ROADWORKS SUMMARY
Harestone Hill, CATERHAM, CR3 6SX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Harestone Hill, CR3 6SX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Harestone Hill, CATERHAM, CR3 6SX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Harestone Hill are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Surrey County Council are carrying out Highway improvement works on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 07:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Oct 2024 at 09:17.

Surrey County Council logo
LONG TERM
Between
26 Feb and 20 Dec 2024
Details
View Map
Share
Follow
Croydon Road

Surrey County Council are proposing to carry out Highway improvement works on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Feb 2024 at 12:05.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
12 Aug and 17 Dec 2024
Details
View Map
Share
Follow
Pendell Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Statutory Infrastructure Works on Pendell Road, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Feb 2024 at 09:27.

Southern Gas Networks logo
LONG TERM
Between
12 Aug 2024 and 23 May 2025
Details
View Map
Share
Follow
Hollymead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollymead Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 23 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 13:44.

Southern Gas Networks logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Hollymead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hollymead Road, Chipstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:00.

Southern Gas Networks logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Oxted Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Oxted Road, Godstone.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 11:00 and could run through until 4 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:39.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Mar 2025
Details
View Map
Share
Follow
Gatton Park Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Jun 2024 at 12:07.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Court Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 08:49.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 23 Dec 2024
Details
View Map
Share
Follow
Court Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 10:41.

Surrey County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Nutfield Road

Surrey County Council are carrying out Highway repair and maintenance works on Nutfield Road, Merstham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 14:13 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 15:00.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Copthorne Rise

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Copthorne Rise, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 09:17.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Copthorne Rise

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Copthorne Rise, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 11:55.

Southern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Copthorne Rise

Southern Gas Networks are carrying out Utility repair and maintenance works on Copthorne Rise, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:00 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:43.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 09:13.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 10:35.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Rectory Park

Southern Gas Networks are carrying out Utility repair and maintenance works on Rectory Park, Croydon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:20 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 07:17.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Kendall Avenue South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kendall Avenue South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 15:02.

UK Power Networks South Eastern logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Purley Rise

UK Power Networks South Eastern are carrying out New service connection on Purley Rise, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 08:28.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 2 Dec 2024
Details
View Map
Share
Chipstead Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chipstead Way, Woodmansterne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 09:39.

Southern Gas Networks logo
Today
Details
View Map
Share
Hyde Road

Southern Gas Networks carried out Utility repair and maintenance works on Hyde Road, Croydon.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 28 Oct 2024 and 21 Nov 2024 and were actually completed between 1 Nov 2024 (15:50) and 21 Nov 2024 (12:50). The works impacted the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 12:58.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Westfield Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Westfield Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 15:50 and could run through until 21 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 07:35.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2024 at 07:54.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 09:38.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:13.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 12:33.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Nutfield Marsh Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Nutfield Marsh Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:27.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:20.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Pendell Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Pendell Road, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
1 Nov 2024 and 15 Mar 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Oct 2024 at 14:06.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Oct 2024 at 09:40.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway improvement works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 15:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
East Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill, Oxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Jul 2024 at 14:57.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Limpsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2024 at 12:07.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Albury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Albury Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:24.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Gatton Bottom

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Bottom, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:22.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Coulsdon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 24 Jul 2024 at 09:00.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Mitchley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitchley Avenue, South Croydon, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 11:56.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Borrowdale Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Borrowdale Drive, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 15:50 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 15:57.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 15:02.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Outwood Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Outwood Lane, Chipstead.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 13:48.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cormongers Lane

Surrey County Council are carrying out Highway repair and maintenance works on Cormongers Lane, Redhill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 20:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 08:19.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Nutfield Marsh Road

Surrey County Council are carrying out Highway repair and maintenance works on Nutfield Marsh Road, Merstham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 20:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 08:17.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Kendall Avenue South

Southern Gas Networks are carrying out Utility repair and maintenance works on Kendall Avenue South, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:25 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:32.

Southern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Nutfield Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Nutfield Road, Merstham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:47.

Surrey County Council logo
LONG TERM
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Westerham Road

Surrey County Council are proposing to carry out Works for road purposes on Westerham Road, Limpsfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 12:36.

Surrey County Council logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Westerham Road

Surrey County Council are carrying out Works for road purposes on Westerham Road, Limpsfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 09:25.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Rockshaw Road, Merstham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:50 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:26.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Mitchley Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitchley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 12:04.

Southern Gas Networks logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:45 and could run through until 30 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 13:02.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Rectory Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rectory Park, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 11:58.

Surrey County Council logo
LONG TERM
Between
19 Nov 2024 and 19 May 2025
Details
View Map
Share
Follow
Tithepit Shaw Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tithepit Shaw Lane, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:37.

Surrey County Council logo
Until
4 Dec 2024
Details
View Map
Share
Follow
Tithepit Shaw Lane

Surrey County Council are carrying out Highway repair and maintenance works on Tithepit Shaw Lane, Warlingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 20:00 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 08:16.

Surrey County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Marketfield Way

Surrey County Council are carrying out Highway repair and maintenance works on Marketfield Way, Redhill.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 19:10 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 20:33.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Tollers Lane

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Tollers Lane, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 13:20 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 11:35.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
How Lane

UK Power Networks South Eastern are proposing to carry out New service connection on How Lane, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2024 at 15:08.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Tuesday
Details
View Map
Share
Fairfield Way

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Fairfield Way, Croydon.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 20 Nov 2024 at 13:24.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Oxted Byway 507/30

Surrey County Council are proposing to carry out Highway repair and maintenance works on Oxted Byway 507/30, Oxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are in progress during today only. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 09:52.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Godstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Godstone Road, Purley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Oct 2024 at 14:49.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Godstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Godstone Road, Purley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 09:12.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Godstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Godstone Road, Purley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Nov 2024 at 14:31.

Surrey County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wiggie Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wiggie Lane, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 13:17.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 08:54.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 08:12.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 10:41.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Westfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 12:11.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 09:04.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:07.

Southern Gas Networks logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Underwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Underwood Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 07:48.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Borrowdale Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Borrowdale Drive, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2024 at 08:24.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Church Lane

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Church Lane, Oxted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Sep 2024 at 13:11.

Southern Gas Networks logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Hartley Old Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hartley Old Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:17.

Southern Gas Networks logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Glebe Hyrst

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Hyrst, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 12:19.

Surrey County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 07:03.

Surrey County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 11:33.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
6 Jan and 15 Jun 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 10:48.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Kent Hatch Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:34.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Golf House Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:38.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Brook Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:01.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:23.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2024 at 15:01.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 14:17.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 13:05.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:34.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 15:03.

Surrey County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Clareville Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.

Surrey County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Elmore Road

Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:28.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Elmore Road

Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:50.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 14:54.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 07:45.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
How Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Jul 2024 at 19:08.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 15:01.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 15:43.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Hartley Down

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hartley Down, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 15:12.

Surrey County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Ormside Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.

Surrey County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.

Surrey County Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Rook Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rook Lane, Chaldon, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 09:34.

Surrey County Council logo
LONG TERM
Between
13 Jan and 13 Jul 2025
Details
View Map
Share
The Green

Surrey County Council were proposing to carry out Highway repair and maintenance works on The Green, Warlingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 10:59.

Surrey County Council logo
LONG TERM
Between
13 Jan and 13 Jul 2025
Details
View Map
Share
Limpsfield Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 11:07.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
North Down

BT were proposing to carry out Utility asset works on North Down, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Oct 2024 at 13:05.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
20 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Kent Hatch Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
20 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Golf House Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.

Surrey County Council logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Clareville Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.

Surrey County Council logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Birch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:29.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Birch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:20.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:25.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 07:27.

Southern Gas Networks logo
Between
21 Jan and 3 Feb 2025
Details
View Map
Share
Follow
How Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:55.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Holly Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 13:28.

Thames Water logo
Between
22 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Baxter Avenue

Thames Water are proposing to carry out Utility asset works on Baxter Avenue, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 17:14.

UK Power Networks South Eastern logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Outwood Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Outwood Lane, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 09:25.

UK Power Networks South Eastern logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Outwood Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Outwood Lane, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 07:43.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 24 Mar 2025
Details
View Map
Share
Follow
West Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on West Hill, Oxted.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 16:14.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 24 Mar 2025
Details
View Map
Share
Follow
Church Lane

UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Lane, Oxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 15:59.

UK Power Networks South Eastern logo
Between
30 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Plough Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Plough Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Nov 2024 at 08:58.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Brook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:16.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 5 May 2025
Details
View Map
Share
Follow
Tupwood Scrubbs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:43.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 5 May 2025
Details
View Map
Share
Follow
Tupwood Scrubbs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:59.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Tupwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Lane, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:06.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Court Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 08:48.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Court Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 13:20.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Sylverdale Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Sylverdale Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:23.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Godstone Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Godstone Road, Kenley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:17.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
St James Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on St James Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:20.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Godstone Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Godstone Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:14.

Southern Gas Networks logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:16.

Southern Gas Networks logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Nelson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nelson Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:29.

Surrey County Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Outwood Lane

Surrey County Council are proposing to carry out Highway improvement works on Outwood Lane, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:08.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:48.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Stanley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Street, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:49.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:48.

Surrey County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Ormside Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:51.

Surrey County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:46.

Southern Gas Networks logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 09:54.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Downlands Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Downlands Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 10:43.


Roadworks Map near to Harestone Hill, CATERHAM, CR3 6SX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 20:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Harestone Hill, CATERHAM, CR3 6SX (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Ses Water (formerly Sutton & East Surrey Water Company) logo
URGENT
  
HARESTONE VALLEY ROAD 
(0.1 miles)
Ses Water (formerly Sutton & East Surrey Water Company)
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 15 Nov 2024 12:30
(Scheduled: 15 Nov 2024 - 21 Nov 2024)
0.1
Details
Share
Follow
2
BT logo
BRADENHURST CLOSE 
(0.4 miles)
BT
New service connection - Footway, Carriageway - Give and take
Complete
19 Nov 2024 10:50 - 20 Nov 2024 13:08
0.4
Details
Share
3
Surrey County Council logo
URGENT
  
FARNINGHAM ROAD 
(0.4 miles)
Surrey County Council
Highway improvement works - Carriageway - Give and take
Complete
21 Nov 2024 13:30 - 13:48
0.4
Details
Share
4
Surrey County Council logo
MAJOR
  
CROYDON ROAD 
(0.4 miles)
Surrey County Council
Highway improvement works - Footway, Carriageway - Two-way signals
In Progress
Since: 26 Feb 2024 07:00
(Scheduled: 26 Feb 2024 - 25 Apr 2025)
0.4
Details
Share
Follow
5
Surrey County Council logo
MAJOR
  
CROYDON ROAD 
(0.4 miles)
Surrey County Council
Highway improvement works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 26 Feb 2024 - 20 Dec 2024
0.4
Details
Share
Follow
6
Southern Gas Networks logo
MAJOR
  
YEW TREE DRIVE 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 14 Nov 2024 - 9 Dec 2024
0.4
Details
Share
Follow
7
Surrey County Council logo
HIGH STREET 
(0.7 miles)
Surrey County Council
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Nov 2024 - 22 Nov 2024
0.7
Details
Share
Follow
8
Virgin Media logo
CHALDON ROAD 
(0.7 miles)
Virgin Media
Utility asset works - Footway, Verge - Some carriageway incursion
Complete
19 Nov 2024 10:05 - 17:00
0.7
Details
Share
9
Virgin Media logo
LONDON ROAD 
(0.8 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
19 Nov 2024 10:10 - 17:00
0.8
Details
Share
10
T-Mobile (UK) logo
WESTWAY 
(0.8 miles)
T-Mobile (UK)
Utility repair and maintenance works - Verge - Two-way signals
In Progress
Since: 19 Nov 2024 11:40
(Scheduled: 19 Nov 2024 - 22 Nov 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.