ROADWORKS SUMMARY
Maple Close, ELY, CB7 5WT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Maple Close, CB7 5WT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Maple Close, ELY, CB7 5WT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Maple Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Until
26 May 2025
Details
View Map
Share
Follow
Beck Road (C144)

Anglian Water are carrying out Utility asset works on Beck Road (C144), Isleham.

These works are categorised as Major.

The works started on 27 November 2023 at 10:00 and could run through until 26 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Nov 2023 at 11:51.

Anglian Water logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Sheldricks Road

Anglian Water are carrying out Utility asset works on Sheldricks Road, Isleham.

These works are categorised as Major.

The works started on 11 December 2023 at 13:30 and could run through until 10 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 11 Dec 2023 at 13:54.

Anglian Water logo
LONG TERM
Until
8 Jun 2025
Details
View Map
Share
Follow
East Fen Road

Anglian Water are carrying out Utility asset works on East Fen Road, Isleham.

These works are categorised as Major.

The works started on 9 January 2024 at 14:42 and could run through until 8 June 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 9 Jan 2024 at 14:42.

Anglian Water logo
LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
Station Road

Anglian Water are carrying out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

The works started on 26 January 2024 at 17:13 and could run through until 26 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 26 Jan 2024 at 17:23.

Cambridgeshire County Council logo
LONG TERM
Between
2 Jan and 31 Mar 2025
Details
View Map
Share
Upware

Cambridgeshire County Council were proposing to carry out Works for road purposes on Upware, Upware.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 27 Jan 2025 at 09:53.

Cambridgeshire County Council logo
LONG TERM
Between
2 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Upware

Cambridgeshire County Council are proposing to carry out Works for road purposes on Upware, Upware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 18 Nov 2024 at 09:05.

Cambridgeshire County Council logo
LONG TERM
Between
2 Jan and 31 Mar 2025
Details
View Map
Share
Prior Fen

Cambridgeshire County Council were proposing to carry out Works for road purposes on Prior Fen, Upware, Swaffham Prior.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 27 Jan 2025 at 09:56.

Cambridgeshire County Council logo
LONG TERM
Between
2 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Prior Fen

Cambridgeshire County Council are proposing to carry out Works for road purposes on Prior Fen, Upware, Swaffham Prior.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 18 Nov 2024 at 09:40.

Finishing
Friday
Details
View Map
Share
Follow
Broad Piece

GTC Pipelines are proposing to carry out Utility asset works on Broad Piece, Soham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 22 Jan 2025 at 09:52.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Broad Piece

Electricity Network Company were proposing to carry out Utility asset works on Broad Piece, Soham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 29 Jan 2025 at 15:31.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
Broad Piece

Electricity Network Company are proposing to carry out Utility asset works on Broad Piece, Soham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 17 Jan 2025 at 14:20.

Cambridgeshire County Council logo
Until
4 Mar 2025
Details
View Map
Share
Follow
Bancroft Lane

Cambridgeshire County Council are carrying out Works for road purposes on Bancroft Lane, Soham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:04 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 17 Feb 2025 at 09:11.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
The Causeway (C221)

Anglian Water are carrying out Utility repair and maintenance works on The Causeway (C221), Burwell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 06:45 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 17 Feb 2025 at 07:02.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Pound Lane

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Pound Lane, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 10 Dec 2024 at 15:20.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Pound Lane

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Pound Lane, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Nov 2024 at 16:58.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Prickwillow Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Prickwillow Road, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 26 Nov 2024 at 10:08.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Prickwillow Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Prickwillow Road, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 10 Dec 2024 at 15:20.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
The Causeway (C221)

Anglian Water are proposing to carry out Utility repair and maintenance works on The Causeway (C221), Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 13:52.

Cambridgeshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Pound Lane

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Pound Lane, Isleham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 16:00.

Cambridgeshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Fordham Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Fordham Road, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 9 Dec 2024 at 12:31.

Cambridgeshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Fordham Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Fordham Road, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 19 Nov 2024 at 12:32.

Cambridgeshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Prickwillow Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Prickwillow Road, Isleham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 16:00.

Cambridgeshire County Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Prior Fen

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Prior Fen, Upware, Swaffham Prior.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 30 Dec 2024 at 09:33.

Cambridgeshire County Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Prior Fen

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Prior Fen, Upware, Swaffham Prior.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 22 Jan 2025 at 12:22.

Electricity Network Company logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Fordham Road

Electricity Network Company are proposing to carry out Utility asset works on Fordham Road, Soham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 31 Dec 2024 at 10:37.

Electricity Network Company logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Fordham Road

Electricity Network Company are proposing to carry out Utility asset works on Fordham Road, Soham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 3 Feb 2025 at 11:52.

Electricity Network Company logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Fordham Road

Electricity Network Company are proposing to carry out Utility asset works on Fordham Road, Soham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 10 Feb 2025 at 14:13.

Cambridgeshire County Council logo
LONG TERM
Between
3 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 14 Jan 2025 at 13:33.

Electricity Network Company logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

Electricity Network Company are proposing to carry out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 31 Dec 2024 at 09:39.

Electricity Network Company logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Station Road

Electricity Network Company were proposing to carry out Utility asset works on Station Road, Isleham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 16 Jan 2025 at 11:00.

Independent Water Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

Independent Water Networks are proposing to carry out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Independent Water Networks on 31 Dec 2024 at 10:46.

Independent Water Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

Independent Water Networks are proposing to carry out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Independent Water Networks on 16 Jan 2025 at 09:44.

Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

GTC Pipelines are proposing to carry out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 31 Dec 2024 at 10:50.

Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

GTC Pipelines are proposing to carry out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 15 Jan 2025 at 16:31.

Cambridgeshire County Council logo
Between
17 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Stretham Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Stretham Road, Wicken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Jan 2025 at 14:34.

Cambridgeshire County Council logo
Between
17 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Dimmocks Cote Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Dimmocks Cote Road, Wicken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Jan 2025 at 14:36.

Cambridgeshire County Council logo
Between
17 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Dimmocks Cote Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Dimmocks Cote Road, Wicken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 21 Jan 2025 at 11:40.

Cambridgeshire County Council logo
Between
17 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Upware

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Upware, Upware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Jan 2025 at 14:36.

Cambridgeshire County Council logo
Between
17 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Stretham Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Stretham Road, Wicken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 27 Jan 2025 at 13:54.

Cambridgeshire County Council logo
Between
17 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Upware

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Upware, Upware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 29 Jan 2025 at 13:56.

Cadent Gas logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Newnham Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Newnham Lane, Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 14:03.

Cambridgeshire County Council logo
Between
8 and 12 Apr 2025
Details
View Map
Share
Follow
Murfitts Lane

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Murfitts Lane, Fordham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jan 2025 at 08:07.

Anglian Water logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Mereside

Anglian Water are proposing to carry out Utility repair and maintenance works on Mereside, Soham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 4 Feb 2025 at 11:02.

LONG TERM
Between
21 Apr and 23 May 2025
Details
View Map
Share
Follow
Station Road

GTC Pipelines are proposing to carry out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 27 Jan 2025 at 14:37.

Independent Water Networks logo
Between
21 Apr and 13 May 2025
Details
View Map
Share
Follow
Station Road

Independent Water Networks are proposing to carry out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Independent Water Networks on 24 Jan 2025 at 14:48.

Independent Water Networks logo
Between
21 Apr and 13 May 2025
Details
View Map
Share
Follow
Station Road

Independent Water Networks are proposing to carry out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Independent Water Networks on 24 Jan 2025 at 14:26.

Electricity Network Company logo
LONG TERM
Between
21 Apr and 23 May 2025
Details
View Map
Share
Follow
Station Road

Electricity Network Company are proposing to carry out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 Jan 2025 at 12:22.

Anglian Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Elms Road

Anglian Water are proposing to carry out Remedial works on Elms Road, Freckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Feb 2025 at 11:08.


Roadworks Map near to Maple Close, ELY, CB7 5WT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Maple Close, ELY, CB7 5WT (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
BREWHOUSE LANE 
(0.2 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 15 Feb 2025 10:12
(Scheduled: 15 Feb 2025 - 19 Feb 2025)
0.2
Details
Share
Follow
2
Anglian Water logo
BREWHOUSE LANE 
(0.2 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
13 Feb 2025 08:16 - 09:10
0.2
Details
Share
3
Anglian Water logo
URGENT
  
MERESIDE 
(0.4 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 17 Feb 2025 09:34
(Scheduled: 17 Feb 2025 - 21 Feb 2025)
0.4
Details
Share
Follow
4
Cambridgeshire County Council logo
MILL CORNER 
(0.4 miles)
Cambridgeshire County Council
Highway repair and maintenance works - Footway - Two-way signals
Cancelled
(Scheduled: 17 Feb 2025 - 19 Feb 2025)
0.4
Details
Share
5
Anglian Water logo
CYPRIAN RUST WAY 
(0.7 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
13 Feb 2025 09:24 - 10:14
0.7
Details
Share
6
Cambridgeshire County Council logo
MAJOR
  
BANCROFT LANE 
(0.7 miles)
Cambridgeshire County Council
Works for road purposes - Footway, Carriageway - Multi-way signals
In Progress
Since: 17 Feb 2025 09:04
(Scheduled: 13 Feb 2025 - 4 Mar 2025)
0.7
Details
Share
Follow
7
Cambridgeshire County Council logo
MAJOR
  
BANCROFT LANE 
(0.7 miles)
Cambridgeshire County Council
Works for road purposes - Footway, Carriageway - Give and take
Planned
Scheduled: 13 Feb 2025 - 28 Feb 2025
0.7
Details
Share
Follow
8
Electricity Network Company logo
MAJOR
  
BROAD PIECE 
(0.9 miles)
Electricity Network Company
Utility asset works - Carriageway, Verge - Road closure
Planned
Scheduled: 3 Feb 2025 - 21 Feb 2025
0.9
Details
Share
Follow
9
Electricity Network Company logo
MAJOR
  
BROAD PIECE 
(0.9 miles)
Electricity Network Company
Utility asset works - Carriageway, Verge - Road closure
Cancelled
(Scheduled: 3 Feb 2025 - 21 Feb 2025)
0.9
Details
Share
10
MAJOR
  
BROAD PIECE 
(0.9 miles)
GTC Pipelines
Utility asset works - Carriageway - Road closure