ROADWORKS SUMMARY
Camps End, CAMBRIDGE, CB21 4TR
Introduction
View current and future planned roadworks and road closures for Camps End, CB21 4TR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Camps End, CAMBRIDGE, CB21 4TR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Camps End are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
11 Nov 2024 and 17 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Bumpstead Road, Sturmer.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 20 Sep 2024 at 15:56.
6 Mar 2025
Cadent Gas are carrying out Utility asset works on Thaxted Road, Saffron Walden.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:11 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:15.
18 Nov 2024 and 6 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Thaxted Road, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 13:27.
18 Nov 2024 and 6 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Thaxted Road, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:00.
Friday
Cambridgeshire County Council are carrying out Highway repair and maintenance works on Granta Vale, Linton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 6 Dec 2024 at 17:31.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Bumpstead Road, Haverhill.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 14:19 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 12:23.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Sturmer Road, Haverhill.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 14:21 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 12:21.
2 Dec 2024 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Shire Hill, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 14:48.
Friday
Essex County Council are proposing to carry out Highway improvement works on Water Lane, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Aug 2024 at 09:10.
3 Dec 2024 and 3 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Victoria Avenue, Saffron Walden.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 11:50.
3 Dec 2024 and 3 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Avenue, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:43.
Today
Nexfibre Networks Limited are proposing to carry out Utility asset works on Chauntry Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 26 Sep 2024 at 08:20.
Today
Nexfibre Networks Limited are proposing to carry out Utility asset works on Chauntry Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 10:47.
Today
Nexfibre Networks Limited are proposing to carry out Utility asset works on Mill Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 25 Sep 2024 at 15:36.
Today
Nexfibre Networks Limited are proposing to carry out Utility asset works on Mill Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 17 Sep 2024 at 10:45.
Today
Suffolk County Council are carrying out Highway improvement works on Burton End, Haverhill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 08:30 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 16 Dec 2024 at 08:53.
Today
Suffolk County Council are proposing to carry out Highway improvement works on Burton End, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 4 Nov 2024 at 12:51.
Friday
Suffolk County Council were proposing to carry out Highway improvement works on Millfields Way, Haverhill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 24 Oct 2024 at 14:43.
Friday
Suffolk County Council are proposing to carry out Highway improvement works on Millfields Way, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 24 Oct 2024 at 16:01.
Friday
Suffolk County Council are proposing to carry out Highway improvement works on Millfields Way, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 28 Oct 2024 at 11:00.
6 and 8 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Blois Road, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Jul 2024 at 09:35.
6 Jan and 21 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 14:56.
6 Jan and 7 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 13:24.
6 Jan and 7 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 08:58.
6 and 8 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Blois Road, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jul 2024 at 16:06.
6 Jan and 21 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 11 Nov 2024 at 11:49.
6 and 13 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Long Lane, Linton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Oct 2024 at 10:15.
6 and 13 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Long Lane, Linton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Dec 2024 at 09:04.
6 Jan and 7 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Granta Vale, Linton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 10:17.
6 Jan and 7 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Granta Vale, Linton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 11 Nov 2024 at 11:45.
6 Jan and 7 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Granta Vale, Linton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 19 Nov 2024 at 10:35.
6 and 8 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Walden Road, Radwinter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 15:04.
6 and 8 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Walden Road, Radwinter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 12:26.
6 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Shire Hill, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 15:56.
6 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Shire Hill, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 08:10.
6 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Shire Hill, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 13:37.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Linton Road, Hadstock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 13:30.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Linton Road, Hadstock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 13:48.
9 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 16:17.
9 Jan and 10 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:19.
9 Jan and 23 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:25.
13 Jan and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Road, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:31.
13 and 15 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Anso Road, Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 15:00.
13 and 15 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Anso Road, Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 12:21.
13 Jan and 14 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Endway, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:11.
14 and 17 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Anso Road, Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:26.
14 and 17 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Anso Road, Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 13:01.
27 and 29 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Bartlow Road, Hadstock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 11:15.
27 and 29 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Bartlow Road, Hadstock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:05.
27 Jan and 21 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 28 Nov 2024 at 09:22.
27 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Avenue, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 12:33.
27 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Avenue, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 12:38.
27 Jan and 21 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on North Street, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 08:56.
27 Jan and 21 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on North Street, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 14:52.
27 Jan and 21 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 16:16.
30 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:33.
30 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:31.
30 Jan and 23 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on North Street, Steeple Bumpstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:29.
30 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:35.
30 Jan and 23 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:35.
31 Jan and 2 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on A1307 From Linton To Horseheath Bypass Single Carriageway Section, Horseheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 13 Dec 2024 at 13:09.
31 Jan and 2 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Linton Bypass, Linton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 13 Dec 2024 at 13:06.
3 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Steeple Bumpstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:33.
3 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Blois Road, Steeple Bumpstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 10:35.
4 and 6 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Saffron Walden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 10:10.
5 and 7 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Thaxted Road, Wimbish.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 February 2025 and run through until 7 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 13:36.
7 Feb and 8 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on North Avenue, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:00.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Queensway, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:30.
14 Feb and 30 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Crowland Road, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:30.
17 Feb and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Shire Hill, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 12:14.
17 Feb and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Shire Hill, Saffron Walden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 16:22.
17 and 21 Feb 2025
Suffolk County Council are proposing to carry out Highway improvement works on Millfields Way, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 29 Oct 2024 at 12:19.
19 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Lambert Cross, Saffron Walden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 12:50.
19 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Little Walden Road, Saffron Walden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 10:01.
21 Feb and 6 May 2025
Cadent Gas are proposing to carry out Utility asset works on Eastern Avenue, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:00.
21 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Allington Walk, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:30.
24 and 28 Feb 2025
Cadent Gas are proposing to carry out New service connection on Mill Lane, Linton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 10:48.
24 Feb and 28 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Bumpstead Road, Sturmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 11 Nov 2024 at 12:03.
24 Feb and 28 Mar 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 10:15.
24 Feb and 28 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Bumpstead Road, Sturmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:17.
28 Feb and 1 Apr 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 1 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 16:23.
28 Feb and 1 Apr 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 1 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 16:42.
28 Feb and 1 Apr 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Haverhill Bypass, Haverhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 1 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 14:15.
3 and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Castle Lane, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:30.
4 and 7 Mar 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Radwinter Road, Sewards End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 3 Oct 2024 at 15:09.
10 and 13 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Anso Road, Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 15:08.
14 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Downs Crescent, Haverhill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:00.
14 and 18 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Girton Road, Haverhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 11:39.
17 and 19 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Fallowden Lane, Ashdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 12 Dec 2024 at 10:04.
Roadworks Map near to Camps End, CAMBRIDGE, CB21 4TR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Camps End, CAMBRIDGE, CB21 4TR (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.