View current and future planned roadworks and road closures for Denny End Road, CB25 9PB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Denny End Road, CAMBRIDGE, CB25 9PB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Denny End Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cambridgeshire County Council logo
LONG TERM
Until
11 Apr 2025
Details
View Map
Share
Follow
Cowley Road

Cambridgeshire County Council are carrying out Highway improvement works on Cowley Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 09:00 and could run through until 11 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 27 Nov 2024 at 11:33.

Cambridgeshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Prior Fen

Cambridgeshire County Council are proposing to carry out Works for road purposes on Prior Fen, Upware, Swaffham Prior.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 18 Nov 2024 at 09:40.

Cambridgeshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Prior Fen

Cambridgeshire County Council were proposing to carry out Works for road purposes on Prior Fen, Upware, Swaffham Prior.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 27 Jan 2025 at 09:56.

Cambridgeshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Upware

Cambridgeshire County Council are proposing to carry out Works for road purposes on Upware, Upware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 18 Nov 2024 at 09:05.

Cambridgeshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Upware

Cambridgeshire County Council were proposing to carry out Works for road purposes on Upware, Upware.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 27 Jan 2025 at 09:53.

Cambridgeshire County Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
A14 J B1049 Leave W

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on A14 J B1049 Leave W, South Cambridgeshire.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 6 Jan 2025 at 16:30.

Cambridgeshire County Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
A14 J B1049 Leave W

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on A14 J B1049 Leave W, South Cambridgeshire.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jan 2025 at 11:11.

Cambridgeshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bridge Road (B1049)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bridge Road (B1049), Impington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 2 Jan 2025 at 14:05.

Cambridgeshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bridge Road (B1049)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bridge Road (B1049), Impington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 14 Jan 2025 at 09:38.

Cambridgeshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bridge Road (B1049)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bridge Road (B1049), Impington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 24 Jan 2025 at 16:20.

Cambridgeshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on Oakington Road, Cottenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 17 Jan 2025 at 10:34.

Cambridgeshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are carrying out Works for road purposes on Oakington Road, Cottenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 11:26 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 27 Feb 2025 at 14:32.

Cambridgeshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Rampton Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on Rampton Road, Cottenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 17 Jan 2025 at 10:20.

Cambridgeshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Rampton Road

Cambridgeshire County Council are carrying out Works for road purposes on Rampton Road, Cottenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 11:26 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 3 Feb 2025 at 12:40.

Cambridgeshire County Council logo
LONG TERM
Between
10 Feb and 17 Apr 2025
Details
View Map
Share
Follow
A14 J B1049 Leave W

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on A14 J B1049 Leave W, South Cambridgeshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 April 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 14 Jan 2025 at 16:30.

Cambridgeshire County Council logo
LONG TERM
Between
10 Feb and 17 Apr 2025
Details
View Map
Share
Follow
A14 J B1049 Leave W

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on A14 J B1049 Leave W, South Cambridgeshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 April 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jan 2025 at 11:12.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Waddelow Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Waddelow Road, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 10:02.

Cityfibre Metro Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Waddelow Road

Cityfibre Metro Networks are carrying out Utility asset works on Waddelow Road, Waterbeach.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2025 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 08:10.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Waddelow Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Waddelow Road, Waterbeach.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 10:07.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Rookery Close

Cityfibre Metro Networks are proposing to carry out Utility asset works on Rookery Close, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 09:59.

Cityfibre Metro Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Rookery Close

Cityfibre Metro Networks are carrying out Utility asset works on Rookery Close, Waterbeach.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2025 at 08:53 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 08:53.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Rookery Close

Cityfibre Metro Networks were proposing to carry out Utility asset works on Rookery Close, Waterbeach.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 10:11.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Robson Court

Cityfibre Metro Networks are proposing to carry out Utility asset works on Robson Court, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 09:59.

Cityfibre Metro Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Robson Court

Cityfibre Metro Networks are carrying out Utility asset works on Robson Court, Waterbeach.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2025 at 08:52 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 08:52.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Robson Court

Cityfibre Metro Networks were proposing to carry out Utility asset works on Robson Court, Waterbeach.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 10:10.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Jubilee Close

Cityfibre Metro Networks are proposing to carry out Utility asset works on Jubilee Close, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 09:56.

Cityfibre Metro Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Jubilee Close

Cityfibre Metro Networks are carrying out Utility asset works on Jubilee Close, Waterbeach.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2025 at 08:51 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 08:52.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Jubilee Close

Cityfibre Metro Networks were proposing to carry out Utility asset works on Jubilee Close, Waterbeach.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 10:08.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Butt Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Butt Lane, Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 09:27.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Butt Lane

Cityfibre Metro Networks are carrying out Utility asset works on Butt Lane, Milton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 09:30 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Mar 2025 at 09:30.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Long Drove

Cityfibre Metro Networks are proposing to carry out Utility asset works on Long Drove, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Dec 2024 at 09:17.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Long Drove

Cityfibre Metro Networks are proposing to carry out Utility asset works on Long Drove, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 13:18.

Cambridgeshire County Council logo
Between
31 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Twentypence Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Twentypence Road, Cottenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 24 Feb 2025 at 11:42.

Cambridgeshire County Council logo
Between
1 and 7 Apr 2025
Details
View Map
Share
Follow
Melvin Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Melvin Way, Histon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 12:47.

Cambridgeshire County Council logo
Between
2 and 9 Apr 2025
Details
View Map
Share
Follow
Payton Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Payton Way, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 26 Feb 2025 at 15:00.

Cambridgeshire County Council logo
Between
4 and 10 Apr 2025
Details
View Map
Share
Follow
Spurgeons Avenue

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Spurgeons Avenue, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:06.

Cambridgeshire County Council logo
Between
6 and 9 Apr 2025
Details
View Map
Share
Follow
Payton Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Payton Way, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Feb 2025 at 09:20.

Cambridgeshire County Council logo
Between
6 and 10 Apr 2025
Details
View Map
Share
Follow
Bannold Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bannold Road, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 11 Feb 2025 at 16:58.

Cambridgeshire County Council logo
Between
6 and 11 Apr 2025
Details
View Map
Share
Bannold Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Bannold Road, Waterbeach.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Mar 2025 at 11:01.

Cambridgeshire County Council logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Ditton Lane

Cambridgeshire County Council are proposing to carry out Highway improvement works on Ditton Lane, Fen Ditton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Mar 2025 at 15:32.

Cambridgeshire County Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Providence Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Providence Way, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:07.

Cambridge Water Company logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
The Green

Cambridge Water Company are proposing to carry out New service connection on The Green, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 18 Feb 2025 at 11:35.

Cambridge Water Company logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Hertford Street

Cambridge Water Company are proposing to carry out Highway repair and maintenance works on Hertford Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 17 Mar 2025 at 09:37.

Cambridgeshire County Council logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Providence Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Providence Way, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 11 Feb 2025 at 16:48.

Cityfibre Metro Networks logo
Between
14 and 22 Apr 2025
Details
View Map
Share
Follow
Tunbridge Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Tunbridge Lane, Bottisham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Jan 2025 at 08:28.

Cityfibre Metro Networks logo
Between
14 and 22 Apr 2025
Details
View Map
Share
Follow
Tunbridge Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Tunbridge Lane, Bottisham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Jan 2025 at 09:05.

Cadent Gas logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Pieces Terrace

Cadent Gas are proposing to carry out New service connection on Pieces Terrace, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 16:27.

Cambridgeshire County Council logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
Perse Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Perse Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Feb 2025 at 12:58.

Cambridgeshire County Council logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
Perse Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Perse Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:29.

Cambridgeshire County Council logo
Between
23 and 27 Apr 2025
Details
View Map
Share
Follow
Durnford Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Durnford Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Feb 2025 at 00:13.

Cambridgeshire County Council logo
Between
23 and 27 Apr 2025
Details
View Map
Share
Follow
Durnford Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Durnford Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:28.

Cambridgeshire County Council logo
Between
24 and 27 Apr 2025
Details
View Map
Share
Follow
Redfern Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Redfern Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Feb 2025 at 00:09.

Cambridgeshire County Council logo
Between
24 and 27 Apr 2025
Details
View Map
Share
Follow
Redfern Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Redfern Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:05.

Cambridgeshire County Council logo
Between
24 and 27 Apr 2025
Details
View Map
Share
Follow
Montgomery Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Montgomery Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Feb 2025 at 11:23.

Cambridgeshire County Council logo
Between
24 and 27 Apr 2025
Details
View Map
Share
Follow
Montgomery Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Montgomery Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:28.

Cambridgeshire County Council logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Essex Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Essex Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Feb 2025 at 00:17.

Cambridgeshire County Council logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Essex Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Essex Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:26.

Cambridgeshire County Council logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Roland Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Roland Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Feb 2025 at 00:15.

Cambridgeshire County Council logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Roland Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Roland Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:15.

Cambridgeshire County Council logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Cunningham Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cunningham Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Feb 2025 at 13:01.

Cambridgeshire County Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Cunningham Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cunningham Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 6 Mar 2025 at 15:23.

Cambridgeshire County Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Wavell Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Wavell Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Feb 2025 at 00:18.

Cambridgeshire County Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Wavell Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Wavell Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:09.

Cambridgeshire County Council logo
Between
26 and 29 Apr 2025
Details
View Map
Share
Follow
Wynborne Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Wynborne Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Feb 2025 at 00:10.

Cambridgeshire County Council logo
Between
26 and 29 Apr 2025
Details
View Map
Share
Follow
Wynborne Close

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Wynborne Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:09.

Cambridgeshire County Council logo
Between
26 and 29 Apr 2025
Details
View Map
Share
Follow
Brimley Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brimley Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Feb 2025 at 11:36.

Cambridgeshire County Council logo
Between
26 and 29 Apr 2025
Details
View Map
Share
Follow
Brimley Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brimley Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Mar 2025 at 13:03.

Cityfibre Metro Networks logo
Between
28 Apr and 7 May 2025
Details
View Map
Share
Follow
King Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on King Street, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Feb 2025 at 13:19.

Cityfibre Metro Networks logo
Between
28 Apr and 7 May 2025
Details
View Map
Share
Follow
King Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on King Street, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Feb 2025 at 16:00.

Cityfibre Metro Networks logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
Church End

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church End, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Feb 2025 at 13:19.

Cityfibre Metro Networks logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Cycleway From Church Road To Newmarket Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cycleway From Church Road To Newmarket Road, Stow Cum Quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway, verge and cycleway.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 10:14.

Cityfibre Metro Networks logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Church End

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church End, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Feb 2025 at 15:18.

Cityfibre Metro Networks logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Church End

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church End, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 5 Mar 2025 at 10:13.

Cityfibre Metro Networks logo
Between
7 and 12 May 2025
Details
View Map
Share
Follow
Cow Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cow Lane, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Feb 2025 at 13:19.

Cityfibre Metro Networks logo
Between
7 and 12 May 2025
Details
View Map
Share
Follow
Cow Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cow Lane, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Feb 2025 at 11:32.

Cambridge Water Company logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Albert Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Albert Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 17 Mar 2025 at 10:26.

Cambridge Water Company logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Albert Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Albert Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 21 Mar 2025 at 11:56.

Cityfibre Metro Networks logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Station Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Station Road, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 10:15.

Cityfibre Metro Networks logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
Hereward Close

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hereward Close, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 10:50.

Cityfibre Metro Networks logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
Hereward Close

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hereward Close, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 09:28.

Cityfibre Metro Networks logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Hereward Close

Cityfibre Metro Networks were proposing to carry out Utility asset works on Hereward Close, Impington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 10:11.

Cadent Gas logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Waterbeach Road

Cadent Gas are proposing to carry out New service connection on Waterbeach Road, Landbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 15:12.

Cityfibre Metro Networks logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Lockspit Hall Drove

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lockspit Hall Drove, Cottenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 10:45.

Cityfibre Metro Networks logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Lockspit Hall Drove

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lockspit Hall Drove, Cottenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 09:32.

Cityfibre Metro Networks logo
Between
13 and 19 May 2025
Details
View Map
Share
Josiah Court

Cityfibre Metro Networks were proposing to carry out Utility asset works on Josiah Court, Waterbeach.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 May 2025 and run through until 19 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Feb 2025 at 07:35.

Cityfibre Metro Networks logo
Between
13 and 19 May 2025
Details
View Map
Share
Follow
Josiah Court

Cityfibre Metro Networks are proposing to carry out Utility asset works on Josiah Court, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 13:29.

Cityfibre Metro Networks logo
Between
13 and 19 May 2025
Details
View Map
Share
Follow
Josiah Court

Cityfibre Metro Networks are proposing to carry out Utility asset works on Josiah Court, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 15:34.

Cambridge Water Company logo
Between
14 and 16 May 2025
Details
View Map
Share
Follow
The Green

Cambridge Water Company are proposing to carry out New service connection on The Green, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 17 Mar 2025 at 08:56.

Cityfibre Metro Networks logo
Between
14 and 20 May 2025
Details
View Map
Share
Follow
Setchel Drove

Cityfibre Metro Networks are proposing to carry out Utility asset works on Setchel Drove, Cottenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 20 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 13:25.

Cityfibre Metro Networks logo
Between
14 and 20 May 2025
Details
View Map
Share
Follow
Setchel Drove

Cityfibre Metro Networks are proposing to carry out Utility asset works on Setchel Drove, Cottenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 20 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 15:32.

Cityfibre Metro Networks logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Main Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Main Street, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 10:14.

Cadent Gas logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Gunning Way

Cadent Gas are proposing to carry out New service connection on Gunning Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 11:46.

Cityfibre Metro Networks logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Burgess Drove

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgess Drove, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 13:28.

Cityfibre Metro Networks logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Burgess Drove

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgess Drove, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Mar 2025 at 10:11.

Cityfibre Metro Networks logo
Between
26 May and 2 Jun 2025
Details
View Map
Share
Follow
Bishop Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bishop Way, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 11:56.

Cambridge Water Company logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Horningsea Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Horningsea Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 3 Feb 2025 at 12:23.

Cambridgeshire County Council logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Mar 2025 at 11:53.

Cityfibre Metro Networks logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Bishop Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bishop Way, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Mar 2025 at 14:00.

Cityfibre Metro Networks logo
Between
27 May and 2 Jun 2025
Details
View Map
Share
Follow
Impington Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Impington Lane, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 11:58.

Cityfibre Metro Networks logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Impington Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Impington Lane, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Mar 2025 at 14:43.

Cambridgeshire County Council logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Mar 2025 at 12:02.

Cambridgeshire County Council logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
New Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on New Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Mar 2025 at 11:59.

Cambridgeshire County Council logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Mar 2025 at 11:56.

Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Newmarket Road

Stark Infra – Electric are proposing to carry out New service connection on Newmarket Road, Cambridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Stark Infra – Electric on 21 Mar 2025 at 15:02.

Anglian Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Fisher Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Fisher Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 24 Mar 2025 at 10:09.

Cambridgeshire County Council logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Mar 2025 at 08:45.

Cambridgeshire County Council logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Mar 2025 at 08:39.

Cambridgeshire County Council logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
New Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on New Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Mar 2025 at 08:12.

Cambridgeshire County Council logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Oakington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Mar 2025 at 08:07.

Cambridgeshire County Council logo
LONG TERM
Between
2 Jun and 20 Oct 2025
Details
View Map
Share
Follow
Oakington Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Oakington Road, Cottenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 6 Jun 2024 at 14:34.

Cityfibre Metro Networks logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Cow Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cow Lane, Rampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Mar 2025 at 14:29.

Cambridgeshire County Council logo
Between
17 and 26 Jun 2025
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Newmarket Road, Teversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Mar 2025 at 14:48.

Cambridgeshire County Council logo
Between
17 and 25 Jun 2025
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Newmarket Road, Teversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Mar 2025 at 07:36.


Roadworks Map near to Denny End Road, CAMBRIDGE, CB25 9PB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 26 Mar 2025 10:35
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Denny End Road, CAMBRIDGE, CB25 9PB (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cityfibre Metro Networks logo
MAJOR
  
JUBILEE CLOSE 
(0.1 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
Cancelled
(Scheduled: 17 Mar 2025 - 28 Mar 2025)
0.1
Details
Share
2
Cityfibre Metro Networks logo
MAJOR
  
JUBILEE CLOSE 
(0.1 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 17 Mar 2025 - 28 Mar 2025
0.1
Details
Share
Follow
3
Cityfibre Metro Networks logo
MAJOR
  
JUBILEE CLOSE 
(0.1 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
In Progress
Since: 18 Mar 2025 08:51
(Scheduled: 17 Mar 2025 - 31 Mar 2025)
0.1
Details
Share
Follow
4
Cityfibre Metro Networks logo
MAJOR
  
ROBSON COURT 
(0.2 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 17 Mar 2025 - 28 Mar 2025
0.2
Details
Share
Follow
5
Cityfibre Metro Networks logo
MAJOR
  
ROBSON COURT 
(0.2 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
In Progress
Since: 18 Mar 2025 08:52
(Scheduled: 17 Mar 2025 - 31 Mar 2025)
0.2
Details
Share
Follow
6
Cityfibre Metro Networks logo
MAJOR
  
ROBSON COURT 
(0.2 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
Cancelled
(Scheduled: 17 Mar 2025 - 28 Mar 2025)
0.2
Details
Share
7
Cityfibre Metro Networks logo
MAJOR
  
ROOKERY CLOSE 
(0.3 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 17 Mar 2025 - 28 Mar 2025
0.3
Details
Share
Follow
8
Cityfibre Metro Networks logo
MAJOR
  
ROOKERY CLOSE 
(0.3 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
In Progress
Since: 18 Mar 2025 08:53
(Scheduled: 17 Mar 2025 - 31 Mar 2025)
0.3
Details
Share
Follow
9
Cityfibre Metro Networks logo
MAJOR
  
ROOKERY CLOSE 
(0.3 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
Cancelled
(Scheduled: 17 Mar 2025 - 28 Mar 2025)
0.3
Details
Share
10
Cityfibre Metro Networks logo
MAJOR
  
WADDELOW ROAD 
(0.3 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway, Verge - Road closure
In Progress
Since: 18 Mar 2025 08:00
(Scheduled: 17 Mar 2025 - 31 Mar 2025)
0.3
Details
Share
Follow