ROADWORKS SUMMARY
Craig Gardens, ELLESMERE PORT, CH66 1LA
Introduction

View current and future planned roadworks and road closures for Craig Gardens, CH66 1LA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Craig Gardens, ELLESMERE PORT, CH66 1LA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Craig Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
Friday
Cheshire West And Chester Council are proposing to carry out Remedial works on Whitby Lane, Backford, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cheshire West And Chester Council on 29 May 2025 at 07:59.
Friday
Cheshire West And Chester Council are proposing to carry out Remedial works on Liverpool Road, Backford, Chester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cheshire West And Chester Council on 29 May 2025 at 07:59.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harrogate Road, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 1 Apr 2025 at 09:56.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harrogate Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 1 Apr 2025 at 09:58.
1 Apr 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on New Chester Road, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 19 Mar 2025 at 09:19.
19 May 2026
Wirral Borough Council are carrying out Highway repair and maintenance works on Ferry Road, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 09:00 and could run through until 19 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 May 2025 at 15:25.
29 Apr and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 16:01.
Friday
Cadent Gas are proposing to carry out Utility asset works on Rochester Drive, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 15:31.
Friday
Cadent Gas are proposing to carry out Utility asset works on Rochester Drive, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 11:57.
Friday
ESP Electricity are carrying out Utility asset works on Pool Lane, Bromborough.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 29 May 2025 at 11:24.
Friday
Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:14.
26 May and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Park Road, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:15.
27 May and 11 Jun 2025
Wirral Borough Council are proposing to carry out Section 50 on Dock Road South, Bromborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 22 May 2025 at 09:19.
16 Jun 2025
Cadent Gas are carrying out Utility asset works on Stanney Lane, Ellesmere Port.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 08:09 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:23.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Langfield Grove, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:27.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on The Glen, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Baumville Drive, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bellward Close, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Finstall Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:19.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Colmore Avenue, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:19.
28 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Harborne Drive, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:20.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Tanar Close, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brinley Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:19.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodlea Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:20.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Edgewood Drive, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:19.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Redcar Drive, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:20.
28 May and 17 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Gilbert Close, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:22.
28 May and 20 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kinglass Road, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:27.
29 May and 23 Jun 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kelsall Avenue, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Mar 2025 at 10:28.
2 and 13 Jun 2025
G2 Energy IDNO were proposing to carry out Utility asset works on Stanney Lane, Little Stanney, Chester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 7 Apr 2025 at 13:37.
Friday
Cadent Gas are proposing to carry out Utility asset works on Old Chester Road, Great Sutton, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 15:20.
Monday
Cadent Gas are proposing to carry out New service connection on Old Chester Road, Great Sutton, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 11:45.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Mere Road, Raby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:57.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Royd Drive, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 14:58.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 14:58.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:57.
4 Jun 2025 and 3 Jun 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Hall Road, Raby Mere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Mar 2025 at 11:57.
9 and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 14:37.
9 Jun and 3 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Poulton Royd Drive, Spital.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 15:39.
16 and 18 Jun 2025
BT are proposing to carry out Utility asset works on Shotwick Lane, Shotwick, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 15 May 2025 at 09:15.
16 and 18 Jun 2025
BT are proposing to carry out Utility asset works on Shotwick Lane, Shotwick, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 16 May 2025 at 14:20.
16 and 18 Jun 2025
BT are proposing to carry out Utility asset works on Shotwick Lane, Shotwick, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 18 Mar 2025 at 16:21.
16 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Park Road, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 14:41.
16 and 18 Jun 2025
BT are proposing to carry out Utility asset works on Shotwick Lane, Shotwick, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 May 2025 at 12:07.
16 and 18 Jun 2025
BT are proposing to carry out Utility asset works on Shotwick Lane, Shotwick, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 May 2025 at 11:10.
16 and 18 Jun 2025
BT are proposing to carry out Utility asset works on Shotwick Lane, Woodbank, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 15 May 2025 at 09:13.
16 and 18 Jun 2025
BT are proposing to carry out Utility asset works on Shotwick Lane, Woodbank, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 May 2025 at 11:10.
16 and 18 Jun 2025
BT are proposing to carry out Utility asset works on Shotwick Lane, Woodbank, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 18 Mar 2025 at 16:22.
23 Jun and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 11:27.
23 Jun and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 10:28.
23 Jun and 4 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Enfield Road, Ellesmere Port.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Mar 2025 at 11:59.
30 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Stanney Lane, Ellesmere Port.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 09:15.
1 Jul 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 14 Mar 2025 at 12:54.
1 Jul 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wirral Borough Council on 14 Mar 2025 at 12:53.
1 Jul 2025 and 31 Mar 2026
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 14 Mar 2025 at 11:16.
7 and 11 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Picton Lane, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Apr 2025 at 13:13.
28 Jul and 15 Aug 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Church Road, Saughall, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 25 Feb 2025 at 15:30.
28 Jul and 11 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Mobberley Way, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 09:24.
28 Jul and 15 Aug 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Church Road, Saughall, Chester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 7 Feb 2025 at 14:04.
1 Aug and 5 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Mere Road, Raby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 30 Apr 2025 at 14:07.
1 Aug and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Apr 2025 at 14:09.
1 Aug and 30 Sep 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Raby Hall Road, Raby Mere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 8 Apr 2025 at 14:35.
18 Aug and 2 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Uplands Road, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 16:00.
21 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Croft Avenue, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.
Roadworks Map near to Craig Gardens, ELLESMERE PORT, CH66 1LA (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Craig Gardens, ELLESMERE PORT, CH66 1LA (19 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.