ROADWORKS SUMMARY
Valentine Street, ELLESMERE PORT, CH66 7PL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Valentine Street, CH66 7PL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Valentine Street, ELLESMERE PORT, CH66 7PL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Valentine Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cheshire West And Chester Council logo
LONG TERM
Between
1 Feb 2025 and 31 May 2026
Details
View Map
Share
Follow
Leighton Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Leighton Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 31 May 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cheshire West And Chester Council on 28 Feb 2025 at 11:19.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Harrogate Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harrogate Close, Eastham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 1 Apr 2025 at 09:58.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Harrogate Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harrogate Road, Eastham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 1 Apr 2025 at 09:56.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
New Chester Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on New Chester Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 09:19.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Rest Hill Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rest Hill Road, Storeton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 14 Oct 2024 at 11:31.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Town Lane

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Town Lane, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 29 Jan 2025 at 09:19.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Woodcote Bank

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodcote Bank, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 16:18.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Rocklands Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rocklands Avenue, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Mar 2025 at 15:17.

Wirral Borough Council logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Easton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Easton Road, New Ferry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 29 Jan 2025 at 09:01.

Wirral Borough Council logo
LONG TERM
Between
7 Apr 2025 and 8 Apr 2026
Details
View Map
Share
Follow
Old Chester Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Old Chester Road, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 8 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 4 Apr 2025 at 11:13.

Wirral Borough Council logo
LONG TERM
Between
1 Jun 2025 and 31 Mar 2026
Details
View Map
Share
Highcroft Avenue

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Highcroft Avenue, Bebington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 June 2025 and run through until 31 March 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 3 Apr 2025 at 10:30.

Wirral Borough Council logo
LONG TERM
Between
4 Jun 2025 and 3 Jun 2026
Details
View Map
Share
Follow
Raby Mere Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Mere Road, Raby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:57.

Wirral Borough Council logo
LONG TERM
Between
4 Jun 2025 and 3 Jun 2026
Details
View Map
Share
Follow
Raby Hall Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Hall Road, Raby Mere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:57.

Wirral Borough Council logo
LONG TERM
Between
4 Jun 2025 and 3 Jun 2026
Details
View Map
Share
Follow
Poulton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:57.

Wirral Borough Council logo
LONG TERM
Between
4 Jun 2025 and 3 Jun 2026
Details
View Map
Share
Follow
Ferry Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Eastham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 14:58.

Wirral Borough Council logo
LONG TERM
Between
4 Jun 2025 and 3 Jun 2026
Details
View Map
Share
Follow
Poulton Royd Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Royd Drive, Spital.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 14:58.

Wirral Borough Council logo
LONG TERM
Between
4 Jun 2025 and 3 Jun 2026
Details
View Map
Share
Follow
Brackenwood Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brackenwood Road, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 13 Mar 2025 at 11:05.

Wirral Borough Council logo
LONG TERM
Between
4 Jun 2025 and 3 Jun 2026
Details
View Map
Share
Follow
Bracken Lane

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bracken Lane, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 14:57.

ManWeb logo
LONG TERM
Between
8 Aug and 6 Nov 2025
Details
View Map
Share
St Andrews Road

ManWeb were proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 August 2025 and run through until 6 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 26 Jun 2025 at 10:52.

Wirral Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Plymyard Avenue

Wirral Borough Council are carrying out Highway repair and maintenance works on Plymyard Avenue, Eastham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 August 2025 at 09:30 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Sep 2025 at 09:54.

Wirral Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Raby Hall Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Raby Hall Road, Raby Mere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 August 2025 at 11:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2025 at 08:10.

Wirral Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Plymyard Avenue

Wirral Borough Council are carrying out Highway repair and maintenance works on Plymyard Avenue, Bromborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 August 2025 at 09:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Sep 2025 at 09:55.

Wirral Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Poulton Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Poulton Road, Spital.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 August 2025 at 10:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2025 at 08:09.

Wirral Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Spital Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Spital Road, Bromborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2025 at 12:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Sep 2025 at 09:54.

Wirral Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Stadium Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Stadium Road, Bromborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 August 2025 at 13:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Oct 2025 at 11:23.

Wirral Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
New Chester Road

Wirral Borough Council are carrying out Highway repair and maintenance works on New Chester Road, Bromborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2025 at 13:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Sep 2025 at 09:52.

Wirral Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Commercial Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Commercial Road, Bromborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 August 2025 at 12:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 1 Oct 2025 at 11:23.

Wirral Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Raby Mere Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Raby Mere Road, Raby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 August 2025 at 11:30 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2025 at 08:11.

ManWeb logo
LONG TERM
Between
18 Aug and 31 Oct 2025
Details
View Map
Share
St Andrews Road

ManWeb were proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 26 Jun 2025 at 10:55.

Wirral Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Bolton Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Bolton Road, Port Sunlight.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 08:30 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Sep 2025 at 14:07.

Wirral Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
New Chester Road

Wirral Borough Council are carrying out Highway repair and maintenance works on New Chester Road, New Ferry.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 09:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Sep 2025 at 12:59.

Wirral Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Willaston Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Willaston Road, Raby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 August 2025 at 09:30 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2025 at 08:17.

Wirral Borough Council logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Bromborough Village Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Bromborough Village Road, Bromborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2025 at 10:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 30 Sep 2025 at 09:53.

Wirral Borough Council logo
LONG TERM
Between
27 Aug 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Stadium Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Stadium Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 30 Jul 2025 at 14:31.

Wirral Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Raby Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Raby Road, Raby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 08:30 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2025 at 08:11.

Wirral Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Thornton Common Road

Wirral Borough Council are carrying out Highway repair and maintenance works on Thornton Common Road, Thornton Hough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2025 at 09:30 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2025 at 08:16.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Hinderton Road

Cadent Gas are proposing to carry out Utility asset works on Hinderton Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 10:50.

ManWeb logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Quarry Road East

ManWeb are carrying out Utility repair and maintenance works on Quarry Road East, Bebington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 16:55 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 9 Sep 2025 at 09:37.

Wirral Borough Council logo
LONG TERM
Between
16 Sep and 31 Oct 2025
Details
View Map
Share
Follow
St Andrews Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on St Andrews Road, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Aug 2025 at 16:16.

Wirral Borough Council logo
LONG TERM
Between
17 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Poulton Royd Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Royd Drive, Spital.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Aug 2025 at 14:31.

Wirral Borough Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Poulton Royd Drive

Wirral Borough Council are carrying out Highway repair and maintenance works on Poulton Royd Drive, Spital.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 09:00 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 29 Sep 2025 at 10:35.

Wirral Borough Council logo
LONG TERM
Between
17 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Poulton Royd Drive

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Royd Drive, Spital.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Aug 2025 at 14:13.

Wirral Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Poulton Royd Drive

Wirral Borough Council are carrying out Highway repair and maintenance works on Poulton Royd Drive, Spital.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 12:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2025 at 14:23.

Cheshire West And Chester Council logo
LONG TERM
Between
18 Sep and 30 Oct 2025
Details
View Map
Share
Boathouse Lane

Cheshire West And Chester Council were proposing to carry out Remedial works on Boathouse Lane, Parkgate, Neston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 September 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 25 Sep 2025 at 12:44.

ManWeb logo
LONG TERM
Between
18 Sep and 16 Dec 2025
Details
View Map
Share
Follow
St Andrews Road

ManWeb are proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 16 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 2 Jul 2025 at 14:18.

ManWeb logo
LONG TERM
Between
18 Sep and 16 Dec 2025
Details
View Map
Share
Follow
St Andrews Road

ManWeb are proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 16 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 2 Jul 2025 at 14:21.

Wirral Borough Council logo
LONG TERM
Between
18 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Bracken Lane

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bracken Lane, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Aug 2025 at 16:12.

Wirral Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Bracken Lane

Wirral Borough Council are carrying out Highway repair and maintenance works on Bracken Lane, Higher Bebington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 09:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2025 at 14:18.

Cadent Gas logo
LONG TERM
Between
22 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Hinderton Road

Cadent Gas are proposing to carry out Utility asset works on Hinderton Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 11:39.

ESP Electricity logo
Finishing
Friday
Details
View Map
Share
Follow
New Chester Road

ESP Electricity are carrying out Utility asset works on New Chester Road, Eastham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 22 Sep 2025 at 08:22.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Raby Mere Road

Cadent Gas are carrying out Utility repair and maintenance works on Raby Mere Road, Raby.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 September 2025 at 11:44 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 14:35.

ManWeb logo
Between
25 Sep and 23 Oct 2025
Details
View Map
Share
Follow
Manor Road

ManWeb are proposing to carry out Utility repair and maintenance works on Manor Road, Eastham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 3 Jul 2025 at 13:38.

ManWeb logo
Between
25 Sep and 23 Oct 2025
Details
View Map
Share
Follow
Manor Road

ManWeb are proposing to carry out Utility repair and maintenance works on Manor Road, Eastham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Jul 2025 at 14:54.

ManWeb logo
LONG TERM
Between
25 Sep and 23 Dec 2025
Details
View Map
Share
Follow
St Andrews Road

ManWeb are proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Jul 2025 at 14:02.

ManWeb logo
LONG TERM
Between
25 Sep and 23 Dec 2025
Details
View Map
Share
Follow
Quarry Road East

ManWeb are proposing to carry out Utility repair and maintenance works on Quarry Road East, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Jul 2025 at 14:02.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 10:32.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 10:37.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 08:12.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 11:18.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Redmere Drive

Cadent Gas were proposing to carry out Utility asset works on Redmere Drive, Barnston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 15:10.

Cadent Gas logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Brimstage Road

Cadent Gas were proposing to carry out Utility asset works on Brimstage Road, Barnston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 15:09.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
New Ferry Road

Cadent Gas are carrying out Utility asset works on New Ferry Road, New Ferry.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 13:05 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 13:05.

Cheshire West And Chester Council logo
LONG TERM
Between
30 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Rossfield Road

Cheshire West And Chester Council are proposing to carry out Remedial works on Rossfield Road, Ellesmere Port.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 7 Oct 2025 at 09:30.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Primrose Hill

Cadent Gas are carrying out Utility repair and maintenance works on Primrose Hill, Port Sunlight.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2025 at 12:20 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 11:36.

ManWeb logo
LONG TERM
Between
1 Oct and 15 Dec 2025
Details
View Map
Share
Follow
St Andrews Road

ManWeb are proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 11 Jul 2025 at 13:54.

ManWeb logo
LONG TERM
Between
1 Oct and 18 Nov 2025
Details
View Map
Share
St Andrews Road

ManWeb were proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 18 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 21 Jul 2025 at 13:40.

ManWeb logo
LONG TERM
Between
1 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Quarry Road East

ManWeb are proposing to carry out Utility repair and maintenance works on Quarry Road East, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 11 Jul 2025 at 13:55.

Wirral Borough Council logo
LONG TERM
Until
18 Nov 2025
Details
View Map
Share
Follow
St Andrews Road

Wirral Borough Council are carrying out Highway repair and maintenance works on St Andrews Road, Bebington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 08:00 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 7 Oct 2025 at 10:37.

Wirral Borough Council logo
Until
15 Oct 2025
Details
View Map
Share
Follow
Dock Road South

Wirral Borough Council are carrying out Section 50 on Dock Road South, Bromborough.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 10:00 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 6 Oct 2025 at 14:18.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Hinderton Road

Cadent Gas are proposing to carry out Utility asset works on Hinderton Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 10:27.

Cadent Gas logo
Between
7 and 27 Oct 2025
Details
View Map
Share
Follow
Eton Drive

Cadent Gas are proposing to carry out Utility asset works on Eton Drive, Thornton Hough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 10:09.

ManWeb logo
Between
13 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Greenfield Road

ManWeb are proposing to carry out Utility repair and maintenance works on Greenfield Road, Little Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Jul 2025 at 15:16.

ManWeb logo
Between
13 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Greenfield Road

ManWeb are proposing to carry out Utility repair and maintenance works on Greenfield Road, Little Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Jul 2025 at 13:29.

ManWeb logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Greenfield Road

ManWeb are proposing to carry out Utility repair and maintenance works on Greenfield Road, Little Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 21 Jul 2025 at 11:17.

ManWeb logo
Between
13 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Greenfield Road

ManWeb are proposing to carry out Utility repair and maintenance works on Greenfield Road, Little Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 24 Jul 2025 at 08:22.

Cadent Gas logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 15:51.

ManWeb logo
LONG TERM
Between
13 Oct and 29 Dec 2025
Details
View Map
Share
Follow
St Andrews Road

ManWeb are proposing to carry out Utility repair and maintenance works on St Andrews Road, Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 5 Aug 2025 at 14:33.

ManWeb logo
LONG TERM
Between
13 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Quarry Road East

ManWeb are proposing to carry out Utility repair and maintenance works on Quarry Road East, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 5 Aug 2025 at 14:40.

ManWeb logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Gordon Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Gordon Lane, Backford, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Jul 2025 at 08:45.

ManWeb logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Gordon Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Gordon Lane, Backford, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Jul 2025 at 10:59.

ManWeb logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Gordon Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Gordon Lane, Backford, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Sep 2025 at 09:49.

ManWeb logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Gordon Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Gordon Lane, Backford, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 17 Sep 2025 at 13:59.

Cadent Gas logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Hinderton Road

Cadent Gas are proposing to carry out Utility asset works on Hinderton Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 11:22.

Cadent Gas logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Parkgate Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Parkgate Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 13:57.

Cadent Gas logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Parkgate Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Parkgate Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 15:08.

Wirral Borough Council logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Old Hall Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Old Hall Road, Bromborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 28 Aug 2025 at 15:19.

United Utilities Water (formerly North West Water) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Berwick Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Berwick Road, Little Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Aug 2025 at 08:21.

United Utilities Water (formerly North West Water) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Berwick Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Berwick Road, Little Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Aug 2025 at 10:53.

Cadent Gas logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hinderton Road

Cadent Gas are proposing to carry out Utility asset works on Hinderton Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 14:53.

United Utilities Water (formerly North West Water) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Benty Heath Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Benty Heath Lane, Willaston, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 11:08.

United Utilities Water (formerly North West Water) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Benty Heath Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Benty Heath Lane, Willaston, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Sep 2025 at 11:48.

United Utilities Water (formerly North West Water) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Benty Heath Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Benty Heath Lane, Willaston, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Sep 2025 at 10:42.

Cadent Gas logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Radley Drive

Cadent Gas are proposing to carry out Utility asset works on Radley Drive, Thornton Hough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 11:52.

Cadent Gas logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Mobberley Way

Cadent Gas are proposing to carry out Utility asset works on Mobberley Way, Spital.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 09:19.

Wirral Borough Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Woodcote Bank

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodcote Bank, Higher Bebington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 29 Aug 2025 at 15:22.

Cadent Gas logo
Between
3 and 18 Nov 2025
Details
View Map
Share
Footpath Ludlow Drive To Thornton Road

Cadent Gas were proposing to carry out Utility asset works on Footpath Ludlow Drive To Thornton Road, Ellesmere Port.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 18 November 2025. The works were due to impact the footway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 15:00.

ManWeb logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Fulbrook Road

ManWeb are proposing to carry out New service connection on Fulbrook Road, Spital.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 2 Sep 2025 at 09:12.

Cadent Gas logo
LONG TERM
Between
10 Nov and 30 Dec 2025
Details
View Map
Share
Follow
Poulton Road

Cadent Gas are proposing to carry out Utility asset works on Poulton Road, Spital.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 08:48.

Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Bolton Road East

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bolton Road East, New Ferry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Oct 2025 at 13:56.

ManWeb logo
Between
17 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Tarporley Road

ManWeb are proposing to carry out Disconnection or alteration of supply on Tarporley Road, Great Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 19 Aug 2025 at 15:15.

ManWeb logo
Between
17 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Tarporley Road

ManWeb are proposing to carry out Disconnection or alteration of supply on Tarporley Road, Great Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Sep 2025 at 15:48.

Cadent Gas logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 14:49.

Cadent Gas logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 09:47.

ManWeb logo
LONG TERM
Between
24 Nov 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Liverpool Road

ManWeb are proposing to carry out Utility asset works on Liverpool Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 2 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ManWeb on 21 Aug 2025 at 15:45.

ManWeb logo
LONG TERM
Between
24 Nov and 30 Dec 2025
Details
View Map
Share
Follow
Buildwas Road

ManWeb are proposing to carry out Utility asset works on Buildwas Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 21 Aug 2025 at 15:46.

ManWeb logo
LONG TERM
Between
24 Nov and 30 Dec 2025
Details
View Map
Share
Follow
Buildwas Road

ManWeb are proposing to carry out Utility asset works on Buildwas Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 22 Aug 2025 at 14:23.

Cadent Gas logo
Between
24 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Mobberley Way

Cadent Gas are proposing to carry out Utility asset works on Mobberley Way, Spital.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 09:22.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Thorburn Close

Cadent Gas are proposing to carry out Utility asset works on Thorburn Close, New Ferry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 11:00.

Cadent Gas logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Follow
Radley Drive

Cadent Gas are proposing to carry out Utility asset works on Radley Drive, Thornton Hough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 09:44.

Wirral Borough Council logo
LONG TERM
Between
1 Jan and 31 Aug 2026
Details
View Map
Share
Follow
Poulton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2026 and could run through until 31 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 9 Sep 2025 at 15:02.

Wirral Borough Council logo
LONG TERM
Between
1 Jan and 31 Aug 2026
Details
View Map
Share
Follow
Spital Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2026 and could run through until 31 August 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 9 Sep 2025 at 15:04.

Wirral Borough Council logo
LONG TERM
Between
1 Jan and 31 Aug 2026
Details
View Map
Share
Follow
Brimstage Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brimstage Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2026 and could run through until 31 August 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 9 Sep 2025 at 15:03.

Wirral Borough Council logo
LONG TERM
Between
1 Jan and 31 Aug 2026
Details
View Map
Share
Follow
Church Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2026 and could run through until 31 August 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 9 Sep 2025 at 15:40.

ManWeb logo
LONG TERM
Between
5 Jan and 6 Feb 2026
Details
View Map
Share
Follow
Buildwas Road

ManWeb are proposing to carry out Utility asset works on Buildwas Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 11 Sep 2025 at 14:28.

Cadent Gas logo
Between
5 and 20 Jan 2026
Details
View Map
Share
Follow
Thorburn Close

Cadent Gas are proposing to carry out Utility asset works on Thorburn Close, New Ferry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 20 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 14:26.

Cadent Gas logo
Between
5 and 20 Jan 2026
Details
View Map
Share
Follow
Thorburn Close

Cadent Gas are proposing to carry out Utility asset works on Thorburn Close, New Ferry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 20 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 09:53.


Roadworks Map near to Valentine Street, ELLESMERE PORT, CH66 7PL (5 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 8 Oct 2025 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Valentine Street, ELLESMERE PORT, CH66 7PL (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
HOOTON ROAD, WILLASTON 
(0.8 miles)
BT
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 8 Oct 2025 - 10 Oct 2025
0.8
Details
Share
Follow
2
United Utilities Water (formerly North West Water) logo
ARGYLL AVENUE 
(0.9 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
6 Oct 2025 13:35 - 15:53
0.9
Details
Share
3
BT logo
GLADE DRIVE, LITTLE SUTTON 
(1.0 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 9 Oct 2025 - 10 Oct 2025)
1.0
Details
Share
4
BT logo
MOSS CLOSE, WILLASTON 
(1.0 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
7 Oct 2025 13:08 - 15:20
1.0
Details
Share
5
Wirral Borough Council logo
MAJOR
  
PLYMYARD AVENUE 
(1.0 miles)
Wirral Borough Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 16 Aug 2025 09:30
(Scheduled: 16 Aug 2025 - 24 Oct 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.