ROADWORKS SUMMARY
Victoria Place, CARLISLE, CA1 1EJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Victoria Place, CA1 1EJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Victoria Place, CARLISLE, CA1 1EJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Victoria Place are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cumberland Council logo
LONG TERM
Between
1 Oct 2023 and 29 May 2025
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2023 and could run through until 29 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 5 Jul 2023 at 08:59.

Cumberland Council logo
LONG TERM
Between
8 Oct 2023 and 29 May 2025
Details
View Map
Share
Follow
Peter Lane

Cumberland Council are proposing to carry out roadworks on Peter Lane, Newby West.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2023 and could run through until 29 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 12 Jul 2023 at 16:07.

Cumberland Council logo
LONG TERM
Until
9 Jan 2025
Details
View Map
Share
Follow
Newby Cross Village

Cumberland Council are carrying out Highway improvement works on Newby Cross Village, Newby Cross.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 January 2024 at 04:00 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 23 Aug 2024 at 17:02.

Cumberland Council logo
LONG TERM
Until
18 Oct 2024
Details
View Map
Share
Follow
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council are carrying out roadworks on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 March 2024 at 07:00 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 8 Aug 2024 at 20:47.

Cumberland Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Road Leading From Stoneraise Through Ratten Row

Cumberland Council are carrying out Highway improvement works on Road Leading From Stoneraise Through Ratten Row, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 06:00 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 7 May 2024 at 10:20.

Cumberland Council logo
LONG TERM
Until
18 Oct 2024
Details
View Map
Share
Follow
Road Leading From Pow Bank To Durdar Crossroads

Cumberland Council are carrying out roadworks on Road Leading From Pow Bank To Durdar Crossroads, Durdar.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 May 2024 at 07:00 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 8 Aug 2024 at 20:36.

Cumberland Council logo
LONG TERM
Until
19 Feb 2025
Details
View Map
Share
Follow
Dalston Road

Cumberland Council are carrying out Highway improvement works on Dalston Road, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:00 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 10 Sep 2024 at 10:47.

Cumberland Council logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Cumwhinton Drive

Cumberland Council are carrying out Highway repair and maintenance works on Cumwhinton Drive, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 09:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 2 Jul 2024 at 06:41.

Cumberland Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
English Street

Cumberland Council are carrying out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 07:00 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 15 Jul 2024 at 15:18.

Westmorland And Furness Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Dalston Road

Westmorland And Furness Council are carrying out roadworks on Dalston Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 11:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Westmorland And Furness Council on 5 Sep 2024 at 17:36.

Cumberland Council logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are carrying out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 07:00 and could run through until 8 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 29 Jul 2024 at 17:35.

Cumberland Council logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Road Leading From Brisco To Wreay

Cumberland Council are carrying out Highway repair and maintenance works on Road Leading From Brisco To Wreay, Wreay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 July 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Sep 2024 at 12:00.

Cumberland Council logo
LONG TERM
Between
5 Aug 2024 and 17 Apr 2025
Details
View Map
Share
Castle Street

Cumberland Council were proposing to carry out Highway improvement works on Castle Street, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2024 and run through until 17 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 23 Aug 2024 at 11:30.

Cumberland Council logo
LONG TERM
Between
5 Aug 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Castle Street

Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 17 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 17 Apr 2024 at 12:04.

Cumberland Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Victoria Viaduct

Cumberland Council are carrying out Highway improvement works on Victoria Viaduct, Carlisle.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 18 Sep 2024 at 15:57.

Cumberland Council logo
LONG TERM
Until
18 Oct 2024
Details
View Map
Share
Follow
Peter Lane

Cumberland Council are carrying out roadworks on Peter Lane, Newby West.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 August 2024 at 07:00 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 19 Sep 2024 at 17:58.

Cumberland Council logo
LONG TERM
Until
18 Oct 2024
Details
View Map
Share
Follow
A689 Cndr Bypass Route

Cumberland Council are carrying out roadworks on A689 Cndr Bypass Route, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 August 2024 at 07:00 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 19 Sep 2024 at 15:24.

Cumberland Council logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Durdar Road

Cumberland Council are carrying out Highway improvement works on Durdar Road, Carlisle.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 August 2024 at 07:00 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Sep 2024 at 14:51.

Cumberland Council logo
LONG TERM
Between
1 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Castle Street

Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 26 Feb 2024 at 15:19.

Northern Gas Networks logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Kirkstead Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Kirkstead Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 11 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2024 at 08:00.

Northern Gas Networks logo
Between
16 Sep and 11 Oct 2024
Details
View Map
Share
Follow
Kirkstead Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirkstead Close, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 11 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 May 2024 at 08:42.

Northern Gas Networks logo
Between
16 Sep and 11 Oct 2024
Details
View Map
Share
Follow
Kirkstead Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirkstead Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 11 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Jun 2024 at 13:55.

Cumberland Council logo
LONG TERM
Between
22 Sep and 6 Dec 2024
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 26 Sep 2024 at 11:23.

Cumberland Council logo
Between
24 Sep and 14 Oct 2024
Details
View Map
Share
Follow
Backhouses Walk

Cumberland Council are proposing to carry out Core Sampling on Backhouses Walk, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 14 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 10 Sep 2024 at 08:13.

Cumberland Council logo
Between
24 Sep and 14 Oct 2024
Details
View Map
Share
Follow
Backhouses Walk

Cumberland Council are proposing to carry out Core Sampling on Backhouses Walk, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 14 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 23 Sep 2024 at 17:12.

Fibrus Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wreay To Wreay Hall

Fibrus Networks are proposing to carry out Utility asset works on Wreay To Wreay Hall, Wreay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 5 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 19 Jun 2024 at 10:24.

Fibrus Networks logo
Between
3 and 12 Oct 2024
Details
View Map
Share
Follow
Broadwath Road

Fibrus Networks are proposing to carry out Utility asset works on Broadwath Road, Great Corby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 12 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 10 Sep 2024 at 08:46.

Fibrus Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wreay To Wreay Hall

Fibrus Networks are carrying out Utility asset works on Wreay To Wreay Hall, Wreay.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 08:00 and could run through until 5 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 3 Oct 2024 at 14:43.

Fibrus Networks logo
Until
12 Oct 2024
Details
View Map
Share
Follow
Broadwath Road

Fibrus Networks are carrying out Utility asset works on Broadwath Road, Great Corby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 09:30 and could run through until 12 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 3 Oct 2024 at 09:42.

Fibrus Networks logo
Between
3 and 12 Oct 2024
Details
View Map
Share
Follow
Clints Road

Fibrus Networks are proposing to carry out Utility asset works on Clints Road, Great Corby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 12 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 10 Sep 2024 at 08:47.

Fibrus Networks logo
Until
12 Oct 2024
Details
View Map
Share
Follow
Clints Road

Fibrus Networks are carrying out Utility asset works on Clints Road, Great Corby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 09:30 and could run through until 12 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 3 Oct 2024 at 09:41.

Cumberland Council logo
LONG TERM
Between
6 Oct and 4 Dec 2024
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 2 May 2024 at 15:43.

Northern Gas Networks logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
St Ninians Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Ninians Avenue, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 11:59.

Northern Gas Networks logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
St Ninians Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Ninians Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2024 at 13:46.

Northern Gas Networks logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
St Ninians Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Ninians Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 11:59.

Northern Gas Networks logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
St Ninians Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Ninians Avenue, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2024 at 13:43.

Cumberland Council logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Road Leading From Orton Grange Junction To North Of Great Orton

Cumberland Council are proposing to carry out Works for road purposes on Road Leading From Orton Grange Junction To North Of Great Orton, Great Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 1 Oct 2024 at 15:44.

Cumberland Council logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Road Leading From Orton Grange Junction To North Of Great Orton

Cumberland Council are proposing to carry out Works for road purposes on Road Leading From Orton Grange Junction To North Of Great Orton, Great Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 24 Jul 2024 at 14:48.

Cumberland Council logo
LONG TERM
Between
7 Oct and 6 Dec 2024
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 2 May 2024 at 15:20.

Northern Gas Networks logo
Between
7 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Wigton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wigton Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 09:58.

Cumberland Council logo
Between
7 and 18 Oct 2024
Details
View Map
Share
Follow
London Road

Cumberland Council are proposing to carry out Highway improvement works on London Road, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 11 Jul 2024 at 07:07.

Cumberland Council logo
Between
9 and 11 Oct 2024
Details
View Map
Share
Follow
Road Leading From Brisco To Wreay

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 11 Sep 2024 at 13:03.

Cumberland Council logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Road Leading To Bow At Moorhouse

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading To Bow At Moorhouse, Moorhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 21 Aug 2024 at 07:54.

Northern Gas Networks logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Wigton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wigton Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 May 2024 at 13:34.

Cumberland Council logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Road Leading From Junction North Of Great Orton To Bow

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Junction North Of Great Orton To Bow, Great Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 21 Aug 2024 at 07:55.

Electricity North West (NorWeb) logo
Between
15 and 21 Oct 2024
Details
View Map
Share
Follow
Road Leading From Harker Substation North To A74 Underpass

Electricity North West (NorWeb) are proposing to carry out New service connection on Road Leading From Harker Substation North To A74 Underpass, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 21 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Aug 2024 at 15:39.

Electricity North West (NorWeb) logo
Between
15 and 21 Oct 2024
Details
View Map
Share
Follow
Road Leading From Harker Substation North To A74 Underpass

Electricity North West (NorWeb) are proposing to carry out New service connection on Road Leading From Harker Substation North To A74 Underpass, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 21 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 2 Aug 2024 at 12:23.

Fibrus Networks logo
Between
16 and 20 Oct 2024
Details
View Map
Share
Follow
Road Leading From Aglionby To Holmegate

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Aglionby To Holmegate, Aglionby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 20 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 17 Jun 2024 at 13:17.

Fibrus Networks logo
Between
16 and 20 Oct 2024
Details
View Map
Share
Follow
Road Leading From Aglionby To Holmegate

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Aglionby To Holmegate, Aglionby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 20 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 1 Oct 2024 at 09:42.

Cumberland Council logo
Between
20 and 22 Oct 2024
Details
View Map
Share
Botchergate

Cumberland Council were proposing to carry out Works for road purposes on Botchergate, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2024 and run through until 22 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 19 Sep 2024 at 08:37.

Cumberland Council logo
Between
20 and 22 Oct 2024
Details
View Map
Share
Court Square Brow

Cumberland Council were proposing to carry out Works for road purposes on Court Square Brow, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2024 and run through until 22 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 19 Sep 2024 at 08:38.

Cumberland Council logo
Between
20 and 22 Oct 2024
Details
View Map
Share
The Crescent

Cumberland Council were proposing to carry out Works for road purposes on The Crescent, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2024 and run through until 22 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 19 Sep 2024 at 08:38.

Northern Gas Networks logo
Between
21 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Brisco Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brisco Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2024 at 13:31.

Hutchinson 3G logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Silverdale Road

Hutchinson 3G were proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 October 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 16 Aug 2024 at 11:46.

Cumberland Council logo
Between
21 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Beverley Rise

Cumberland Council are proposing to carry out Highway improvement works on Beverley Rise, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 1 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 12 Aug 2024 at 11:52.

Electricity North West (NorWeb) logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Silverdale Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Silverdale Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the verge only.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Sep 2024 at 08:45.

Electricity North West (NorWeb) logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Silverdale Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Silverdale Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the verge only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 14:18.

Electricity North West (NorWeb) logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Silverdale Road

Electricity North West (NorWeb) were proposing to carry out New service connection on Silverdale Road, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 25 October 2024. The works were due to impact the verge only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 11:00.

Fibrus Networks logo
Between
22 and 28 Oct 2024
Details
View Map
Share
Follow
Road Leading From High Buckabank To Junction South Of Sprunston Bridge Via Unthank

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From High Buckabank To Junction South Of Sprunston Bridge Via Unthank, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 28 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 7 Aug 2024 at 12:39.

Cumberland Council logo
LONG TERM
Between
22 Oct 2024 and 22 Apr 2025
Details
View Map
Share
Follow
The Crescent

Cumberland Council are proposing to carry out Works for road purposes on The Crescent, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 3 Sep 2024 at 14:36.

Electricity North West (NorWeb) logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Barras Brow

Electricity North West (NorWeb) are proposing to carry out Remedial works on Barras Brow, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Aug 2024 at 12:06.

Fibrus Networks logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Little Corby North To Newby Bridge

Fibrus Networks are proposing to carry out Utility asset works on Little Corby North To Newby Bridge, Little Corby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 25 Sep 2024 at 11:35.

Cumberland Council logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Road Leading From Brisco To Wreay

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Sep 2024 at 14:13.

Electricity North West (NorWeb) logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Barras Lane

Electricity North West (NorWeb) are proposing to carry out Remedial works on Barras Lane, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Aug 2024 at 12:06.

Fibrus Networks logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Newby East

Fibrus Networks are proposing to carry out Utility asset works on Newby East, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 25 Sep 2024 at 11:34.

Network Rail logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Viaduct Estate Road

Network Rail are proposing to carry out Works for Rail Purposes on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Jul 2024 at 12:01.

Northern Gas Networks logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Crown Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Crown Street, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2024 at 13:53.

Cumberland Council logo
LONG TERM
Between
4 Nov 2024 and 18 Feb 2025
Details
View Map
Share
Follow
Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate, Cargo.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 15 Aug 2024 at 10:47.

Hutchinson 3G logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Silverdale Road

Hutchinson 3G were proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 13 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 22 Aug 2024 at 15:39.

Northern Gas Networks logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Dalston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dalston Road, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 May 2024 at 08:33.

Northern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Low Moor Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Low Moor Avenue, Blackwell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 Aug 2024 at 13:09.

Northern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Stockwell Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Stockwell Road, Blackwell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 Aug 2024 at 13:23.

Northern Gas Networks logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Brisco Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Brisco Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2024 at 10:09.

Northern Gas Networks logo
Between
11 and 29 Nov 2024
Details
View Map
Share
St Ninians Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on St Ninians Avenue, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2024 at 08:38.

Northern Gas Networks logo
Between
11 and 29 Nov 2024
Details
View Map
Share
St Ninians Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on St Ninians Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2024 at 08:25.

Northern Gas Networks logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Upperby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upperby Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 12:10.

Northern Gas Networks logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Upperby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upperby Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 14:32.

Hutchinson 3G logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Silverdale Road

Hutchinson 3G were proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 13 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 10 Sep 2024 at 13:54.

Hutchinson 3G logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Follow
Silverdale Road

Hutchinson 3G are proposing to carry out Utility asset works on Silverdale Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 10 Sep 2024 at 13:57.

Northern Gas Networks logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Shaddongate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shaddongate, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 May 2024 at 08:32.

Northern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Upperby Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Upperby Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 08:44.

BT logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Road Leading From Blackford Bridge To Keysmount Via Mount Farm

BT are proposing to carry out Utility asset works on Road Leading From Blackford Bridge To Keysmount Via Mount Farm, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Sep 2024 at 10:05.

BT logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Road Leading From Blackford Bridge To Keysmount Via Mount Farm

BT are proposing to carry out Utility asset works on Road Leading From Blackford Bridge To Keysmount Via Mount Farm, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 1 Oct 2024 at 12:32.

Fibrus Networks logo
Between
26 and 30 Nov 2024
Details
View Map
Share
Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford, Blackford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 30 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 16 Sep 2024 at 09:00.

Fibrus Networks logo
Between
26 and 30 Nov 2024
Details
View Map
Share
Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford, Blackford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 30 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 17 Sep 2024 at 11:29.

Fibrus Networks logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Road Leading From Stoneraise Through Ratten Row

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Stoneraise Through Ratten Row, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 8 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Fibrus Networks on 9 Sep 2024 at 15:12.

Fibrus Networks logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 23 Sep 2024 at 09:44.

Cumberland Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Utility asset works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 12 Sep 2024 at 08:50.

Cumberland Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council were proposing to carry out Utility asset works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 9 Sep 2024 at 12:52.

Cumberland Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
M6 J42 Leave N

Cumberland Council are proposing to carry out Highway improvement works on M6 J42 Leave N, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 26 Sep 2024 at 10:48.

Cumberland Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Garden Village

Cumberland Council are proposing to carry out Highway improvement works on Garden Village, Newby West.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 2 Oct 2024 at 11:48.


Roadworks Map near to Victoria Place, CARLISLE, CA1 1EJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Oct 2024 03:32
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Victoria Place, CARLISLE, CA1 1EJ (38 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cumberland Council logo
MAJOR
  
LOWTHER STREET 
(0.1 miles)
Cumberland Council
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 12 Sep 2024 - 10 Mar 2026
0.1
Details
Share
Follow
2
Cumberland Council logo
MAJOR
  
LOWTHER STREET 
(0.1 miles)
Cumberland Council
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 12 Sep 2024 - 10 Mar 2026
0.1
Details
Share
Follow
3
Cumberland Council logo
MAJOR
  
ENGLISH STREET 
(0.1 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 27 Aug 2024 - 8 Nov 2024
0.1
Details
Share
Follow
4
Cumberland Council logo
MAJOR
  
ENGLISH STREET 
(0.1 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 27 Aug 2024 08:00
(Scheduled: 27 Aug 2024 - 8 Nov 2024)
0.1
Details
Share
Follow
5
Cumberland Council logo
MAJOR
  
CASTLE STREET 
(0.2 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 1 Sep 2024 - 30 Apr 2025
0.2
Details
Share
Follow
6
Cumberland Council logo
MAJOR
  
ENGLISH STREET 
(0.2 miles)
Cumberland Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Some carriageway incursion
In Progress
Since: 15 Jul 2024 07:00
(Scheduled: 15 Jul 2024 - 15 Dec 2025)
0.2
Details
Share
Follow
7
Cumberland Council logo
MAJOR
  
ENGLISH STREET 
(0.2 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Lane closure
In Progress
Since: 15 Jul 2024 07:00
(Scheduled: 15 Jul 2024 - 4 Oct 2024)
0.2
Details
Share
Follow
8
Cumberland Council logo
MAJOR
  
VICTORIA VIADUCT 
(0.2 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Lane closure
In Progress
Since: 12 Aug 2024 08:00
(Scheduled: 12 Aug 2024 - 4 Oct 2024)
0.2
Details
Share
Follow
9
Cumberland Council logo
MAJOR
  
ENGLISH STREET 
(0.2 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Lane closure
Planned
Scheduled: 22 Sep 2024 - 6 Dec 2024
0.2
Details
Share
Follow
10
Cumberland Council logo
MAJOR
  
CASTLE STREET 
(0.2 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 5 Aug 2024 - 17 Apr 2025
0.2
Details
Share
Follow
  • ...