ROADWORKS SUMMARY
Spencer Street, CARLISLE, CA1 1BA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Spencer Street, CA1 1BA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Spencer Street, CARLISLE, CA1 1BA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Spencer Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cumberland Council logo
LONG TERM
Between
1 Oct 2023 and 29 May 2025
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2023 and could run through until 29 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 5 Jul 2023 at 08:59.

Cumberland Council logo
LONG TERM
Between
8 Oct 2023 and 29 May 2025
Details
View Map
Share
Follow
Peter Lane

Cumberland Council are proposing to carry out roadworks on Peter Lane, Newby West.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2023 and could run through until 29 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 12 Jul 2023 at 16:07.

Cumberland Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Newby Cross Village

Cumberland Council are carrying out Highway improvement works on Newby Cross Village, Newby Cross.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 January 2024 at 04:00 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 11 Apr 2025 at 11:58.

Cumberland Council logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are carrying out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 07:00 and could run through until 30 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 1 Apr 2025 at 09:24.

Cumberland Council logo
LONG TERM
Between
1 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Castle Street

Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 26 Feb 2024 at 15:19.

Cumberland Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
The Crescent

Cumberland Council were proposing to carry out Works for road purposes on The Crescent, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 22 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 18 Nov 2024 at 15:13.

Cumberland Council logo
LONG TERM
Between
11 Nov 2024 and 30 May 2025
Details
View Map
Share
Follow
Castle Street

Cumberland Council are proposing to carry out Highway improvement works on Castle Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 May 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 12:51.

Cumberland Council logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Castle Street

Cumberland Council are carrying out Highway improvement works on Castle Street, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 29 Jan 2025 at 15:38.

Cumberland Council logo
LONG TERM
Between
1 Dec 2024 and 1 Dec 2025
Details
View Map
Share
Follow
Court Square

Cumberland Council are proposing to carry out Highway improvement works on Court Square, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 21 Oct 2024 at 15:21.

Cumberland Council logo
LONG TERM
Until
1 Dec 2025
Details
View Map
Share
Follow
Court Square

Cumberland Council are carrying out Highway improvement works on Court Square, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 07:00 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 2 Dec 2024 at 09:56.

Cumberland Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
A689 Cndr Bypass Route

Cumberland Council are carrying out Highway improvement works on A689 Cndr Bypass Route, Carlisle.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:00 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 11 Apr 2025 at 11:59.

Cumberland Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 9 Oct 2024 at 17:14.

Cumberland Council logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
English Street

Cumberland Council are carrying out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 14 Apr 2025 at 15:14.

Cumberland Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
English Street

Cumberland Council were proposing to carry out Highway improvement works on English Street, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 23 Jan 2025 at 14:57.

Cumberland Council logo
LONG TERM
Between
12 Jan and 11 May 2025
Details
View Map
Share
The Crescent

Cumberland Council were proposing to carry out Works for road purposes on The Crescent, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 January 2025 and run through until 11 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 18 Nov 2024 at 15:26.

Cumberland Council logo
LONG TERM
Between
13 Jan and 4 May 2025
Details
View Map
Share
Follow
The Crescent

Cumberland Council are proposing to carry out Highway improvement works on The Crescent, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 21 Nov 2024 at 12:42.

Cumberland Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
The Crescent

Cumberland Council are carrying out Highway improvement works on The Crescent, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 06:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 10 Apr 2025 at 08:29.

Cumberland Council logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Court Square Brow

Cumberland Council are carrying out Highway improvement works on Court Square Brow, Carlisle.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 07:30 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 8 Apr 2025 at 10:54.

Cumberland Council logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
English Street

Cumberland Council are carrying out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 07:30 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 8 Apr 2025 at 10:54.

Cumberland Council logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council are carrying out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:00 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 8 Apr 2025 at 09:38.

Cumberland Council logo
LONG TERM
Until
9 Jun 2025
Details
View Map
Share
Follow
Road Leading From Carleton To High Hesket Crossing The Motorway

Cumberland Council are carrying out Highway improvement works on Road Leading From Carleton To High Hesket Crossing The Motorway, Carleton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 20:00 and could run through until 9 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 5 Mar 2025 at 10:52.

Cumberland Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
The Crescent

Cumberland Council are proposing to carry out Highway improvement works on The Crescent, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 16:07.

Cumberland Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 16:04.

Cumberland Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 30 Apr 2024 at 15:43.

Cumberland Council logo
LONG TERM
Between
24 Feb and 1 Jun 2025
Details
View Map
Share
Peter Lane

Cumberland Council were proposing to carry out Highway improvement works on Peter Lane, Newby West.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 1 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 10:25.

Cumberland Council logo
LONG TERM
Between
24 Feb and 1 Jun 2025
Details
View Map
Share
Garden Village

Cumberland Council were proposing to carry out Highway improvement works on Garden Village, Newby West.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 1 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 8 Nov 2024 at 10:23.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
Eden Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Eden Street, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Sep 2024 at 12:56.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
Follow
Eden Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eden Street, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 08:11.

Northern Gas Networks logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
Eden Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Eden Street, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2024 at 11:41.

Cumberland Council logo
LONG TERM
Between
3 Mar and 8 Jun 2025
Details
View Map
Share
Peter Lane

Cumberland Council were proposing to carry out Highway improvement works on Peter Lane, Newby West.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Dec 2024 at 13:07.

Cumberland Council logo
LONG TERM
Between
3 Mar and 8 Jun 2025
Details
View Map
Share
Newby Cross Village

Cumberland Council were proposing to carry out Highway improvement works on Newby Cross Village, Newby Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Dec 2024 at 13:08.

Cumberland Council logo
LONG TERM
Between
3 Mar and 8 Jun 2025
Details
View Map
Share
Garden Village

Cumberland Council were proposing to carry out Highway improvement works on Garden Village, Newby West.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Dec 2024 at 13:10.

Cumberland Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Road Leading From Carleton To High Hesket Crossing The Motorway

Cumberland Council are carrying out Highway improvement works on Road Leading From Carleton To High Hesket Crossing The Motorway, Carleton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 07:15 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 17 Apr 2025 at 11:44.

Northern Gas Networks logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Eden Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Eden Street, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Mar 2025 at 08:18.

Cumberland Council logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
English Street

Cumberland Council are carrying out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2025 at 07:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 11 Apr 2025 at 12:06.

Cumberland Council logo
LONG TERM
Between
31 Mar and 3 Aug 2025
Details
View Map
Share
Peter Lane

Cumberland Council were proposing to carry out Highway improvement works on Peter Lane, Newby West.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 16 Jan 2025 at 13:11.

Cumberland Council logo
LONG TERM
Between
31 Mar and 3 Aug 2025
Details
View Map
Share
Newby Cross Village

Cumberland Council were proposing to carry out Highway improvement works on Newby Cross Village, Newby Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 16 Jan 2025 at 13:13.

Cumberland Council logo
LONG TERM
Between
31 Mar and 3 Aug 2025
Details
View Map
Share
Garden Village

Cumberland Council were proposing to carry out Highway improvement works on Garden Village, Newby West.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 16 Jan 2025 at 13:12.

Cumberland Council logo
LONG TERM
Between
31 Mar and 1 Aug 2025
Details
View Map
Share
Follow
Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate, Cargo.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 21 Jan 2025 at 13:25.

Cumberland Council logo
LONG TERM
Between
31 Mar and 1 Aug 2025
Details
View Map
Share
Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate, Cargo.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Mar 2025 at 16:28.

Cumberland Council logo
LONG TERM
Between
31 Mar and 1 Aug 2025
Details
View Map
Share
Follow
Cargo

Cumberland Council are proposing to carry out Highway improvement works on Cargo, Cargo.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 22 Jan 2025 at 09:56.

Cumberland Council logo
LONG TERM
Between
2 Apr and 5 May 2025
Details
View Map
Share
Follow
Road Leading From Stoneraise Through Ratten Row

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Stoneraise Through Ratten Row, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 21 Feb 2025 at 14:06.

Cumberland Council logo
LONG TERM
Until
11 May 2025
Details
View Map
Share
Follow
Road Leading From Stoneraise Through Ratten Row

Cumberland Council are carrying out Highway improvement works on Road Leading From Stoneraise Through Ratten Row, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2025 at 00:01 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 2 Apr 2025 at 16:00.

Electricity North West (NorWeb) logo
LONG TERM
Until
15 May 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are carrying out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 15:35 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Apr 2025 at 17:32.

Cumberland Council logo
LONG TERM
Between
5 Apr and 5 May 2025
Details
View Map
Share
Road Leading From Pow Bank To Durdar Crossroads

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Pow Bank To Durdar Crossroads, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 17 Jan 2025 at 08:00.

Cumberland Council logo
LONG TERM
Between
5 Apr and 5 May 2025
Details
View Map
Share
Road Leading From Pow Bank To Durdar Crossroads

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Pow Bank To Durdar Crossroads, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 13 Mar 2025 at 12:49.

Electricity North West (NorWeb) logo
LONG TERM
Between
5 Apr and 18 May 2025
Details
View Map
Share
Viaduct Estate Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 13:37.

Electricity North West (NorWeb) logo
LONG TERM
Between
5 Apr and 18 May 2025
Details
View Map
Share
Viaduct Estate Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 13:38.

Electricity North West (NorWeb) logo
LONG TERM
Between
5 Apr and 18 May 2025
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:40.

Cumberland Council logo
LONG TERM
Between
7 Apr and 15 Jun 2025
Details
View Map
Share
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 15 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 10 Dec 2024 at 11:55.

Cumberland Council logo
LONG TERM
Between
7 Apr and 15 Jun 2025
Details
View Map
Share
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 15 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 15 Jan 2025 at 12:46.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
St Cuthberts Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Cuthberts Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 11:54.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Alexander Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 14:26.

Northern Gas Networks logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Yewdale Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Yewdale Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 11:47.

Northern Gas Networks logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Yewdale Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Yewdale Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 11:23.

Electricity North West (NorWeb) logo
Between
11 and 28 Apr 2025
Details
View Map
Share
Follow
Barras Lane

Electricity North West (NorWeb) are proposing to carry out Remedial works on Barras Lane, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Jan 2025 at 13:46.

Electricity North West (NorWeb) logo
Between
11 and 28 Apr 2025
Details
View Map
Share
Follow
Barras Brow

Electricity North West (NorWeb) are proposing to carry out Remedial works on Barras Brow, Dalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Jan 2025 at 13:47.

Cumberland Council logo
Until
11 May 2025
Details
View Map
Share
Follow
Road Leading From Pow Bank To Durdar Crossroads

Cumberland Council are carrying out Highway improvement works on Road Leading From Pow Bank To Durdar Crossroads, Durdar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 04:00 and could run through until 11 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 14 Apr 2025 at 11:18.

Cumberland Council logo
Between
14 Apr and 11 May 2025
Details
View Map
Share
Follow
Road Leading From Pow Bank To Durdar Crossroads

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Pow Bank To Durdar Crossroads, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 11 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 13 Mar 2025 at 14:07.

Northern Gas Networks logo
Between
14 Apr and 9 May 2025
Details
View Map
Share
Yewdale Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Yewdale Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 9 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 08:53.

Cumberland Council logo
LONG TERM
Between
15 Apr and 8 Jul 2025
Details
View Map
Share
Road Leading From Wetheral Pasture To Wetheral

Cumberland Council were proposing to carry out Highway repair and maintenance works on Road Leading From Wetheral Pasture To Wetheral, Wetheral.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 8 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 28 Jan 2025 at 18:48.

Cumberland Council logo
LONG TERM
Between
15 Apr and 8 Jul 2025
Details
View Map
Share
Station Road

Cumberland Council were proposing to carry out Highway repair and maintenance works on Station Road, Cumwhinton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 8 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 28 Jan 2025 at 18:48.

Northern Gas Networks logo
LONG TERM
Until
16 May 2025
Details
View Map
Share
Follow
Yewdale Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Yewdale Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 10:55 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 10:55.

Electricity North West (NorWeb) logo
LONG TERM
Between
21 Apr and 9 Jun 2025
Details
View Map
Share
Follow
Willowholme Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Willowholme Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Feb 2025 at 09:02.

Cumberland Council logo
LONG TERM
Between
22 Apr and 29 Aug 2025
Details
View Map
Share
Follow
Peter Lane

Cumberland Council are proposing to carry out Highway improvement works on Peter Lane, Newby West.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 16 Jan 2025 at 15:13.

Cumberland Council logo
LONG TERM
Between
22 Apr and 29 Aug 2025
Details
View Map
Share
Follow
Peter Lane

Cumberland Council are proposing to carry out Highway improvement works on Peter Lane, Newby West.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 14 Apr 2025 at 10:51.

Cumberland Council logo
LONG TERM
Between
22 Apr and 29 Aug 2025
Details
View Map
Share
Follow
Newby Cross Village

Cumberland Council are proposing to carry out Highway improvement works on Newby Cross Village, Newby Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 16 Jan 2025 at 15:13.

Cumberland Council logo
LONG TERM
Between
22 Apr and 29 Aug 2025
Details
View Map
Share
Follow
Garden Village

Cumberland Council are proposing to carry out Highway improvement works on Garden Village, Newby West.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 16 Jan 2025 at 15:12.

Fibrus Networks logo
Finishing
Saturday
Details
View Map
Share
Follow
Steeles Bank

Fibrus Networks are proposing to carry out Utility asset works on Steeles Bank, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 11 Feb 2025 at 09:11.

Fibrus Networks logo
Finishing
Saturday
Details
View Map
Share
Follow
Steeles Bank

Fibrus Networks are proposing to carry out Utility asset works on Steeles Bank, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 3 Apr 2025 at 11:25.

Northern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Princess Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Princess Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 14:36.

Northern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Princess Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Princess Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 15:07.

Northern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Princess Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Princess Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Feb 2025 at 09:24.

Northern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Princess Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Princess Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Mar 2025 at 09:50.

Northern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Princess Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Princess Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Apr 2025 at 08:09.

Cumberland Council logo
Between
22 Apr and 9 May 2025
Details
View Map
Share
Follow
West Tower Street

Cumberland Council are proposing to carry out Highway repair and maintenance works on West Tower Street, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 25 Mar 2025 at 10:03.

Fibrus Networks logo
Finishing
Saturday
Details
View Map
Share
Follow
From Junction 43 On The M6 To Warwick On Eden On The A69t Via Wetheral

Fibrus Networks are proposing to carry out Utility asset works on From Junction 43 On The M6 To Warwick On Eden On The A69t Via Wetheral, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 11 Feb 2025 at 09:21.

Fibrus Networks logo
Finishing
Saturday
Details
View Map
Share
Follow
From Junction 43 On The M6 To Warwick On Eden On The A69t Via Wetheral

Fibrus Networks are proposing to carry out Utility asset works on From Junction 43 On The M6 To Warwick On Eden On The A69t Via Wetheral, Wetheral.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 3 Apr 2025 at 11:25.

Fibrus Networks logo
Finishing
Saturday
Details
View Map
Share
Follow
Scaleby

Fibrus Networks are proposing to carry out Utility asset works on Scaleby, Scaleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 24 Jan 2025 at 09:58.

Fibrus Networks logo
Finishing
Saturday
Details
View Map
Share
Follow
Scaleby

Fibrus Networks are proposing to carry out Utility asset works on Scaleby, Scaleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 7 Apr 2025 at 09:27.

United Utilities Water (formerly North West Water) logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Peter Gate

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Peter Gate, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Jan 2025 at 08:48.

United Utilities Water (formerly North West Water) logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Peter Gate

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Peter Gate, Cumwhinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Mar 2025 at 14:19.

Cumberland Council logo
Between
28 Apr and 4 May 2025
Details
View Map
Share
Road Leading From Carleton To High Hesket Crossing The Motorway

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Carleton To High Hesket Crossing The Motorway, Carleton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 4 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Mar 2025 at 09:47.

Cumberland Council logo
LONG TERM
Between
28 Apr and 29 Aug 2025
Details
View Map
Share
Follow
Newby Cross Village

Cumberland Council are proposing to carry out Highway improvement works on Newby Cross Village, Newby Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 17 Apr 2025 at 14:01.

Cumberland Council logo
LONG TERM
Between
28 Apr and 29 Aug 2025
Details
View Map
Share
Follow
Garden Village

Cumberland Council are proposing to carry out Highway improvement works on Garden Village, Newby West.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 17 Apr 2025 at 14:00.

United Utilities Water (formerly North West Water) logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Road Leading From Orton Grange Junction To North Of Great Orton

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Road Leading From Orton Grange Junction To North Of Great Orton, Great Orton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Apr 2025 at 09:56.

Cumberland Council logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Follow
Victoria Viaduct

Cumberland Council are proposing to carry out Highway improvement works on Victoria Viaduct, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 26 Feb 2025 at 14:31.

Cumberland Council logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Follow
Victoria Viaduct

Cumberland Council are proposing to carry out Highway improvement works on Victoria Viaduct, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 12 Mar 2025 at 08:17.

Cumberland Council logo
LONG TERM
Between
28 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Victoria Viaduct

Cumberland Council are proposing to carry out Highway improvement works on Victoria Viaduct, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 11 Apr 2025 at 13:50.

Cumberland Council logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Follow
Devonshire Street

Cumberland Council are proposing to carry out Highway improvement works on Devonshire Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 12 Mar 2025 at 08:17.

Cumberland Council logo
LONG TERM
Between
28 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Devonshire Street

Cumberland Council are proposing to carry out Highway improvement works on Devonshire Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 14 Apr 2025 at 15:15.

BT logo
Between
29 Apr and 3 May 2025
Details
View Map
Share
Follow
Chesterholm

BT are proposing to carry out Utility asset works on Chesterholm, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Mar 2025 at 15:42.

United Utilities Water (formerly North West Water) logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Scaleby

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Scaleby, Scaleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 5 Feb 2025 at 16:20.

United Utilities Water (formerly North West Water) logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Scaleby

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Scaleby, Scaleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Feb 2025 at 12:00.

United Utilities Water (formerly North West Water) logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Scaleby

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Scaleby, Scaleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Mar 2025 at 08:33.

Electricity North West (NorWeb) logo
Between
30 Apr and 7 May 2025
Details
View Map
Share
Devonshire Walk

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Devonshire Walk, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 April 2025 and run through until 7 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Apr 2025 at 09:11.

Electricity North West (NorWeb) logo
Between
30 Apr and 7 May 2025
Details
View Map
Share
Follow
Devonshire Walk

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Devonshire Walk, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Apr 2025 at 09:39.

Electricity North West (NorWeb) logo
Between
30 Apr and 7 May 2025
Details
View Map
Share
Follow
Devonshire Walk

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Devonshire Walk, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Apr 2025 at 13:06.

Northern Gas Networks logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Corporation Road Back

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Corporation Road Back, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Mar 2025 at 10:13.

Northern Gas Networks logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Corporation Road Back

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Corporation Road Back, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Apr 2025 at 09:23.

Fibrus Networks logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 3 Apr 2025 at 09:27.

Fibrus Networks logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 14 Apr 2025 at 12:50.

Fibrus Networks logo
Between
3 and 6 May 2025
Details
View Map
Share
Follow
Road Leading From Kirkandrews On Eden To Junction To The East Of Moorhouse

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Kirkandrews On Eden To Junction To The East Of Moorhouse, Kirkandrews On Eden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 6 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 1 Apr 2025 at 14:00.

Fibrus Networks logo
Between
3 and 6 May 2025
Details
View Map
Share
Follow
Road Leading From Kirkandrews On Eden To Junction To The East Of Moorhouse

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Kirkandrews On Eden To Junction To The East Of Moorhouse, Kirkandrews On Eden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 6 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 16 Apr 2025 at 13:43.

Fibrus Networks logo
Between
5 and 12 May 2025
Details
View Map
Share
Cargo

Fibrus Networks were proposing to carry out Utility asset works on Cargo, Cargo.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 12 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 30 Jan 2025 at 12:37.

Fibrus Networks logo
Between
5 and 8 May 2025
Details
View Map
Share
Follow
Access Road To Jerriestown From The C1009

Fibrus Networks are proposing to carry out Utility asset works on Access Road To Jerriestown From The C1009, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 8 May 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 14 Feb 2025 at 11:09.

Fibrus Networks logo
Between
5 and 8 May 2025
Details
View Map
Share
Follow
Access Road To Jerriestown From The C1009

Fibrus Networks are proposing to carry out Utility asset works on Access Road To Jerriestown From The C1009, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 8 May 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 16 Apr 2025 at 14:15.

Cumberland Council logo
LONG TERM
Between
6 May and 13 Jul 2025
Details
View Map
Share
Follow
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 13 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 15 Jan 2025 at 13:51.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 May 2025
Details
View Map
Share
James Street

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on James Street, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Feb 2025 at 10:37.

Cumberland Council logo
LONG TERM
Between
6 May and 22 Aug 2025
Details
View Map
Share
Follow
Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate, Cargo.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 6 Mar 2025 at 11:19.

Cumberland Council logo
LONG TERM
Between
6 May and 22 Aug 2025
Details
View Map
Share
Cargo

Cumberland Council were proposing to carry out Highway improvement works on Cargo, Cargo.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 6 Mar 2025 at 10:10.

Cumberland Council logo
LONG TERM
Between
6 May and 16 Aug 2025
Details
View Map
Share
Follow
Cargo

Cumberland Council are proposing to carry out Highway improvement works on Cargo, Cargo.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 6 Mar 2025 at 08:56.

Fibrus Networks logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Road Leading From Scaleby Moss Junction To Longpark Via Burnhill

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Scaleby Moss Junction To Longpark Via Burnhill, Scaleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 17 Feb 2025 at 09:52.

Fibrus Networks logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Road Leading From Scaleby Moss Junction To Longpark Via Burnhill

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Scaleby Moss Junction To Longpark Via Burnhill, Scaleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 16 Apr 2025 at 13:27.

Fibrus Networks logo
Between
9 and 11 May 2025
Details
View Map
Share
Follow
Road Leading From Dandy Dinmont Caravan Park North To Junction South Of Down By Rigg

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Dandy Dinmont Caravan Park North To Junction South Of Down By Rigg, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 11 May 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 17 Feb 2025 at 10:00.

Northern Gas Networks logo
LONG TERM
Between
12 May and 4 Jul 2025
Details
View Map
Share
Warwick Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Warwick Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 15:30.

Northern Gas Networks logo
LONG TERM
Between
12 May and 4 Jul 2025
Details
View Map
Share
Follow
Warwick Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Warwick Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Feb 2025 at 10:05.

Cumberland Council logo
Between
12 and 19 May 2025
Details
View Map
Share
Follow
Scotby Road

Cumberland Council are proposing to carry out Works for road purposes on Scotby Road, Scotby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cumberland Council on 27 Feb 2025 at 13:50.

Fibrus Networks logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Barclose On The C1011 To The C1012

Fibrus Networks are proposing to carry out Utility asset works on Barclose On The C1011 To The C1012, Scaleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 17 Feb 2025 at 10:02.

Cumberland Council logo
LONG TERM
Between
19 May and 27 Jul 2025
Details
View Map
Share
Follow
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 27 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 1 Apr 2025 at 09:29.

Northern Gas Networks logo
Between
19 May and 3 Jun 2025
Details
View Map
Share
Victoria Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Victoria Road, Carlisle.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Feb 2025 at 11:12.

Northern Gas Networks logo
Between
19 May and 2 Jun 2025
Details
View Map
Share
Follow
Victoria Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 14:03.

Northern Gas Networks logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Rockcliffe Village

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockcliffe Village, Rockcliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 3 Mar 2025 at 09:13.

Fibrus Networks logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Blackdyke Farm Junction To Wide Open Dykes Via Newtown And Blackford, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 8 Apr 2025 at 13:29.

Northern Gas Networks logo
Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
Brook Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Mar 2025 at 10:40.

Cumberland Council logo
LONG TERM
Between
27 May and 24 Oct 2025
Details
View Map
Share
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Mar 2025 at 10:01.

Cumberland Council logo
LONG TERM
Between
1 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Road Leading From Carleton To High Hesket Crossing The Motorway

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Carleton To High Hesket Crossing The Motorway, Carleton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 6 Mar 2025 at 15:03.

Cumberland Council logo
LONG TERM
Between
1 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Road Leading From Carleton To High Hesket Crossing The Motorway

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Carleton To High Hesket Crossing The Motorway, Carleton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 10 Mar 2025 at 08:42.

Cumberland Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Road Leading From Carleton To High Hesket Crossing The Motorway

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Carleton To High Hesket Crossing The Motorway, Carleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Mar 2025 at 11:12.

Cumberland Council logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Castlerigg Drive

Cumberland Council are proposing to carry out Highway improvement works on Castlerigg Drive, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 2 Apr 2025 at 09:24.

Northern Gas Networks logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Alexander Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 14:02.

Northern Gas Networks logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Yewdale Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Yewdale Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 11:48.

Northern Gas Networks logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Yewdale Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Yewdale Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 11:11.

Northern Gas Networks logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Yewdale Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Yewdale Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 11:10.

Northern Gas Networks logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Greystone Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greystone Road, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 14:04.

Northern Gas Networks logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Greystone Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Greystone Road, Carlisle.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 24 Feb 2025 at 15:49.

Northern Gas Networks logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Greystone Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greystone Road, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 Feb 2025 at 13:17.

Cumberland Council logo
Between
8 and 23 Jun 2025
Details
View Map
Share
Follow
M6 J42 Leave N

Cumberland Council are proposing to carry out Highway improvement works on M6 J42 Leave N, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 11 Mar 2025 at 12:35.

Cumberland Council logo
Between
8 and 23 Jun 2025
Details
View Map
Share
Follow
M6 J42 Leave N

Cumberland Council are proposing to carry out Highway improvement works on M6 J42 Leave N, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 31 Mar 2025 at 16:30.

Cumberland Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
From The C1036 To The C1017

Cumberland Council are proposing to carry out Highway repair and maintenance works on From The C1036 To The C1017, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 7 Apr 2025 at 14:02.

Cumberland Council logo
LONG TERM
Between
9 Jun and 7 Nov 2025
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Mar 2025 at 11:05.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Jun 2025
Details
View Map
Share
James Street

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on James Street, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Apr 2025 at 11:59.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Jun 2025
Details
View Map
Share
James Street

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on James Street, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Apr 2025 at 15:54.

Cumberland Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Scotby Road

Cumberland Council are proposing to carry out Works for road purposes on Scotby Road, Scotby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cumberland Council on 1 Apr 2025 at 15:25.

Cumberland Council logo
Between
10 and 20 Jun 2025
Details
View Map
Share
Follow
Road Leading From Harker Substation North To A74 Underpass

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Harker Substation North To A74 Underpass, Blackford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 20 June 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 17 Apr 2025 at 10:28.

Cumberland Council logo
Between
10 and 20 Jun 2025
Details
View Map
Share
Follow
Road Leading From Tewthwaite Green North To Junction West Of Justicetown

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From Tewthwaite Green North To Junction West Of Justicetown, Westlinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 20 June 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 17 Apr 2025 at 10:11.

Northern Gas Networks logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Brook Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Street, Carlisle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 12:26.

Fibrus Networks logo
Between
26 Jun and 9 Jul 2025
Details
View Map
Share
Glebe Close

Fibrus Networks were proposing to carry out Utility asset works on Glebe Close, Dalston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 9 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 7 Apr 2025 at 15:51.

Northern Gas Networks logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Orton Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Orton Road, Carlisle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 18 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 11:37.

Northern Gas Networks logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Orton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Orton Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 11:47.

Northern Gas Networks logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Orton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Orton Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 14:37.

Fibrus Networks logo
Between
1 and 5 Jul 2025
Details
View Map
Share
Follow
Road Leading From South Of Harker Road Ends To Edge Of Motorway Via Heathlands Farm

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From South Of Harker Road Ends To Edge Of Motorway Via Heathlands Farm, Harker.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 5 July 2025. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 19 Mar 2025 at 11:42.

Northern Gas Networks logo
LONG TERM
Between
10 Jul and 5 Sep 2025
Details
View Map
Share
Church Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Road, Warwick Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 10:44.

Northern Gas Networks logo
LONG TERM
Between
10 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Church Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Warwick Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 10:45.

Northern Gas Networks logo
LONG TERM
Between
10 Jul and 5 Sep 2025
Details
View Map
Share
Follow
A69 From J A689 South West Of Brampton To J B6263

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on A69 From J A689 South West Of Brampton To J B6263, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 10:05.

Northern Gas Networks logo
LONG TERM
Between
10 Jul and 5 Sep 2025
Details
View Map
Share
Road Leading From Catholic Church At Warwick Bridge South To Burnrigg

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Road Leading From Catholic Church At Warwick Bridge South To Burnrigg, Warwick Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 10:59.

Northern Gas Networks logo
LONG TERM
Between
10 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Road Leading From Catholic Church At Warwick Bridge South To Burnrigg

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Road Leading From Catholic Church At Warwick Bridge South To Burnrigg, Warwick Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 11:00.

Northern Gas Networks logo
LONG TERM
Between
10 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Little Corby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Corby Road, Little Corby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 09:53.

Cumberland Council logo
LONG TERM
Between
11 Jul and 15 Dec 2025
Details
View Map
Share
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council were proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 July 2025 and run through until 15 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 6 Feb 2025 at 13:59.

Fibrus Networks logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Road Leading From Monkhill To Beaumont Village

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Monkhill To Beaumont Village, Beaumont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 14 Apr 2025 at 08:57.


Roadworks Map near to Spencer Street, CARLISLE, CA1 1BA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Apr 2025 02:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Spencer Street, CARLISLE, CA1 1BA (53 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cumberland Council logo
MAJOR
  
LOWTHER STREET 
(0.1 miles)
Cumberland Council
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 12 Sep 2024 00:01
(Scheduled: 12 Sep 2024 - 10 Mar 2026)
0.1
Details
Share
Follow
2
Cumberland Council logo
MAJOR
  
LOWTHER STREET 
(0.1 miles)
Cumberland Council
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 12 Sep 2024 - 10 Mar 2026
0.1
Details
Share
Follow
3
Cumberland Council logo
MAJOR
  
THE CRESCENT 
(0.2 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Lane closure
Planned
Scheduled: 10 Feb 2025 - 21 Apr 2025
0.2
Details
Share
Follow
4
Cumberland Council logo
MAJOR
  
THE CRESCENT 
(0.2 miles)
Cumberland Council
Works for road purposes - Carriageway - Multi-way signals
Cancelled
(Scheduled: 22 Oct 2024 - 22 Apr 2025)
0.2
Details
Share
5
Cumberland Council logo
MAJOR
  
THE CRESCENT 
(0.2 miles)
Cumberland Council
Works for road purposes - Carriageway - Multi-way signals
Cancelled
(Scheduled: 12 Jan 2025 - 11 May 2025)
0.2
Details
Share
6
Cumberland Council logo
MAJOR
  
THE CRESCENT 
(0.2 miles)
Cumberland Council
Highway improvement works - Carriageway - Multi-way signals
Planned
Scheduled: 13 Jan 2025 - 4 May 2025
0.2
Details
Share
Follow
7
Cumberland Council logo
MAJOR
  
THE CRESCENT 
(0.2 miles)
Cumberland Council
Highway improvement works - Carriageway - Multi-way signals
In Progress
Since: 13 Jan 2025 06:00
(Scheduled: 13 Jan 2025 - 19 Sep 2025)
0.2
Details
Share
Follow
8
Cumberland Council logo
MAJOR
  
ENGLISH STREET 
(0.2 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Lane closure
Planned
Scheduled: 10 Feb 2025 - 21 Apr 2025
0.2
Details
Share
Follow
9
Cumberland Council logo
MAJOR
  
ENGLISH STREET 
(0.2 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Lane closure
In Progress
Since: 26 Feb 2025 07:00
(Scheduled: 17 Mar 2025 - 27 Jun 2025)
0.2
Details
Share
Follow
10
Cumberland Council logo
MAJOR
  
COURT SQUARE BROW 
(0.2 miles)
Cumberland Council
Highway improvement works - Footway, Carriageway - Lane closure
In Progress
Since: 20 Jan 2025 07:30
(Scheduled: 20 Jan 2025 - 28 Jul 2025)
0.2
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.