ROADWORKS SUMMARY
Kenwood Gardens, CAMBRIDGE, CB21 4UR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Kenwood Gardens, CB21 4UR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Kenwood Gardens, CAMBRIDGE, CB21 4UR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kenwood Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cambridgeshire County Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are carrying out Works for road purposes on Cambridge Road, Hinxton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 09:39 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 12 Feb 2025 at 13:50.

Cambridgeshire County Council logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Granta Vale

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Granta Vale, Linton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 27 Feb 2025 at 11:28.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Little Walden Road

Essex County Council are proposing to carry out Highway improvement works on Little Walden Road, Saffron Walden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Feb 2025 at 10:49.

Cambridgeshire County Council logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Linton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 26 Feb 2025 at 14:21.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lambert Cross

Essex County Council are proposing to carry out Highway improvement works on Lambert Cross, Saffron Walden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Feb 2025 at 10:03.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Little Walden Road

Essex County Council are proposing to carry out Highway improvement works on Little Walden Road, Saffron Walden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Feb 2025 at 12:58.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Cambridge Road

Essex County Council are proposing to carry out Highway improvement works on Cambridge Road, Little Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:42.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Ickleton Road

Essex County Council are proposing to carry out Highway improvement works on Ickleton Road, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Feb 2025 at 10:21.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Ickleton Road

Essex County Council are proposing to carry out Highway improvement works on Ickleton Road, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:43.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
London Road

Essex County Council are proposing to carry out Highway improvement works on London Road, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Feb 2025 at 11:42.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
London Road

Essex County Council are proposing to carry out Highway improvement works on London Road, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:42.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Newmarket Road

Essex County Council are proposing to carry out Highway improvement works on Newmarket Road, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:41.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
London Road

Essex County Council are proposing to carry out Highway improvement works on London Road, Little Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Feb 2025 at 11:41.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
London Road

Essex County Council are proposing to carry out Highway improvement works on London Road, Little Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:42.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Cambridge Road

Essex County Council are proposing to carry out Highway improvement works on Cambridge Road, Little Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Feb 2025 at 11:39.

Essex County Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Newmarket Road

Essex County Council are proposing to carry out Highway improvement works on Newmarket Road, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Feb 2025 at 11:46.

Network Rail logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Ickleton Road

Network Rail are proposing to carry out Works for Rail Purposes on Ickleton Road, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Dec 2024 at 11:17.

Network Rail logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Ickleton Road

Network Rail are proposing to carry out Works for Rail Purposes on Ickleton Road, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Jan 2025 at 16:04.

Cambridgeshire County Council logo
LONG TERM
Between
10 Mar and 24 Apr 2025
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Linton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 19 Feb 2025 at 15:24.

Essex County Council logo
Between
17 and 29 Mar 2025
Details
View Map
Share
Walden Road

Essex County Council were proposing to carry out Highway improvement works on Walden Road, Great Chesterford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Feb 2025 at 18:31.

Affinity Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Fallowden Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Fallowden Lane, Ashdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Jan 2025 at 10:16.

Affinity Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Fallowden Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Fallowden Lane, Ashdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Jan 2025 at 11:41.

Cambridgeshire County Council logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
A1307 From Linton To Horseheath Bypass Single Carriageway Section

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on A1307 From Linton To Horseheath Bypass Single Carriageway Section, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Feb 2025 at 15:26.

Cambridgeshire County Council logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Linton Bypass

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Linton Bypass, Linton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Feb 2025 at 15:25.

Cambridgeshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
High Street (B1052)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on High Street (B1052), Linton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 27 Feb 2025 at 13:56.

Cambridgeshire County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
High Street (B1052)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on High Street (B1052), Linton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 4 Feb 2025 at 11:09.

Cambridgeshire County Council logo
Between
9 and 12 Apr 2025
Details
View Map
Share
Follow
Horseshoes Lane

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Horseshoes Lane, Weston Colville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 19 Feb 2025 at 12:31.

Cambridgeshire County Council logo
Between
10 and 13 Apr 2025
Details
View Map
Share
Follow
Horseshoes Lane

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Horseshoes Lane, Weston Colville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 26 Feb 2025 at 15:30.

BT logo
Between
16 and 24 Apr 2025
Details
View Map
Share
Haverhill Road

BT were proposing to carry out Utility asset works on Haverhill Road, Horseheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 April 2025 and run through until 24 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 09:56.

Cambridge Water Company logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
High Street (B1052)

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on High Street (B1052), Linton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 24 Feb 2025 at 15:56.

Nexfibre Networks Limited logo
Between
8 May and 5 Jun 2025
Details
View Map
Share
Follow
Cambridge Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Cambridge Road, Withersfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 5 June 2025. The works will impact the verge only.

This roadwork event was last updated by Nexfibre Networks Limited on 12 Feb 2025 at 17:14.

Nexfibre Networks Limited logo
Between
8 May and 5 Jun 2025
Details
View Map
Share
Follow
Linton Bypass

Nexfibre Networks Limited are proposing to carry out Utility asset works on Linton Bypass, Linton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 5 June 2025. The works will impact the verge only.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Feb 2025 at 08:58.

Nexfibre Networks Limited logo
Between
8 May and 5 Jun 2025
Details
View Map
Share
Follow
A1307 From Linton To Horseheath Bypass Single Carriageway Section

Nexfibre Networks Limited are proposing to carry out Utility asset works on A1307 From Linton To Horseheath Bypass Single Carriageway Section, Horseheath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 5 June 2025. The works will impact the verge only.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Feb 2025 at 08:59.

Affinity Water logo
Between
8 and 12 May 2025
Details
View Map
Share
Follow
School Street

Affinity Water are proposing to carry out Utility repair and maintenance works on School Street, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Feb 2025 at 09:47.

Affinity Water logo
Between
8 and 12 May 2025
Details
View Map
Share
Follow
Church Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Church Street, Great Chesterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Feb 2025 at 09:48.

Nexfibre Networks Limited logo
Between
8 May and 5 Jun 2025
Details
View Map
Share
Follow
Haverhill Road (A1307)

Nexfibre Networks Limited are proposing to carry out Utility asset works on Haverhill Road (A1307), Horseheath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 5 June 2025. The works will impact the verge only.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Feb 2025 at 08:59.

Cadent Gas logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Linton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 10:30.

Cambridgeshire County Council logo
Between
18 and 21 May 2025
Details
View Map
Share
Follow
Bull Lane

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Bull Lane, West Wratting.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 13 Feb 2025 at 12:19.

Cambridgeshire County Council logo
Between
18 and 21 May 2025
Details
View Map
Share
Follow
Horseheath Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Horseheath Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Feb 2025 at 14:50.

Cambridgeshire County Council logo
Between
18 and 21 May 2025
Details
View Map
Share
Follow
Cardinals Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cardinals Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Feb 2025 at 14:51.

Cambridgeshire County Council logo
Between
18 and 21 May 2025
Details
View Map
Share
Follow
Mill Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mill Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Feb 2025 at 14:49.

Cambridgeshire County Council logo
Between
18 and 21 May 2025
Details
View Map
Share
Follow
Mill Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mill Green, Shudy Camps.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Feb 2025 at 14:49.

BT logo
Between
19 May and 11 Jun 2025
Details
View Map
Share
Linton Bypass

BT were proposing to carry out Utility asset works on Linton Bypass, Linton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 11 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 09:43.

BT logo
Between
19 May and 11 Jun 2025
Details
View Map
Share
A1307 From Linton To Horseheath Bypass Single Carriageway Section

BT were proposing to carry out Utility asset works on A1307 From Linton To Horseheath Bypass Single Carriageway Section, Horseheath.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 11 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 09:49.

Cambridgeshire County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Horseheath Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Horseheath Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Feb 2025 at 11:22.

Cambridgeshire County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Cardinals Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cardinals Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Feb 2025 at 11:24.

Cambridgeshire County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Mill Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mill Green, Horseheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Feb 2025 at 11:26.

Cadent Gas logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Back Road

Cadent Gas are proposing to carry out New service connection on Back Road, Linton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 15:00.

Cambridgeshire County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Mill Green

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mill Green, Shudy Camps.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Feb 2025 at 11:28.


Roadworks Map near to Kenwood Gardens, CAMBRIDGE, CB21 4UR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 2 Mar 2025 15:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Kenwood Gardens, CAMBRIDGE, CB21 4UR (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nexfibre Networks Limited logo
LONSDALE 
(0.2 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 24 Feb 2025 - 3 Mar 2025)
0.2
Details
Share
2
Nexfibre Networks Limited logo
RHUGARVE GARDENS 
(0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 24 Feb 2025 - 3 Mar 2025)
0.3
Details
Share
3
Cambridgeshire County Council logo
MAJOR
  
GRANTA VALE 
(0.4 miles)
Cambridgeshire County Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 6 Jan 2025 08:00
(Scheduled: 6 Jan 2025 - 30 May 2025)
0.4
Details
Share
Follow
4
Cambridgeshire County Council logo
MAJOR
  
HIGH STREET 
(0.4 miles)
Cambridgeshire County Council
Highway repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 3 Mar 2025 - 30 May 2025
0.4
Details
Share
Follow
5
Nexfibre Networks Limited logo
PALMERS CLOSE 
(0.9 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway, Verge -
Planned
Scheduled: 18 Feb 2025 - 3 Mar 2025
0.9
Details
Share
Follow
6
Nexfibre Networks Limited logo
CRABTREE CROFT 
(0.9 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway -
Planned
Scheduled: 26 Feb 2025 - 11 Mar 2025
0.9
Details
Share
Follow
7
Nexfibre Networks Limited logo
FOOTPATH OFF CRABTREE CROFT 
(0.9 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway -
Cancelled
(Scheduled: 26 Feb 2025 - 11 Mar 2025)
0.9
Details
Share
8
Nexfibre Networks Limited logo
GRANTA LEYS 
(0.9 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway -
Planned
Scheduled: 27 Feb 2025 - 12 Mar 2025
0.9
Details
Share
Follow
9
Nexfibre Networks Limited logo
THE GROVE 
(0.9 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway -
Planned
Scheduled: 26 Feb 2025 - 11 Mar 2025
0.9
Details
Share
Follow
10
Nexfibre Networks Limited logo
CHERRY CLOSE 
(1.0 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway -
Planned
Scheduled: 26 Feb 2025 - 11 Mar 2025
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.