ROADWORKS SUMMARY
Ruckcroft, Armathwaite, CARLISLE, CA4 9QS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for CA4 9QS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ruckcroft, Armathwaite, CARLISLE, CA4 9QS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
10 Mar 2025
Details
View Map
Share
Follow
Brockley Moor

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Brockley Moor, Plumpton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Feb 2025 at 09:55.

Fibrus Networks logo
Finishing
Today
Details
View Map
Share
Ainstable On The C1039 From Dale To The U3049

Fibrus Networks were proposing to carry out Utility asset works on Ainstable On The C1039 From Dale To The U3049, Ainstable.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 February 2025 and run through until 16 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:38.

Fibrus Networks logo
Finishing
Wednesday
Details
View Map
Share
Lane From Staffield Cottages To Strait Loaning

Fibrus Networks were proposing to carry out Utility asset works on Lane From Staffield Cottages To Strait Loaning, Staffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:39.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Calthwaite On The C1037 From Low Wool Oaks To Hallrigg

BT are proposing to carry out Utility asset works on Calthwaite On The C1037 From Low Wool Oaks To Hallrigg, Calthwaite.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 Jan 2025 at 10:25.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Calthwaite On The C1037 From Low Wool Oaks To Hallrigg

BT are proposing to carry out Utility asset works on Calthwaite On The C1037 From Low Wool Oaks To Hallrigg, Calthwaite.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 25 Nov 2024 at 13:07.

Fibrus Networks logo
Finishing
Friday
Details
View Map
Share
Follow
From The C1042 To The B6431

Fibrus Networks are proposing to carry out Utility asset works on From The C1042 To The B6431, Armathwaite.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 3 Feb 2025 at 12:38.

Fibrus Networks logo
Finishing
Friday
Details
View Map
Share
Follow
From The C1042 To The B6431

Fibrus Networks are proposing to carry out Utility asset works on From The C1042 To The B6431, Armathwaite.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 10 Sep 2024 at 08:52.

Fibrus Networks logo
Finishing
Saturday
Details
View Map
Share
Ainstable On The U3049 From The C1039 Back To The C1039 At Bell House

Fibrus Networks were proposing to carry out Utility asset works on Ainstable On The U3049 From The C1039 Back To The C1039 At Bell House, Ainstable.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 22 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:39.

Fibrus Networks logo
Between
22 and 24 Feb 2025
Details
View Map
Share
Road On The C3018 From South Dyke To The Junction With The C3002

Fibrus Networks were proposing to carry out Utility asset works on Road On The C3018 From South Dyke To The Junction With The C3002, South Dyke, Great Salkeld.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:40.

Fibrus Networks logo
Between
22 and 24 Feb 2025
Details
View Map
Share
Road From Great Salkeld On The C3018 Green Lane To South Dyke

Fibrus Networks were proposing to carry out Utility asset works on Road From Great Salkeld On The C3018 Green Lane To South Dyke, Great Salkeld.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:40.

Fibrus Networks logo
Between
23 and 25 Feb 2025
Details
View Map
Share
Access Road To Ruckcroft From The C1042

Fibrus Networks were proposing to carry out Utility asset works on Access Road To Ruckcroft From The C1042, Armathwaite.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 February 2025 and run through until 25 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:41.

Fibrus Networks logo
Between
25 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Southwaite Road

Fibrus Networks are proposing to carry out Utility asset works on Southwaite Road, Low Hesket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 10 Feb 2025 at 12:01.

Fibrus Networks logo
Between
25 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Southwaite Road

Fibrus Networks are proposing to carry out Utility asset works on Southwaite Road, Low Hesket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 6 Feb 2025 at 14:19.

Fibrus Networks logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Access Road U3074 To Newbiggin From The C1042 Crossing The B6413

Fibrus Networks were proposing to carry out Utility asset works on Access Road U3074 To Newbiggin From The C1042 Crossing The B6413, Heads Nook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 27 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:41.

Fibrus Networks logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Ainstable On The C1039 From Dale To The U3049

Fibrus Networks are proposing to carry out Utility asset works on Ainstable On The C1039 From Dale To The U3049, Ainstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 24 Sep 2024 at 12:02.

Fibrus Networks logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Ainstable On The C1039 From Dale To The U3049

Fibrus Networks are proposing to carry out Utility asset works on Ainstable On The C1039 From Dale To The U3049, Ainstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 12 Feb 2025 at 10:33.

Fibrus Networks logo
Between
28 Feb and 2 Mar 2025
Details
View Map
Share
Access Roads Into Great Salkeld

Fibrus Networks were proposing to carry out Utility asset works on Access Roads Into Great Salkeld, Great Salkeld.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 2 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:42.

Fibrus Networks logo
Between
28 Feb and 3 Mar 2025
Details
View Map
Share
Follow
High Bank Hill On The B6413 To The Junction Of The U3054

Fibrus Networks are proposing to carry out Utility asset works on High Bank Hill On The B6413 To The Junction Of The U3054, Kirkoswald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 3 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 13 Feb 2025 at 14:45.

Fibrus Networks logo
Between
28 Feb and 3 Mar 2025
Details
View Map
Share
Follow
High Bank Hill On The B6413 To The Junction Of The U3054

Fibrus Networks are proposing to carry out Utility asset works on High Bank Hill On The B6413 To The Junction Of The U3054, Kirkoswald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 3 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 17 Oct 2024 at 09:04.

Fibrus Networks logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Ainstable On The C3024 To The C1042 At Cairnhead Farm

Fibrus Networks are proposing to carry out Utility asset works on Ainstable On The C3024 To The C1042 At Cairnhead Farm, Ainstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 10 Sep 2024 at 08:54.

Fibrus Networks logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Road On The C1042 From The County Boundary To The C1038 Via Ainstable And Ruckcroft

Fibrus Networks were proposing to carry out Utility asset works on Road On The C1042 From The County Boundary To The C1038 Via Ainstable And Ruckcroft, Armathwaite.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 5 Sep 2024 at 13:25.

Fibrus Networks logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Road On The C1042 From The County Boundary To The C1038 Via Ainstable And Ruckcroft

Fibrus Networks are proposing to carry out Utility asset works on Road On The C1042 From The County Boundary To The C1038 Via Ainstable And Ruckcroft, Armathwaite.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 10 Sep 2024 at 08:55.

Fibrus Networks logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Croglin On The B6413 From The U3077 To Sumburgh House

Fibrus Networks were proposing to carry out Utility asset works on Croglin On The B6413 From The U3077 To Sumburgh House, Croglin.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 22 Nov 2024 at 14:26.

Fibrus Networks logo
Between
6 and 8 Mar 2025
Details
View Map
Share
Road On The C1042 From The County Boundary To The C1038 Via Ainstable And Ruckcroft

Fibrus Networks were proposing to carry out Utility asset works on Road On The C1042 From The County Boundary To The C1038 Via Ainstable And Ruckcroft, Armathwaite.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 March 2025 and run through until 8 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:43.

Fibrus Networks logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Croglin On The B6413 From The U3077 To Sumburgh House

Fibrus Networks were proposing to carry out Utility asset works on Croglin On The B6413 From The U3077 To Sumburgh House, Croglin.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 March 2025 and run through until 11 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 22 Nov 2024 at 14:27.

Fibrus Networks logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Newbiggin On The B6413 To The District Boundary

Fibrus Networks were proposing to carry out Utility asset works on Newbiggin On The B6413 To The District Boundary, Newbiggin, Heads Nook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 March 2025 and run through until 11 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 22 Nov 2024 at 14:28.

Fibrus Networks logo
Between
9 and 11 Mar 2025
Details
View Map
Share
Road On The C3017 From The Junction With The B6413 To Windyridge

Fibrus Networks were proposing to carry out Utility asset works on Road On The C3017 From The Junction With The B6413 To Windyridge, North Dykes, Great Salkeld.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 March 2025 and run through until 11 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:45.

Fibrus Networks logo
Between
9 and 11 Mar 2025
Details
View Map
Share
Road From Windyridge On The C3017 To South Dyke At The Junction With The C3018

Fibrus Networks were proposing to carry out Utility asset works on Road From Windyridge On The C3017 To South Dyke At The Junction With The C3018, South Dyke, Great Salkeld.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 March 2025 and run through until 11 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:44.

Fibrus Networks logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Lazonby On The B6413 From The C3017 To Eden Bridge

Fibrus Networks were proposing to carry out Utility asset works on Lazonby On The B6413 From The C3017 To Eden Bridge, Lazonby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 22 Nov 2024 at 14:29.

Fibrus Networks logo
Between
15 and 17 Mar 2025
Details
View Map
Share
Road Along Front Street On The C1038 From The Junction With The C1040

Fibrus Networks were proposing to carry out Utility asset works on Road Along Front Street On The C1038 From The Junction With The C1040, Armathwaite.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 17 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 27 Jan 2025 at 12:37.

Fibrus Networks logo
Between
15 and 17 Mar 2025
Details
View Map
Share
Follow
Armathwaite On The C1038 From Front Street To The District Boundary

Fibrus Networks are proposing to carry out Utility asset works on Armathwaite On The C1038 From Front Street To The District Boundary, Armathwaite.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 19 Nov 2024 at 16:14.

Fibrus Networks logo
Between
15 and 18 Mar 2025
Details
View Map
Share
Follow
Armathwaite On The C3007 To Crag Nook

Fibrus Networks are proposing to carry out Utility asset works on Armathwaite On The C3007 To Crag Nook, Armathwaite.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 18 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 26 Sep 2024 at 09:57.

Fibrus Networks logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Road On The C1042 From The County Boundary To The C1038 Via Ainstable And Ruckcroft

Fibrus Networks were proposing to carry out Utility asset works on Road On The C1042 From The County Boundary To The C1038 Via Ainstable And Ruckcroft, Armathwaite.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Nov 2024 at 15:46.

Fibrus Networks logo
Between
22 and 24 Mar 2025
Details
View Map
Share
Follow
Armathwaite On The U3050 To The U3047

Fibrus Networks are proposing to carry out Utility asset works on Armathwaite On The U3050 To The U3047, Armathwaite.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 March 2025 and could run through until 24 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 26 Sep 2024 at 09:55.

BT logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
Calthwaite On The C1037 From Low Wool Oaks To Hallrigg

BT are proposing to carry out Utility repair and maintenance works on Calthwaite On The C1037 From Low Wool Oaks To Hallrigg, Calthwaite.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Jan 2025 at 10:42.

Fibrus Networks logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Low Hesket To The C3015

Fibrus Networks are proposing to carry out Utility asset works on Low Hesket To The C3015, Low Hesket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 11 Feb 2025 at 13:32.


Roadworks Map near to Ruckcroft, Armathwaite, CARLISLE, CA4 9QS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Feb 2025 12:14
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ruckcroft, Armathwaite, CARLISLE, CA4 9QS (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
ACCESS ROAD TO RUCKCROFT FROM THE C1042 
(0.4 miles)
United Utilities Water (formerly North West Water)
Remedial works - Footway -
Planned
Scheduled: 17 Feb 2025
0.4
Details
Share
Follow
2
Fibrus Networks logo
MAJOR
  
LANE FROM STAFFIELD COTTAGES TO STRAIT LOANING 
(1.0 miles)
Fibrus Networks
Utility asset works - Carriageway, Verge - Road closure
Cancelled
(Scheduled: 17 Feb 2025 - 19 Feb 2025)
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.