ROADWORKS SUMMARY
Vineyard Walk, CAMBRIDGE, CB25 9BP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Vineyard Walk, CB25 9BP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Vineyard Walk, CAMBRIDGE, CB25 9BP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Vineyard Walk are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cambridgeshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Lovell Road

Cambridgeshire County Council are carrying out Highway improvement works on Lovell Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 15 Aug 2024 at 10:58.

Cambridgeshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Kings Hedges Road

Cambridgeshire County Council are carrying out Highway improvement works on Kings Hedges Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 19 Aug 2024 at 13:11.

Cambridgeshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are carrying out Highway improvement works on Green End Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 15:24.

Cambridgeshire County Council logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
High Ditch Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 25 Nov 2024 at 12:42.

Cambridgeshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Cambridge To Newmarket Road

Cambridgeshire County Council are carrying out Highway improvement works on Cambridge To Newmarket Road, Swaffham Bulbeck.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Nov 2024 at 10:38.

Cambridgeshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Swaffham Heath Road

Cambridgeshire County Council are carrying out Highway improvement works on Swaffham Heath Road, Dullingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2024 at 13:32.

Cambridgeshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Swaffham Heath Road (C218)

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Swaffham Heath Road (C218), Swaffham Bulbeck.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Nov 2024 at 10:39.

Cambridgeshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Geoffrey Bishop Avenue

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Geoffrey Bishop Avenue, Fulbourn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 07:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 26 Nov 2024 at 11:00.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Brooks Road

UK Power Networks Eastern & London are carrying out New service connection on Brooks Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:15 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 10:39.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Enniskillen Road

Cambridgeshire County Council are proposing to carry out Section 50 on Enniskillen Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 7 Nov 2024 at 15:46.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are proposing to carry out Section 50 on Green End Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 7 Nov 2024 at 15:32.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are carrying out Section 50 on Green End Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:13 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 18 Nov 2024 at 14:30.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Enniskillen Road

Cambridgeshire County Council are carrying out Section 50 on Enniskillen Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:40 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 11 Nov 2024 at 11:26.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on High Street, Horningsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 13 Nov 2024 at 15:41.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on High Street, Horningsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Nov 2024 at 10:41.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Cherry Hinton Road (C235)

Cadent Gas are carrying out Utility repair and maintenance works on Cherry Hinton Road (C235), Cambridge.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 13:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 16:47.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
Cherry Hinton Road (C233)

Electricity Network Company are proposing to carry out Permanent reinstatement on Cherry Hinton Road (C233), Teversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 7 Nov 2024 at 13:36.

Cambridge Water Company logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
High Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on High Street, East Chesterton, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 16 Aug 2024 at 10:38.

Cambridgeshire County Council logo
LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Newmarket Road, Bottisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 11 Jul 2024 at 15:08.

Anglian Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Newnham Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Newnham Lane, Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 13:04.

Anglian Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Newnham Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Newnham Lane, Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 09:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
High Ditch Road

UK Power Networks Eastern & London are proposing to carry out New service connection on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 12:25.

Cityfibre Metro Networks logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Burgess Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgess Road, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Oct 2024 at 09:59.

Cityfibre Metro Networks logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Burgess Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgess Road, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Oct 2024 at 10:37.

Cityfibre Metro Networks logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Burgess Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgess Road, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Oct 2024 at 10:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
High Ditch Road

UK Power Networks Eastern & London are proposing to carry out New service connection on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 09:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
High Ditch Road

UK Power Networks Eastern & London are proposing to carry out New service connection on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 15:01.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Cow Lane

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cow Lane, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 11 Nov 2024 at 15:55.

Cambridgeshire County Council logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Brookfields (C280)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brookfields (C280), Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 15 Oct 2024 at 16:42.

Cambridgeshire County Council logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Brookfields (C280)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brookfields (C280), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Oct 2024 at 15:54.

Cambridge Water Company logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
High Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on High Street, East Chesterton, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 16 Oct 2024 at 14:58.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 12:58.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Queens Meadow

UK Power Networks Eastern & London were proposing to carry out New service connection on Queens Meadow, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 10:51.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Queens Meadow

UK Power Networks Eastern & London are proposing to carry out New service connection on Queens Meadow, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:01.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Queens Meadow

UK Power Networks Eastern & London are proposing to carry out New service connection on Queens Meadow, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:18.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 12:53.

Cambridgeshire County Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Dullingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Sep 2024 at 15:33.

Cambridgeshire County Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Dullingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 24 Sep 2024 at 08:18.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Lanes

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on The Lanes, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Nov 2024 at 12:06.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 15:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Brooks Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Brooks Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Jun 2024 at 14:57.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Lanes

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on The Lanes, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Nov 2024 at 14:02.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 19 Nov 2024 at 12:27.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 7 Nov 2024 at 15:12.

Cityfibre Metro Networks logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Cycleway From Church Road To Newmarket Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cycleway From Church Road To Newmarket Road, Stow Cum Quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway, verge and cycleway.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Nov 2024 at 07:52.

Cityfibre Metro Networks logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

Cityfibre Metro Networks are proposing to carry out Utility asset works on Fulbourn Old Drift, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 09:45.

Cityfibre Metro Networks logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Cycleway From Church Road To Newmarket Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cycleway From Church Road To Newmarket Road, Stow Cum Quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway, verge and cycleway.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 09:35.

Cityfibre Metro Networks logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Station Road, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 15:17.

Cityfibre Metro Networks logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Station Road, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Nov 2024 at 07:53.

Cambridgeshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 14:11.

Cambridgeshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 11 Nov 2024 at 11:28.

Cambridgeshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 5 Nov 2024 at 10:59.

Cityfibre Metro Networks logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Main Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Main Street, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 10:16.

Cityfibre Metro Networks logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Main Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Main Street, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Nov 2024 at 07:52.

Cityfibre Metro Networks logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Stonebridge Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Stonebridge Lane, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Nov 2024 at 11:53.

Cambridge Water Company logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Fulbourn Old Drift

Cambridge Water Company were proposing to carry out Utility asset works on Fulbourn Old Drift, Fulbourn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 2 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 25 Nov 2024 at 14:58.

Cityfibre Metro Networks logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Stonebridge Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Stonebridge Lane, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Nov 2024 at 12:09.

Cambridgeshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Nov 2024 at 15:25.

Cambridgeshire County Council logo
Between
16 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Newmarket Road, Stow-cum-quy.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 19 Sep 2024 at 12:29.

Cambridge Water Company logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

Cambridge Water Company are proposing to carry out Utility asset works on Fulbourn Old Drift, Fulbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 25 Nov 2024 at 14:58.

Cityfibre Metro Networks logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Cattells Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cattells Lane, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 11:12.

Anglian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Causeway (C221)

Anglian Water are proposing to carry out Utility repair and maintenance works on The Causeway (C221), Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 13:52.

Cadent Gas logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Stourbridge Grove

Cadent Gas are proposing to carry out New service connection on Stourbridge Grove, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 12:15.

Cambridge Water Company logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Horningsea Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Horningsea Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 30 Oct 2024 at 08:24.

Cambridge Water Company logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Horningsea Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Horningsea Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 23 Oct 2024 at 12:37.

Cambridge Water Company logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Horningsea Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Horningsea Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 30 Aug 2024 at 15:17.

Cityfibre Metro Networks logo
Between
19 and 27 Feb 2025
Details
View Map
Share
Cambridge Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Cambridge Road, Waterbeach.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 27 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 11:34.

Cityfibre Metro Networks logo
Between
21 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Cambridge Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cambridge Road, Waterbeach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 11:35.

Nexfibre Networks Limited logo
Between
22 and 25 Feb 2025
Details
View Map
Share
Heath Road

Nexfibre Networks Limited were proposing to carry out Utility asset works on Heath Road, Burwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 February 2025 and run through until 25 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 25 Nov 2024 at 11:30.

Nexfibre Networks Limited logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Heath Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Heath Road, Burwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 25 Nov 2024 at 11:31.


Roadworks Map near to Vineyard Walk, CAMBRIDGE, CB25 9BP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 06:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Vineyard Walk, CAMBRIDGE, CB25 9BP (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cambridgeshire County Council logo
SPRING LANE 
(0.1 miles)
Cambridgeshire County Council
Highway improvement works - Verge - Some carriageway incursion
Planned
Scheduled: 27 Nov 2024 - 28 Nov 2024
0.1
Details
Share
Follow
2
Cityfibre Metro Networks logo
BEECHWOOD AVENUE 
(0.2 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 27 Nov 2024 - 10 Dec 2024
0.2
Details
Share
Follow
3
Cityfibre Metro Networks logo
HIGH STREET 
(0.2 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 27 Nov 2024 - 10 Dec 2024
0.2
Details
Share
Follow
4
Cityfibre Metro Networks logo
STOCKS CLOSE 
(0.2 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Verge - Give and take
Planned
Scheduled: 27 Nov 2024 - 29 Nov 2024
0.2
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.