ROADWORKS SUMMARY
Rudstone Close, ELLESMERE PORT, CH66 4TH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Rudstone Close, CH66 4TH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Rudstone Close, ELLESMERE PORT, CH66 4TH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Rudstone Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Baumville Drive

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Baumville Drive, Spital.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 19 Nov 2024 at 13:49.

Wirral Borough Council logo
LONG TERM
Between
1 May 2024 and 31 Mar 2025
Details
View Map
Share
Bellward Close

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Bellward Close, Spital.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Oct 2024 at 16:27.

Wirral Borough Council logo
LONG TERM
Between
24 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bowness Avenue

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bowness Avenue, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 26 Jun 2024 at 10:11.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Mark Rake

Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Mark Rake, Bromborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 23 Sep 2024 at 11:24.

Wirral Borough Council logo
LONG TERM
Between
15 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Parkwood Close

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Parkwood Close, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 5 Jul 2024 at 11:42.

Wirral Borough Council logo
LONG TERM
Between
31 Jul 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Poulton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:54.

Wirral Borough Council logo
LONG TERM
Between
31 Jul 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Spital Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:52.

Wirral Borough Council logo
LONG TERM
Between
31 Jul 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Brimstage Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brimstage Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:53.

Wirral Borough Council logo
LONG TERM
Between
31 Jul 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Church Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:51.

The Environment Agency logo
LONG TERM
Between
9 Sep and 12 Dec 2024
Details
View Map
Share
Follow
Chase Way

The Environment Agency are proposing to carry out Section 50 on Chase Way, Great Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by The Environment Agency on 23 Apr 2024 at 12:25.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Chester High Road

Cadent Gas are proposing to carry out Utility asset works on Chester High Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 31 Jul 2024 at 16:10.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Chester High Road

Cadent Gas are proposing to carry out Utility asset works on Chester High Road, Neston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 09:39.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Raby Park Road

Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Jun 2024 at 10:28.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Raby Park Road

Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 31 Jul 2024 at 16:03.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Chester High Road

Cadent Gas are proposing to carry out Utility asset works on Chester High Road, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Jun 2024 at 10:27.

The Environment Agency logo
LONG TERM
Between
11 Oct 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Chase Way

The Environment Agency are proposing to carry out Utility repair and maintenance works on Chase Way, Great Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by The Environment Agency on 30 Jul 2024 at 10:28.

The Environment Agency logo
LONG TERM
Between
14 Oct 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Chase Way

The Environment Agency are proposing to carry out Utility repair and maintenance works on Chase Way, Great Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by The Environment Agency on 13 Sep 2024 at 15:47.

The Environment Agency logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Chase Way

The Environment Agency are carrying out Utility repair and maintenance works on Chase Way, Great Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by The Environment Agency on 14 Oct 2024 at 09:41.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Town Lane

Cadent Gas are proposing to carry out Utility asset works on Town Lane, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 13:06.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Woodfall Lane

Cadent Gas were proposing to carry out Utility asset works on Woodfall Lane, Little Neston, Neston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 15:02.

Wirral Borough Council logo
LONG TERM
Between
13 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Thursby Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Thursby Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:32.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Poulton Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Willowbrow Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Willowbrow Road, Raby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:40.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Ferry Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Eastham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 14:26.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Church Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Kinglass Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kinglass Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 25 Oct 2024 at 13:46.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Spital Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.

Wirral Borough Council logo
LONG TERM
Between
18 Nov 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Brimstage Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brimstage Road, Bebington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 31 Oct 2024 at 09:41.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Parkgate Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Parkgate Road, Mollington, Chester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Ringway

Cadent Gas are proposing to carry out Utility asset works on Ringway, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:19.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Parkgate Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Parkgate Road, Mollington, Chester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 12:02.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Parkgate Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Parkgate Road, Mollington, Chester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 13:14.

Cadent Gas logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Rockfarm Drive

Cadent Gas are proposing to carry out Utility asset works on Rockfarm Drive, Little Neston, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 09:55.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Mayfield Gardens

Cadent Gas are proposing to carry out Utility asset works on Mayfield Gardens, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:20.

Cadent Gas logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Rockfarm Drive

Cadent Gas are carrying out Utility asset works on Rockfarm Drive, Little Neston, Neston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 08:35 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 10:05.

Cadent Gas logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Rockfarm Drive

Cadent Gas are proposing to carry out Utility asset works on Rockfarm Drive, Little Neston, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 08:44.

Cheshire West And Chester Council logo
LONG TERM
Between
28 Nov and 28 Dec 2024
Details
View Map
Share
Follow
Milton Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Milton Road, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 28 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 26 Nov 2024 at 11:43.

ManWeb logo
Between
28 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Oteley Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 5 Sep 2024 at 15:29.

ManWeb logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Acre Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Sep 2024 at 10:47.

ManWeb logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Oteley Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Sep 2024 at 10:47.

Cadent Gas logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Rockfarm Close

Cadent Gas are carrying out Utility asset works on Rockfarm Close, Little Neston, Neston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 11:30 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:30.

Cadent Gas logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Rockfarm Close

Cadent Gas are proposing to carry out Utility asset works on Rockfarm Close, Little Neston, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 08:43.

Cadent Gas logo
LONG TERM
Between
5 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Raby Park Road

Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 16 January 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:42.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Buildwas Road

Cadent Gas are proposing to carry out Utility asset works on Buildwas Road, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:20.

ManWeb logo
Between
11 and 27 Dec 2024
Details
View Map
Share
Follow
Oteley Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Sep 2024 at 11:19.

ManWeb logo
Between
11 and 27 Dec 2024
Details
View Map
Share
Follow
Acre Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Sep 2024 at 11:19.

ManWeb logo
Between
19 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Oteley Avenue

ManWeb were proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 7 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 15:29.

ManWeb logo
Between
19 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Acre Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 7 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 15:34.

ManWeb logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Heath Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 24 Oct 2024 at 11:37.

ManWeb logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Heath Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 24 Oct 2024 at 11:27.

ManWeb logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Heath Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Heath Lane, Little Sutton, Ellesmere Port.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 21 Oct 2024 at 12:05.

Wirral Borough Council logo
Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Thursby Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Thursby Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 13:33.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Upton Lane

BT are proposing to carry out Utility repair and maintenance works on Upton Lane, Upton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 1 Nov 2024 at 15:30.

Wirral Borough Council logo
Between
22 and 29 Jan 2025
Details
View Map
Share
Follow
Ferry Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Eastham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 11 Nov 2024 at 09:34.

ManWeb logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hillside Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Hillside Drive, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 27 Nov 2024 at 09:12.

ManWeb logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hillside Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Hillside Drive, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 27 Nov 2024 at 10:25.

Wirral Borough Council logo
Between
12 and 17 Feb 2025
Details
View Map
Share
Follow
Willowbrow Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Willowbrow Road, Raby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:07.

Wirral Borough Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Kinglass Road

Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kinglass Road, Bromborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wirral Borough Council on 8 Nov 2024 at 14:08.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Shotwick Lane

BT are proposing to carry out Utility asset works on Shotwick Lane, Woodbank, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Nov 2024 at 15:56.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Shotwick Lane

BT are proposing to carry out Utility asset works on Shotwick Lane, Shotwick, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Nov 2024 at 15:57.

ManWeb logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Hillside Drive

ManWeb were proposing to carry out Utility repair and maintenance works on Hillside Drive, Ellesmere Port.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 25 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 27 Nov 2024 at 08:59.


Roadworks Map near to Rudstone Close, ELLESMERE PORT, CH66 4TH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Rudstone Close, ELLESMERE PORT, CH66 4TH (29 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
SELBY GREEN, LITTLE SUTTON 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Dec 2024 - 6 Dec 2024
0.1
Details
Share
Follow
2
Virgin Media logo
WETHERBY WAY, LITTLE SUTTON 
(0.2 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
29 Nov 2024 11:02 - 2 Dec 2024 10:15
0.2
Details
Share
3
Virgin Media logo
SKIPTON DRIVE, LITTLE SUTTON 
(0.2 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
29 Nov 2024 09:38 - 3 Dec 2024 12:09
0.2
Details
Share
4
Virgin Media logo
THORNE DRIVE, LITTLE SUTTON 
(0.2 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 4 Dec 2024
0.2
Details
Share
Follow
5
BT logo
SKIPTON DRIVE, LITTLE SUTTON 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 2 Dec 2024 - 4 Dec 2024)
0.2
Details
Share
6
Virgin Media logo
SKIPTON DRIVE, LITTLE SUTTON 
(0.2 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
29 Nov 2024 12:14 - 3 Dec 2024 13:48
0.2
Details
Share
7
BT logo
STARBECK DRIVE, LITTLE SUTTON 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Dec 2024 - 6 Dec 2024
0.2
Details
Share
Follow
8
Virgin Media logo
DUNMORE ROAD, LITTLE SUTTON 
(0.3 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Dec 2024
0.3
Details
Share
Follow
9
Virgin Media logo
DUDLESTON ROAD, LITTLE SUTTON 
(0.3 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
4 Dec 2024 08:00 - 08:58
0.3
Details
Share
10
Virgin Media logo
CHESTER ROAD, LITTLE SUTTON 
(0.3 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 30 Nov 2024 - 4 Dec 2024
0.3