ROADWORKS SUMMARY
Cyclamen Road, SWANLEY, BR8 8HJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cyclamen Road, BR8 8HJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cyclamen Road, SWANLEY, BR8 8HJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cyclamen Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 15 Sep 2025
Details
View Map
Share
Hatherley Crescent

Thames Water were proposing to carry out New service connection on Hatherley Crescent, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 1 Dec 2025
Details
View Map
Share
Faraday Avenue

Thames Water were proposing to carry out New service connection on Faraday Avenue, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Jan and 19 Jun 2025
Details
View Map
Share
Follow
Sandy Lane

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Jan and 19 Jun 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Jan and 2 Jul 2025
Details
View Map
Share
Sevenoaks Way

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 2 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 11:11.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jan and 29 Jul 2025
Details
View Map
Share
Cray Avenue

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.

These works were categorised as Major.

The works were originally planned to start 13 January 2025 and run through until 29 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Sep 2024 at 11:40.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Jan and 14 Aug 2025
Details
View Map
Share
Follow
Sevenoaks Way

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:35.

Transport for London (TfL) logo
LONG TERM
Between
26 Jan 2025 and 28 Jan 2026
Details
View Map
Share
Sidcup By Pass

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 January 2025 and run through until 28 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:21.

Transport for London (TfL) logo
LONG TERM
Between
6 Apr and 4 Jul 2025
Details
View Map
Share
East Rochester Way

Transport for London (TfL) were proposing to carry out Highway improvement works on East Rochester Way, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 April 2025 and run through until 4 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 13:57.

Southern Gas Networks logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Waldenhurst Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Waldenhurst Road, Orpington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 08:25 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 11:27.

UK Power Networks South Eastern logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Sevenoaks Way

UK Power Networks South Eastern are carrying out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 10:00 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 12:32.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Jan 2025 at 15:04.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Rookesley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Rookesley Road, Orpington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 April 2025 at 11:15 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 18:01.

Southern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Old Farm Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Old Farm Avenue, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 08:20 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 10:55.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Mansfield Close

Southern Gas Networks are carrying out Utility repair and maintenance works on Mansfield Close, Orpington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2025 at 14:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 18:01.

LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Thames Road

Riverside Energy Park are carrying out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 29 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:57.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 11:59.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Jul 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 09:14.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Jul 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 09:18.

Southern Gas Networks logo
LONG TERM
Between
12 May and 23 Jun 2025
Details
View Map
Share
Follow
Chelsfield Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chelsfield Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 10:02.

Thames Water logo
LONG TERM
Between
12 May and 15 Sep 2025
Details
View Map
Share
Old Farm Avenue

Thames Water were proposing to carry out New service connection on Old Farm Avenue, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.

Kent County Council logo
LONG TERM
Between
16 May and 21 Jun 2025
Details
View Map
Share
Follow
London Road

Kent County Council are proposing to carry out Highway improvement works on London Road, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 13 May 2025 at 10:00.

Kent County Council logo
LONG TERM
Until
21 Jun 2025
Details
View Map
Share
Follow
London Road

Kent County Council are carrying out Highway improvement works on London Road, Farningham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 09:17 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 May 2025 at 09:21.

Southern Gas Networks logo
LONG TERM
Between
19 May and 31 Aug 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 09:02.

Southern Gas Networks logo
LONG TERM
Between
19 May and 7 Jul 2025
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 07:46.

Southern Gas Networks logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Worlds End Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 09:10.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Parkhill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Parkhill Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Apr 2025 at 08:41.

Kent County Council logo
LONG TERM
Between
19 May 2025 and 19 May 2026
Details
View Map
Share
Follow
Hythe Street

Kent County Council are proposing to carry out Highway improvement works on Hythe Street, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 19 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Feb 2025 at 13:48.

Kent County Council logo
LONG TERM
Between
19 May 2025 and 19 May 2026
Details
View Map
Share
Follow
Spital Street

Kent County Council are proposing to carry out Highway improvement works on Spital Street, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 19 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Feb 2025 at 13:49.

London Borough Of Bromley logo
Finishing
Thursday
Details
View Map
Share
Follow
Somerden Road

London Borough Of Bromley are carrying out Highway improvement works on Somerden Road, Orpington.

The works started on 22 May 2025 at 09:17 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Jun 2025 at 12:45.

UK Power Networks South Eastern logo
LONG TERM
Between
23 May and 18 Jul 2025
Details
View Map
Share
Follow
Sevenoaks Way

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 09:05.

Finishing
Monday
Details
View Map
Share
Follow
Brampton Road

Harlaxton Energy Networks are carrying out Utility asset works on Brampton Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 27 May 2025 at 10:32.

Southern Gas Networks logo
LONG TERM
Between
26 May and 30 Jun 2025
Details
View Map
Share
Follow
Brow Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brow Crescent, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 10:02.

Kent County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Jacobs Lane

Kent County Council are proposing to carry out Highway improvement works on Jacobs Lane, Horton Kirby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 13 Mar 2025 at 10:46.

Kent County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Jacobs Lane

Kent County Council are proposing to carry out Highway improvement works on Jacobs Lane, Horton Kirby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 13 Mar 2025 at 11:51.

National Highways logo
LONG TERM
Between
26 May and 8 Sep 2025
Details
View Map
Share
Follow
Princes Road

National Highways are proposing to carry out Highway repair and maintenance works on Princes Road, East Of Junction One B, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 12 May 2025 at 13:50.

Kent County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Priory Road

Kent County Council are carrying out Highway improvement works on Priory Road, Dartford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 May 2025 at 00:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 8 May 2025 at 07:58.

Southern Gas Networks logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
Mayplace Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayplace Avenue, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 11:28.

Southern Gas Networks logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
Medway Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Medway Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 08:29.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hook Green Lane

Kent County Council are carrying out Highway improvement works on Hook Green Lane, Wilmington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 00:00 and could run through until 6 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 10:00.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Watling Street

National Highways are carrying out Works for road purposes on Watling Street, Stone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 21:45 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 May 2025 at 08:39.

Between
27 May and 16 Jun 2025
Details
View Map
Share
Crayford Creek Road

Aurora Utilities Limited were proposing to carry out Utility asset works on Crayford Creek Road, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 28 Mar 2025 at 09:23.

Southern Gas Networks logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Chelsfield Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Chelsfield Lane, Orpington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 13:00 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:36.

London Borough Of Bromley logo
Finishing
Today
Details
View Map
Share
Follow
Waldens Close

London Borough Of Bromley are carrying out Highway improvement works on Waldens Close, Orpington.

The works started on 30 May 2025 at 10:04 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 2 Jun 2025 at 11:27.

Southern Gas Networks logo
Between
2 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Norsted Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norsted Lane, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 13:38.

Kent County Council logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Walnut Close

Kent County Council are proposing to carry out Highway improvement works on Walnut Close, Eynsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 4 Mar 2025 at 11:43.

Kent County Council logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Walnut Close

Kent County Council are carrying out Highway improvement works on Walnut Close, Eynsford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:07 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 08:10.

Southern Gas Networks logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Brow Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brow Crescent, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 12:32.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Jun and 19 Dec 2025
Details
View Map
Share
Follow
Cray Avenue

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 17:33.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Longmead Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:03.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Priory Road South

Thames Water are proposing to carry out Utility repair and maintenance works on Priory Road South, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 11:08.

Thames Water logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Priory Road South

Thames Water are carrying out Utility repair and maintenance works on Priory Road South, Dartford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:37.

Southern Gas Networks logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Gwillim Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gwillim Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 13:14.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Chieveley Road

Southern Gas Networks are proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 12:14.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Chieveley Road

Southern Gas Networks are proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 09:21.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Chieveley Road

Southern Gas Networks were proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:58.

Kent County Council logo
Today
Details
View Map
Share
Sycamore Drive

Kent County Council carried out Highway improvement works on Sycamore Drive, Swanley.

The road was closed for some or all of the period.

The works were completed on 3 June 2025 The works impacted the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Jun 2025 at 13:41.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Yester Road

Thames Water are carrying out Utility repair and maintenance works on Yester Road, Chislehurst.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 10:24 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:02.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Chestnut Grove

Kent County Council are carrying out Highway improvement works on Chestnut Grove, Wilmington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 00:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 3 Jun 2025 at 07:55.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Avalon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avalon Road, Orpington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 19:00.

London Borough Of Bromley logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Crofton Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Crofton Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 15 Jan 2025 at 11:34.

London Borough Of Bromley logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Court Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Court Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 24 Mar 2025 at 08:47.

Southern Gas Networks logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Ash Close

Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 12:40.

Southern Gas Networks logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Ash Close

Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 13:11.

Southern Gas Networks logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Ash Close

Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 10:42.

Southern Gas Networks logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Ash Close

Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 10:02.

Southern Gas Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Dallin Road

Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 10:40.

Southern Gas Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Dallin Road

Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 13:54.

Kent County Council logo
On
11 Jun 2025
Details
View Map
Share
Follow
Maplescombe Lane

Kent County Council are carrying out Highway improvement works on Maplescombe Lane, Farningham.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 June 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 30 May 2025 at 14:35.

Kent County Council logo
On
11 Jun 2025
Details
View Map
Share
Leydenhatch Lane

Kent County Council were proposing to carry out Highway improvement works on Leydenhatch Lane, Swanley.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 11 June 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 May 2025 at 14:34.

Kent County Council logo
On
11 Jun 2025
Details
View Map
Share
Leydenhatch Lane

Kent County Council were proposing to carry out Remedial works on Leydenhatch Lane, Swanley.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 11 June 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 May 2025 at 08:24.

Kent County Council logo
On
12 Jun 2025
Details
View Map
Share
Follow
Calfstock Lane

Kent County Council are carrying out Highway improvement works on Calfstock Lane, Farningham.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 12 June 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 May 2025 at 06:03.

Southern Gas Networks logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Bynon Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bynon Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 15:24.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Stonehouse Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stonehouse Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 06:08.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Stonehouse Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stonehouse Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 12:45.

Southern Gas Networks logo
Between
16 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Stonehouse Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stonehouse Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:28.

Southern Gas Networks logo
Between
16 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Stonehouse Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stonehouse Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 11:11.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Stonehouse Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stonehouse Road, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 06:08.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Stonehouse Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stonehouse Road, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 12:44.

London Borough Of Bromley logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Crofton Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Crofton Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 15 Jan 2025 at 11:34.

Kent County Council logo
Between
16 and 26 Jun 2025
Details
View Map
Share
Follow
Green Street Green Road

Kent County Council are proposing to carry out Highway improvement works on Green Street Green Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Nov 2024 at 12:54.

Kent County Council logo
Between
16 and 26 Jun 2025
Details
View Map
Share
Follow
Princes Road

Kent County Council are proposing to carry out Highway improvement works on Princes Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Nov 2024 at 12:54.

Southern Gas Networks logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Esher Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Esher Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 08:51.

Kent County Council logo
Between
16 and 26 Jun 2025
Details
View Map
Share
Follow
Oakwood Close

Kent County Council are proposing to carry out Highway improvement works on Oakwood Close, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Nov 2024 at 12:54.

Kent County Council logo
Between
16 and 26 Jun 2025
Details
View Map
Share
Follow
Park Road

Kent County Council are proposing to carry out Highway improvement works on Park Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Nov 2024 at 12:55.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Gwillim Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gwillim Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:14.

Southern Gas Networks logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Bynon Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bynon Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:47.

Kent County Council logo
Between
17 and 21 Jun 2025
Details
View Map
Share
Follow
Princes Road

Kent County Council are proposing to carry out Highway improvement works on Princes Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 26 Feb 2025 at 08:04.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Otford Lane

Thames Water are proposing to carry out New service connection on Otford Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 11:11.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Otford Lane

Thames Water are proposing to carry out New service connection on Otford Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 08:59.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Norsted Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norsted Lane, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 10:01.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Wood Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Wood Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Mar 2025 at 12:39.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Longmead Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:34.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Longmead Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:52.

Southern Gas Networks logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Stansted Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stansted Crescent, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 11:22.

Southern Gas Networks logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Shoreham Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shoreham Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 12:24.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Meadow Way

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Meadow Way, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Mar 2025 at 08:10.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Meadow Way

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Meadow Way, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 11:13.

Thames Water logo
Between
23 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Burnt Oak Lane

Thames Water are proposing to carry out New service connection on Burnt Oak Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:52.

Transport for London (TfL) logo
Between
25 and 28 Jun 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:56.

Between
26 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Crayford Creek Road

Aurora Utilities Limited are proposing to carry out New service connection on Crayford Creek Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 23 Apr 2025 at 15:46.

National Highways logo
Between
28 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Watling Street

National Highways are proposing to carry out Works for road purposes on Watling Street, Stone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 Jan 2025 at 11:31.

Southern Gas Networks logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Beesfield Lane

Southern Gas Networks are proposing to carry out New service connection on Beesfield Lane, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 06:42.

Southern Gas Networks logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Beesfield Lane

Southern Gas Networks are proposing to carry out New service connection on Beesfield Lane, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 10:53.

Transport for London (TfL) logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:21.

Transport for London (TfL) logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 08:41.

Transport for London (TfL) logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:42.

Transport for London (TfL) logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 07:31.

Transport for London (TfL) logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 16:36.

Thames Water logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Shirehall Road

Thames Water are proposing to carry out New service connection on Shirehall Road, Hawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 13:56.

Transport for London (TfL) logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:01.

Southern Gas Networks logo
LONG TERM
Between
2 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 26 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 10:29.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:05.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:40.

Transport for London (TfL) logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:06.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:08.

Transport for London (TfL) logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:13.

Transport for London (TfL) logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:41.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:07.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:16.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 17 Oct 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 19:00.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 5 Oct 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 13:40.

London Borough Of Bromley logo
Between
7 and 14 Jul 2025
Details
View Map
Share
Follow
Chelsfield Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Chelsfield Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 10 Apr 2025 at 14:14.

Thames Water logo
Between
7 and 22 Jul 2025
Details
View Map
Share
Follow
Goldsel Road

Thames Water are proposing to carry out Utility repair and maintenance works on Goldsel Road, Swanley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 22 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 09:14.

Kent County Council logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Follow
Heath Lane Upper

Kent County Council are proposing to carry out Highway improvement works on Heath Lane Upper, Dartford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 20 May 2025 at 10:49.

Cornerstone Telecommunications Infrastructure logo
Between
7 and 12 Jul 2025
Details
View Map
Share
Follow
Princes Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Princes Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 15 Apr 2025 at 08:02.

Cornerstone Telecommunications Infrastructure logo
Between
7 and 13 Jul 2025
Details
View Map
Share
Follow
Princes Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Princes Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 13 July 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 22 Apr 2025 at 12:26.

Kent County Council logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Follow
Chastilian Road

Kent County Council are proposing to carry out Highway improvement works on Chastilian Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Jun 2025 at 15:09.

Kent County Council logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Follow
Chastilian Road

Kent County Council are proposing to carry out Highway improvement works on Chastilian Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Jun 2025 at 15:50.

Kent County Council logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Follow
Chastilian Road

Kent County Council are proposing to carry out Highway improvement works on Chastilian Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 May 2025 at 12:15.

London Borough Of Bexley logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Erith Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 27 Feb 2025 at 14:45.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:20.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 16:35.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 12:09.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:17.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 16:34.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 11:20.

London Borough Of Bexley logo
Between
9 and 12 Jul 2025
Details
View Map
Share
Follow
Maidstone Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Maidstone Road, Foots Cray, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 11 Mar 2025 at 10:35.

Kent County Council logo
Between
10 and 18 Jul 2025
Details
View Map
Share
Follow
Oakfield Lane

Kent County Council are proposing to carry out Section 50 on Oakfield Lane, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 1 May 2025 at 15:03.

Kent County Council logo
Between
10 and 18 Jul 2025
Details
View Map
Share
Follow
Oakfield Lane

Kent County Council are proposing to carry out Section 50 on Oakfield Lane, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 1 May 2025 at 15:03.

Southern Gas Networks logo
LONG TERM
Between
11 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Bursdon Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bursdon Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 13:42.

Between
11 and 20 Jul 2025
Details
View Map
Share
Follow
Thames Road

Aurora Utilities Limited are proposing to carry out New service connection on Thames Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Aurora Utilities Limited on 17 Apr 2025 at 16:37.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jul and 29 Sep 2025
Details
View Map
Share
Follow
Sandy Lane

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 May 2025 at 16:22.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:47.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 14:09.

Transport for London (TfL) logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 10:23.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:52.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 12:47.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 15:54.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:18.

Transport for London (TfL) logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:57.

Kent County Council logo
Between
14 and 22 Jul 2025
Details
View Map
Share
Follow
Oakfield Lane

Kent County Council are proposing to carry out Section 50 on Oakfield Lane, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 1 May 2025 at 13:36.

Kent County Council logo
Between
14 and 22 Jul 2025
Details
View Map
Share
Follow
Oakfield Lane

Kent County Council are proposing to carry out Section 50 on Oakfield Lane, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 1 May 2025 at 13:36.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 09:05.

Kent County Council logo
Between
18 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Clement Street

Kent County Council are proposing to carry out Highway repair and maintenance works on Clement Street, Swanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 10:37.

Kent County Council logo
Between
18 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Darenth Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Darenth Road, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 10:39.

Kent County Council logo
Between
18 and 19 Jul 2025
Details
View Map
Share
Follow
Darenth Road

Kent County Council are proposing to carry out Highway improvement works on Darenth Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Mar 2025 at 10:02.

Kent County Council logo
Between
18 and 19 Jul 2025
Details
View Map
Share
Follow
Darenth Road

Kent County Council are proposing to carry out Highway improvement works on Darenth Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Mar 2025 at 11:39.

Kent County Council logo
Between
18 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Darenth Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Darenth Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 10:39.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Otford Lane

Thames Water were proposing to carry out New service connection on Otford Lane, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 24 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 10:08.

Southern Gas Networks logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Knockholt Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Knockholt Road, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 13:08.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
St Georges Road

Southern Gas Networks are proposing to carry out roadworks on St Georges Road, Swanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Apr 2025 at 10:25.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Horton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horton Road, Horton Kirby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 10:36.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Church Row

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Row, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 07:30.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
School Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on School Road, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 07:30.

Kent County Council logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Heath Lane Upper

Kent County Council are proposing to carry out Highway improvement works on Heath Lane Upper, Dartford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 21 May 2025 at 07:36.

Kent County Council logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Heath Lane Upper

Kent County Council are proposing to carry out Highway improvement works on Heath Lane Upper, Dartford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 21 May 2025 at 10:06.

Between
21 and 27 Jul 2025
Details
View Map
Share
Follow
Iron Mill Lane

Aurora Utilities Limited are proposing to carry out New service connection on Iron Mill Lane, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 29 May 2025 at 15:06.

Between
21 and 27 Jul 2025
Details
View Map
Share
Follow
Iron Mill Lane

Aurora Utilities Limited are proposing to carry out New service connection on Iron Mill Lane, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Aurora Utilities Limited on 25 Apr 2025 at 11:09.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Shoreham Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Shoreham Lane, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 13:11.

UK Power Networks South Eastern logo
Between
23 and 29 Jul 2025
Details
View Map
Share
Forest Way

UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Forest Way, St Mary Cray.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 29 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Apr 2025 at 14:22.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Moreton Industrial Estate, Swanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Swanley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 09:27.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Swanley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 11:09.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Swanley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Sep 2024 at 09:08.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
London Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Swanley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 08:43.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Hurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 30 Sep 2025
Details
View Map
Share
Follow
Selborne Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selborne Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 11:09.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Ridge Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridge Avenue, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 13:04.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Aug 2024 at 15:10.

Southern Gas Networks logo
Between
23 and 29 Jul 2025
Details
View Map
Share
Follow
Dallin Road

Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 15:10.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Pelham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pelham Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 14:49.

Southern Gas Networks logo
LONG TERM
Between
27 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Gravel Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gravel Hill, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2023 at 11:16.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Hookwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hookwood Road, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 11:31.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Berwick Way

UK Power Networks South Eastern are proposing to carry out New service connection on Berwick Way, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 22 May 2025 at 18:01.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Forest Way

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Forest Way, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 May 2025 at 16:34.

Thames Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Saxville Road

Thames Water are proposing to carry out New service connection on Saxville Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 08:28.

Southern Gas Networks logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Royal Parade

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Royal Parade, Chislehurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2024 at 16:15.

Southern Gas Networks logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Kemnal Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kemnal Road, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 07:30.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Bromley Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Lane, Chislehurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2024 at 17:13.

Southern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Broad Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Broad Lane, Wilmington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 May 2024 at 09:52.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Common Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Common Lane, Wilmington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 May 2024 at 09:52.

London Borough Of Bexley logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Onslow Drive

London Borough Of Bexley were proposing to carry out Highway improvement works on Onslow Drive, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 24 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Feb 2025 at 12:01.

London Borough Of Bexley logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Onslow Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Onslow Drive, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Mar 2025 at 13:17.

London Borough Of Bexley logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Dulverton Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Dulverton Road, Eltham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 12:33.

Transport for London (TfL) logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:25.

Transport for London (TfL) logo
Between
28 and 30 Jul 2025
Details
View Map
Share
East Rochester Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 10:54.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Penshurst Avenue

BT are proposing to carry out Utility asset works on Penshurst Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Apr 2025 at 11:21.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Penshurst Avenue

BT were proposing to carry out Utility asset works on Penshurst Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 May 2025 at 10:35.

Thames Water logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Broadway

Thames Water were proposing to carry out Utility repair and maintenance works on Broadway, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 May 2025 at 11:13.

London Borough Of Bexley logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Dulverton Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Dulverton Road, Eltham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 2 Jun 2025 at 13:43.

Southern Gas Networks logo
LONG TERM
Between
29 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Oakley Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakley Drive, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:41.

Southern Gas Networks logo
Between
29 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Ellison Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ellison Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:49.

Southern Gas Networks logo
LONG TERM
Between
30 Jul and 6 Oct 2025
Details
View Map
Share
Follow
Valentine Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 15:18.

UK Power Networks South Eastern logo
Between
31 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Top Dartford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Top Dartford Road, Hextable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Apr 2025 at 09:47.

UK Power Networks South Eastern logo
Between
1 and 14 Aug 2025
Details
View Map
Share
Follow
Top Dartford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Top Dartford Road, Hextable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Apr 2025 at 12:23.

Southern Gas Networks logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Avebury Road

Southern Gas Networks are proposing to carry out New service connection on Avebury Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 08:32.

Southern Gas Networks logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Avebury Road

Southern Gas Networks are proposing to carry out New service connection on Avebury Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 09:11.

UK Power Networks South Eastern logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Avebury Road

UK Power Networks South Eastern are proposing to carry out New service connection on Avebury Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Apr 2025 at 16:51.

UK Power Networks South Eastern logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Avebury Road

UK Power Networks South Eastern are proposing to carry out New service connection on Avebury Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by UK Power Networks South Eastern on 13 May 2025 at 14:55.

Southern Gas Networks logo
Between
4 and 12 Aug 2025
Details
View Map
Share
Follow
Beesfield Lane

Southern Gas Networks are proposing to carry out New service connection on Beesfield Lane, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 06:28.

Thames Water logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Shirehall Road

Thames Water are proposing to carry out New service connection on Shirehall Road, Hawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 09:02.

UK Power Networks Eastern & London logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Church Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Church Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 16:31.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Aug and 11 Sep 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 11:59.

Thames Water logo
Between
7 and 10 Aug 2025
Details
View Map
Share
Follow
Broadway

Thames Water are proposing to carry out Utility repair and maintenance works on Broadway, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 May 2025 at 13:29.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Shoreham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Shoreham Road, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 13:09.

South East Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Speedgate Hill

South East Water are proposing to carry out New service connection on Speedgate Hill, Fawkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 8 May 2025 at 06:13.

Southern Gas Networks logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Salisbury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Avenue, Swanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 06:27.

Southern Gas Networks logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Salisbury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Avenue, Swanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:53.

Southern Gas Networks logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Beechenlea Lane

Southern Gas Networks are proposing to carry out roadworks on Beechenlea Lane, Swanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Apr 2025 at 10:37.

Southern Gas Networks logo
Between
11 and 18 Aug 2025
Details
View Map
Share
Follow
Wood Lane

Southern Gas Networks are proposing to carry out New service connection on Wood Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 07:51.

Southern Gas Networks logo
Between
11 and 18 Aug 2025
Details
View Map
Share
Follow
Wood Lane

Southern Gas Networks are proposing to carry out New service connection on Wood Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 09:24.

Thames Water logo
Between
11 and 27 Aug 2025
Details
View Map
Share
Follow
Sidcup Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 13:26.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Chieveley Road

Thames Water are proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway, verge and cycleway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 12:03.

UK Power Networks South Eastern logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
School Lane

UK Power Networks South Eastern are proposing to carry out New service connection on School Lane, Horton Kirby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 29 May 2025 at 12:52.

London Borough Of Bexley logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
The Park

London Borough Of Bexley are proposing to carry out Highway improvement works on The Park, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:27.

Southern Gas Networks logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Chastilian Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chastilian Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 11:43.

Transport for London (TfL) logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:06.

Southern Gas Networks logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Lyndhurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyndhurst Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 15:16.

Southern Gas Networks logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Silverdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Silverdale Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 14:51.

Thames Water logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Kent Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kent Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:59.

UK Power Networks South Eastern logo
Between
19 and 22 Aug 2025
Details
View Map
Share
Follow
Beechenlea Lane

UK Power Networks South Eastern are proposing to carry out Utility asset works on Beechenlea Lane, Swanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 May 2025 at 06:23.

London Borough Of Bexley logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Canterbury Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Canterbury Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 16:11.

London Borough Of Bexley logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Foots Cray Lane

London Borough Of Bexley were proposing to carry out Highway improvement works on Foots Cray Lane, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Apr 2025 at 09:06.

London Borough Of Bexley logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Foots Cray Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Foots Cray Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 15:58.

Transport for London (TfL) logo
Between
21 and 23 Aug 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:28.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Chelsfield Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chelsfield Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Feb 2025 at 12:22.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 08:49.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Worlds End Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 08:49.

Kent County Council logo
Between
26 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Old Bexley Lane

Kent County Council are proposing to carry out Highway improvement works on Old Bexley Lane, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 May 2025 at 11:20.

London Borough Of Bexley logo
Between
26 and 30 Aug 2025
Details
View Map
Share
Manor Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Manor Way, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 11:40.

London Borough Of Bexley logo
Between
26 and 30 Aug 2025
Details
View Map
Share
Hurst Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Hurst Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 10:21.


Roadworks Map near to Cyclamen Road, SWANLEY, BR8 8HJ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 16:02
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cyclamen Road, SWANLEY, BR8 8HJ (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
PHILIP AVENUE 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.1
Details
Share
2
Kent County Council logo
PINKS HILL 
(0.6 miles)
Kent County Council
Highway improvement works - Footway - Give and take
In Progress
Since: 2 Jun 2025 14:53
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.6
Details
Share
Follow
3
BT logo
DALE ROAD 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.6
Details
Share
Follow
4
Kent County Council logo
URGENT
  
SYCAMORE DRIVE 
(0.6 miles)
Kent County Council
Highway improvement works - Carriageway - Multi-way signals
Complete
3 Jun 2025 10:00 - 10:21
0.6
Details
Share
5
Southern Gas Networks logo
URGENT
  
LOWER CROFT 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
27 May 2025 10:00 - 2 Jun 2025 12:30
0.6
Details
Share
6
BT logo
IRVING WAY 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
3 Jun 2025 12:48 - 13:30
0.7
Details
Share
7
Kent County Council logo
EMERGENCY
  
SYCAMORE DRIVE 
(0.8 miles)
Kent County Council
Highway improvement works - Carriageway - Road closure
Complete
3 Jun 2025 09:30 - 13:35
0.8
Details
Share
8
Kent County Council logo
SOUTHVIEW CLOSE 
(0.8 miles)
Kent County Council
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.8
Details
Share
Follow
9
Thames Water logo
URGENT
  
MAYES CLOSE 
(0.8 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
30 May 2025 07:48 - 3 Jun 2025 09:24
0.8
Details
Share
10
BT logo
LONDON ROAD, KENT 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.