ROADWORKS SUMMARY
Warwick Road, CARLISLE, CA1 1DE
Introduction
View current and future planned roadworks and road closures for Warwick Road, CA1 1DE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Warwick Road, CARLISLE, CA1 1DE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Warwick Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Oct 2023 and 29 May 2025
Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2023 and could run through until 29 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cumberland Council on 5 Jul 2023 at 08:59.
8 Oct 2023 and 29 May 2025
Cumberland Council are proposing to carry out roadworks on Peter Lane, Newby West.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2023 and could run through until 29 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cumberland Council on 12 Jul 2023 at 16:07.
3 Mar 2025
Cumberland Council are carrying out Highway improvement works on Newby Cross Village, Newby Cross.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 January 2024 at 04:00 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 12:51.
9 May 2025
Cumberland Council are carrying out Highway improvement works on Road Leading From Stoneraise Through Ratten Row, Durdar.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 May 2024 at 07:00 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 16:04.
19 Feb 2025
Cumberland Council are carrying out Highway improvement works on Dalston Road, Carlisle.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 08:00 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 10 Sep 2024 at 10:47.
10 Jan 2025
Cumberland Council are carrying out Highway repair and maintenance works on Cumwhinton Drive, Carlisle.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 09:00 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 17 Dec 2024 at 10:04.
4 Apr 2025
Cumberland Council are carrying out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 July 2024 at 07:00 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 15:46.
5 Aug 2024 and 17 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2024 and could run through until 17 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cumberland Council on 17 Apr 2024 at 12:04.
5 Aug 2024 and 17 Apr 2025
Cumberland Council were proposing to carry out Highway improvement works on Castle Street, Carlisle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2024 and run through until 17 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 23 Aug 2024 at 11:30.
1 Sep 2024 and 30 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cumberland Council on 26 Feb 2024 at 15:19.
31 Jan 2025
Cumberland Council are carrying out Highway improvement works on English Street, Carlisle.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 11 Dec 2024 at 12:09.
22 Oct 2024 and 22 Apr 2025
Cumberland Council were proposing to carry out Works for road purposes on The Crescent, Carlisle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 October 2024 and run through until 22 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 18 Nov 2024 at 15:13.
4 Nov 2024 and 18 Feb 2025
Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate, Cargo.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 18 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cumberland Council on 7 Nov 2024 at 13:42.
11 Nov 2024 and 30 May 2025
Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 May 2025. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 12:51.
1 Dec 2024 and 1 Dec 2025
Cumberland Council are proposing to carry out Highway improvement works on Court Square, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2024 and could run through until 1 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 21 Oct 2024 at 15:21.
1 Dec 2025
Cumberland Council are carrying out Highway improvement works on Court Square, Carlisle.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 07:00 and could run through until 1 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 2 Dec 2024 at 09:56.
Monday
Northern Gas Networks are carrying out Utility repair and maintenance works on Durranhill Road, Carlisle.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 December 2024 at 10:00 and could run through until 23 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 08:28.
Tuesday
Northern Gas Networks are carrying out Utility repair and maintenance works on Roads Leading From Buckabank To Bridge End, Dalston.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 December 2024 at 15:45 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Dec 2024 at 09:37.
2 and 8 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Crown Street, Carlisle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 14:31.
6 and 31 Jan 2025
Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 09:52.
6 and 31 Jan 2025
Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 22 Nov 2024 at 13:07.
6 and 31 Jan 2025
Cumberland Council are proposing to carry out Highway improvement works on Peter Lane, Newby West.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 16 Dec 2024 at 13:09.
6 and 31 Jan 2025
Cumberland Council are proposing to carry out Highway improvement works on A689 Cndr Bypass Route, Carlisle.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 16 Dec 2024 at 13:14.
6 and 31 Jan 2025
Cumberland Council are proposing to carry out Highway improvement works on A689 Cndr Bypass Route, Carlisle.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 16 Dec 2024 at 13:42.
6 Jan and 12 Feb 2025
Cumberland Council are proposing to carry out Highway improvement works on Court Square Brow, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 15:28.
6 Jan and 12 Feb 2025
Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 15:22.
6 Jan and 7 Feb 2025
Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 2 May 2024 at 15:50.
6 Jan and 27 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 9 Oct 2024 at 17:14.
6 Jan and 27 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 26 Sep 2024 at 11:18.
6 and 24 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Queen Street, Carlisle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 10:59.
6 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Queen Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 11:08.
6 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Queen Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 15:43.
7 and 13 Jan 2025
Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Stoneraise Through Ratten Row, Durdar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 January 2025. The works will impact the verge only.
This roadwork event was last updated by Fibrus Networks on 12 Sep 2024 at 08:56.
7 and 13 Jan 2025
Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Stoneraise Through Ratten Row, Durdar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 January 2025. The works will impact the verge only.
This roadwork event was last updated by Fibrus Networks on 19 Dec 2024 at 11:50.
7 and 9 Jan 2025
Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Blackford Bridge To Keysmount Via Mount Farm, Blackford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Fibrus Networks on 5 Dec 2024 at 15:01.
7 and 9 Jan 2025
Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Blackford Bridge To Keysmount Via Mount Farm, Blackford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Fibrus Networks on 19 Dec 2024 at 09:29.
9 and 11 Jan 2025
Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Buckabank Hall Junction To Crown Inn Crossroads At Southwaite Via Pinquays, Dalston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 January 2025 and run through until 11 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Fibrus Networks on 17 Dec 2024 at 13:04.
9 and 11 Jan 2025
Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Buckabank Hall Junction To Crown Inn Crossroads At Southwaite Via Pinquays, Dalston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the verge only.
This roadwork event was last updated by Fibrus Networks on 19 Dec 2024 at 14:43.
12 and 14 Jan 2025
Cumberland Council are proposing to carry out Highway improvement works on Botchergate, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 23 Oct 2024 at 08:16.
12 and 14 Jan 2025
Cumberland Council are proposing to carry out Highway improvement works on Court Square Brow, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 23 Oct 2024 at 08:16.
12 Jan and 11 May 2025
Cumberland Council were proposing to carry out Works for road purposes on The Crescent, Carlisle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 January 2025 and run through until 11 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 18 Nov 2024 at 15:26.
12 and 14 Jan 2025
Cumberland Council are proposing to carry out Highway improvement works on The Crescent, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 23 Oct 2024 at 08:16.
12 and 16 Jan 2025
Fibrus Networks were proposing to carry out Utility asset works on Cargo, Cargo.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 January 2025 and run through until 16 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Fibrus Networks on 13 Dec 2024 at 10:20.
13 Jan and 9 Feb 2025
Cumberland Council are proposing to carry out Highway improvement works on Newbiggin Road, Durdar.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cumberland Council on 12 Dec 2024 at 15:38.
13 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scalegate Road, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 12:17.
13 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scalegate Road, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 14:31.
13 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scalegate Road, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 16:04.
13 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridley Road, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 12:18.
13 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridley Road, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 14:31.
13 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridley Road, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 16:04.
13 Jan and 4 May 2025
Cumberland Council are proposing to carry out Highway improvement works on The Crescent, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 4 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 21 Nov 2024 at 12:42.
13 and 15 Jan 2025
BT were proposing to carry out Utility asset works on Back Of Warwick Square West, Carlisle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 2 Oct 2024 at 10:34.
13 and 15 Jan 2025
Fibrus Networks were proposing to carry out Utility asset works on Scaleby, Scaleby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Fibrus Networks on 16 Dec 2024 at 09:43.
19 and 30 Jan 2025
Cumberland Council are proposing to carry out Works for road purposes on Devonshire Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 January 2025 and could run through until 30 January 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cumberland Council on 14 Nov 2024 at 08:31.
19 and 31 Jan 2025
Cumberland Council are proposing to carry out Highway improvement works on Devonshire Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cumberland Council on 19 Nov 2024 at 16:16.
20 Jan and 28 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bridge Street, Carlisle.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 11:03.
20 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Street, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 15:43.
20 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Street, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 10:39.
20 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Annetwell Street, Carlisle.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 07:45.
20 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Devonshire Walk, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 14:23.
20 Jan and 28 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Castle Way, Carlisle.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 11:41.
20 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 13:45.
20 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 15 Oct 2024 at 09:30.
20 Jan and 3 Feb 2025
Cumberland Council are proposing to carry out Works for road purposes on Road Leading To Bow At Moorhouse, Moorhouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cumberland Council on 28 Oct 2024 at 10:49.
3 and 7 Feb 2025
Cumberland Council are proposing to carry out Highway improvement works on Garden Village, Newby West.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cumberland Council on 9 Dec 2024 at 13:47.
3 and 14 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 24 Oct 2024 at 08:31.
3 and 14 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 10:56.
10 and 21 Feb 2025
Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 30 Oct 2024 at 09:45.
10 and 28 Feb 2025
Cumberland Council are proposing to carry out Highway improvement works on Beverley Rise, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cumberland Council on 22 Nov 2024 at 10:48.
10 Feb and 21 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on The Crescent, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 16:07.
10 Feb and 21 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 16:04.
10 Feb and 21 Apr 2025
Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 15:43.
10 and 12 Feb 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate, Cargo.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 6 Dec 2024 at 11:33.
13 and 15 Feb 2025
Cumberland Council were proposing to carry out Highway improvement works on Garden Village, Newby West.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 15 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cumberland Council on 4 Dec 2024 at 10:41.
17 and 23 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Devonshire Walk, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 11:07.
17 and 21 Feb 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford, Blackford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 25 Nov 2024 at 08:44.
24 Feb and 1 Jun 2025
Cumberland Council were proposing to carry out Highway improvement works on Peter Lane, Newby West.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 1 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 10:25.
24 Feb and 1 Jun 2025
Cumberland Council were proposing to carry out Highway improvement works on Garden Village, Newby West.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 1 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 10:23.
24 Feb and 21 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Street, Carlisle.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 14:08.
24 Feb and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Street, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 09:18.
24 Feb and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Milbourne Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 08:34.
24 Feb and 6 Jun 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Eden Street, Carlisle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Sep 2024 at 12:56.
24 Feb and 6 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eden Street, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 08:11.
24 Feb and 6 Jun 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Eden Street, Carlisle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 12 Sep 2024 at 11:41.
24 Feb and 4 Apr 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Scotland Road, Carlisle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 4 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Sep 2024 at 12:55.
24 Feb and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scotland Road, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2024 at 08:52.
24 Feb and 4 Apr 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Waverley Road, Carlisle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Sep 2024 at 10:53.
24 Feb and 4 Apr 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Waverley Road, Carlisle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 4 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Sep 2024 at 11:00.
24 Feb and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Road, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 08:11.
24 Feb and 4 Apr 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Kingstown Road, Carlisle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 4 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Sep 2024 at 12:54.
24 Feb and 7 Mar 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Scaleby Moss Junction To Longpark Via Burnhill, Scaleby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 18 Dec 2024 at 14:52.
25 Feb and 4 Mar 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Brisco, Brisco.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 4 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Dec 2024 at 10:01.
3 Mar and 8 Jun 2025
Cumberland Council were proposing to carry out Highway improvement works on Peter Lane, Newby West.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 5 Dec 2024 at 13:07.
3 Mar and 8 Jun 2025
Cumberland Council were proposing to carry out Highway improvement works on Newby Cross Village, Newby Cross.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 5 Dec 2024 at 13:08.
3 Mar and 8 Jun 2025
Cumberland Council were proposing to carry out Highway improvement works on Garden Village, Newby West.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 5 Dec 2024 at 13:10.
3 and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blundell Road, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:53.
3 and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blundell Road, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 10:49.
3 Mar and 11 Apr 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Crown Street, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 20 Dec 2024 at 15:25.
3 Mar and 6 Apr 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 07:42.
3 and 14 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 22 Nov 2024 at 10:46.
3 and 24 Mar 2025
Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Harker Substation North To A74 Underpass, Blackford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cumberland Council on 17 Dec 2024 at 16:12.
5 Mar and 9 Apr 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 08:10.
17 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Cuthberts Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 09:10.
17 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Carlisle.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 13:30.
17 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Street, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 09:13.
17 and 21 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Devonshire Walk, Carlisle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 22 Nov 2024 at 10:51.
Roadworks Map near to Warwick Road, CARLISLE, CA1 1DE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Warwick Road, CARLISLE, CA1 1DE (18 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Dec 2024 - 1 Dec 2025)
(Scheduled: 22 Sep 2024 - 31 Jan 2025)
(Scheduled: 15 Jul 2024 - 15 Dec 2025)
(Scheduled: 27 Aug 2024 - 31 Jul 2025)
(Scheduled: 5 Jan 2022 - 5 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.