ROADWORKS SUMMARY
Church Lane, BRISTOL, BS39 7LF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Church Lane, BS39 7LF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Church Lane, BRISTOL, BS39 7LF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Church Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bath And North East Somerset Council logo
Finishing
Today
Details
View Map
Share
Follow
The Island

Bath And North East Somerset Council are carrying out Highway improvement works on The Island, Midsomer Norton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 08:15 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 2 Dec 2024 at 10:39.

Wales And West Utilities logo
Until
26 Dec 2024
Details
View Map
Share
Follow
Salisbury Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Salisbury Road, Paulton, Bristol.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 19:35 and could run through until 26 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 14:20.

Wales And West Utilities logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Redfield Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Redfield Road, Midsomer Norton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 17:39 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Dec 2024 at 08:54.

Bristol Waterworks Company logo
Between
30 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Redfield Road

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Redfield Road, Midsomer Norton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 2 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 19 Sep 2024 at 11:49.

Wales And West Utilities logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hallatrow Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Hallatrow Road, Paulton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 10:32.

Bristol Waterworks Company logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Hinton Blewett Road

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Hinton Blewett Road, Stowey, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 3 Oct 2024 at 15:01.

Bristol Waterworks Company logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Clutton Hill

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Clutton Hill, Clutton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 18 Oct 2024 at 09:54.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Fosse Road To Silver Street

BT are proposing to carry out Utility asset works on Fosse Road To Silver Street, Stratton On The Fosse, Shepton Mallet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Nov 2024 at 11:02.

Western Power Distribution (South West) logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Downsway

Western Power Distribution (South West) are proposing to carry out Utility asset works on Downsway, Paulton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Oct 2024 at 15:42.

Western Power Distribution (South West) logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Downsway

Western Power Distribution (South West) are proposing to carry out Utility asset works on Downsway, Paulton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 5 Nov 2024 at 15:23.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Fosse Road To Silver Street

BT were proposing to carry out Utility asset works on Fosse Road To Silver Street, Stratton On The Fosse, Shepton Mallet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 11 Oct 2024 at 15:04.

BT logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Silver Street

BT are proposing to carry out Utility asset works on Silver Street, Midsomer Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Nov 2024 at 11:03.

BT logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Silver Street

BT are proposing to carry out Utility asset works on Silver Street, Midsomer Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Oct 2024 at 10:55.

BT logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Silver Street

BT are proposing to carry out Utility asset works on Silver Street, Midsomer Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Dec 2024 at 14:40.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Silver Street

BT are proposing to carry out Utility asset works on Silver Street, Midsomer Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Oct 2024 at 09:20.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Fosse Road To Silver Street

BT are proposing to carry out Utility asset works on Fosse Road To Silver Street, Stratton On The Fosse, Shepton Mallet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Oct 2024 at 14:04.

Wales And West Utilities logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hallatrow Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Hallatrow Road, Paulton, Bristol.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Dec 2024 at 10:25.

Wales And West Utilities logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hallatrow Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Hallatrow Road, Paulton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Dec 2024 at 10:26.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Fosse Road To Silver Street

BT are proposing to carry out Utility asset works on Fosse Road To Silver Street, Stratton On The Fosse, Shepton Mallet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 17 Dec 2024 at 11:59.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Fosse Road To Silver Street

BT are proposing to carry out Utility asset works on Fosse Road To Silver Street, Stratton On The Fosse, Shepton Mallet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 28 Oct 2024 at 14:21.

Bristol Waterworks Company logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Clutton Hill

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Clutton Hill, Clutton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 6 Nov 2024 at 14:45.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Edford Hill

BT are proposing to carry out Utility asset works on Edford Hill, Holcombe, Shepton Mallet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Oct 2024 at 14:44.

Bristol Waterworks Company logo
Between
30 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Walnut Buildings

Bristol Waterworks Company are proposing to carry out Utility asset works on Walnut Buildings, Radstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 21 Nov 2024 at 14:49.

Bristol Waterworks Company logo
Between
30 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Walnut Buildings

Bristol Waterworks Company are proposing to carry out Utility asset works on Walnut Buildings, Radstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 11 Dec 2024 at 15:59.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Northmead Road

BT are proposing to carry out Utility asset works on Northmead Road, Midsomer Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Nov 2024 at 15:02.

Wales And West Utilities logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Main Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Main Street, Farrington Gurney, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Oct 2024 at 15:55.

Wales And West Utilities logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Main Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Main Street, Farrington Gurney, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 09:09.

Wales And West Utilities logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bath Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bath Road, Paulton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Dec 2024 at 12:23.

Wales And West Utilities logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bath Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bath Road, Paulton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Dec 2024 at 14:09.

Bristol Waterworks Company logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Redfield Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Redfield Road, Midsomer Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 19 Sep 2024 at 13:47.

Bath And North East Somerset Council logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
The Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on The Street, Radstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 5 Nov 2024 at 14:53.

Bath And North East Somerset Council logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
The Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on The Street, Radstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 31 Oct 2024 at 13:37.

Bristol Waterworks Company logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Redfield Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Redfield Road, Midsomer Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 25 Oct 2024 at 15:05.

Wales And West Utilities logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bath Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bath Road, Paulton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Nov 2024 at 15:05.

Bristol Waterworks Company logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Sixpence

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Sixpence, High Littleton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 17 Dec 2024 at 12:10.

Bristol Waterworks Company logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Parklands

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Parklands, High Littleton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 17 Dec 2024 at 12:09.

Wales And West Utilities logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Cameley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cameley Road, Cameley, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 9 Dec 2024 at 12:08.

Bath And North East Somerset Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Frome Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Frome Road, Radstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 31 Oct 2024 at 13:38.

Bath And North East Somerset Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Frome Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Frome Road, Radstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 5 Nov 2024 at 14:54.

BT logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Top Lane

BT are proposing to carry out Utility asset works on Top Lane, Farmborough, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 2 Dec 2024 at 15:46.

Bristol Waterworks Company logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Longleat Lane

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Longleat Lane, Holcombe, Shepton Mallet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 4 Dec 2024 at 09:36.


Roadworks Map near to Church Lane, BRISTOL, BS39 7LF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Church Lane, BRISTOL, BS39 7LF (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
BRISTOL ROAD, PAULTON 
(0.3 miles)
BT
Utility asset works - Verge - No carriageway incursion
Planned
Scheduled: 16 Dec 2024 - 18 Dec 2024
0.3
Details
Share
Follow
2
Wales And West Utilities logo
MAJOR
  
GREGORY'S TYNING, PAULTON 
(0.3 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 2 Dec 2024 - 14 Mar 2025
0.3
Details
Share
Follow
3
Wales And West Utilities logo
MAJOR
  
ALPINE ROAD, PAULTON 
(0.6 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 18 Nov 2024 - 20 Dec 2024
0.6
Details
Share
Follow
4
Wales And West Utilities logo
EMERGENCY
  
SALISBURY ROAD, PAULTON 
(0.6 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 28 Nov 2024 19:35
(Scheduled: 28 Nov 2024 - 26 Dec 2024)
0.6
Details
Share
Follow
5
Wales And West Utilities logo
MAJOR
  
FIR TREE AVENUE, PAULTON 
(0.7 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 2 Dec 2024 10:30
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.