERM
Between
16 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Dingwall Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Dingwall Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:17.

London Borough Of Croydon logo
LONG TERM
Between
16 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Dingwall Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Dingwall Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 15 Jul 2025 at 10:08.

Transport for London (TfL) logo
Between
16 and 24 Oct 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:31.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:00.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:13.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:16.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
19 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Streatham Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 10:09.

Southern Gas Networks logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 11:30.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Southway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:21.

Southern Gas Networks logo
Between
20 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 14:24.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:24.

Southern Gas Networks logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:19.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ingleton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 16:20.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Fullerton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 16:19.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 16:05.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 12:19.

Southern Gas Networks logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 16:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 14:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Mackenzie Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Mackenzie Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 11:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 14:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 12:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 16:17.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 19:09.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 09:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Leopold Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Leopold Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Aug 2025 at 14:19.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Leopold Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Leopold Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 08:39.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Gleneldon Road

London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:13.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Gleneldon Road

London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:16.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Gleneldon Road

London Borough Of Lambeth are proposing to carry out Works for road purposes on Gleneldon Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:22.

Southern Gas Networks logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 14:10.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
St Anns Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:36.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Falcon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:10.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Falcon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 15:50.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 14:59.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2025 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 14:56.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 14:58.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2025 at 14:27.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 15:50.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Oct and 20 Nov 2025
Details
View Map
Share
Follow
Duppas Road

UK Power Networks South Eastern are proposing to carry out New service connection on Duppas Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 09:05.

Thames Water logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Trossachs Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Trossachs Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.

London Borough Of Croydon logo
Between
22 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 16 Sep 2025 at 15:24.

London Borough Of Croydon logo
Between
22 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 17 Sep 2025 at 07:26.

London Borough Of Croydon logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 10 Sep 2025 at 09:15.

London Borough Of Croydon logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Ampere Way

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 10 Sep 2025 at 10:19.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Onslow Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:42.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Onslow Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:26.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Blenheim Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 13:08.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Blenheim Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:23.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Milton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:36.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Milton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:27.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Stafford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stafford Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:33.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Stafford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stafford Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:20.

Thames Water logo
Between
25 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Lower Addiscombe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lower Addiscombe Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 16:08.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Bert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bert Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:57.

Transport for London (TfL) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:01.

Transport for London (TfL) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:14.

Transport for London (TfL) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:16.

Transport for London (TfL) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:01.

Thames Water logo
Between
25 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Long Road

Thames Water are proposing to carry out Utility repair and maintenance works on Long Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 14:56.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 10:46.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Farm Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Lane, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 15:14.

Southern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
The Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridge, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 14:50.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Heathhurst Road

Southern Gas Networks are proposing to carry out New service connection on Heathhurst Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 11:53.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Heathhurst Road

Southern Gas Networks are proposing to carry out New service connection on Heathhurst Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 08:59.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out New service connection on Brambledown Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:06.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out New service connection on Brambledown Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 13:07.

Southern Gas Networks logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 16:31.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Aberdeen Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberdeen Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 07:06.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Wiltshire Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 12:13.

London Borough Of Merton logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cricket Green

London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 29 Oct 2024 at 16:15.

London Borough Of Merton logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cricket Green

London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Dec 2024 at 07:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 09:52.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Summerstown

Thames Water are proposing to carry out New service connection on Summerstown, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:22.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:28.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:38.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 22:40.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:35.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 13:41.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Tierney Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Tierney Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 11:52.

London Borough Of Wandsworth logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Balham Park Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Aug 2025 at 12:26.

London Borough Of Wandsworth logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Balham Park Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 31 Jul 2025 at 15:16.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Streatham Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 13:01.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:18.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:36.

Southern Gas Networks logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Wilna Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 08:41.

Southern Gas Networks logo
Between
27 Oct and 23 Nov 2025
Details
View Map
Share
Follow
St Anns Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:46.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Marcilly Road

Thames Water are proposing to carry out Utility repair and maintenance works on Marcilly Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 10:42.

Transport for London (TfL) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Clapham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:30.

Transport for London (TfL) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Edgeley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 12:44.

Thames Water logo
LONG TERM
Between
28 Oct 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Marjorie Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Marjorie Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:46.

Transport for London (TfL) logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Clapham Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:47.

UK Power Networks South Eastern logo
LONG TERM
Between
29 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Dagmar Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagmar Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 12:07.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:52.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:55.

UK Power Networks South Eastern logo
LONG TERM
Between
30 Oct 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Bungalow Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Sep 2025 at 12:41.

UK Power Networks South Eastern logo
LONG TERM
Between
30 Oct 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Bungalow Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Sep 2025 at 12:05.

UK Power Networks South Eastern logo
LONG TERM
Between
31 Oct and 19 Dec 2025
Details
View Map
Share
South Norwood Hill

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 15:00.

London Borough Of Hammersmith & Fulham logo
Between
31 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Sep 2025 at 14:33.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:17.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 15:59.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:14.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:02.

Transport for London (TfL) logo
Between
2 and 6 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 14:27.

London Borough Of Lambeth logo
Between
2 and 6 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 6 November 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.

Southern Gas Networks logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Cliff End

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff End, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:28.

Southern Gas Networks logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Cliff End

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff End, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:12.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Kayemoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kayemoor Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 13:28.

UK Power Networks South Eastern logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Croham Valley Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croham Valley Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Aug 2025 at 21:48.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 29 Dec 2025
Details
View Map
Share
Follow
Willis Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 29 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 13:28.

Southern Gas Networks logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Alberta Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:24.

Southern Gas Networks logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Southbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 14:32.

Southern Gas Networks logo
Between
3 and 20 Nov 2025
Details
View Map
Share
Follow
Southbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 08:57.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Lower Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Lower Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Jul 2025 at 08:22.

UK Power Networks South Eastern logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Trent Way

UK Power Networks South Eastern are proposing to carry out New service connection on Trent Way, Worcester Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Jul 2025 at 16:12.

UK Power Networks South Eastern logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Leighton Street

UK Power Networks South Eastern are proposing to carry out Utility asset works on Leighton Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2025 at 11:28.

London Borough Of Croydon logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Bingham Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 18 Sep 2025 at 07:15.

London Borough Of Croydon logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Bingham Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 18 Sep 2025 at 07:37.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 8 Sep 2025 at 11:58.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 25 Jun 2025 at 11:05.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 23 Jul 2025 at 07:32.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 30 Jul 2025 at 12:57.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 7 Aug 2025 at 11:44.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 15 Aug 2025 at 15:06.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 16:37.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Canterbury Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 24 Jun 2025 at 12:53.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Canterbury Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 22 Jul 2025 at 14:11.

London Borough Of Croydon logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Canterbury Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 11 Sep 2025 at 11:51.

Network Rail logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Jun 2025 at 09:05.

London Borough Of Wandsworth logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Garratt Lane

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Garratt Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 8 Sep 2025 at 09:07.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Atheldene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:45.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Farlton Road

Southern Gas Networks were proposing to carry out roadworks on Farlton Road, Earlsfield, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 10:53.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:35.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:22.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Dingwall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dingwall Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 11:27.

Thames Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Gilkes Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:10.

Thames Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Gilkes Crescent

Thames Water were proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 07:23.

Thames Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Gilkes Crescent

Thames Water were proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 07:07.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Holman Road

Thames Water are proposing to carry out Utility asset works on Holman Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:35.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Holman Road

Thames Water are proposing to carry out Utility asset works on Holman Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 08:04.

UK Power Networks South Eastern logo
Between
4 and 20 Nov 2025
Details
View Map
Share
Follow
Princess Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Princess Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2025 at 12:26.

Thames Water logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Forthbridge Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forthbridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 14:57.

BT logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Thesiger Road

BT are proposing to carry out Utility asset works on Thesiger Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Aug 2025 at 12:16.

BT logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Thesiger Road

BT are proposing to carry out Utility asset works on Thesiger Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Aug 2025 at 13:39.

Thames Water logo
LONG TERM
Between
7 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 13:12.

London Borough Of Hammersmith & Fulham logo
Between
7 and 26 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 09:15.

Transport for London (TfL) logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 15:59.

Transport for London (TfL) logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:16.

Transport for London (TfL) logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 November 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:17.

Transport for London (TfL) logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:03.

Southern Gas Networks logo
LONG TERM
Between
10 Nov 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Russell Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Russell Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 09:42.

Southern Gas Networks logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 13:16.

Network Rail logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
Shorts Road

Network Rail are proposing to carry out Works for Rail Purposes on Shorts Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jul 2025 at 14:01.

Network Rail logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
Shorts Road

Network Rail are proposing to carry out Works for Rail Purposes on Shorts Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Aug 2025 at 12:09.

Thames Water logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Glenthorne Avenue

Thames Water are proposing to carry out New service connection on Glenthorne Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 13:38.

Thames Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 16:26.

Thames Water logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Gilkes Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 09:36.

Southern Gas Networks logo
Between
10 and 18 Nov 2025
Details
View Map
Share
Follow
Colwell Road

Southern Gas Networks are proposing to carry out New service connection on Colwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 09:44.

Thames Water logo
Between
11 and 24 Nov 2025
Details
View Map
Share
Casewick Road

Thames Water were proposing to carry out Utility repair and maintenance works on Casewick Road, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 24 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 15:52.

Thames Water logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Willett Place

Thames Water are proposing to carry out Remedial works on Willett Place, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:14.

London Borough Of Wandsworth logo
Between
12 and 17 Nov 2025
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Sep 2025 at 08:14.

Cadent Gas logo
LONG TERM
Between
12 Nov 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Ingrave Street

Cadent Gas are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:08.

Cadent Gas logo
LONG TERM
Between
12 Nov 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Wye Street

Cadent Gas are proposing to carry out Utility asset works on Wye Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:06.

Thames Water logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Wimbledon Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wimbledon Hill Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 08:18.

London Borough Of Southwark logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.

Thames Water logo
LONG TERM
Between
13 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Shelgate Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Shelgate Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:06.

Southern Gas Networks logo
LONG TERM
Between
14 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Selcroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selcroft Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:17.

Southern Gas Networks logo
LONG TERM
Between
14 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Selcroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selcroft Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:16.

Thames Water logo
LONG TERM
Between
14 Nov 2025 and 29 Jan 2026
Details
View Map
Share
Follow
Marmion Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Marmion Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 29 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:06.

London Borough Of Croydon logo
Between
15 and 21 Nov 2025
Details
View Map
Share
Follow
Bingham Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 18 Sep 2025 at 07:16.

London Borough Of Croydon logo
Between
15 and 21 Nov 2025
Details
View Map
Share
Follow
Bingham Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 18 Sep 2025 at 07:45.

Transport for London (TfL) logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:00.

Transport for London (TfL) logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 November 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:17.

Transport for London (TfL) logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:17.

Transport for London (TfL) logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:04.

UK Power Networks South Eastern logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Kings Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Kings Road, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2025 at 20:53.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 15:11.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Edgar Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Edgar Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:46.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:23.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Glebe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:15.

UK Power Networks South Eastern logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Newhaven Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2025 at 12:43.

UK Power Networks South Eastern logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Newhaven Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Sep 2025 at 12:54.

Southern Gas Networks logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Tamworth Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tamworth Lane, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 11:59.

Southern Gas Networks logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Bond Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bond Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 15:58.

Southern Gas Networks logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Follow
Oakshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakshaw Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:34.

Southern Gas Networks logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Follow
Waverton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:34.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 08:53.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 10:43.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 14:55.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 14:07.

London Borough Of Wandsworth logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2025 at 12:42.

UK Power Networks South Eastern logo
Between
19 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Violet Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Violet Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Aug 2025 at 20:50.

Transport for London (TfL) logo
Between
20 and 26 Nov 2025
Details
View Map
Share
Follow
Edridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Edridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 14:17.

Transport for London (TfL) logo
Between
20 and 29 Nov 2025
Details
View Map
Share
Follow
Innes Yard

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Innes Yard, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 14:17.

Transport for London (TfL) logo
Between
20 and 29 Nov 2025
Details
View Map
Share
Follow
Whitgift Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Whitgift Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 16:17.

Transport for London (TfL) logo
Between
20 and 29 Nov 2025
Details
View Map
Share
Follow
Innes Yard

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Innes Yard, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 14:16.

Transport for London (TfL) logo
Between
20 and 22 Nov 2025
Details
View Map
Share
Fell Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Fell Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 15:40.

Transport for London (TfL) logo
Between
20 and 26 Nov 2025
Details
View Map
Share
Follow
Fell Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Fell Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 15:39.

Transport for London (TfL) logo
Between
20 and 29 Nov 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 16:01.

Transport for London (TfL) logo
Between
20 and 26 Nov 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 15:44.

London Borough Of Wandsworth logo
Between
20 and 25 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2025 at 13:53.

Network Rail logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Kent House Road

Network Rail are proposing to carry out Works for Rail Purposes on Kent House Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Aug 2025 at 08:08.

Network Rail logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Half Moon Lane

Network Rail are proposing to carry out Works for Rail Purposes on Half Moon Lane, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Aug 2025 at 09:07.

Network Rail logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Shakespeare Road

Network Rail were proposing to carry out Works for Rail Purposes on Shakespeare Road, Herne Hill & Loughborough Junction, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Aug 2025 at 15:45.

Southern Gas Networks logo
Between
24 Nov and 21 Dec 2025
Details
View Map
Share
Follow
Hall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hall Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 16:30.

Southern Gas Networks logo
Between
24 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Ardrossan Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ardrossan Gardens, Worcester Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:16.

London Borough Of Croydon logo
Between
24 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Bingham Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 18 Sep 2025 at 07:16.

London Borough Of Croydon logo
Between
24 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Bingham Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 18 Sep 2025 at 07:57.

UK Power Networks Eastern & London logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Croydon Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Croydon Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 16:51.

Southern Gas Networks logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 14:16.

Southern Gas Networks logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Lytcott Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lytcott Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 11:38.

Thames Water logo
LONG TERM
Between
25 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Waddon Close

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Close, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.

Southern Gas Networks logo
Between
28 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Purley Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:27.

Southern Gas Networks logo
Between
28 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Purley Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:09.

Network Rail logo
Between
29 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Ferndale Road

Network Rail are proposing to carry out Works for Rail Purposes on Ferndale Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Sep 2025 at 14:24.

London Borough Of Lambeth logo
Between
30 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Hailsham Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Hailsham Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:44.

London Borough Of Lambeth logo
Between
30 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.

Thames Water logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Goodwin Road

Thames Water were proposing to carry out Utility asset works on Goodwin Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:40.

Southern Gas Networks logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Commonside East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Commonside East, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 11:53.

UK Power Networks South Eastern logo
LONG TERM
Between
1 Dec 2025 and 30 Jan 2026
Details
View Map
Share
Follow
South Norwood Hill

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 16:35.

Southern Gas Networks logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 12:41.

Thames Water logo
Between
1 and 6 Dec 2025
Details
View Map
Share
Follow
Summerstown

Thames Water are proposing to carry out New service connection on Summerstown, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 09:34.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:26.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Faygate Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Faygate Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:02.

Transport for London (TfL) logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Marius Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:49.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
1 Dec 2025 and 22 Jan 2026
Details
View Map
Share
Follow
Lytcott Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lytcott Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 14:08.

UK Power Networks South Eastern logo
Between
3 and 24 Dec 2025
Details
View Map
Share
Newhaven Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2025 and run through until 24 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 15:02.

BT logo
Between
3 and 5 Dec 2025
Details
View Map
Share
Follow
Tremadoc Road

BT are proposing to carry out Utility asset works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Sep 2025 at 10:11.

London Borough Of Croydon logo
Between
4 and 6 Dec 2025
Details
View Map
Share
Follow
Roman Way

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Roman Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:49.

London Borough Of Croydon logo
Between
4 and 6 Dec 2025
Details
View Map
Share
Follow
Roman Way

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Roman Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 1 Apr 2025 at 06:34.

London Borough Of Croydon logo
Between
4 and 6 Dec 2025
Details
View Map
Share
Follow
Mitcham Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Mitcham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:54.

London Borough Of Croydon logo
Between
4 and 6 Dec 2025
Details
View Map
Share
Follow
Mitcham Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Mitcham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 1 Apr 2025 at 06:35.

Thames Water logo
LONG TERM
Between
5 Dec 2025 and 9 Apr 2026
Details
View Map
Share
Follow
Kelmscott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kelmscott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 9 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 16:02.

London Borough Of Croydon logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Dingwall Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Dingwall Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 12 Sep 2025 at 07:53.

UK Power Networks South Eastern logo
LONG TERM
Between
8 Dec 2025 and 9 Feb 2026
Details
View Map
Share
Follow
South Norwood Hill

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 9 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 12:11.

Thames Water logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Follow
Clarence Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Clarence Crescent, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 10:22.

Thames Water logo
LONG TERM
Between
8 Dec 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Acanthus Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Acanthus Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:02.

UK Power Networks South Eastern logo
Between
10 and 24 Dec 2025
Details
View Map
Share
Follow
Dagnall Park

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagnall Park, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 24 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 16:21.

Southern Gas Networks logo
Between
10 and 18 Dec 2025
Details
View Map
Share
Colwell Road

Southern Gas Networks were proposing to carry out New service connection on Colwell Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2025 and run through until 18 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:34.

Southern Gas Networks logo
Between
15 and 24 Dec 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 14:54.

Southern Gas Networks logo
Between
15 and 24 Dec 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 14:21.

Transport for London (TfL) logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Chepstow Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chepstow Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 10:39.

Thames Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Falcon Terrace

Thames Water are proposing to carry out Utility asset works on Falcon Terrace, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 15:09.


Roadworks Map near to Commonside East, MITCHAM, CR4 1HA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Commonside East, MITCHAM, CR4 1HA (61 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Merton logo
MAJOR
  
COMMONSIDE EAST 
(0.1 miles)
London Borough Of Merton
Highway repair and maintenance works - Carriageway - Priority working
Planned
Scheduled: 11 Jun 2025 - 11 Jun 2026
0.1
Details
Share
Follow
2
Thames Water logo
TAMWORTH LANE 
(0.4 miles)
Thames Water
Disconnection or alteration of supply - Footway - Some carriageway incursion
In Progress
Since: 16 Sep 2025 10:35
(Scheduled: 16 Sep 2025 - 18 Sep 2025)
0.4
Details
Share
Follow
3
London Borough Of Merton logo
CRANMER ROAD 
(0.5 miles)
London Borough Of Merton
Highway improvement works - Footway - Two-way signals
Planned
Scheduled: 17 Sep 2025 - 22 Sep 2025
0.5
Details
Share
Follow
4
London Borough Of Merton logo
CRANMER ROAD 
(0.5 miles)
London Borough Of Merton
Highway improvement works - Footway - Two-way signals
Planned
Scheduled: 15 Sep 2025 - 20 Sep 2025
0.5
Details
Share
Follow
5
London Borough Of Merton logo
MAJOR
  
LOWER GREEN WEST 
(0.5 miles)
London Borough Of Merton
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 18 Sep 2025 - 19 Sep 2025
0.5
Details
Share
Follow
6
Thames Water logo
CRICKET GREEN 
(0.6 miles)
Thames Water
Utility repair and maintenance works - Verge - No carriageway incursion
Planned
Scheduled: 15 Sep 2025 - 28 Sep 2025
0.6
Details
Share
Follow
7
Thames Water logo
CRICKET GREEN 
(0.6 miles)
Thames Water
Utility repair and maintenance works - Verge - No carriageway incursion
In Progress
Since: 16 Sep 2025 09:30
(Scheduled: 15 Sep 2025 - 26 Sep 2025)
0.6
Details
Share
Follow
8
Thames Water logo
CRICKET GREEN 
(0.6 miles)
Thames Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 16 Sep 2025 09:30
(Scheduled: 15 Sep 2025 - 26 Sep 2025)
0.6
Details
Share
Follow
9
Thames Water logo
CRICKET GREEN 
(0.6 miles)
Thames Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 15 Sep 2025 - 28 Sep 2025
0.6
Details
Share
Follow
10
Thames Water logo
EMERGENCY
  
WESTERN ROAD 
(0.6 miles)
Thames Water
Utility repair and maintenance works - Footway - Two-way signals
In Progress
Since: 15 Sep 2025 14:15
(Scheduled: 15 Sep 2025 - 22 Sep 2025)
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data