ROADWORKS SUMMARY
Mere Way, CAMBRIDGE, CB4 2JN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Mere Way, CB4 2JN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Mere Way, CAMBRIDGE, CB4 2JN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mere Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cambridgeshire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Springfield Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Springfield Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2022 and could run through until 29 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 14 Feb 2022 at 17:17.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
George Street

Cambridgeshire County Council are carrying out Highway improvement works on George Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 22:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jan 2024 at 09:26.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Milton Road (A1134)

Cambridgeshire County Council are carrying out Highway improvement works on Milton Road (A1134), Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 4 Apr 2024 at 12:29.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Ascham Road

Cambridgeshire County Council are carrying out Highway improvement works on Ascham Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 29 Jan 2024 at 11:08.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Milton Road

Cambridgeshire County Council are carrying out Highway improvement works on Milton Road, Cambridge.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 8 Apr 2024 at 15:02.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Highworth Avenue

Cambridgeshire County Council are carrying out Highway improvement works on Highworth Avenue, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 22:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jan 2024 at 09:13.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Union Lane

Cambridgeshire County Council are carrying out Highway improvement works on Union Lane, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 07:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 5 Jan 2024 at 10:14.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Arbury Road

Cambridgeshire County Council are carrying out Highway improvement works on Arbury Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 07:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 6 Jun 2023 at 11:56.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Kendal Way

Cambridgeshire County Council are carrying out Highway improvement works on Kendal Way, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 22:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jan 2024 at 09:16.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Ramsden Square

Cambridgeshire County Council are carrying out Highway improvement works on Ramsden Square, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 22:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 5 Jan 2024 at 10:52.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are carrying out Highway improvement works on Green End Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 22:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 6 Jun 2023 at 12:05.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Kings Hedges Road

Cambridgeshire County Council are carrying out Highway improvement works on Kings Hedges Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 22:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 6 Jun 2023 at 12:05.

UK Power Networks Eastern & London logo
LONG TERM
Until
6 Jun 2024
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are carrying out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2023 at 07:44 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2024 at 11:39.

UK Power Networks Eastern & London logo
LONG TERM
Until
12 Jun 2024
Details
View Map
Share
Follow
Worts Causeway

UK Power Networks Eastern & London are carrying out New service connection on Worts Causeway, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 10:30 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2024 at 07:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 Feb and 19 May 2024
Details
View Map
Share
Follow
Nightingale Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Nightingale Avenue, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2023 at 13:03.

Cambridgeshire County Council logo
LONG TERM
Between
4 Mar and 27 Jun 2024
Details
View Map
Share
Follow
Barton Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Barton Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2024 and could run through until 27 June 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 3 Jan 2024 at 10:06.

Cambridgeshire County Council logo
LONG TERM
Between
18 Mar and 12 Jul 2024
Details
View Map
Share
Follow
Cowley Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cowley Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 24 Jan 2024 at 11:17.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Horningsea Road

Cambridgeshire County Council are carrying out Highway improvement works on Horningsea Road, Fen Ditton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 07:00 and could run through until 3 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 9 Apr 2024 at 07:16.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Buchan Street

Cadent Gas are carrying out Utility asset works on Buchan Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:07 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 07:24.

Cambridgeshire County Council logo
LONG TERM
Between
14 Apr and 30 May 2024
Details
View Map
Share
Follow
Hattons Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on Hattons Road, Longstanton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 30 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 11 Apr 2024 at 08:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Apr and 17 May 2024
Details
View Map
Share
Follow
Hulatt Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hulatt Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Jan 2024 at 10:21.

ESP Electricity logo
Finishing
Wednesday
Details
View Map
Share
Follow
Barton Road

ESP Electricity are carrying out New service connection on Barton Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:34 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 26 Apr 2024 at 10:15.

Cambridgeshire County Council logo
LONG TERM
Until
30 May 2024
Details
View Map
Share
Follow
Park Street

Cambridgeshire County Council are carrying out Section 50 on Park Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 08:00 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 22 Apr 2024 at 14:10.

Cambridgeshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Fisher Street

Cambridgeshire County Council are carrying out Section 50 on Fisher Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 08:00 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 22 Apr 2024 at 09:46.

BT logo
Until
7 May 2024
Details
View Map
Share
Follow
James Street

BT are carrying out Utility repair and maintenance works on James Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 08:28 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Apr 2024 at 09:28.

Cambridgeshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Newton Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Newton Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 23 Apr 2024 at 08:24.

Cambridgeshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hall Farm Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Hall Farm Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Apr 2024 at 14:50.

Cambridgeshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Cockerell Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cockerell Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 26 Mar 2024 at 09:57.

Cambridgeshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Barnard Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Barnard Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Apr 2024 at 14:51.

Cambridgeshire County Council logo
LONG TERM
Between
29 Apr 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Barton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Barton Road, Grantchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 February 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 19 Mar 2024 at 12:33.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ferrars Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Ferrars Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 28 Mar 2024 at 14:48.

Cambridge Water Company logo
Finishing
Friday
Details
View Map
Share
Follow
Godwin Way

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Godwin Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 12 Mar 2024 at 14:11.

Gigaclear logo
Between
6 and 13 May 2024
Details
View Map
Share
Follow
Main Street

Gigaclear are proposing to carry out Utility repair and maintenance works on Main Street, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 6 Mar 2024 at 15:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 May and 12 Jun 2024
Details
View Map
Share
Follow
Cherry Hinton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Cherry Hinton Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2024 at 14:45.

Cambridgeshire County Council logo
Between
9 and 12 May 2024
Details
View Map
Share
Follow
Bar Hill Intersection From B1050 To Bar Hill Roundabout

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bar Hill Intersection From B1050 To Bar Hill Roundabout, Bar Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Apr 2024 at 10:56.

Cambridgeshire County Council logo
Between
9 and 12 May 2024
Details
View Map
Share
Follow
Bar Hill Intersection On And Off Slips To A14

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bar Hill Intersection On And Off Slips To A14, Longstanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 12 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 25 Apr 2024 at 10:16.

Cambridge Water Company logo
Between
12 and 18 May 2024
Details
View Map
Share
Follow
Parker Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Parker Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 3 Apr 2024 at 10:39.

Cambridgeshire County Council logo
Between
13 and 26 May 2024
Details
View Map
Share
Follow
Hills Avenue

Cambridgeshire County Council are proposing to carry out New service connection on Hills Avenue, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 26 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 21 Feb 2024 at 15:49.

UK Power Networks Eastern & London logo
Between
13 and 15 May 2024
Details
View Map
Share
Follow
Teversham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Teversham Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 14:33.

Cambridgeshire County Council logo
LONG TERM
Between
13 May and 14 Jun 2024
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on High Street, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 14 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 27 Apr 2024 at 21:28.

Cambridgeshire County Council logo
Between
13 and 31 May 2024
Details
View Map
Share
Horningsea Road (C210)

Cambridgeshire County Council were proposing to carry out Highway improvement works on Horningsea Road (C210), Horningsea.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 May 2024 and run through until 31 May 2024. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 27 Apr 2024 at 07:30.

Gigaclear logo
Between
14 and 22 May 2024
Details
View Map
Share
Follow
Bottisham Cycletrack 1

Gigaclear are proposing to carry out Utility repair and maintenance works on Bottisham Cycletrack 1, Bottisham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 22 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 22 Mar 2024 at 13:29.

Cambridgeshire County Council logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Bar Hill Intersection From B1050 To Bar Hill Roundabout

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bar Hill Intersection From B1050 To Bar Hill Roundabout, Bar Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 5 Apr 2024 at 14:25.

Cambridgeshire County Council logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Bar Hill Intersection On And Off Slips To A14

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bar Hill Intersection On And Off Slips To A14, Longstanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 5 Apr 2024 at 14:29.

Cadent Gas logo
LONG TERM
Between
19 May and 8 Aug 2024
Details
View Map
Share
Follow
Fendon Road

Cadent Gas are proposing to carry out Utility asset works on Fendon Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 8 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 07:35.

Cadent Gas logo
Between
20 May and 7 Jun 2024
Details
View Map
Share
Follow
Fendon Close

Cadent Gas are proposing to carry out Utility asset works on Fendon Close, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 10:35.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 May and 11 Jul 2024
Details
View Map
Share
Follow
Perne Road (A1134)

UK Power Networks Eastern & London are proposing to carry out New service connection on Perne Road (A1134), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Aug 2023 at 11:11.

Cambridgeshire County Council logo
Between
20 May and 7 Jun 2024
Details
View Map
Share
Follow
Horningsea Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Horningsea Road, Horningsea.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 27 Apr 2024 at 07:20.

Cambridgeshire County Council logo
Between
21 May and 6 Jun 2024
Details
View Map
Share
Follow
Babraham Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Babraham Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Apr 2024 at 13:21.

UK Power Networks Eastern & London logo
Between
21 May and 18 Jun 2024
Details
View Map
Share
Follow
Hills Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Sep 2023 at 09:39.

Cambridgeshire County Council logo
Between
22 May and 7 Jun 2024
Details
View Map
Share
Follow
Babraham Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Babraham Road, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 8 Apr 2024 at 13:32.

UK Power Networks Eastern & London logo
Between
24 May and 18 Jun 2024
Details
View Map
Share
Follow
Babraham Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Babraham Road, Great Shelford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Feb 2024 at 12:23.

UK Power Networks Eastern & London logo
Between
24 May and 18 Jun 2024
Details
View Map
Share
Follow
Cherry Hinton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Cherry Hinton Road, Great Shelford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2024 at 13:26.

UK Power Networks Eastern & London logo
Between
25 May and 2 Jun 2024
Details
View Map
Share
Follow
High Street (C233)

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street (C233), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 2 June 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2024 at 14:14.

Cambridgeshire County Council logo
LONG TERM
Between
25 May and 30 Sep 2024
Details
View Map
Share
Follow
Cowley Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cowley Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 30 September 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 24 Apr 2024 at 15:01.

Cadent Gas logo
LONG TERM
Between
26 May and 27 Jun 2024
Details
View Map
Share
Follow
Teversham Road

Cadent Gas are proposing to carry out Utility asset works on Teversham Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 15:10.

Cambridgeshire County Council logo
Between
26 and 30 May 2024
Details
View Map
Share
Follow
Shelly Row

Cambridgeshire County Council are proposing to carry out Highway improvement works on Shelly Row, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Apr 2024 at 11:31.

Cambridgeshire County Council logo
Between
27 May and 2 Jun 2024
Details
View Map
Share
Follow
Gwydir Street

Cambridgeshire County Council are proposing to carry out Section 50 on Gwydir Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 4 Apr 2024 at 15:33.

Cambridgeshire County Council logo
Between
27 and 31 May 2024
Details
View Map
Share
Follow
Huntingdon Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Huntingdon Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 15 Mar 2024 at 12:00.

Cambridgeshire County Council logo
Between
27 and 31 May 2024
Details
View Map
Share
Follow
Huntingdon Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Huntingdon Road, Girton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2024 at 11:40.

Cambridgeshire County Council logo
Between
28 May and 4 Jun 2024
Details
View Map
Share
Follow
Wulfstan Way

Cambridgeshire County Council are proposing to carry out Section 50 on Wulfstan Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 25 Apr 2024 at 11:49.

Cambridge Water Company logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Suez Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Suez Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 5 Apr 2024 at 12:44.

Cambridgeshire County Council logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Union Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Union Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 10 Apr 2024 at 12:11.

Cambridge Water Company logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Sidgwick Avenue

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Sidgwick Avenue, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 28 Mar 2024 at 09:37.

Cadent Gas logo
Between
29 and 31 May 2024
Details
View Map
Share
Follow
St Johns Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on St Johns Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 10:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
31 May and 12 Jul 2024
Details
View Map
Share
Follow
Brooks Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Brooks Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Apr 2024 at 14:18.

Cadent Gas logo
LONG TERM
Between
2 Jun and 8 Aug 2024
Details
View Map
Share
Follow
Mowbray Road

Cadent Gas are proposing to carry out Utility asset works on Mowbray Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 8 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 16:40.

Cambridgeshire County Council logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Adams Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Adams Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 10 Apr 2024 at 14:35.

Cambridgeshire County Council logo
Between
2 and 5 Jun 2024
Details
View Map
Share
Follow
Clayhithe Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Clayhithe Road, Horningsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 21 Dec 2023 at 15:39.

Cambridgeshire County Council logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Waterbeach Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Waterbeach Road, Landbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 22 Dec 2023 at 09:53.

Cambridgeshire County Council logo
Between
3 and 7 Jun 2024
Details
View Map
Share
Follow
Comberton Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Comberton Road, Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 15 Mar 2024 at 14:30.

Cambridgeshire County Council logo
Between
3 and 6 Jun 2024
Details
View Map
Share
Follow
Dry Drayton Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Dry Drayton Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Feb 2024 at 12:05.

Cambridgeshire County Council logo
Between
9 and 13 Jun 2024
Details
View Map
Share
Follow
Access Road To No 335-353 Hills Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Access Road To No 335-353 Hills Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 10 Apr 2024 at 14:39.

Cambridgeshire County Council logo
Between
9 and 13 Jun 2024
Details
View Map
Share
Follow
Access Road To No 319a-331 Hills Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Access Road To No 319a-331 Hills Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 10 Apr 2024 at 14:37.

Cadent Gas logo
Between
9 and 27 Jun 2024
Details
View Map
Share
Follow
Hulatt Road To Mowbray Road

Cadent Gas are proposing to carry out Utility asset works on Hulatt Road To Mowbray Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 27 June 2024. The works will impact the footway only.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 11:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 Jun and 4 Sep 2024
Details
View Map
Share
Follow
Cherry Hinton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Cherry Hinton Road, Great Shelford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 4 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2023 at 14:06.

Cambridge Water Company logo
Between
16 and 19 Jun 2024
Details
View Map
Share
Follow
Victoria Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Victoria Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 16 Apr 2024 at 08:07.

Cambridge Water Company logo
Between
16 and 20 Jun 2024
Details
View Map
Share
Follow
Longstanton Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Longstanton Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 25 Apr 2024 at 09:19.

Cambridgeshire County Council logo
LONG TERM
Between
17 Jun and 28 Oct 2024
Details
View Map
Share
Follow
Hills Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Hills Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 October 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 18 Apr 2024 at 11:12.

Cadent Gas logo
Between
17 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2024 at 13:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Jun and 1 Nov 2024
Details
View Map
Share
Follow
Babraham Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Babraham Road, Stapleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Feb 2024 at 12:26.

Cadent Gas logo
LONG TERM
Between
24 Jun and 13 Sep 2024
Details
View Map
Share
Follow
Water Lane

Cadent Gas are proposing to carry out Utility asset works on Water Lane, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 13 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Mar 2024 at 11:26.

Cadent Gas logo
Between
24 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Mill Road

Cadent Gas are proposing to carry out Utility asset works on Mill Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Mar 2024 at 15:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Jul and 7 Oct 2024
Details
View Map
Share
Follow
Mowbray Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Mowbray Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 7 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2024 at 15:01.

Cadent Gas logo
LONG TERM
Between
7 Jul and 8 Aug 2024
Details
View Map
Share
Follow
Fendon Road

Cadent Gas are proposing to carry out Utility asset works on Fendon Road, Cambridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 8 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 13:00.

Cambridge Water Company logo
Between
7 and 9 Jul 2024
Details
View Map
Share
Follow
Shirley Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Shirley Road, Histon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 16 Apr 2024 at 14:34.

Cadent Gas logo
Between
7 and 25 Jul 2024
Details
View Map
Share
Follow
Queens Way

Cadent Gas are proposing to carry out Utility asset works on Queens Way, Oakington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2023 at 10:39.

Cadent Gas logo
LONG TERM
Between
8 Jul and 9 Aug 2024
Details
View Map
Share
Follow
Queen Ediths Way (A1134)

Cadent Gas are proposing to carry out Utility asset works on Queen Ediths Way (A1134), Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 9 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2024 at 16:09.

Cadent Gas logo
LONG TERM
Between
8 Jul and 9 Aug 2024
Details
View Map
Share
Follow
Queen Ediths Way

Cadent Gas are proposing to carry out Utility asset works on Queen Ediths Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 9 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2024 at 14:13.

BT logo
Between
8 and 12 Jul 2024
Details
View Map
Share
Follow
Grange Road

BT are proposing to carry out Utility asset works on Grange Road, Cambridgeshire, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by BT on 26 Apr 2024 at 08:42.

Cambridge Water Company logo
Between
8 and 11 Jul 2024
Details
View Map
Share
Follow
Holland Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Holland Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 26 Apr 2024 at 08:56.

Virgin Media logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Hobson Street

Virgin Media are proposing to carry out Utility asset works on Hobson Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 28 Mar 2024 at 09:40.

Cambridge Water Company logo
Between
15 and 18 Jul 2024
Details
View Map
Share
Follow
Sleaford Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Sleaford Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 25 Apr 2024 at 10:35.

Cambridgeshire County Council logo
LONG TERM
Between
15 Jul and 6 Sep 2024
Details
View Map
Share
Follow
Ditton Lane

Cambridgeshire County Council are proposing to carry out Highway improvement works on Ditton Lane, Fen Ditton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 6 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 15 Mar 2024 at 10:43.

Cambridgeshire County Council logo
Between
21 Jul and 8 Aug 2024
Details
View Map
Share
Follow
High Street (C233)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on High Street (C233), Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 8 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 9 Apr 2024 at 13:40.

Cambridgeshire County Council logo
Between
21 and 30 Jul 2024
Details
View Map
Share
Follow
Nuffield Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Nuffield Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 30 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 17 Apr 2024 at 11:14.

Cambridge Water Company logo
Between
22 and 25 Jul 2024
Details
View Map
Share
Follow
Perne Avenue

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Perne Avenue, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 25 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 15 Apr 2024 at 13:17.

BT logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Burgoynes Road

BT are proposing to carry out Utility asset works on Burgoynes Road, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Apr 2024 at 09:22.

BT logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Milton Road

BT are proposing to carry out Utility asset works on Milton Road, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 23 Apr 2024 at 09:18.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Jul and 27 Aug 2024
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 27 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 15:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Jul and 2 Sep 2024
Details
View Map
Share
Follow
Radegund Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Radegund Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2024 and could run through until 2 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2024 at 10:40.


Roadworks Map near to Mere Way, CAMBRIDGE, CB4 2JN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Apr 2024 14:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Mere Way, CAMBRIDGE, CB4 2JN (33 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cambridgeshire County Council logo
MAJOR
  
FERRARS WAY 
(0.2 miles)
Cambridgeshire County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 29 Apr 2024 - 3 May 2024
0.2
Details
Share
Follow
2
Cambridgeshire County Council logo
MAJOR
  
COCKERELL ROAD 
(0.2 miles)
Cambridgeshire County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 25 Apr 2024 - 2 May 2024
0.2
Details
Share
Follow
3
Cambridge Water Company logo
EMERGENCY
  
BRIMLEY ROAD 
(0.2 miles)
Cambridge Water Company
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 25 Apr 2024 15:40
(Scheduled: 25 Apr 2024 - 28 Apr 2024)
0.2
Details
Share
Follow
4
Cambridgeshire County Council logo
MAJOR
  
HALL FARM ROAD 
(0.3 miles)
Cambridgeshire County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 25 Apr 2024 - 1 May 2024
0.3
Details
Share
Follow
5
Cambridge Water Company logo
ARAGON CLOSE 
(0.3 miles)
Cambridge Water Company
Utility asset works - Carriageway, Footpath - Multi-way signals
Planned
Scheduled: 22 Apr 2024 - 3 May 2024
0.3
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
BUCHAN STREET 
(0.4 miles)
Cadent Gas
Utility asset works - Carriageway - Road closure
In Progress
Since: 15 Apr 2024 07:07
(Scheduled: 14 Apr 2024 - 2 May 2024)
0.4
Details
Share
Follow
7
Cadent Gas logo
KINGS HEDGES ROAD 
(0.4 miles)
Cadent Gas
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 22 Apr 2024 11:55
(Scheduled: 21 Apr 2024 - 2 May 2024)
0.4
Details
Share
Follow
8
Cambridgeshire County Council logo
MAJOR
  
BARNARD WAY 
(0.4 miles)
Cambridgeshire County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 28 Apr 2024 - 1 May 2024
0.4
Details
Share
Follow
9
Virgin Media logo
THIRLEBY CLOSE 
(0.4 miles)
Virgin Media
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 28 Apr 2024
0.4
Details
Share
Follow
10
BT logo
LAWRENCE WAY, CAMBRIDGESHIRE 
(0.6 miles)
BT
Utility asset works - Footway, Verge - Multi-way signals
Planned
Scheduled: 29 Apr 2024 - 1 May 2024
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.