ROADWORKS SUMMARY
Inglewood Close, WORKINGTON, CA14 4LE
Introduction
View current and future planned roadworks and road closures for Inglewood Close, CA14 4LE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Inglewood Close, WORKINGTON, CA14 4LE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Inglewood Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
20 May 2025
Cumberland Council are carrying out Highway repair and maintenance works on Camerton To Great Broughton, Camerton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2023 at 07:00 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 16 May 2024 at 04:58.
2 Jan 2024 and 29 May 2025
Westmorland And Furness Council are proposing to carry out Highway improvement works on Central Way, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 29 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Westmorland And Furness Council on 18 Oct 2023 at 11:22.
2 Jan 2024 and 30 May 2025
Cumberland Council are proposing to carry out Highway improvement works on Central Way, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 30 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cumberland Council on 19 Oct 2023 at 13:01.
Thursday
Northern Gas Networks are carrying out Utility repair and maintenance works on High Seaton Village, Seaton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 08:00 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 08:33.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Seaton Village, Seaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 14:44.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Seaton Village, Seaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 11:40.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Seaton Village, Seaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 13:44.
2 Dec 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 07:17.
2 Dec 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 10:15.
23 Dec 2024 and 7 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on High Seaton Village, Seaton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 14:02.
30 Dec 2024 and 21 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 December 2024 and run through until 21 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 15:35.
2 Jan and 6 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lowca, Whitehaven.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 14:43.
2 Jan and 6 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Lowca, Whitehaven.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 6 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 09:42.
2 Jan and 6 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on From Junction With Keys Brow To Boundary Near Jubilee House, High Harrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 14:49.
2 Jan and 6 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on From Junction With Keys Brow To Boundary Near Jubilee House, High Harrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 09:41.
23 Jan 2025
Cumberland Council are carrying out Highway repair and maintenance works on Hugh Street, Whitehaven.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2025 at 08:00 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 3 Jan 2025 at 12:00.
6 Jan and 4 Apr 2025
Cumberland Council were proposing to carry out Highway improvement works on Hall Park View, Workington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 12:29.
6 Jan and 4 Apr 2025
Cumberland Council were proposing to carry out Highway improvement works on Bridge Street, Workington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 12:28.
6 Jan and 4 Apr 2025
Cumberland Council were proposing to carry out Highway improvement works on Bridge Street, Workington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 12:24.
6 Jan and 4 Apr 2025
Cumberland Council were proposing to carry out Highway improvement works on Ramsay Brow, Workington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 12:26.
6 Jan and 4 Apr 2025
Cumberland Council were proposing to carry out Highway improvement works on Ramsay Brow, Workington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 12:27.
6 Jan and 31 May 2025
Cumberland Council are proposing to carry out Highway improvement works on Murray Road, Workington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 7 Nov 2024 at 09:44.
6 Jan and 30 May 2025
Cumberland Council were proposing to carry out Highway improvement works on Murray Road, Workington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 2 Oct 2024 at 14:36.
6 Jan and 4 Apr 2025
Cumberland Council were proposing to carry out Highway improvement works on Bridge Street, Workington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 12:27.
6 Jan and 4 Apr 2025
Cumberland Council were proposing to carry out Highway improvement works on Hall Brow, Workington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 12:29.
6 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Minster Close, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 07:35.
6 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Minster Close, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Oct 2024 at 14:51.
6 Jan and 7 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Calder Drive, Workington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 1 Oct 2024 at 13:53.
6 and 31 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Minster Close, Workington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 09:33.
Saturday
Fibrus Networks are proposing to carry out Utility asset works on Arlecdon Road, Arlecdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Fibrus Networks on 11 Dec 2024 at 13:01.
Saturday
Fibrus Networks are proposing to carry out Utility asset works on Arlecdon Road, Arlecdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Fibrus Networks on 18 Dec 2024 at 08:57.
Friday
Fibrus Networks were proposing to carry out Utility asset works on Woodhall Brow, Dean.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Fibrus Networks on 10 Dec 2024 at 15:59.
10 and 14 Jan 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Ashfield Gardens, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 12 Sep 2024 at 13:11.
13 Jan and 7 Mar 2025
Cumberland Council were proposing to carry out Highway repair and maintenance works on Main Road, High Harrington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 10 Oct 2024 at 12:33.
13 and 17 Jan 2025
Fibrus Networks are proposing to carry out Utility asset works on Whitestiles, High Seaton, Seaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Fibrus Networks on 2 Jan 2025 at 11:44.
13 Jan and 21 Mar 2025
Cumberland Council are proposing to carry out Works for road purposes on Seaton Road, Seaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 18 Dec 2024 at 10:44.
13 Jan and 7 Mar 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Main Road, High Harrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cumberland Council on 21 Aug 2024 at 07:35.
13 and 15 Jan 2025
Fibrus Networks are proposing to carry out Utility asset works on Woodhall Brow, Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by Fibrus Networks on 11 Dec 2024 at 12:59.
13 and 15 Jan 2025
Fibrus Networks are proposing to carry out Utility asset works on Woodhall Brow, Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by Fibrus Networks on 2 Jan 2025 at 12:48.
18 and 24 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Vulcans Lane, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Dec 2024 at 15:27.
20 and 24 Jan 2025
Fibrus Networks are proposing to carry out Utility asset works on Whitestiles, High Seaton, Seaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Fibrus Networks on 6 Jan 2025 at 11:13.
20 Jan and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 14:44.
20 and 24 Jan 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Riverside, Great Clifton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 16 Oct 2024 at 14:49.
22 Jan and 6 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on School Brow, Moresby Parks.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Dec 2024 at 09:58.
22 Jan and 6 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on School Brow, Moresby Parks.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 4 Dec 2024 at 13:19.
22 Jan and 6 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on School Brow, Moresby Parks.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 11:20.
22 Jan and 7 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on School Brow, Moresby Parks.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Jan 2025 at 11:47.
27 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Minster Close, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 27 Feb 2024 at 13:21.
27 Jan and 21 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Calder Drive, Workington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 09:46.
27 and 31 Jan 2025
Fibrus Networks are proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Fibrus Networks on 15 Oct 2024 at 17:50.
27 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Calder Drive, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 18 Oct 2024 at 10:14.
3 and 13 Feb 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Roper Street, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Dec 2024 at 14:33.
3 and 21 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Howgate, Whitehaven.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 10:49.
3 and 13 Feb 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on John Street, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Dec 2024 at 14:34.
10 and 21 Feb 2025
Cumberland Council are proposing to carry out Section 50 on Yearl Rise, Seaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 24 Dec 2024 at 09:12.
10 and 21 Feb 2025
Cumberland Council are proposing to carry out Section 50 on Seaton Road, Seaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 23 Dec 2024 at 11:03.
10 and 21 Feb 2025
Cumberland Council are proposing to carry out Section 50 on Seaton Road, Seaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 31 Dec 2024 at 08:49.
10 Feb and 21 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Distington To Parton, Parton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 10:50.
17 Feb and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Edinburgh Avenue, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 27 Feb 2024 at 13:24.
24 Feb and 6 Mar 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Moss Bay Road, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 20 Dec 2024 at 07:18.
24 Feb and 6 Mar 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Moss Bay Road, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 16 Dec 2024 at 07:53.
24 Feb and 1 Mar 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Moss Bay Road, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 3 Dec 2024 at 14:51.
24 Feb and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Edinburgh Avenue, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Oct 2024 at 10:39.
24 Feb and 21 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Edinburgh Avenue, Workington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 10:24.
3 Mar and 4 Apr 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Loop Road, Distington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Dec 2024 at 07:11.
3 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beverley Close, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Feb 2024 at 13:26.
3 Mar and 4 Apr 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Loop Road, Distington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 Dec 2024 at 10:37.
3 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lowca, Whitehaven.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 11:27.
3 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on From Junction With Keys Brow To Boundary Near Jubilee House, High Harrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 11:28.
17 and 31 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Beverley Close, Workington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 31 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 7 Oct 2024 at 07:34.
17 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beverley Close, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Oct 2024 at 10:40.
17 and 21 Mar 2025
Cumberland Council are proposing to carry out New service connection on Minor Road From Overcroft To Overend Farms, Greysouthen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cumberland Council on 19 Dec 2024 at 08:47.
23 Mar and 13 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on Murray Road, Workington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 March 2025 and could run through until 13 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 7 Nov 2024 at 09:45.
1 Apr and 1 Sep 2025
Cumberland Council were proposing to carry out Highway improvement works on Ramsay Brow, Workington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 12:32.
1 Apr and 1 Sep 2025
Cumberland Council were proposing to carry out Highway improvement works on A66 From J A596 To J A595 At Little Clifton Including Roundabouts, Allerdale.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 12:32.
Roadworks Map near to Inglewood Close, WORKINGTON, CA14 4LE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Inglewood Close, WORKINGTON, CA14 4LE (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 6 Jan 2025 - 8 Jan 2025)