ROADWORKS SUMMARY
Broad Lane, BRISTOL, BS36 2TY
Introduction
View current and future planned roadworks and road closures for Broad Lane, BS36 2TY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Broad Lane, BRISTOL, BS36 2TY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Broad Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Coalsack Lane, Winterbourne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:05.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Cooks Lane, Coalpit Heath.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Ruffet Road, Winterbourne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.
23 Jan 2024 and 23 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Sorrel Place, Stoke Gifford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 23 January 2024 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Oct 2023 at 14:06.
13 Feb 2024 and 12 Feb 2026
National Highways are proposing to carry out Works for road purposes on Badminton Road, Winterbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2024 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 8 Feb 2024 at 07:22.
13 Feb 2024 and 12 Feb 2026
National Highways are proposing to carry out Works for road purposes on Badminton Road, Winterbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2024 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 19 Sep 2024 at 07:10.
20 Dec 2024
Wales And West Utilities are carrying out Utility repair and maintenance works on Coniston Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 13:54.
1 Jul 2024 and 12 Dec 2025
National Highways are proposing to carry out Utility asset works on Cuckoo Lane, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 11 Jun 2024 at 06:12.
1 Jul 2024 and 14 Mar 2025
National Highways are proposing to carry out Utility asset works on Cuckoo Lane, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 14 March 2025. The works will impact the footway, carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 11:06.
24 Jan 2025
South Gloucestershire Council are carrying out Highway improvement works on Link Road, Filton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 07:45 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 08:10.
24 Jan 2025
South Gloucestershire Council are carrying out Highway improvement works on Southmead Road, Filton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 07:45 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 08:10.
24 Jan 2025
South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road North, Filton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 07:45 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 08:09.
24 Jan 2025
South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road North, Filton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 07:45 and could run through until 24 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 08:08.
20 Dec 2024
Wales And West Utilities are carrying out Utility repair and maintenance works on Midland Road, Staple Hill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 07:04.
Friday
Bristol Waterworks Company are carrying out Utility asset works on Gloucester Road North, Filton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bristol Waterworks Company on 6 Nov 2024 at 14:07.
7 Oct 2024 and 7 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 21 Feb 2024 at 15:46.
7 Oct 2024 and 7 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 21 Feb 2024 at 15:47.
Friday
Wales And West Utilities are carrying out Utility repair and maintenance works on Chapel Lane, Warmley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 14:50.
21 Oct and 13 Dec 2024
South Gloucestershire Council are proposing to carry out Highway repair and maintenance works on Perrinpit Road, Frampton Cotterell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 8 Oct 2024 at 07:12.
20 Dec 2024
Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Station Road, Filton.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 11:30 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:36.
20 Dec 2024
Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Great Stoke Way Roundabout A4174, Stoke Gifford.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 11:30 and could run through until 20 December 2024. The works will impact the footway and cycleway.
This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:37.
20 Dec 2024
Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Great Stoke Way South, Stoke Gifford.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 11:30 and could run through until 20 December 2024. The works will impact the footway and cycleway.
This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:34.
20 Dec 2024
Wales And West Utilities are carrying out Utility repair and maintenance works on Morley Road, Staple Hill.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 13:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 09:58.
20 Dec 2024
Wales And West Utilities are carrying out Utility repair and maintenance works on Soundwell Road, Soundwell.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 12:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 13:51.
20 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Foot And Cyclepath Mod Perimeter, Stoke Gifford.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 28 October 2024 at 07:45 and could run through until 20 December 2024. The works will impact the cycleway and footpath.
This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 09:12.
30 Oct and 9 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Douglas Road, Kingswood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Aug 2024 at 09:43.
30 Oct and 9 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Pillingers Road, Kingswood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Aug 2024 at 09:41.
30 Oct and 9 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Forest Road, Kingswood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Aug 2024 at 09:35.
31 Oct 2024 and 31 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 14:36.
31 Oct 2024 and 31 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:40.
31 Oct 2024 and 31 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:30.
31 Oct 2024 and 31 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 13:24.
31 Oct 2024 and 31 Oct 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:54.
1 Nov 2024 and 3 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 9 Aug 2024 at 13:55.
1 Nov 2024 and 3 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 9 Aug 2024 at 13:48.
15 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Filton Road, Stoke Gifford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:30.
15 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Harry Stoke Road, Stoke Gifford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:30.
15 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Filton Lane, Stoke Gifford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:29.
Friday
South Gloucestershire Council are carrying out Highway improvement works on Station Road, Filton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:30.
Friday
South Gloucestershire Council were proposing to carry out Highway improvement works on New Road, Stoke Gifford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:55.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Nibley Lane, Yate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 12 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:35.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Nibley Lane, Iron Acton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:45 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:36.
Friday
Bristol Waterworks Company are carrying out Utility repair and maintenance works on Rodway Road, Patchway.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 18:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bristol Waterworks Company on 21 Nov 2024 at 14:41.
Friday
Bristol Waterworks Company are carrying out Utility repair and maintenance works on Durban Road, Patchway.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 18:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bristol Waterworks Company on 22 Nov 2024 at 15:38.
Saturday
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Windermere Road, Patchway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 19 Aug 2024 at 14:12.
3 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Almondsbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:15.
3 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Hortham Lane, Almondsbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:15.
3 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Fernhill, Almondsbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:15.
17 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Emma-chris Way, Filton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 09:30 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 19 Nov 2024 at 10:01.
17 Dec 2024
South Gloucestershire Council are carrying out Highway improvement works on Station Road, Filton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 09:30 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 19 Nov 2024 at 10:00.
Tuesday
Wales And West Utilities are carrying out Utility repair and maintenance works on Cock Road, Kingswood.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 12:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 20 Nov 2024 at 15:27.
20 Nov and 13 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Park Lane, Winterbourne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 28 Aug 2024 at 14:42.
20 Nov and 13 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Winterbourne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 28 Aug 2024 at 14:44.
20 Nov and 13 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Station Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 28 Aug 2024 at 16:16.
20 Nov and 13 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Henfield Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 28 Aug 2024 at 16:18.
20 Nov and 13 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Beesmoor Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 28 Aug 2024 at 16:20.
20 Nov and 13 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 28 Aug 2024 at 14:47.
21 Nov 2024 and 6 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 29 Aug 2024 at 09:39.
21 Nov 2024 and 6 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Henfield Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 29 Aug 2024 at 09:35.
21 Nov 2024 and 6 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Beesmoor Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 29 Aug 2024 at 09:32.
21 Nov 2024 and 6 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Church Road, Frampton Cotterell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 29 Aug 2024 at 09:41.
Wednesday
National Highways are proposing to carry out Works for road purposes on Badminton Road, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Nov 2024 at 13:50.
25 Nov and 21 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Bristol Road, Hambrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 14:36.
25 Nov and 21 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Whiteshill, Hambrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 14:36.
25 Nov and 21 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Bristol Road, Winterbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 14:36.
25 Nov and 19 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Henfield Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 14:30.
25 Nov and 19 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Beesmoor Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 12:42.
25 Nov and 19 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 12:43.
25 Nov and 19 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Church Road, Frampton Cotterell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 12:44.
Thursday
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Oldlands Avenue, Coalpit Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bristol Waterworks Company on 11 Nov 2024 at 09:41.
26 Nov and 11 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Almondsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:10.
26 Nov and 11 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Hortham Lane, Almondsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:05.
26 Nov and 11 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Fernhill, Almondsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:11.
Friday
National Highways are proposing to carry out Utility asset works on Badminton Road, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by National Highways on 14 Nov 2024 at 07:47.
Friday
National Highways are proposing to carry out Utility asset works on Badminton Road, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 14:24.
Friday
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Engine Common Lane, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Bristol Waterworks Company on 29 Oct 2024 at 12:10.
2 and 20 Dec 2024
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Acacia Road, Staple Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 23 Jul 2024 at 09:25.
2 and 4 Dec 2024
National Highways are proposing to carry out Statutory Infrastructure Works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Nov 2024 at 14:34.
2 and 4 Dec 2024
National Highways are proposing to carry out Statutory Infrastructure Works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 14:25.
2 and 6 Dec 2024
Wessex Water are proposing to carry out Utility repair and maintenance works on Mackie Road, Filton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 15 Aug 2024 at 09:06.
2 and 6 Dec 2024
Wessex Water are proposing to carry out Utility repair and maintenance works on Mackie Road, Filton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 15 Aug 2024 at 09:30.
4 and 6 Dec 2024
National Highways are proposing to carry out Statutory Infrastructure Works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Nov 2024 at 14:34.
4 and 6 Dec 2024
National Highways are proposing to carry out Statutory Infrastructure Works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 14:25.
16 and 18 Dec 2024
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Cleeve Wood Road, Downend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 11 Sep 2024 at 09:00.
16 and 18 Dec 2024
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Alexandra Road, Coalpit Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 16 Sep 2024 at 09:17.
25 and 28 Dec 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Blackhorse Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 December 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 3 Oct 2024 at 10:22.
27 Dec 2024 and 13 Jan 2025
South Gloucestershire Council are proposing to carry out Section 50 on Bristol Road, Frampton Cotterell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Oct 2024 at 07:55.
30 Dec 2024 and 24 Feb 2025
South Gloucestershire Council are proposing to carry out Highway repair and maintenance works on Perrinpit Road, Frampton Cotterell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 24 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Oct 2024 at 14:53.
6 Jan and 7 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pillingers Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 25 Jul 2024 at 11:19.
6 and 31 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morley Road, Staple Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 26 Jun 2024 at 09:01.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bromley Heath Roundabout, Downend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:37.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road Avon Ring Road, Hambrook.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:37.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:38.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Wick Wick Roundabout, Downend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:39.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:36.
6 Jan and 12 Dec 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road, Stoke Gifford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:36.
6 and 10 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Great Stoke Way Roundabout A4174, Stoke Gifford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 14 Oct 2024 at 13:42.
6 and 23 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Emma-chris Way, Filton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 14 Oct 2024 at 13:41.
6 and 23 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Station Road, Filton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 14 Oct 2024 at 13:44.
6 and 31 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Station Road, Filton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 14 Oct 2024 at 13:42.
6 and 10 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Henfield Road, Coalpit Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 14 Oct 2024 at 15:44.
6 and 8 Jan 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Love Lane, Chipping Sodbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bristol Waterworks Company on 2 Oct 2024 at 13:58.
6 and 8 Jan 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Love Lane, Chipping Sodbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bristol Waterworks Company on 11 Nov 2024 at 10:38.
6 and 8 Jan 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Yate Rocks, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.
This roadwork event was last updated by Bristol Waterworks Company on 5 Nov 2024 at 15:04.
7 Jan and 3 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on New Road, Stoke Gifford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 15 Oct 2024 at 13:08.
7 Jan 2025 and 13 Apr 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Nibley Lane, Yate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 April 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 16 Oct 2024 at 07:21.
7 Jan 2025 and 13 Apr 2026
South Gloucestershire Council are proposing to carry out Highway improvement works on Nibley Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 16 Oct 2024 at 07:17.
8 and 10 Jan 2025
Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on The Stream, Hambrook.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Bristol Waterworks Company on 1 Nov 2024 at 11:31.
13 and 24 Jan 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Downend Road, Kingswood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:15.
13 and 24 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Gilbert Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 15 Oct 2024 at 16:09.
13 and 24 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Gilbert Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 17 Oct 2024 at 07:21.
13 and 24 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Mangotsfield Road, Mangotsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 8 Nov 2024 at 07:42.
15 and 17 Jan 2025
Bristol Waterworks Company are proposing to carry out New service connection on Cooks Close, Bradley Stoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bristol Waterworks Company on 16 Oct 2024 at 13:01.
19 and 27 Jan 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Chaingate Lane, Iron Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Oct 2024 at 15:16.
20 Jan and 14 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bristol Road, Hambrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 12:15.
20 Jan and 14 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Whiteshill, Hambrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 12:15.
20 Jan and 14 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bristol Road, Winterbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 12:15.
30 Jan and 26 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Mangotsfield Road, Mangotsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 26 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Nov 2024 at 15:45.
30 Jan and 25 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Henfield Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Nov 2024 at 09:25.
30 Jan and 25 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Beesmoor Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 7 Nov 2024 at 07:10.
30 Jan and 25 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Badminton Road, Coalpit Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 6 Nov 2024 at 21:20.
30 Jan and 25 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Church Road, Frampton Cotterell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 6 Nov 2024 at 21:22.
17 Feb and 4 Apr 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Counterpool Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 25 Jul 2024 at 11:16.
17 Feb and 7 Mar 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Gilbert Road, Kingswood.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:15.
17 Feb and 2 May 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Winterbourne Road, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:18.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Baileys Court Road, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.
17 Feb and 2 May 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:17.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:12.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Webbs Wood Road, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:14.
17 Feb and 14 Nov 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.
Roadworks Map near to Broad Lane, BRISTOL, BS36 2TY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Broad Lane, BRISTOL, BS36 2TY (15 Events)
(Scheduled Dates)
(miles)
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.